Loading...
HomeMy WebLinkAboutContract Documents for Refusing Various Roads Augusta Richmond GA DOCUMENT NAME: CiJrrh"ClcA- ~entS roY" KC~,'L)"f:x-C\r'\J \f CLri 0 lA. S "hoo..d s DOCUMENT TYPE: Con+yaC+ YEAR: /01(19 BOX NUMBER: 5 FILE NUMBER: /3 '7 (p I NUMBER OF PAGES: L 14- , PERFORMANCE BOND LIBERTY ~ BOND SERVICES ~ Bond Number: 14-000-021)-07.41 KNOW ALL MEN BY THESE PRESENTS, that we APAC-GEORGIA, INC. , as Principal (the "Principal"), and Liberty Mutual Insurance Company, a mutual company duly organized under the laws of the Commonwealth of Massachusetts, as Surety (the "Surety"), are held and firmly bound unto AUGUSTA-RICHMOND COUNTY COMMISSION-COUNCIL Augusta, Georgia ,as Obligee (the "Obligee"), in the penal sum of One Million-One Hundred Nineteen Thousand- Nine Hundred-Seventy Five and no/100 Dollars ($1 , 11 9, 975. 00 ), for the payment of which sum well and truly to be made, the Principal and the Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents, WHEREAS, the Principal has by written agreement, dated (the "Contract") with the Obligee for Resurfacing Various Roads - Phase V Project No. 57-8087-098 Project No. 59-8087-098 ,19 , entered into a contract which Gontracl is by reference made a part hereof. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal shall promptly and faithfully perform the Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. PROVIDED AND SUBJECT TO THE CONDITIONS PRECEDENT: 1, Whenover the Principal shall be, and be declared by the Obligee to be in default under the Contract, the Obligee having perfornfed the Obligee's obligations thereunder, the Surety may promptly remedy the default, or shall promptly: 1,1 Compete the Contract in accordance with its terms and conditions, or 1,2 Obtain a bid or bids from alternative contractors to complete the Contract in accordance with its terms and conditions, and upon determination by the Surety of the lowest responsible bidder, or if the Obligee elects, upon determination by the Obligee and the Surely jointly of the lowest responsible bidder, arrange for a contract between such bidder and the Obligee, and make available as work progresses (even though there should be a defaul! or a succession of defaults under the contract or contracts of completion arranged under this paragraph) sufficient funds to pay the cost of completion less the balance of the contract price; but not exceeding, including other costs and damages for which the Surety ma'{ be liable hereunder, the amount set forth in the first paragraph of this bond, The term "balance of the contract pI' ce," as used in this paragraph, shall mean the total amount payable by the Obligee to the Principal under the Contract and any amendments thereto, less the amount properly paid by the Obligee to the Principal. 2, Notwithstanding any other provision of this bond or the Contract, or otherwise, the Surety is not responsible for and shall not be held liable to the Obligee for any hazardous waste removal and the Surety shall not be held liable to, or in any other respE'ct be responsible to, the Obligee by way of indemnity, claims or otherwise, or to any public authority or to any other person, firm or corporation, for or on account of any fines or claims by any public authority or for bodily injuries or property damage to any person or thing, including, but not limited to, injury or damage due to the release or threat of release of hazardous substances of any kind or damage to real estate or to the environment or clean-up costs or other damages of whatever kind or nature arising out of any act of commission or omission by the Principal, the Principal's agents, servants, employees, subcontractors or suppliers or any other person in connection with the performance of the Contract. This limitation applies regardless of when any such fine is assessed, claim is made, or injury, damage, release or threat of release occurs and without regard to any term or condition of the Contract. LBS-5100 8/94 Rev, , ,. 1 3, The Surety hereby waives notice of any alteration or extension of time made by the Obligee, 4, Any suit under this bond must be instituted before the expiration of two (2) years from the date on which the Principal ceased to work on the Contract. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 5. No right of action shall accrue on this bond to or for the use of any person or corporation other than the Obligee named herein or the heirs, executors, administrators or successors of the Obligee, 6. Any claims must be presented in writing to Liberty Mutual Insurance Company, to the attention of Liberty Bond Services, Claim Department, 600 W, Germantown Pike, Plymouth Meeting, PA 19462, Signed and sealed this day of . 19 WITNESS OR ArrEST: APAC-GEORGIA. INC. Principal (Seal) ~ ~d7~ By: Name: ~ &> Tille: his 6 .....----...-.. L1~ERTY MlJITUAL INSURANCE COMPANY Surely By: Allor Roy (Seal) LBS-5100 8/94 Rev, . PA 't~MENT BOND Bond Number: 1 4 - 0 00- 025 - 0 2 4 1 KNOW ALL MEN BY THESE PRESENTS, that we UBERTY ~ BOND SERVICES ~ APAC-GEORGIA, INC. , as Principal (the "Principal"), and Liberty Mutual Insurance Company, a mutual company duly organized under the laws of the Commc,nwealth of Massachusetts, as Surety (the "Surety"), are held and firmly bound unto AUGUSTA-RICHMOND COUNTY COMMISSION-COUNCIL Augusta, Georgia ,as Obligee (lhe "Obligee"), in the penal sum of One Million-One Hundred Nineteen Thousand _ Nine Hundred-Seventy Five and no/100 Dollars ($ 1 , 11 9, 975 . 00 ), for the paymlmt of which sum well and truly to be made, the Principal and the Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHER.EAS, the Principal has by written agreement dated - (the "Contract') with the Obligee for -- -","'-" ~ Resurfacing Various Roads - Phase V Project No. 57-8087-098 Project No. 59-8087-098 , 19 , entered into a contract which Contract is by reference made a part hereof, NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal shall promptly make payment to al Claimants, as hereinafter defined, for all labor and material used or reasonably required for use in the perfor~anc~ cf the Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. PR?VIDE? AND SUBJECT TO THE CONDITIONS PRECEDENT: ; 1, A "ClairT)~lI1t" is defined as one having a direct contract with the Principal or with a subcontractor of the Principal for labor, matl3rial, or both, used or reasonably required for use in the performance of the Contract, labor and material being con~;trued to include that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental of equipment directly applicable to the Contract. 2, The Principal and the Surety hereby jointly and severally agree with the Obligee that every Claimant, who has not been paid in full before the expiration of a period of ninety (90) days after the date on which the last of such Claimant's work or labor was done or performed, or materials were furnished by such Claimant, may sue on this bond for the use of such Claimant, prosecute the suit to final judgment for such sum or sums as may be justly due Claimant, and have execution thereon. The Obligee shall not be liable for the payment of any costs or expenses of any such suit. 3, No suit or action shall be commenced hereunder by any Claimant: (a) Unless Claimant, other than one having a direct contract with the Principal, shall have given written notice to the Principal and the Surety within ninety (90) days after such Claimant did or performed the last of the work or labor, or furnished the last of the materials for which said claim is made, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were furnished, or for whom the work or labor was done or performed, Such notice shall be served by mailing the same by registered mail or certified mail, postage prepaicl, in an envelope addressed to the Principal or the Obligee at any place where an office is regularly mainta1l1ed for the transaction of business, or in any manner in which legal process may be served in the state in which the aforesaid project is located, save that such service need not be made by a public officer, and to the Surety to the attention of Liberty Bond Services, Claim Department, 600 W, Germantown Pike, Plymouth Meetinq, PA 19462, (b) Other t:lan in a state court of competent jurisdiction in and for the county or other political subdivision of Ihe slate in whic'lthe project, or any part thereof, is situated, or in the United States District Court for the district in whicll the pro, ect, or any part thereof, is situated, and not elsewhere, I BS.S200 8/91\ Rev, , (c) After the expiration of one (1) year following the date on which Principal ceased work on the Contract. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable, 4, The amount of this bond shall be reduced by and to the extent of any payment or payments made in good faith hereunder, inclusive of the payment by the Surety of mechanics' liens which may be filed of record against such improvement, whether or not claim for the amount of such lien be presented under and against this bond, Signed and sealed this day of , 19 WITNESS OR ATTEST: APAC-GEORGIA, INC. Principal (Seal) ~ ;f dC'r~ BY~~ Name: SC~ S I es Title: As.s.J. S~C //re4 (Seal) LBS-5200 8/94 Rev, THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. 208048 This PO\'ler of Attorney limits the act of those named herein, and they have no authority to bind the Company except in the manner snd to the extent herein stated. LIBERTY MUTUAL INSURANCE COMPANY BOSTON, MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the "Company"), a Massachusetts mutual insurance company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint ROY SCARBOROUGH, JR., EUGENE A. CRONIC, MICHAEL C. SHELTON, ALICIA J. RHOADES, ALL OF THE,91TY OF AU~USTA,STAT~OF.~~ORGIA'.;:.<,~... "'~;;'<::"':~:;"""""""""""""'" . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ._...~:~~.~ .. .. .. .. .. .. .~:;.:,~.~:.,; .. .. .. .. .:~..~..:'~::,;-,..'. ::. ~"';, ?~"~~''-~,:.~'~~~:.' .. .. .. .. ~../-...~...-.; .. .. .. '.<'-~'~~':~:~:';':."";':/.:::~::::'."'~"...., .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ............................ .'........... .:~~::...~.-........... ......;..,;,.~..... ... ~...;....:;-..~:. .0........... ,t.. ':.'~..""" .~.~:.~'.'''~.. .', ....~.~..~...-... io........ ".':"~':"~:~,.'"'''''''''''''''''''''''''''''''''''' .................... .-..................... ..:~;'~"'!.:.';~... ....~......:...... .'.:.;'''~~II!''..'....'... ~.. .:....~../:~: i. .-. .;.~.....,;.~. ... oi"~I;'''~:.::;'''..... ..."!......,:.~...~... ..,................ ............................. ~...~.~ .'-... .......:.jj..~., '". ..........;".:............ ~.. ;.'.'~..-,.-~.. .:.._'..;':'.... .....:',;..~.:............ .'.;..~.:....... ~................. ..:.. ... ,.,'...:. , .. ... ...... ' .- .~. .. ". ." ..' . ..' ':.' . .................... ........ ~........'... ~_,,,,,.,..'_....... ..,.,..:....;'".........'... ~,~"".'.~'-:'" "~'_'.'." .,.... ~ ~~"":". ..... '.' oi ~...._:..'.,":.~........'.'."'.'."'" , each individually if there be morethai1~qn~~i1amed,its tr~eand lawful attor~ay'~;~-facU(:i,ri:i~ke, e~e~ut~, seal, ackn6wl~dge and deliver, for and on its behalf as surety and as its act and deed., ,any and all undert~kings, bOnd$,JeCo.gnizances.~nd other,,~iJrety ?blig,Clti,?0f(in the. penal sum not exceeding TWENTY-FIVE M ILLION...*....*...:.:ri"':***~**...........*...*~*..;.**.**~~**..~***....*,i. . '25000 000 ,*****....*** .' " .' : : .', ... '.. " , .. '~bLLARS'l$': ' '. "i, '. ) each, on behalf of APAC-GEORGIA, INC. AND/OR APAC-CAROLlNA;'INC........ ~....:....... :.~~.. .'............................ r~c"og~i~a~~~s' a~d' ~th~; ~~;e"ty 'o"bilg~ti~~s' io" b~' ~ig~~d 'f~; ih~ '60~p;n'y' a~d 'th~' ~e"~ '~f' th~' C~~pa~y 'atii~eci iher~t~~ct ~~~e~a~i~~~h~o~~fd ROY SCARBOnOUGH, JR., EUGENE A. CRONIC, MICHAEL C. SHELTON, ALICIA J. RHOADES. . . . . . . . . . . . . . . . . COMMONWEALTH OF PENNSYLVANIA ". ' COUNTY OF MONTGOMERY',":' ,',' ., . 28th '., OCtober . . ',',:' , 96" , . On this -----...4ay-of :0:..;. ' '. " > .', , , A,O. 19~ , before me, a Notary,Public, personally came the individual, known to me to be the therein described indlViati~1 and officer of Liberty Mutual Insurance Company Who executed the preceding .instrument, and he acknowled- ged that h~ e~ecutejt;tl:\,&'~tTfE('i!~~I';J:leseal affixed ,t() ,the said p~eceding:instrument is.the corporate seal of ~aidsOinpany; a~d that said corporate seal and hiS slgna~~r~;~~scrlbed"t~z~,~:"'iClSdUIY afflxedahd,subscnbed to the said Instrument bY'<'I~thonty and dlrf:lC~IOn of the said company, IN TESTIMON,CWHEREOF, I hefe~ntoset my hand 8(1daffixmy official seal at Plymouth Meemng;"PA, the day 'arid year first above written, ',IJ.; ~ .. ':~:~\"',: I' -L;~"" '~;~:~~~~f::'V'~;~,~,-~' -1!.,../1/ ' ::-.~i?':)/'~ / \\_ \~'-~~>" . ~'~~> of' ~."'~':I-,./,I-:'~II.>+';;"r"',(,, ';.1,'-, ~~ ..~ \~ "''''-f ~-"-J~' .,--i..~J:,.+-'>~.u j ;'-:';. ,~~ I" :--"- ~ +: j-. !-,"l', il'.f r Notary Public \<: 1:~<---:':'};~~' -- --~ - - -- C-ERTIFicATE I,the, undersiglle(t,~~lstahb;ef)re~ary of Liberty Mutual Insurance Company, do ,hereby certify that the orig,inal power of , attorney of which the foregomg IS a full, trlJe and correct copy, IS In full force and effect on the date of thiS certificate; and I do further certify that the officer who executed the said power of attorni!Y was one of the officers specially authorized by the chairman or the president to appoint any attorney-in-fact as provided in Article XVI, Section 5 of the By-laws of Liberty Mutual Insurance Company, This certificate may be signed by facsimile under and by authority of the following vote of the board of directors of Liberty Mutual Insurance Company at a meeti1g duly called and held on the 12th day of March, 1980, VOTED that the facsimile or mechanically reproduced signature of any 'assistant secretary of the. company wherever appearing upon a certified copy of any power of attorney issued by the company, shall be valid and binding upon the company with the same force and effect as thou~lh manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed ,tt!.e corporate seal of the said company, this ,19 ,4":'\ !- /, -'-'\"1 'Q.> ';/)' THIS POWER OF ATT<:>RNEY MAY NOT BE USED TO EXECUTE ANY BOND WITH AN INCEPTI :>. m '0 1/1 1/1 Q) r:: '(jj ~ .Q > r:: m _r:: -0 ~h- >(J) Q)W Ee 00. =0 <(M - .. oo::t ...'0 Q)r:: :=m Oe a.m ,~o .r::o - .. _0'1 Or:: >Q) :!:: Q) :E~ -Q) ~.Q (1)0 .r::'<t' _N ECIil ...N '-M -lX) r::, 00 u..... O~ 1-..... -~ '(jj o a. Q) '0. .x ~ .......................... ..................... .'............;................................................ r::Q) " m- ...... ........ ..... ..... ..... .......... ............ ........... .... ........ ....... ............. ..... .Q r:: , individually, _~ f!! And the execution 01 such undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents, shall be as binding upon :c ~ the Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons, Q)m ' U Q) That this power is made and executed pursuant to and by authority of the following By-law and Authorization: '0.2 ARTICLE XVI - Execution of Contracts: Section 5, Surety Bonds and Undertakings, ... ~ Any officer or other official of the company authorized for that purpose in wnting by the chairman or the president, and subject to such ~ - limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Q) ~ company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety -:. '0 obligations, SL ch attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shalf have full power to bind the r:: '(jj company by their signature and execution of aoy such instruments and to attach thereto the seal of the company, When so executed such ~ ~ instruments Shetll be as binding as if signed by the president and attested by the secretary, -;~ 0 By the following insliument the chairman or the president has authorized the officer or other official named therein to appoint attorneys-in-fact: -Q) Pursuant to Art,cle XVI, Section 5 of the By-laws, Assistant Secretary Garnet W, Elliott is hereby authorized to appoint such attorneys-In-fact g 1ii as may be nec3ssary to act in behalf of the company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, ~ ... bonds, recognii'ances and other surety obligations: Q)- ~ ~ That the By-law and the Authorization above set forth are true copies thereof and are now in full force and effect. .g'.! IN WITNESS WHEFlEOF, this instrument has been subscribed by its authori~t9fficer and the corporate seal eJdBt)eflid Liberty Mutual I~rance o ,s: Company has been affixed/~~r~,tf:,~n Plymouth Meeting, Pennsylvania this day of , 19 , ~'* (:<~)jl LIBERTY MUTUAL INSURANCE COMPANY ~ ~ By ~e:;t- t:i'>at:.::66 ~ ; Garnet W, Elliott. A;sistant SElIlrelary -... 0'" Z~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . ... . .-. . '.' . . .. . ... .. .'. . . . ... . ,.. . . . . . . . . .. . . . . . . ... , . . . . . . . ., , . . . . . . .. . .. . . . . .. . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . ... . .. . . .'. . , . . . . . , . . . . . . . . . . . . . . . . . .. . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . .. . .. . day of October 28 98 ,19 I I I I I I I I I I 1 I 1 I I I I I I ,;J;L 7f /.17 CONTRACT DOCUMENTS FOR ]~ESURF ACING VARIOUS ROADS PHASE V PROJECT NO. 57-8087-098 59-8087-0,98 I I I I I I I I I I I I 1 I I I I I I LIST OF PROJECT OOCUMENfS Resurfacing Various Roads, Phase V Project Numbers: 57-8087-098 & 59-8087-098 ;SECTION PAGES Instruction to Bidders IB-1 thru IB-3 lGeorgia Prompt Pay Act PPA-1 Minority and Economically Disadvantaged Business Support Special Conditions ME-1 SP-1 A-1 thru A-4 1 thru 33 SC-1 thru SC-2 P-1 thru P-2 L-1 thru L-2 Agreement General Conditions Supplementary Conditions Proposal List of Roads for Resurfacing (Suburban District) List of Roads for Resurfacing (Urban District) L-3 'rypical sections TS-1 thru TS-2 Location Maps (Suburban District) Location Maps (Urban District) D-1 thru D-18 D-19 thru D-25 General Notes G-1 thru G-8 rraffic Control TC-1 thru TC-23 I I I I I I 1 I I I I I I I I I I I I SECTION IB INSTRUCTION TO BIDDERS IB-01 GENERAL All proposals must be presented in a sealed envelope, addressed to the Owner. The proposal must be filed with the Owner on or before the time stated in the invitation for bids. Mailed proposals will be treated in every respect as though filed in person and will be subject to the same requirements. Proposals received subsequent to the time stated will be returned unopened. Prior to the time stated any proposal may be withdrawn at the discretion of the bidder, but no proposal may be withdrawn for a period of sixty (60) days after bids have been opened, pending the execution of contract with the successful bidder. IB-02 EXAMINATION OF WORK Each bidder shall, by careful examination, satisfy himself as to the nature and location of the work, the conformation of the ground, the character, quality and quantity of the facilities needed preliminary to and during the prosecution of the work, the general and local conditions, and all other matters which can in any way affect the work or the cost thereof under the contract. No oral agreement or conversation with any officer, agent, or employee of the Owner, either before or after the execution of the contract, shall affect or modify any of the terms or obligations therein. IB-03 ADDENDA AND INTERPRETATIONS No interpretation of the meaning of plans, specifications or other prebid documents will be made to any bidder orally. Every request for such interpretation should be in writing addressed to the Director of Public Works, 1815 Marvin Griffin Road, Augusta, Georgia 30906, and to be given consideration must be received at least five days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications which, if issued, will be sent by certified mail with return receipt requested to all prospective bidders (at the respective addresses furnished for such purposes), not later than three days prior to the date fixed for the opening of bids. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents. IB-1 I I I 1 I I I I I I I I I I I I I I I IB-04 PREPARATION OF BIDS Bids shall be submitted on the forms provided and must be signed by the bidder or his authorized representative. Any corrections to entries made on bid forms should be initialed by the person signing the bid. Bidders must quote on all items appearing on the bid forms, unless specific directions in the advertisement, on the bid form, or in the special specifications allow for partial bids. Failure to quote on all items may disqualify the bid. When quotations on all items are not required, bidders shall insert the words "no bid" where appropriate. Alternative bids will not be considered unless specifically called for. Telegraphic bids will not be considered. Modifications to bids already submitted will be allowed if submitted by telegraph prior to the time fixed in the Invitation for Bids. Modifications shall be submitted as such, and shall not reveal the total amount of either the original or revised bids. Bids by wholly owned proprietorships or partnerships will be signed by all owners. Bids of corporations will be signed by an officer of the ~irm and his signature attested by the secretary thereof who will affix the corporate seal to the proposal. NOTE: A 10% Bid Bond is required in All cases. IB-OS BASIS OF AWARD The bids will be compared on the basis of unit prices, as extended, which will include and cover the furnishing of all material and the performance of all labor requisite or proper;- and completing of all the work called for under the accompanying contract, and in the manner set forth and described in the specifications. Where estimated quantities are included in certain items of the proposal, they are for the purpose of comparing bids. While they are believed to be close approximations, they are not guaranteed. It is the responsibility of the Contractor to check all items of construction. In case of error in extension of prices in a proposal, unit bid prices shall govern. IB-2 I I I I I I I I I I I I I I I I I I I IB-06 BIDDER'S OUALIFICATIONS No proposal will be received from any bidder unless he I=an present satisfactory evidence that he is skilled in work of a similar nature to that covered by the contract and has sufficient assets to meet all obligations to be incurred in carrying out the work. He shall submit with his proposal, sealed in a separate envelope, a FINANCIAL EXPERIENCE AND EQUIPMENT STATEMENT, giving reliable information as to working capital available, plant equipment, and his experience and general qualifications. The Owner may make such investigations as are deemed necessary to determine the ability of the bidder to perform the work and the bidder shall furnish to him all such additional information and data for this purpose as may be requested. The Owner reserves the right to reject any bid if the evidence submitted by the bidder or investigation of him fails to satisfy the Owner that such bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein. Part of the evidence required above shall consist of a list of the names and addresses of not less than five (5) firms or corporations for which the bidder has done similar work. IB-07 PERFORMANCE BOND At the time of entering into the contract, the Contractor shall give bond to the Owner for the use of the Owner and all persons doing work or furnishing skill, tools, machinery or materials under or for the purpose of such contract, conditional for the payment as they become due, of all just claims for such work, tools, machinery, skill and terms, for saving the Owner harmless from all cost and charges that may accrue on account of the doing of the work specified, and for compliance with the laws pertaining thereto. Said bond shall be for the amount of the contract satisfactory to the Owner and authorized by law to do business in the State of Georgia. Attorneys-in-fact who sign bonds must file with each copy thereof a certified and effectively dated copy of the power of attorney. IB-08 REJECTION OF BIDS These proposals are asked for in good faith, and awards will be made as soon as practicable, provided satisfactory bids are received. The right is reserved, however to waive any informalities in bidding, to reject any and all proposals, or to accept a bid other than the lowest submitted if such action is deemed to be in the best interest of the Own.er. IB-3 I I I I I I I I I I I I I I I I I I I GEORGIA PROMPT PAY ACT This contract is intended by the parties to, and does, supersede any and all provisions of the Georgia Prompt Pay Act, o. C. G. A. section 13-11-1, et seg. In the event any provision of this Contract is inconsistent with any provision of the Prompt Pay Act, the provision of this contract shall control. NOTICE All references in this document, which includes all papers, writings, drawings, plans or photographs to be used in connection with this document, to "Richmond County Board of Commissioners" shall be deemed to mean "Augusta-Richmond County Commission- Council and all references to "Chairman" shall be deemed to mean "Mayor" . DISPOSALS Prior to any material from this project being wasted or otherwise disposed of outside the project limits the Contractor shall furnish the Engineer a copy of written permission, signed by the property owner (or his authorized agent) describing the estimated amount and type of material to be placed on said property. If any portland cement concrete, asphaltic concrete, wood or other such materials are to be wasted on the property, a copy of the owner's inert landfill permit, issued by the Environmental Protection Division shall be furnished to the Engineer prior to any such waste being removed from the project. In all cases, regardless of the material being wasted, a grading permit issued by Augusta-Richmond County must be furnished to the Engineer. PPA-1 1- I I I I I I I I I I I I I I I I I I I ~{INORITY AND ECONOMICALLY DISADVANTAGED BUSINESS SUPPORT It is the intent of the Augusta-Richmond County- Council to increase the involvement of qualified minority and economically disadvantaged businesses in the contracted work of County Government. In an effort to support this intention, this project is offered to all qualified firms. The bids will be evaluated based on qualifications, price and construction time. with all other items being considered equal, the contract, if awarded will be awarded to a minority and economically disadvantaged firm or a firm that has included such firms as subcontractors on this project. The bidders shall include with their bid a statement of qualification for themselves and/or any qualified subcontractors explaining why they should be considered a minority or economically disadvantaged firm. If the firm does not fall into this category, no information is necessary. ME-l I I I I I I I I I I I I I I I I I I I RESURFACING VARIOUS ROADS, PHASE V project Numbers: 57-8087-098' 59-8087-098 SPECIAL CONDIDONS SCOPE: This project includes the patching, milling, leveling and resurfacing of roads and streets located within Augusta in accordance with the plans and specifications. It also includes adjusting to grade manholes, water valves and lamp holes. (See page G-1) TERMINI AND LENGTH: The beginning and ending of each indi vidual road or street is shown on the tabulation list contained in this document. The total length of this proj ect is 15. 75 miles. MILLING: Several locations in this contract require milling only. The milling of these locations shall be scheduled as directed by the Engineer in order to coordinate these locations with the proposed LARP resurfacing project. Also limits of milling (both length and width) will be as directed by the Engineer as will patching. PATCHING: Asphaltic Concrete Patching includes removing areas identified by the Engineer and replacing the existing pavement and base (if necessary). Costs will be paid as Asphaltic Concrete Patching, per ton. TRAFFIC LOOPS: The Contractor shall restore all traffic loops effected by milling and/or resurfacing in this contract. Costs for restoring traffic loops shall be included in the price bid for other items. There will be no separate payment for this work. SP-1 I I I I I I I I I I I I I I I I I I I SECTION A AGREEMENT THIS AGREEMENT, made on the _ day of 19_ by and bebTeen Aucmsta-Richmond County Commission-Council party of the first part, hereinafter called the OWNER, and APAC-- Georgia, Inc. party of the second part, hereinafter called the CONTRACTOR. WITNESSETH, that the Contractor and the Owner, for the considerations hereinafter named, agree as follows: ARTICLE I - SCOPE OF THE WORK The Contractor hereby agrees to furnish all of the materials and all of the equipment and labor necessary, and to perform all of the work shown on the plans and described in the specifications for the project entitled: Resurfacing Various Roads, Phase V Project Numbers: 57-8087-098 & 59-8087-098 and in accordance with the requirements and provisions of the Contract Documents as defined in the General and Special Condi tions hereto attached, which are hereby made a part of this agreement. ARTICLE II - TIME OF COMPLETION - LIQUIDATED DAMAGES commemced notic:e by shall be exter.lsions Condi.tions. The work to be performed under this Contract shall be within ~ calendar days after the date of written the Owner to the Contractor to proceed. All work completed within 180 calendar days with such of time as are provided for in the General It is hereby understood and mutually agreed, by and between the Contractor and the Owner, that the date of beginning, rate of progress and the time for completion of the work to be done hereunder are ESSENTIAL CONDITIONS of this contract. Contractor agrees that said work shall be prosecuted regularly, diligently, and uninterruptedly at such rate of progress as will insure full completion thereof wi thin the time spec if ied. It is expressly understood and agreed by and between the Contractor and the Owner, that the time for completion of the work described herein is a reasonable time for c:ompletion of the same, taking into consideration the average climatic range and construction conditions prevailing in this locality. A-l I I I I I I I I I I I I I I I I I I I IF THE CONTRACTOR SHALL NEGLECT, FAIL, OR REFUSE TO COMPLETE THE WORK WITHIN THE TIME HEREIN SPECIFIED, then the Con'tractor does hereby agree, as a part of the consideration for the awarding of this contract, to pay the Owner the sum of Five Hundred Dollars ($500), not as a penalty, but as liquidated damages for such breach of contract as hereinafter set forth, for each and every calendar day that the Contractor shall be in default after the time stipulated in the Contract for completing the work. The said amount is fixed and agreed upon by and between the Contractor and the Owner because of the impracticability and extreme difficulty of fixing and ascertaining the actual damages the Owner would, in such event, sus'tain, and said amounts shall be retained from time to time by 'the Owner from current periodical estimates. It is further agreed that time is of the essence of each and every portion of this Contract and the specifications wherein a definite portion and certain length of time is fixed for the additional time is allowed for the completion of any wor]c, the new time limit fixed by extension shall be the essence of this contract. ARTICLE III - PAYMENT (a) The Contract Sum The Owner shall pay to the Contractor for the performance of the Contract the amount as stated in the Proposal and Schedule of Items. No variations shall be made in the amount except as set forth in the specifications attached hereto. (b) Proqress Pavrnent On no later than the fifth day every month, the Con'tractor shall submit to the Owner's Engineer an estimate covering the percentage of the total amount of the Contract which has been completed from the start of the job up to and including the last working day of the proceeding month, together with such supporting evidence as may be required by the Owner and/or the Engineer. This estimate shall include only the quantities in place and at the unit prices as set forth in the Bid Schedule. On the vendor run following approval of the invoice for payment, the Owner shall after deducting previous payments made, pay to the Contractor 90% of the amount of the estimate on units accepted in place. The 10% retained percentage may be held by the Owner until the final completion and acceptance of all work under the Contract. A-2 I I I I I I I I I I I I I I I I I I I ARTICLE IV - ACCEPTANCE AND FINAL PAYMENT (a) Upon receipt of written notice that the work is ready for final inspection acceptance, the Engineer shall within 10 days make such inspection, and when he finds the work acclaptable under the Contract and the Contract fully performed, he will promptly issue a final certificate, over his own signature, stating that the work required by this Contract has been completed and is accepted by him under the terms and conditions thereof, and the "entire balance found to be due the Con1:ractor, including the retained percentage, shall be paid to the Contractor by the owner within 15 days after the date of said final certificate. (b) Before final payment is due, the Contractor shall submit evidence satisfactory to the Engineer that all payrolls, material bills, and other indebtedness connected with worle have been paid, except that in case of disputed indlabtedness of liens of evidence of payment of all such disputed amounts when adjudicated in cases where such payment has not already been guaranteed by surety bond. (c) The making and acceptance of the final payment shall constitute a waiver of all claims by the Owner, other than those arising from unsettled liens, from faulty work applaaring within 12 months after final payment, from requirements of the spec if ications, or from manufacturer's guarantees. It shall also constitute a waiver of all claims by the Contractor except those previously made and still unslattled. (d) If after the work has been substantially completed, full completion thereof is materially delayed through no faul t of the Contractor, and the Engineer, so ceri:ifies, the Owner shall upon certification of the Engineer, and without terminating the Contract, make payment of the balance due for that portion of the work fully completed and acclapted. Each payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims. A-3 I I I I I I I I I I I I I I I I I I I IN WITNESS WHEREOF, the parties hereto have executed thi!:; Agreement in three (3) counterparts, each of which shall be deemed an original, in the year and day first mentioned above. SEAl, Atte't;#'~ ~etar n~jf f) mm~ Witne SEAL Attest &~ ~~ << Secretary 7 ~V 6_ Lt6drUf,~ witn,ass AUGUSTA-RICHMOND COUNTY COMMISSION-COUNCIL (Owner) 9Y1 ;p a- Commission-Council CONTRACTOR: APAC - Georgia, By: .~ ~~ Title: As! See /7rec, , Address: ? c:? ,8C)X / / z 9. Afu..sk ) Lra. A-4 Inc. - I I I I I I I I I I I I I I I I I I I GENERAL CONDITIONS I I I I I I I I I I I I I I I I I I I TABLE OF CONTENTS OF GENERAL CONDITIONS Article Number Title .., DEFINITIONS.""""""""."",.."""...""",.,..,.,.",. . PRELI~IINARY MATTERS ....,".....................,.,....".." CONTRACT DOCUMENTS: INTENT. AMENDING AND REUSE....,"................,........ AVAILABILITY OF LANDS: PHYSICAL CONDITIONS: REFERENCE POINTS",., '...",..,.., ..... ,. ,...'..",.."" ...', BONDS AND INSURANCE, '. '..."",.... ,..,.......,"'...,..",.' CONTRACTOR"S RESPONSIBILITIES..",...."",..",,",,".,.., OTHER WORK "..,...,..,.""",'.,.,.'.".",'...,.,.",,'..,.'.. OWNER"S RESPONSiBILITIES",.","""".",.,.""",."""" ENGINEER 's STATUS DURING CONSTRUCTION "'.'..".",, CHANGES IN THE WORK.,.., ",.".,.,., ,. " """" , , "., " ,. , , CHANGE OF CONTRACT PRICE"""""",."".,.".,."""" CHANGE OF CONTRACT TIME.",...""."""'.,."""""'" WARRANTY AND GUARANTEE: TESTS AND INSPECTIONS: CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK""",."""""",.."" PA YMENTS TO CONTRACTOR AND COMPLETION ".,'.,.,'.' SUSPENSION OF WORK AND TERMINATION,."." ".,.",., ARBITRATION""""""""...., ,.,., ,...,..,.'".""",'..' '.' MISCELLANEOUS.",.,.,.".,~".,.,.,",..,""'""',.,.,",.,. , -' 4 5 6 7 8 9 10 II I:! 13 14 15 16 17 3 Par<e -; 8 9 10 II 14 18 19 19 21 21 :!4 24 26 29 31 32 I I INDEX TO GENERAL CONDITIONS I Anici~ or Paragraph Numb~r Acceptance of Insurance ............................. 5.13 Access to the Work .................................. 13.2 Addenda-<ieli nition of (see detinition of Specincatio~ls) .,...................................... 1 A~eemenl--dl:tinition of ................................ 1 All Risk Insur.:,nce ... ... , ....... ...... .... ......... .... 5:6 Amendment. Written ............................. 1.3.1.1 Application fol' Payment--detinition of ..,.........,..... I Application for Payment. Final ...................... 14.12 Application for Progress Payment .................... 14.2 Application for Progress Payment-revlew of .... 14.4-14.7 Arbitration "..............................-............. 16 Authorized V a::iation in Work ......................... 9.5 A vailability of Lands .................................. 4.1 Award. Notice of --de tined .............................. I I I I I I Before Starting Construction ........",........,.. 2.5.2. i Bid--dennition of .......".....,...,.................... I Bonds and Insllrance-in general ,....................... 5 Bonds--definitlon of , . . . . .. . . .. . . . . .. .. . .. .. . . .. .. . .. . ... I Bonds. Delivery of ............................._. 1.1.5.1 Bonds. Performance and Other ,................... 5.1-5.2 I I Cash Allowanc:s .,................................... 11.8 Change Order--<iennition of ............................. 1 Change Orders--to be executed ...................... 10.4 Changes in the Work ................................... 10 Claims. Waiver of~n Final Payment ............... 14.16 Clarifications alld Interpretations ....................., 9.4 Cleaning ."..".,..,...,...,......",................ 6.17 Completion, " , , '.....,...,'..., ,....................... 14 Compietion. Substantial......................... 14,8-14,9 Conference. Prl:consuuction .,....",..,."....,....., 1.8 Contlic:. Error. Discrepancy-Contractor 10 Report " ",....".....,...,................ ~.5. 3.3 Construction Machinery. Equipment. etc. .,'.......... 6.~ Continumg Work ",...,....................:......... 6.29 Contract Docur.~ents-amending and supplementing .".........,.",.................. 3,4-3.5 Contract Documents--definition of ...,................,. 1 Contract Documents-Intent ...................... 3. J -3..3 Contract Documents-Reuse of .'...,.....,.....,...., 3.6 Contract Price. Change of .............................. II Contmct Price--definition ,.............".............., I Contrac: Time. Change of ,............................. 11 Contmct Time. Commencement of ..............,...,. :.3 Contmct Time--definition of ............................ 1 Contractor--del;nition of .,',....................,...,... 1 Contmctor May Stop Work or Terminate............. 15.5 Contractor's Continuing Obligation.................. 14.15 Contractor's Dll,ty to Report Discrepancy in Documents ',....."..,...................... :.5.3.: Contmctor's Fee-Cost Plus ... 11.4.5.6. 11.5.1. 11.6-11.-:- Contractor's Liability Insurance..,.................... 5.3 Contmctor's Responsibilities-in general '..,........'... 6 I I I I I I I I I Contractor's Wan-anty of Title ........................ 14.3 Contractors.--other ...................................... i Contractual Liability Insurance ......................., 5.4 Coordinating Conuactor--definition of ................ i, 4 Coordination .......................................,.. 7.4 Copies of Documents ..,..........".....'........'.'" ~.: Correction or Removal of Defective Work ........... 13.11 Correction Period. One Year.. .. .. .. . .. . .. .. .. .. .... J3 .11 Correction. Removal or Acceptance of Defective W ork-in general ........................... 13.11-13. 14 Cost-net decrease ................................. II. 6.1 Cost of Work .,............................".... 11.4-11.5 Costs. Supplemental... . , . . . . . . . . . . . . . , . . . . .. . . . , . .. 11.4.5 Day-<iefinition of ...............,.................."... I D~f~crive-definition of ',..................,."......... 1 D~f~crive Work. Acceptance of ..'........,'.....,... 13.13 Def~crivt Work. Correction or Removal of .......... 13 .JI ' D~fecriveWork-ingeneral ............... 13.14.7.14,11 D~f~crive Work. Rejecting..... ........ .......,'... ..., 9.6 Definitions ...................................."........ I Delivery of Bonds ..................................... 2.1 Detennination for U nit Prices ,....................... 9.10 Disputes. Decisions by Engineer. ,. .............. 9.11-9.11 Documents. Copies of ................................. 1.1 Documents. Record '................................. 6.J9 Documents. Reuse ... ................................. 3.6 Drawings--<ietinition of ..........................,...... 1 Easements .........,.........................,........ 4, 1 Effective date of Agreement-<iefinition of " , . . , . , . , . . . " I Emergencies ........".,..................,."......, 6.'::: Engineer-definition of '....................,..".....", J Engineer's Decisions '........,..............,'., 9.10-9,12 Engineer's-Notice Work is Acceptable ".,."".." 14,13 Engineer's Recommendation of Payment ....., 14,4. 14.13 Engineer's Responsibilities. Limitations on ................. 6.6,9.11,9.13-9.16,18.2 Engineer's Status During Construction-in general ,'.'.. 9 Equipment. Labor. Materials and...., .'........... 6.3-6.6 Equivalent Materials and Equipment .'......,..,.,.,.. 6.7 Explorations of physical conditions, , ... , , ,'...' ....., 4,1 Fee. Conlractor's-CoSts Plus ........................ 11.6 Field Order-definition of ............................... 1 Field Order-issued by Engineer '....,.......... 3.5.1.9.5 Final Application for Payment....................... 14,12 Final Inspection ..................................... 14.11 Final Paymenl and Acceptance ...................... 14,13 Final Payment. Recommendation of ,.......... 14.13-14.14 General Provisions ,............................. 17.3- J i ,4 General Requirements-dennition of . . . . . . . . . . . . . . . . . . . ., I General Requirements-principal references to ,'.,'..,'....,... :.6. 4.4. 6.4. 6.6-6.7. 6.13 ~ I I Giving Notice ........................................ 17.1 Guarantee of Work-by ConU'aCtor ................... 13.1 I IndemnificaticlO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.30-6.32. 7.5 Inspection. Final .................................... 14.11 Inspection. TI:Sts and . . ............................... 13.3 Insurance. Bonds and-in general ....................... 5 Insurance. Certificates of ........................... 2.7. 5 Insurance-cclmpletcd operations...................... 5.3 Insurance. Contractor's Liability ...................... 5.3 Insurance. Contractual Liability ....................... 5.4 Insurance. Owner's Liability .......................... 5.5 Insurance. Property .............................. 5.6-5.13 Insurance-Waiver of Rights ......................... 5.11 Intent of Contract Documents ......,............ 3.3. 9. 14 Interpretation:; and Clarifications ...................... 9.4 Investigations of physical conditions. . . . . . . . . . . . . . . . . .. 4.2 I I I I Labor. Materi:als and Equipment .................. 6.3-6.5 Laws and Regulations-<iefinition of ..................... I Laws and Regulations-general ........ .. .... .. .. .. ... 6.14 Liability Insurance-Contractor's ..................... 5.3 Liability Insurance-Owner's ......................... 5.5 Liens-<iefinitlons of ,............................... 14.2 Limitations on Engineer's Responsibilities ..................... 6.6. 9.11. 9.13-9.16 I I Materials and ,:quipment-fumished by Contractor .... 6.3 Materials and ,:quipment-not incorporatec, in Work .............................. 14.2 Materials or eCluipment-equivalent ................... 6.7 Miscellaneous Provisions ............................... 17 Multi-prime contracts ................................... 7 I I Notice. Giving of.,................... ................ 17.1 Notice of Accc:ptability of Project ................... 14.13 Notice of Award~efinition of .......................... 1 Notice to Proc :ed-detinition of ......................... 1 Notice to Proc:ed-giving of ....,...................., 1.3 I "Or-Equal" It,:ms ",....,............,........,...,... 6.7 Other contract,)rs ",......,............................. 7 Other work, . . , , . . . . , , . . . . . . . . . . . . . . . . . . . . . ;'. . . . . . . . . . . .. 7 Overtime Worl(-prohibition of .. . . . . . . . . . .. .. . . . . . . . .. 6.3 Owner-definil:ion of ,.........,......................... 1 Owner May C(lrrect Defecti\'e Work.............. . .. 13.14 Owner May St,)P Work, .............. ............ .,. 13.10 Owner May Suspend Work. Terminate ........'. 15.1-15A Owner's Duty ~o Execute Change Orders............. 11.8 Owner's Liability Insurance ........................... 5.5 Owner's Representative-Engineer to serve as ...,.... 9.1 Owner's Respc1nsibilities-in general .........'.......... 8 Owner's Separ.lte Representative at site......,.,...... 9.3 I I I I Partial U tilizat::on ..,..,............................ 14.10 Partial Utilizat:,on--definition of '........................ I Partial Utilizlmon-Property Insurance............... 5.15 Patent Fees an j Royalties ............................ 6,1: Payments. Recommendation of ...'....... 14.4-14.-;. 14,13 Payments to C'Jntractor-in general .................... 14 I I I Payments to Contractor-when due ........... 14.4, 14.13 Payments to Contractor-withholding ................ 14. i Performance and other Bonds ..................... 5.1-5.2 Permits ....... . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . .. 6.13 Physical Conditions ................................... 4,1 Physical Conditions-Engineer' 5 review ............. 4,1.4 Physical Conditions-existing structures.. . . . .. .. .. ,. 4.2.2 Physical Conditions-explorations and reports ....... 4.1.1 Physical Conditions-possible document change ..... 4.2.~ Physical Conditions-price and time adjustments .,., 4.2.5 Physical Conditions-report of differing ..........,.. 4.2.3 Physical Conditions-Underground Facilities,......... 4.3 Preconstruction Conference ........................... 2.8 Preliminary Matters ..............................,'..... 1 Premises. Use of ................................ 6.16-6.18 Price. Change of Contract .............................. 11 Price.Contract-detinition of ...........'................ 1 Progress Payment. Applications for. .................. 14.2 Progress Payment-retainage .........,...........,... 14.1 Progress schedule ............... 2.6.2.9.6.6.6.29. 15.2.6 Project-definition of ..........'......................... 1 Project Representation-provision for ,................ 9.3 Project Representative. Resident-definition of ........., 1 Project. Starting the ................................... 1.4 Property Insurance.............................., 5.6-5.13 Property Insurance-Partial Utilization ,.............. 5.15 Property Insurance-Receipt and Application of Proceeds ................................... 5.12-5.13 Protection. Safety and ........................... 6.20-6.21 Punch list ........................................... 14.11 Recommendation of Payment.................. 14.4, 14.13 RC1:ord Documents ................................... 6.19 Reference Points ...................................... 4.4 Regulations. Laws and ............................... 6.14 Rejecting Defective Work ............................. 9.6 Related Work at Site .............................. 7.1-7.3 Remedies Not Exclusive ............................. 17.4 Removal or Correction of Defective Work ........... 13.11 Resident Project Representative~efinition of ,.......... I Resident Project Representative-provision for",..... 9,3 Responsibilities. Contractor's-in general '.............. 6 Responsibilities. Engineer's-in general ........,........ 9 Responsibilities. Owner's-in general.,.......,.......... 8 Retainage ......,..................................... 14.2 Reuse oi Documents .................................. 3.5 Rights of Way "..................,.................... ~.I Royalties. Patent Fees and ................'.......... 6. I::! Safety and Protection ....... 6. 20-6 . 21, 18 .1-18 . 2 Samples ".,....,..,.....,..,.....'............., 6.23-6.18 Schedule of progress ...,..., 1.6.2.8-2.9.6.6.6.29. 15.::!.6 Schedule of Shop Drawing submissions. .. , '...... .... ..'.... 2.6. 2.8-2.9.6.23. 14.1 Schedule of values ...................... 2.6. 2.8-2.9. I ~.1 Schedules. Finalizing ....................... , . . . . . . . . .. 2.9 Shop Drawings and Samples, . . . . . . . . . . . . . . . . . . .. 6.23-6.18 Shop Drawings-definilion of . . . . . . . . . . . . . . . . . . , . . . . . . . .. I Shop Drawings. use 10 approve substitutions ...................................... 6.7.3 5 I I Site. Visits to--by Engineer ........................... 9.2 Specifications--definition of ............................. 1 Staning Consu'Uction. Before..... . . . .. . . . ...... ... 2.5-2.8 Staning the Pmject .................................... 2.4 Stopping Work-by Contractor....................... 15.5 Stopping Work-by Owner.......................... 13.10 Subcontractor--definition of ............................. 1 Subcontracton.-in general ....................... 6.8-6.11 Subcontracts--required provisions ............ 5.11.1. 6.11 11.4.3 Substantial Completion-certification of .............. 14.8 Substantial COlDpletion-<lefinition of . . . . . . . . . . . . . . . . . . .. 1 Substitute or "Or-Equal" Items....................... 6.7 Subsurface Conditions .... . . . . . . . . . . . . . . . . . . . . . . . .. 4.2-4.3 ' Supplemental c:osts ................................. 11.4.5 Supplementary Conditions-definition of . .'. .. . . . . . . .. . .. 1 Supplementary Conditions-principaJ references to .. 2.2.4.2.5.1.5.3.5.6-5.8.6.3.6.13.6.23. 7.4. 9.3 Supplementing Contract Documents............... 3.4-3.5 Supplier-definition of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1 Supplier-princ:ipal references to ... 3.6.6.5. 6.7-6.9. 6.20. 6.24.9.13.9.16.11.8.13.4. 14.12 Surety-consent to payment.................. 14.12. 14.14 Surety-Enginl:er has no duty to ..................... 9.13 Surety-notice to ... .. .. . .. .. . .. . .. .. .. .... 10.1. 10.5. 15.2 Surety~ualifi,::ation of ........................... 5.1-5.2 Suspending WClrk. by Owner ......................... 15.1 Suspension of Work and Tennination-in general....... 15 Superintendent-Contractor's ......................... 6.2 Supervision and Superintendence.................. 6.1-6.2 I I I I I I I I I Taxes--Payment by Contractor. . . . . . . .. . . . . .... . . . . .. 6.15 Termination-by Contractor.......................... 15.5 Tennination-by Owner......................... 15.2-15.4 Tennination. SIJspension of Work and-in general ....:. 15 Tests and Inspe:ctions ........................... 13.3-13.7 Time. Change (If Contract .............................. 12 I I I I I I I I Time. Computation of ................................ 1i.2 Time. Contract-delinition of . . . . . . . . . . . . . . . . . . . . . . . . . . .. I Uncovering Work............................... 13.8-13.9 Underground Facilities-delinition of .................... 1 Underground Facilities-not shown or indicated...., 4.3.2 Underground Facilities-protection of ,.......... 4.3.6.20 Underground Faci1ities--shown or indicated"....", 4.3.1 Unit Price Work-definition of ,......................,.. 1 Unit Price Work-general ................. 11.9. 14.1. 14.5 Unit Prices ...............................,......", 11.3. I Unit Prices. Detenninations for... ............,......, 9.10 Use of Premises ................................. 6.16-6.18 Utility owners .......................... 6.13.6.20.7.2.7.3 Values. Schedule of ......................... 2.6.2.9. 14.1 Variations in Work-Authorized............ 6.25.6.27.9.5 Visits to Site-by Engineer ............................ 9,2 Waiver of Claims-on Final Payment ................ 14.] 6, Waiver of Rights by insured panies ......."..., 5,10. 6.11 Warranty and Guarantee-by Contractor,.,...,....,. 13.1 Warrantv of Title. Contractor's .....,................, ) 4.3 Work. Access to ..................................... 13.2 Work-by others ........................................ 7 Work Continuing During Disputes ...'................ 6.29 Work. Cost of ................................... 11.4-11.5 Work-<lefinition of ............................,........ I Work Directive Change-delinition of ."'...,,.,........ 1 Work Directive Change-principal references to ............................ 3.4.3. ] 0.1-10.2 Work. Neglected by Contractor ..................... 13.14 Work. Stopping by Contractor,......................, 15.5 Work. Stopping by Owner....................... 15.1-15.4 Written Amendmenl-delinition of ,'....,.............,. 1 Written Amendment-principal references to ..................... 3.4.1. 10.1. 11.2. 12.1 6 I I GENERAL CONDITIONS ARTICLE I--DEFINITIONS I I Wherever Llsed in these Geneml ComJitions or in the other Contract Documents the following terms have the meanings indicated whi,:h are applicable to both the singular and plural thereof: I Addenda-Written or graphic instruments issued prior to the opening of Bds which clarify. correct or change the bidding documents or the Contract Documents, I AgreemellT-The written agreement between OWNER and CONTRACTOR covering the Work to be performed: other Contract Documents are attached to the Agreement and made a pan thereof as provided therein, I ApplicaTioll jf)r PaYlllellt- The form accepted by ENG 1- NEER which is to be used by CONTRACTOR in requesting progress or final payments and which is to include such sup- poning documentation as is required by the Contract Documents, I I Bid-The offc:r or proposal of the bidder submitted on the prescribed form setting fonh the prices for the Work to be performed, I BOllds-Bid. performance and payment bonds and other instruments ot' security, I Change Order-A document recommended by ENGINEER. which is signed by CONTRACTOR and OWNER and autho- rizes an addition. deletion or revision in the Work. or an adjustment in the Contract Price or the Contract Time. issued on or after the: Effective Date of the Agreement. I Contract Doclllllenrs- The Agreement. Addenda (which per- tain to the Contract Documents). CONTRACTOR's Bid (including doc'Jmentation accompanying the Bid and any post- Bid documentation submitted prior to the Notice of Award) when attached as an exhibit to the Agreement. the Bonds. these General Conditions. the Supplementary Conditions. the Specifications and the Drawings as the same are more spe- cifically identified in the Agreement. together with all amend- ments. modifications und supplements issued pursuant to paragraphs 3A and 3,5 lm or after the Effective Date of the Agreement. I I I COlltract Prin-The moneys payable by OWNER to CON- - TRACTOR under the ContraCl Documents as stuted in the Agreement (slJbject to the provisions of paragraph 11,9,1 in the case of Unit Price Workl. I I COlltracT Tillll'- The number of days (computed as provided in paragraph /7,2) or the date stated in the Agreement for the completion of the Work. I CONTRACTOR-The person. firm or corporoltion with whum OWNER has entered into the Agreement. I defecril'e-An adjective which when modifying the word Work refers to Work that is unsatisfactory. faully or deficient. or does not conform to the Contract Documents. or does not meet the requirements of any inspection, reference standard. test or approval referred to in the Contract Documents. or has been damaged prior to ENGINEER's recommendation of final payment tunless responsibility for the protection thereof has been assumed by OWNER at Substantial Completion in accordance with paragraph 14.8 or 14,10l. Drall'illgs- The drawings which show the character and scope of the Work to be performed and which have been prepured or approved by ENGINEER and are referred to in the Con- tract Documents, EffecTiI'e D{/fe of the AgreemellT- The date indicated in the Agreement on which it becomes effective. but if no such date is indicated it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. E.VGIN EER- The person. firm or corporation named as such in the Agreement. Field Order-A written order issued by ENGINEER which orders minor changes in the Work in accordance with para- graph 9.5 but which does not involve a change in the Contract Price or the Contract Time, General Requirements-Sections of Division I of the Speci- fications, Lall's and Regulations: Lall'J or ReKlllarions-Laws. rules. regulations. ordinances. codes and/or orders, Notice of .4.II'ard- The written notice by OWNER to the apparent successful bidder stating that upon compliance by the apparent successful bidder with the conditions precedent enumerated therein. within the time specified. OWNER will sign and deliver the Agreement. Notice (0 Proceed-A written notice given by OWNER to CONTRACTOR (with a copy to ENGINEER) fixing the dute on which the Contract Time will commence to run and on which CONTRACTOR shall stan to ~erform CONTRAC- TOR'S obligations under the Contract Documents, OWNER-The public body or authority. corporation. asso- ciation.l1rm or person with whom CONTRACTOR has entered into the Agreement and for whom the Work is to be provid.::d, Parrial UTili:.ari/JI/-Placing a ponion of the Work in service for the purpose for which it is intended lor a related purpose) before reaching Substantiul Completion for all the Work, Projecr- The total construction of which the Work to be provided under the Contract Documents may be the whole. or a part as indicated elsewhere in the Contract Documents. Rt'sidelll P,,~it!cr Rt'preJenttlTil'e- The authorized repr.::sen- tative of ENGIN EER who is assigned to the site or any pan thereof. 7 I I Shop Drawin,rs-AII drawings. diagrams. iIlustrations. schedules and other data which are specifically prepared by or for CONTRACTOR to illustrate some ponion of the Work and al1 illustrations. brochures. standard schedules. perfor- mance chans. instructions. diagrams and other information prepared by a Supplier and submitted by CONTRACTOR to illustrate material or equipment for some ponion of the Work. I I Spt!cijicarions-- Those portions of the Contract Documents consisting of written technical descriptions of materials. equipment. const!'uction systems. standards and workman- ship as applied to the Work and cenain administrative details applicable ther.:to. I I Subconrracror--An individual. firm or corporation having a direct contract with CONTRACTOR or with,any other Sub- contractor for the performance of a pan of the Work at the site. I Subsranrial Complerion- The Work (or a specified pan thereoO has progressed to the point where. in the opinion of ENGI- NEER as evidc:nced by ENGINEER's definitive cenificate of Substantial Completion. it is sufficiently complete. in accordance with the Contract Documents. so that the Work (or specified part) can be utilized for the purposes for which it is intended: (Ir if there be no such cenificate issued. when final payment is due in accordance with paragraph 14.13. The terms "substantialJy complete" and "substantially com- pleted" as applied to any Work refer to Substantial Comple- tion thereof. I I I I Supplemenrary Condirions- The part of the Contract Docu- ments which amends or supplements these General Condi- tions. I Supplier-A manufacturer. fabricator. supplier. distributor. materialman or vendor. I Underground Fllcilities-All pipelines. conduits. ducts. cables. wires. manhole~;. vaults. tanks. tunnels or other such facilities or attachments. and any encasements containing such facil- ities which have been installed underground to furnish any of the foIlowing services or materials: electricity. gases. steam. liquid petroleum products. telephone or other communica- tions. cable television. sewage and drainage removal. traffic or other control systems or water. I I Unit Price Work-Work to be paid for on the basis of unit prices. I Work-The entire completed construction or the various sep- arately identifiable pans thereof required to be furnished under the Contract Documents. Work is the result of per- forming service:s. furnishing labor and furnishing and incor- porating materials and equipment into the construction. all as required by the Contract Documents. I I Work Dirurivt! Change-A written directive to CONTRAC- TOR. issued on or after the Effective Date of the Agreement and signed by OWNER and recommended by ENGINEER. I ordering an addition. deletion or revision in the Work. or responding to differing or unforeseen physical conditions under which the Work is to be performed as provided in paragraph 4.2 or 4.3 or to emergencies under paragraph 6.21. A Work Directive Change may not change the Contract Price or the Contract Time. but is evidence that the panies expect that the change directed or documented by a Work Directive Change will be incorporated in a subsequently issued Change Order following negotiations by the panics as to its effect. if any. on the Contract Price or Contract Time as provided in paragraph 10.2. Writlen Amt!ndmenl-A written amendment of the Contract Documents. signed by OWNER and CONTRACTOR on or after the Effective Date of the Agreement and normally deal- ing with the nonengineering or nontechnical rather than strictly Work-related aspects of the Contract Documents. ARTICLE 2-PRELIMINARY MAITERS Dt!ullt!ry of Bonds: :.1. When CONTRACTOR delivers the executed Agree- ments to OWNER. CONTRACTOR shall also deliver to OWNER such Bonds as CONTRACTOR may be required to furnish in accordance with paragraph 5.1. Copies of Docume1llS: :.:. OWNER shall furnish to CONTRACTOR up to ten copies (unless otherwise specified in the Supplementary Con- ditions) of the Contract Documents as are reasonably nec- essary for the execution of the Work. Additional copies will be furnished. upon request. at the cost of reproduction. Commencemenl ofConlTa&r Time: Notice ro Proceed: 2.3. The Contract Time will commence to run on the thirtieth day afterthe Effective Date of the Agreement. or. if a Notice to Proceed is given. on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within thirty days after the Effective Date of the Agree- ment. In no event will the Contract Time commence to run later than the seventy-fifth day after the day of Bid opening or the thirtieth day after the Effective Date of the Agreement. whichever date is earlier. SlIUting the Projecr: :.4, CONTRACTOR shall start to perform the Work on the date when the Contract Time commences to run. but no Work shall be done at the site prior to the date on which the Contract Time commences to run. Before SlIUting Construcrion: :.5. Before undertaking each pan of the Work. CON- TRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown 8 I I thereon and all applicable field measurements. CONTRAC- TOR shall promptly repon in writing to ENGINEER any conflict. error or discrepancy which CONTRACTOR may discover anc, shall obtain a written interpretation or clarifi- cation from ENGINEER before proceeding with any Work affected thereby: however. CONTRACTOR shall not be lia- ble to OW?,>'ER or ENGINEER for failure to repon any conflict. error or discrepancy in the Contract Documents. unless CONTRACTOR had actual knowledge thereof or should reasonably ha ve known thereof. I I I 2.6, Within ten days after the Effective Date of the Agree- ment (unless otherwise specified in the General Require- ments), CONTRACTOR shall submit to ENGINEER for revIew: I 2.6.1, an estimated progress schedule indicating the staning and completion dates of the various stages of the Work: I 2.6.2. a preliminary schedule of Shop Drawing sub- missions: and I 2.6.3, 1 preliminary schedule of values for all of the Work whi:h will include quantities and prices of items aggregating the Contract Price and will subdivide the Work into component pans in sufficient detail to serve as the basis for progress payments during construction. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work which will be con- firmed in writing by CONTRACTOR at the time of sub- mission, I I I 2.7, Before any Work at the site is staned. CONTRAC- TOR shall deliver to OWNER. with a copy to ENGINEER. cenificates (and other evidence of insurance requested by OWNER) which CONTRACTOR is required to purchase and maintain in accordance with paragraphs 5.3 and 5.4, and OWNER shall deliver to CONTRACTOR cenificates land other evidence of insurance requested by CONTRACTOR) which OWNER is required to purchase .and maintain in accordance with paragraphs 5,6 and 5.7, I I I Pruonstruclio" Conference: 2.8. Withi n twenty days after the Effective Date of the Agreement. but before CONTRACTOR stans the Work at the site. a cor.ierence attended by CONTRACTOR. ENGI- NEER and l)t hers as appropriate will be held to Jiscuss the schedules reterred to in paragraph 2.6. to discuss procedures - for handling :;hop Drawings and other submittals and for processing .~pplications for Payment. and toestablish a working understanding among the panies as to the Work, I I I FinaJi:ing Scll.~du/es: 2.9, At least ten Jays before submission of the first Appli- cation for Pa)"ment a conference attended by CONTRAC- TOR. ENG IN EER and others as appropriate will be held to finalize the ~,'hedules submitted in accordance:: with para- I I graph 2.6, The finalized progress schedule will be:: acceptable to ENGINEER as providing an orderly progression of the Work to completion within the Contract Time. but such acceptance will neither impose on ENGINEER responsibility for the progress or scheduling of the Work nor relieve CON- TRACTOR from full responsibility therefor, The finalized schedule of Shop Drawing submissions will be acceptable to ENGINEER as providing a workable arrangement for pro- cessing the submissions, The finalized schedule of values will be acceptable to ENGINEER as to form and substance, ARTICLE 3-CONTRACT DOCUMENTS: INTENT, AMENDING. REUSE I nlent: 3.1, The Contract Documents comprise the entire agree- ment between OWNER and CONTRACTOR concerning the Work. The Contract Documents are complementary: what is called for by one is as binding as if called for by all, The Contract Documents will be construed in accordance with the law of the place of the Project. 3,2, It is the intent of the Contract Documents to describe a functionally complete Project (or pan thereon to be con- structed in accordance with the Contract Documents, Any Work. materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result will be supplied whether or not specifically called for, When words which have a well-known technical or trade meaning are used to describe Work. materials or equipment such words shall be interpreted in accordance with that meaning. Reference to standard specifications. manuals or codes of any technical society. organization or association. or to the Laws or Regulations of any governmental authority. whether such reference be specific or by implication. shall mean the latest standard specification. manual. code or Laws or Regulations in effect at the time of opening of Bids (or. on the Effective Date of the Agreement if there were no Bids). except as may be otherwise specifically stated, However. no provision of any referenced standard specification. manual or code (whether or not specifically incorporated by reference in the Contract Documents) shall be effective to change the duties and responsibilities of OWNER. CONTRACTOR or ENGINEER. or any of their consuitants. agents or employ- ees from those set fonh in the Contract Documents. nor shall it be effective to <lssign to ENGINEER. or any of ENGI- NEER's consultants. agents or employees. any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undenake responsi- bility contrary to the provisions of pamgraph 9,15 or 9,16, Clarifications and interpretations of the Contract Documents ~hall be issued by ENGINEER as provided in paragrnph 9,4, 3.3. If. during (he performance of the Work. CONTRAC- TOR finds a contlict. error or discrepancy in the Contract Documents. CONTRACTOR shall so repon to ENGINEER in writing at once and before proceeding with the Work alfected thereby shall obtain a written interpretation or clarification 9 I I from ENGINEER: however. CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report any contlict. error or discrepancy in the Contract Documents unless CONTRACTOR had actual knowledge thereof or should reasonably havl: known thereof. I I Anunding and Suppunullling COn1J"tlCt Docu.menu: 3.4. The C(lntract Documents may be amended to pro- vide for additions. deletions and revisions in the Work or to modify the terlilS and conditions thereof in one or more of the following ways: I I 3.4.1. a formal Written Amendment. 3.4.2. a Change Order (pursuant to paragraph 10.4), or I 3.4.3. a Work Directive Change (pursuant to para- graph 10.1). I As indicated in::>aragraphs 11.2 and 12.1. Contract Price and Contract Time may only be changed by a Change Order or a Written Amend::nent. 1 3.5. In addition. the requirements of the Contract Docu- ments may be supplemented. and minor variations and devia- tions in the Work may be authonzec1. In one or more of the following ways: I, 3.5.1. a Field Order (pursuant to paragraph 9.5). 1 3.5.2, ENGINEER's approval of a Shop Drawing or sample (pursuant to paragraphS 6.26 and 6.27), or I 3.5.3. ENGINEER's written interpretation or clarifi- cation (pursuant to paragraph 9,4), I Reuse of Docum~nlS: 3.6. Neither CONTRACTOR nor any Subcontractor or Supplier or othl:r person or organization performing or fur- n~hing any of the Work under a direct or indirect contract with OWNER shall have or acquire any title to or ownership rights in any of the Drawings. Specifications or other docu- ments lor copies of any thereoO prepared by or bearing the seal of ENGINEER: and they shall not reuse any of them on. extensions of th e Project or any other project without written consent of OWNER and ENGINEER and specific written verification or adaptation by ENGINEER. I I 1 ARTICLE ~A V AILABILITY OF LANDS: PHYSICAL CONDITIONS: REFERENCE POINTS I A WliiIlbiiity of Lt.tnds: 4.1. OWNER shall furnish. as indicated in the Contract Documents. the: lands upon which the Work is to be per- formed. rights-cf-way and easements for access thereto. and I I , . such other lands which are designated for the use of CON- TRACTOR. Easements for permanent structures or perma- nent changes in existing facilities will be obtained and paid for by OWNER. unless otherwise provided in the Contract Documents. If CONTRACTOR believes that any delay in OWNER's furnishing these lands. rights-of-way or ease- ments entitles CONTRACTOR to an extension of the Con- tract Time. CONTRACTOR may make a claim therefor as provided in Anicle 12. CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. Physical Conditions: 4.2.1. Exp/orations and Reports: Reference is made to the Supplementary Conditions for identification of those repons of explorations and tests of subsurface conditions at the site that have been utilized by ENGINEER in prep- aration of the Contract Documents. CONTRACTOR may rely upon the accuracy of the technical data contained in such reports. but not upon nontechnical data. interpreta- tions or opinions contained therein or for the completeness thereof for CONTRACTOR's purposes. Except as indi- cated in the immediately preceding sentence and in para- graph 4.2.6. CONTRACTOR shall have full responsibility with respect to subsurface conditions at the site, 4.2.2. Existing Structures: Reference is made to the Supplementary Conditions for identification of those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities referred to in paragraph 4.3) which are at or contiguous to the site that have been utilized by ENGI- NEER in preparation of the Contract Documents. CON- TRACTOR may rely upon the accuracy of the technical data contained in such drawings. but not for the complete- ness thereof for CONTRACTOR's purposes. Except as indicated in the immediately preceding sentence and in paragraph 4.2.6. CONTRACTOR shall have full respon- sibility with respect to physical conditions in or relating to such structures, 4.2.3, Report of Differing Conditions: If CONTRAC. TOR believes that: 4.2.3. I, any technical data on which CONTRAC- TOR is entitled to rely as provided in paragraphs 4.1.1 and 4.1.1 is inaccurate. or 4.2.3.1. any physical condition uncovered or revealed at the site differs materially from that indi. cated. reflected or referred to in the Contract Docu- ments. CONTRACTOR shall. promptly after becoming aware thereof and before performing any Work in connection therewith (except in an emergency as permitted by para- graph 6.22), notify OWNER and ENGINEER in writing about the inaccuracy or difference. 10 I I ~,1,~. E,VCIN EER',f Rniell': ENG IN EER will promptly review the pertinent conditions. determine the necessity of obtaining additional ~xplorations or lests with respect thereto and advise OWN ER in writing (with a copy to CONTRACTOR> of ENGINEER's findings and con- clusions, I I 4,1,5, Pouihle DOCllmenr C!/(/n.r!e: If ENGINEER concludes that there is a material error in the Contract Documents or lhal because of newly discovered condi- lions a change in the Contract Documents is reqlJired~ a Work Directive Change or a Change Order will be issued as provide:d in Article 10 to reflect and document the consequences of the inaccuracy or difference, I I ~,1,6. Pouihle Prici' and Timt' Adju.wlli'lIts: In each such case. an increase or decrease in the Contract Price or an exter,sion or shortening of the Contract Time. or any combination thereof. will be allowable to the extent that they are al':ributable to any such inaccuracy or difference. If OWN EE and CONTRACTOR are unable to agree as to the amount or length thereof. a claim may be made therefor as provided in Articles i J and 12, 1 I I Physical C ond.itions-Cnderground Facilities: ~,3,I, Sholl'n or Il/dicaTed: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the site is based on information and data furnished to OWNER or ENGIN EER by the owners of such Underground Facil- ities or by others. Unless it is otherwise expressly pro- vided in th~ Supplementary Conditions: I I ,U.I.l, OWNER and ENGINEER shall not be responsible for the accuracy or completeness of any such information or data: and. I ~.3,1.~, CONTRACTOR shall have full responsi- bility for reviewing and checking all such information and datL for locating all Underground. Facilities shown or indicated in the Contract Documents. for coordina- tion of the Work with the owners of such Underground Facilities during construction. for the safety and pro- tection thereof as provided in paragraph 6.10 and repairing any damage thereto resulting from the Work. the cost of all of which will be considered as having been included in the Contract Price, I I I ~,3,1, Not Sholl'l/ or II/diemi'd, If an Underground Facility is uncovered or revealed at or contiguous to the sile which was nOI shown or indicated in the Contract Documents and which CONTRACTOR could not reason- ably have been expected to be aware of. CONTRACTOR shall. promptly after becoming aware thereof and before performing any Work affected thereby lexcept in an emer- gency as permilled by paragraph 6.22>. identify the owner of such Underground Facility and give wrillen notice thereof to that owrer and ll) OWNER and ENGINEER. ENGI- NEER will promptl~' review the Underground Facility to I I I I determine the extent to which the Contract Documents should be modified 10 reflect and document the conse- quences of the existence of the Underground Facility. and the Contract Documents will be amended or supplemented to the extent necessary, During such time. CONTRAC- TOR shall be responsible for the safelY and protection of such Underground Facility as provided in paragraph 6.20, CONTRACTOR shall be allowed an increase in lhe Con- tract Price or an extension of the Contract Time. or both. to the extent that they are allributable to the nistence of any Underground Facility that was not shown or indicated in the Contract Documents and which CONTRACTOR could not reasonably have been expected to be aware of. If the parties are unable to agre~ as to the amount or length thereof. CONTRACTOR may make a claim therefor as provided in Articles II and 12, Reference Points: ~.4, OWNER shall provide engineering surveys to estab- lish reference points for construction which in ENG IN EER' s judgment are necessary to enable CONTRACTOR to proc~ed with the Work, CONTRACTOR shall be responsible for lay- ing out the Work (unless otherwise specified in the G~neral Requirements>. shall protect and preserve the established reference points and shall make no changes or relocations without the prior wrillen approval of OWNER. CONTRAC- TOR shall report to ENGINEER whenever any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations. and shall be respon- sible for the accurate replacement or relocation of such ref- erence points by professionally qualified personnel. ARTICLE 5-BONDS AND INSURANCE Performance and Other Bonds: 5. J, CONTRACTOR shall furnish performance and pay- ment Bonds. each in an amount at least equal to the Contract Price as security for the faithful performance and paym~nt of all CONTRACTOR's obligations under the Contract Docu- ments, These Bonds shall remain in ~ffect at I~ast until one year after the date when final payment becomes due. except as otherwise provided by Law or Regulalion or by the Con- tract Documents, CONTRACTOR shall also furnish such other Bonds as are required by the Supplementary C ondi- tions. All Bonds shall be in the forms prescribed by Law or Regulation or by th~ Contract Documents and be executed by such sureties as are named in th~ current list of "Com- panies Holding Certificates of Authority as Acceptable Sure- ties on Federal Bonds and as Acceptable R~jnsuring Com- panies" as published in Circular 570 (amended) by the Audit Staff Bureau of Accounts. U .5, Treasury Department. All Bonds sign~d by an agent must be accompanied by a cenified copy of the authority to act. 5.2. If the surety on any Bond furnished by CONTRAC- TOR is declared a bankrupt or becomes insolvent or its right to do business is terminat~d in any state where any pan of II I I the Project is located or it ceases to meet the requirements of paragraph 5.1. CONTRACTOR shall within five days thereafter substitute another Bond and Surety. both of which must be acceptable to OWNER. I I C onrra.ctor' s LiJJ bilily I nslU'tUlce: 5.3. CONTRACTOR shaH purchase and maintain such comprehensive general liability and other insurance as is appropriate for the Work being performed and furnished and as will provide ',rotection from claims set forth below which may arise out iJf or result from CONTRACTOR's perfor- mance and fumishing of the Work and CONTRACTOR's other obligations under the Contract Documents. whether it is to be perfomled or furnished by CONTRACTOR. by any Subcontractor. by anyone directly or indirectly employed by any of them to perform or furnish any of the Work. or by anyone for whose acts any of them may be liable: I I I 5.3.1. Claims under workers' or workmen's compen- sation. disability benefits and other similar employee ben- efit acts: I I 5.3.1. Claims for damages because of bodily injury, occupational sickness or disease. or death of CONTRAC- TOR's employees: I 5.3.3. Claims for damages because of bodily injury, sickness or disease. or death of any person other than CONTRACTOR's employees: I 5.3.4, CIHims for damages insured by personal injury liability coverage which are sustained ta) by any person as a result 01' an offense directly or indirectly related to the employment of such person by CONTRACTOR, or (b) by any other person for any other reason: I 5.3.5, C/;:.ims for damages. other than to the Work itself. because of injury to or destruction of tangible prop- erty wherevf:r located. including loss of use reSUlting therefrom: I I 5.3.6. Cl.ums arising out of operation of Laws or Reg- ulations for damages because of bodily injury or death of any person or for damage to property: and I 5.3, i. Cl.lims for damages because of bodily injury or death of any :,erson or property damage arising out of the ownership, maintenance or use of any motor vehicle. I The insurance required by this paragraph 5.3 shall include the specific coverages and be written for not less than the limits of liability and coverages provided in the Supplemen- tary Conditions.. or required by law, whichever is greater. The comprehen:iive general liability insurance shall include completed opeliiltions insurance. All of the policies of insur- ance so required to be purchased and maintained (or the certificates or 01 her evidence thereoO shaH contain a provi- sion or endorsement that the coverage afforded will not be cancelled, materially changed or renewal refused until at least I I I thirty days' prior written notice has been given to OWNER and ENGINEER by certified mail. All such insurance shall remain in effect until final payment and at all times thereafter when CONTRACTOR may be correcting, removing or replacingdeju1ivt' Work in accordance with paragraph 13.12. In addition. CONTRACTOR shall maintain such completed operations insurance for at least two years after final payment and furnish OWNER with evidence of continuation of such insurance at final payment and one year thereafter. Conrra.ctzull Liabiiily InslUTUlCe: 5.4. The comprehensive general liability insurance required by paragraph 5.3 will include contractual liability insurance applicable to CONTRACTOR's obligations under paragraphs 6.30 and 6.31. OWMr'sLiabililylnsumnu: 5.5. OWNER shall be responsible for purchasing and maintaining OWNER's own liability insurance and, at OWNER's option, may purchaSe and maintain such insur- ance as will protect OWNER against claims which may arise from operations under the Contract Documents. ProfMrry I MuranCt: 5.6. Unless otherwise provided in the Supplementary Conditions, OWNER shall purchase and maintain property insurance upon the Work at the site to the full insurable value thereof (subject to such deductible amounts as may be pro- vided in the Supplementary Conditions or required by Laws and Regulationsl. This insurance shall include the interests of OWNER, CONTRACTOR, Subcontractors. ENGINEER and ENGINEER's consultants in the Work. all of whom shall be listed as insureds or additional insured parties. shall insure against the perils of fire and extended coverage and shall include "aU risk" insurance for physical loss and damage including theft. vandalism and malicious mischief. collapse and water damage. and such other perils as may be provided in the Supplementary Conditions. and shall include damages. losses and expenses arising out of or resulting from any insured loss or incurred in the repair or replacement of any insured property (including but not limited to fees and charges of engineers. architects. attorneys and other professionalsl. If not covered under the "all risk" insurance or otherwise pro- vided in the Supplementary Conditions. CONTRACTOR shall _purchase and maintain similar propeny insurance on portions of the Work. stored on and ofT the site or in transit when such portions of the Work. are to be included in an Application for Payment. 5.7. OWNER shall purchase and maintain such boiler and machinery insurance or additional propeny insurance as may be required by the Supplementary Conditions or Laws and Regulations which will include the interests of OWNER, CONTRACTOR. Subcontractors, ENGINEER AND ENGINEER's consultants in the Work. all of whom shall be listed as insured or additional insured parties. 12 I I 5.8. All the policies of insurance lor the certificates or other evidence thereof) required to be purchased and main- tained by OWNER in accordance with paragraphs 5.6 and 5.7 will contain a provision or endorsement that the coverage afforded will not be cancelled or materially changed or renewal refused until at least thirty days' prior written notice has been given to CONTRACTOR by certified mail and will contain waiver provi~iions in accordance with paragraph 5.11.2. I I I 5.9, OWNER shall not be responsible for purchasing and maintaining 2,ny property insurance to protect the inten:'sts of CONTRACTOR. Subcontractors or others in the Work to the extent of any deductible amounts that are provided in the Supplementa:"y Conditions, The risk of loss within the deductible amount. will be borne by CONTRACTOR. Sub- contractor or others suffering any such loss and if any of them wishes prope::ty insurance coverage within'the limits of such amounts. each may purchase and maintain it at the purchas- er's own expc:nse. I I I 5,10, If CONTRACTOR requests in writing that other special insurance be included in the property insurance pol- icy. OWNER shall. if possible. include such insurance. and the cost therNf will be charged to CONTRACTOR by appro- priate Change: Order or Written Amendment. Prior to com- mencement of the Work at the site. OWNER shall in writing advise CONTRACTOR whether or not such other insurance has been procured by OWNER, I I Waiver of Rig)rts: 5,11,1, OWNER and CONTRACTOR waive all rights against each other for all losses and damages caused by any of the' perils covered by the policies of insurance provided i;,l response to paragraphs 5,6 and 5.7 and any other prop':rty insurance applicable to the Work. and also waive all such rights against the Subcontractors. ENGI- NEER. ENGINEER's consultants and all other parties named as insureds in such policies for losses and damages so caused, As required by paragraph 6.11. each subcon- tract betw,:en CONTRACTOR and a Supcontractor will contain similar waiver provisions by the Subcontractor in favor of OWNER. CONTRACTOR. ENGINEER. ENGI- NEER 's cc'nsultants and all other parties named as insureds, None of the above waivers shall extend to the rights that any of the insured parties may have to the proceeds of insurance ,leld by OWNER as trustee or otherwise pay- able under any policy so issued. I I I I I 5,11,2, OWNER and CONTRACTOR intend that an~' - policies provided in response to paragraphs 5,6 and 5,7 shall prote,:t all of the parties insured and provide primary coverage fix all losses and damages caused by the perils cO\'ered th :reby. Accordingly. all such policies shall con- tain provisions to the dTect that in the event of payment of any los~, llr dam"ge the insurer will have no rights llf recovery ag"inst any of the parties named as insureds llr additional insureds. and if the insurers require separate waiver forms to be signed by ENGINEER or ENGI- NEER's consultant OWNER will obtain the same. and if I I I I such waiver forms are required of any Subcontractor. CONTRACTOR will obtain the same, Receipt and Applicarion of Proceeds: 5,12. Any insured loss under the policies of insurance required by paragraphs 5,6 and 5,7 will be adjusted with OWNER and made payable to OWNER as trustee for the insureds. as their interests may appear. subject to the require- ments of any applicable mortgage clause and of paragraph 5.13, OWNER shall deposit in a separate account any money so received. and shall distribute it in accordance with such agreement as the parties in interest may reach, If no other special agreement is reached the damaged Work shall be repaired or replaced. the moneys so received applied on account thereof and the Work and the cost thereof covered by an appropriate Change Order or Written Amendment. 5.13, OWNER as trustee shall have power to adjust and settle any loss with the insurers unless one of the parties in interest shall object in writing within fifteen days after the Occurrence of loss to OWNER's exercise of this power. If such objection be made. OWNER as trustee shall make set- tlement with the insurers in accordance with such agreement as the parties in interest may reach. If required in writing by any party in interest. OWNER as trustee shall. upon the occurrence of an insured loss. give bond for the proper per- formance of such duties. Acceptance of Insurance: 5.14. If OWNER has any objection to the coverage afforded by or other provisions of the insurance reqcired to be pur- chased and maintained by CONTRACTOR in accordance wi[h paragraphs 5,3 and 5.4 on the basis of its not complying with the Contract Documents. OWNER shall notify CON- TRACTOR in writing thereof within ten days of the date of delivery of such certificates to OWNER in accordance with paragraph 2.7. If CONTRACTOR has any objection to the coverage afforded by or other provisions of the policies of insurance required to be purchased and maintained by OWNER in accordance with paragraphs 5,6 and 5,7 on the basis of their no~ complying with the Contract Documents. CON- TRACTOR shall notify OWNER in writing thereof within ten days of the date of delivery of such certificates to CON- TRACTOR in accordance with paragraph :'.7, OWNER and CONTRACTOR shall each provide to the other such addi- tional information in respect of insurance provided by each as the other may reasonably request. Failure by OWNER or CONTRACTOR to give any such notice of objection within the time provided shall constitute acceptance of such insur- ance purchased by the other as complying with the Contract Documents, PartiIJl Uti/i:ation-Propert)' Insurance: 5.15, If OWNER finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Comple- tion of all the Work. such use or occupancy may be accom- plished in accordance with paragraph 14,10: provided that no 13 I I such use or oc:cupancy shall commence before the insurers providing the property insurance have acknowledged notice thereof and in writing effected the changes in coverage neces- sitated thereby. The insurers providing the property insur- ance shall con:ient by endorsement on the policy or policies, but the propel'1:y insurance shall not be cancelled or lapse on account of any such partial use or occupancy. I I I ARTICLE ~:ONTRACTOR'S RESPONSIBILITIES I Supervision amI Su~rinuruiellce: 6. I. CONTRACTOR shall supervise and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expenise as may be necessary to perform the Work in accordance with the Contract Doc- uments. CONTRACTOR shall be sOlely responsible for the means. methods. techniques. sequences and procedures of construction. but CONTRACTOR shall not be responsible for the negligence of others in the design or selection of a specific means, method. technique, sequence or procedure of construction which is indicated in and required by the Contract Documents. CONTRACTOR shall be responsible to see that the finished Work complies accurately with the Contract Documents, I I I I 6.2. CONTRACTOR shall keep on the Work at all times during its progress a competent resident superintendent. who shall not be replaced without written notice to OWNER and ENGINEER e,:cept under extraordinary circumstances. The superintendent will be CONTRACTOR's representative at the site and shall have authority to act on behalf of CON- TRACTOR. AI:. communications given to the superintendent shall be as binding as if given to CONTRACTOR, I I Labor. MtUeriDt: and Equipment: 6,3, CONTRACTOR shall provide competent. suitably qualified personnel to survey and layout the Work and per- form construction as required by the Contract Documents, CONTRACTOR shall at all times maintain good discipline and order at the site. Except in connection with the safety or protection of pe:rsons or the Work or property at the site or adjacent there(l). and except as otherwise indicated in the Contract Documents. all Work at the site shall be performed during regular working hours. and CONTRACTOR will not permit overtime: work or the performance of Work on Sat- urday. Sunday or any legal holiday without OWNER's writ- ten consent give:n after prior written notice to ENGINEER. I I I I 6.4, Unless otherwise specified in the General Require- ments. CONTRACTOR shall furnish and assume full respon- sibility for all rnaterials. equipment. labor. transportation. construction equipment and machinery. tools. appliances. fuel. power. light. heat. telephone, water. sanitary facilities. temporary facilllties and all other facilities and incidentals necessary for the furnishing. performance. testing. start-up and completion of the Work. I I I 6.5. All materials and equipment shall be of good quality and new. except as otherwise provided in the Contract Doc- uments. If required by ENGINEER. CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the kind and quality of materials and equipmenl. All materials and equipment shall be applied. installed. con- nected. erected. used. cleaned and conditioned in accordance with the instructions of the applicable Supplier except as otherwise provided in the Contract Documents: but no pro- vision of any such instructions will be effective to assign to ENGINEER. or any of ENGINEER's consultants. agents or employees. any duty or authority to supervise or direct the furniShing or performance of the Work or any duty or author- ity to undertake responsibility contrary to the provisions of paragraph 9.15 or 9.16. Adjusdllg Progress Schedule: 6.6. CONTRACTOR shall submit to ENGINEER for acceptance (to the extent indicated in paragraph 2.9) adjust- ments in the progress schedule to reflect the impact thereon of new developments: these win conform generally to the progress schedule then in effect and additionally will comply with any provisions of the General Requirements applicable thereto. Substinues or "Or-EqUlll" Items: 6.7. I. Whenever materials or equipment are specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier the naming of the item is intended to establish the type. function and quality required. Unless the name is followed by words indicating that no substitution is permined. materials or equipment of other Suppliers may be accepted by ENGINEER if sufficient information is submitted by CONTRACTOR to allow ENGINEER to determine that the material or equipment proposed is equivalent or equal to that named, The procedure for review by ENGINEER will include the following as supplemented in the General Requirements. Requests for review of substitute items of material and equipment will not be accepted by ENGI- NEER from anyone other than CONTRACTOR. If CON- TRACTOR wishes to furnish or use a substitute item of material or equipment. CONTRACTOR shall make writ- ten application to ENGINEER for acceptance thereof. certifying that the proposed substitute will perform ade- quately the functions and achieve the results called for by the general design. be similar and of equal substance to that specified and be suited to the same use as that spec- ified. The application will state that the evaluation and acceptance of the proposed substitute will not prejudice CONTRACTOR's achievement of Substantial Comple- tion on time. whether or not acceptance of the substitute for use in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with OWNER for work on the Project) to adapt the design to the proposed substitute and whether or not incorporation or use of the substitute in connection with the Work is subject to payment of any license fee or 14 I I royalty, All variations of the proposed substitute from that specified will be identified in Ihe application and available maintenance, repair and replacement service will be indi- cated, The application will also contain an ilemized esti- mate of ai I costs that will result directly or indirectly from acceptance of such substitute. including costs of redesign and c1airr.s of other contractors affected by the resulting change. all of which shall be consiQered by ENGINEER in evalua':ing the proposed substitute, ENGINEER may require CONTRACTOR to furnish at CONTRACTOR's expense ~,dditional data about the proposed substitute, I I I 6, / ,2, If a specific means. method. technique. sequence or procedure of construction is indicated in or required by the Contract Documents. CONTRACTOR may furnish or utilize a ~,ubstitute means. method. sequence. technique or procedure of construction acceptable to ENGINEER. if CONTHACTOR submits sufficient information to allo\\" ENGINEER to determine that the substitute proposed is equivalent to that indicated or required by the Contract Documents. The procedure for review by ENGINEER will be similar to that provided in paragraph 6,7. 1 as applied by ENGI:'iEER and as may be supplemented in the Gen- eral Requirements. I I I I 6,/,], ENGINEER will be allowed a reasonable time within which to evaluate each proposed substitute. ENGI- NEER will be the sole judge of acceptability. and no substitute will be ordered. installed or utilized without ENGINEER's prior wrillen acceptance which will be evi- denced by either a Change Order or an approved Shop Drawing, OWNER may require CONTRACTOR to fur- nish at CONTRACTOR's expense a special performance guarantee or other surety with respect to any substitute. ENGINEER will record time required by ENGINEER and ENGINEER's consultants in evaluating substitutions proposed by CONTRACTOR and in making changes in the Contract Documents occasioned thereby, Whether or not ENGINEER accepts a proposed substitute. CON- TRACTOR shall reimburse OWNER for the charges of ENGINEER and ENGINEER's consultants for evaluat- ing each proposed substitute. I I I I I Concerning Subcontractors, Suppliers and Others: 6.8.1, CONTRACTOR shall not employ any Subcon- tractor. Supplier or other person or organization I including those acceptable to OWNER and ENGINEER as indi- cated in paragraph 6.8,2). whether initially or as a substi- tute. agai:tst whom OWNER or ENGINEER may ha\'e ._ reasonable: objection. CONTRACTOR shall not be required to employ any Subcontractor, Supplier or other person l'r organization to furnish or perform any of the Work against whom CONTRACTOR has reasonable objectil1n, 6,8,2, If the Supplementary Conditions require the identity 0:' certain Subcontractors. Suppliers nr other per- sons or organizations (including those who are to furnish the princi pal items of materials and equipment) to be sub- milled to OWNER in advance of the specified date pril'r to the Eff~ctive Date of the Agreement for acceptance: by I I I I I OWNER and ENGINEER and if CONTRACTOR has submitted a list thereof in accordance with the Supple- mentary Conditions. OWNER's or ENGINEER's accept- ance (either in writing or by failing to make written objec- tion thereto by the date indicated for acceptance or objec- tion in the bidding documents or the Contract Documents) of any such Subcontractor. Supplier or other person or organization so identified may be revoked on the basis of reasonable objection after due investigation, in which case CONTRACTOR shall submit an acceptable substitute. the Contract Price will be increased by the difference: in the cost occasioned by such substitution and an appropriate Change Order will be issued or Wrillen Amendment signed. No acceptance by OWNER or ENGINEER of any such Subcontractor. Supplier or other person or organization shall constitute a waiver of an" right of OWNER or ENGI- NEER to reject defecliI'e Work. 6.9, CONTRACTOR shall be fully responsible 10 OWNER and ENGINEER for all acts and omissions of the Subcon- tractors. Suppliers and other persons and organizations per- forming or furnishing any of the Work under a direct or indirect contract with CONTRACTOR just as CONTRAC- TOR is responsible for CONTRACTOR's own acts and omis- sions, Nothing in the Contract Documents shall create any contractual relationship between OWNER or ENGINEER and any such Subcontractor. Supplier or other person or organization. nor shall it create any obligation on the par. of OWNER or ENGINEER to payor to see to the payment of any moneys due any such Subcontractor. Supplier or other person or organization except as may otherwise be required by Laws and Regulations, 6. 10, The divisions and sections of the Specifications and the identifications of any Drawings shall not control CON- TRACTOR in dividing the Work among Subcontractors or Suppliers or delineating the Work to be performed by any specific trade, 6,11, All Work performed for CONTRACTOR by a Sub- contractor will be pursuant to an appropriate agreement between CONTRACTOR and the Subcontractor which spe- cifically binds the Subcontractor to the applicable terms and conditions of the Contract Documents for the benefit of OWNER and ENGINEER and contains waiver provisions as required by paragraph 5.11. CONTRACTOR shall pay each Subcontractor a just share of any insurance moneys received by CONTRACTOR on account of losses under pol- icies issued pursuant to pamgraphs 5,6 and ),7, Patent Fees and Royal/ies: 6.12. CONTRACTOR shall pay alllice:nse fees and roy- alties and assume ,III COSIS incident to the use in the perfor- mance of the Work or the incorporation in the Work of any invention. design. rrocess. producl or device which is the subje:ct of patent rights or copyrighls held by others. If a particular invention. design. process. product or device is specified in the Contract Documents for use in the: perfor- mance of the: Work and iftllthe actual knowledge of OWNER 15 I I or ENGINEER its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others. the existence of such rights shall be disclosed by OWNER in the Contract OclCuments. CONTRACTOR shall indemnify and hold hannlc:ss OWNER and ENGINEER and anyone directly or indimct1y employed by either of them from and against all claims. damages. losses and expenses (including anorneys' fees and court and arbitration costs) arising out of any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention. deSign. process. product or device not specified in the Contract Documents, and shall defend all such claims in connection with any alleged infringement of !;uch rights. I I I I I P~rmils: 6.13. Unless otherwise provided in the Supplementary Conditions. CONTRACTOR shall obtain and pay for all con. struction permit:, and licenses. OWNER shall assist CON- TRACTOR. whc n necessary, in obtaining such pennits and licenses. CONTRACTOR shall pay all governmental charges and inspection fC1:s necessary for the prosecution of the Work. which are applic~Lble at the time of opening of Bids. or if there are no Bids on the Effective Date of the Agreement. CON- TRACTOR shall pay all charges of utility owners for con- nections to the Work. and OWNER shall pay all charges of such utility ownc:rs for capital costs related thereto such as plant investment fees. I I I I lAws and R~gul.tuions: 6.14.1. CONTRACTOR shall give all notices and comply with all Laws and Regulations applicable to fur. nishing and pc:rformance of the Work. Except where oth- erwise expressly required by applicable Laws and Regu- lations. neither OWNER nor ENGINEER shall be respon- sible for monitoring CONTRACTOR's compliance with any Laws or Regulations. I I 6.14.2. If CONTRACTOR observes that the Specifi- cations or Drawings arc at variance with any Laws or Regulations. CONTRACTOR shall give ENGINEER prompt wrine:~ notice thereof. and any necessary changes will be authorized by one of the methods indicated in paragraph 3,4. If CONTRACTOR performs any Work knowing or having reason to know that it is contrary to such Laws OJ' Regulations. and without such notice to ENGINEER. CONTRACTOR shall bear all costs arising therefrom: however. it shall not be CONTRACTOR's pri- mary responsibility to make certain that the Specifications and Drawing! arc in accordance with such Laws and Regulations, I I I I Taz~s: 6.15. CONTRACTOR shall pay all sales, consumer. use and other similar taxes required to be paid by CONTRAC. TOR in accordance with the Laws and Regulations of the I I place of the Project which are applicable during the perfor- mance of the Work. Vs~ of Pnmis~s: 6.16. CONTRACTOR shall confine construction equip- ment. the storage of materials and equipment and the oper- ations of workers to the Project site and land and areas iden- tified in and permitted by the Contract Documents and other land and areas permitted by Laws and Regulations. rights- of-way. permits and easements. and shall not unreasonably encumber the premises with construction equipment or other materials or equipment. CONTRACTOR shall assume full responsibility for any damage to any such land or area. or to the owner or occupant thereof or of any land or areas contig- uous thereto. resulting from the perfonnance of the Work. Should any claim be made against OWNER or ENGINEER by any such owner or occupant because of the perfonnance of the Work. CONTRACTOR shall promptly attempt to settle with such other party by agreement or otherwise resolve the claim by arbitration or at law. CONTRACTOR shall. to the fullest extent permined by Laws and Regulations. indemnify and hold OWNER and ENGINEER harmless from and against all claims. damages. losses and expenses (including. but not limited to. fees of engineers. architects. attorneys and other professionals and court and arbitration costs) arising directly. indirectly or consequentially out of any action, legal or equi- table. brought by any such other party against OWNER or ENGINEER to the extent based on a claim arising out of CONTRACTOR's performance of the Work. 6.17. During the progress of the Work. CONTRACTOR shall keep the premises free from accumulations of waste materials. rubbish and other debris resulting from the Work. At the completion of the Work CONTRACTOR shall remove all waste materials. rubbish and debris from and about the premises as well as all tools. appliances. construction equip- ment and machinery. and surplus materials. and shall leave the site clean and ready for occupancy by OWNER. CON- TRACTOR shall restore to original condition all property not designated for alteration by the Contract Documents. 6.18. CONTRACTOR shall not load nor pennit any part of any structure to be loaded in any manner that will endanger the structure. nor shall CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures that will endanger it. R~cord DocumenlS: 6.19, CONTRACTOR shall maintain in a safe place at the site one record copy of all Drawings. Specifications. Addenda. Written Amendments. Change Orders. Work Directive Changes. Field Orders and written interpretations and clarifications (issued pursuant to paragraph 9.4) in good order and annotated to show all changes made during con- struction. These record documents together with all approved samples and a counterpan of all approved Shop Drawings will be available to ENGINEER for reference. Upon com- 16 I I ptetion of thl~ Work. these record documents. samples and Shop Drawings will be delivered to ENGINEER for OWNER. I Safety and Protection: 6.20. CONTRACTOR shall be responsible for initiating. maintaining and supervising all safety precautions and pro- grams in connection with the Work. CONTRACTOR shall take all nec(:ssary precautions for the safety of. and shall provide the necessary protection to prevent damage. injury or loss to: I I 6.20.1. all employees on the Work and other persons and organizations who may be atTected thereby: I 6.20.2. all the Work and materials' and equipment 10 be incorp:lrated therein. whether in storage on or off the site: and I 6.20.3. other property at the site or adjacent thereto. including trees. shrubs. lawns. walks. pavements. road- ways. stmctures. utilities and Underground Facilities not riesignatd for removal. relocation or replacement in the course of construction. I I CONTRAC~OR shall comply with all applicable Laws and Regulations of any public body having jurisdiction for the safety of per:ions or property or to protect them from damage, injury or 10:is: and shall erect and maintain all necessary safeguards ti)r such safety and protection, CONTRACTOR shall notify (owners of adjacent property and of Underground Facilities and utility owners when prosecution of the Work may affect them. and shall cooperate with them in the pro- tec~ion. removal. relocation and replacement ot' their prop- erty. .-\11 damage. injury or loss to any property referred to in paragrapt 6.20.2 or 6.20.3 caused. directly or indirectl~'. in whole or in part. by CONTRACTOR. any Subcontractor. Supplier or any other person or organization directly or indi- rectly employed by any of them to per1"orm or furnish any of the Work or anyone for whose acts any ofth~m may be liable. shall be rertll:died by CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of OWNER or ENGINEER or anyone employed b~1 either of them or anyone for whose acts eitha of them mal' be liable. and not attributable. directly or indi- rectly. in whok or in part. to the fault or negligence ofCO~- TR.-\CTORl. CONTRACTOR's duties and responsibilities for the safet~. and protection of the Work shall continue until such time a~ all the Work is completed and ENGI~EER has- issued a notice to OWNER and CONTRACTOR in accord- ance with paragraph 14.13 that the Work is acceptable (except as otherwis~: expressly provided in connection \\ ith Substan- tial Complelionl. I I I I I I I I 6.21. CONTRACTOR sh.1I1 designate a respt1nsible rep- resentative .\1 the site whose duty shall be the pre"entilln llf accidents. This person shall be CONTRACTOR's superin- tendent unlc:ss otherwise designated in writin~ by CO:"- TRACTOR 10 OWN ER. I I Emergencies: 6.22. In emergencies affecting the safety or protection of persons or the Work or property at the site or adjacent thereto. CONTRACTOR. without special instruction or authorization from ENGINEER or OWNER. is obligated 10 act to prevent threatened damage. injury or loss. CONTRACTOR shall give ENGINEER prompt written notice if CONTRACTOR believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. IfENGI- NEER determines that a change in the Contract Documents is required because of the action taken in response to an emergency. a Work Directive Change or Change Order will be issued to document the consequences or the changes or variations. Shop Drawings and Samples: 6.23, After checking and verifying all field measurements and after complying with applicable procedures specified in the General Requirements. CONTRACTOR shall submit to ENGINEER for review and approval in accordance with the accepted schedule of Shop Drawing submissions I see para-' graph :.9). or for other appropriate action if so indicated in the Supplementary Conditions. five copies I unless otherwise specified in the General Requirements I of all Shop Drawings. which will bear a stamp or specific written indication that CONTRACTOR has satisfied CONTRACTOR's responsi- bilities under the Contract Documents with respect to the review of the submission. All submissions will be identified as ENGINEER may require. The data shown on the Shop Drawings will be complete with respect to quantities. dimen- sions. specified performance and design criteria. materials and similar data to enable ENGINEER to review the infor- mation as required. 6.24. CONTRACTOR shall also submit to ENGINEER for review and approval with such promptness as to cause no delay in Work. all samples required by the Contract Doc- uments. All samples will have been checked by and accom- panied by a specific written indication that CONTRACTOR has satisfied CONTRACTOR's responsibilities under the Contract Documents with respect to the review of the sub- mission and will be identified clearly as 10 material. S4Pplier. pertinent data such as catalog numbers and the use for which intended. 6.:5.1. Before submission of each Shop Drawing or sample CONTRACTOR shall have determined and veri- fied all quantities. dimensions. specified performance cri- teria. installation requirements. materials. catalog num- bers and similar data ,,'ith respect thereto and reviewed or coordinated each Shop Drawing or sample with other Shop Drawings and samples and with the requirements of the Work and the Contract Documents. 6.25.2. Al the time llf each submission. CONTRAC- TOR shall give ENGIN EER specific written notice of each variation that the Shop Drawings or samples may have from the requirements llf the Cl10tract Documents. and. in addition. shall cause a specific notation to be made on 17 I I each Shop Drawing submitted to ENGINEER for review and approv.u of each such variation. I 6.26. ENGINEER will review and approve with reason- able promptness Shop Drawings and samples. but ENGI. NEER's review and approval will be only for conformance with the desig:11 concept of the Project and for compliance with the inforrnation given in the Contract Documents and shall not extend to means. methods. techniques. sequences or procedures of construction (except where a specific means. method. techmque, sequence or procedure of construction is indicated in 01" required by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the: assembly in which the item functions, CON. TRACTOR shall make corrections required by ENGINEER. and shall return the required number of corrected copies of Shop Drawin~, and submit as required new samples for review and approval. CONTRACTOR shall direct specific attention in writing to r~visions other than the corrections called for by ENGINEER on previous submittals, I I I I I 6.27. ENGINEER's review and approval of Shop Draw- ings or samples shall not relieve CONTRACTOR from responsibility for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called ENGINEER's attention to each such variation at the time of submission as required by paragraph 6.25.2 and ENGINEER has given written approval of each such varia- tion by a spec:tfic written notation thereof incorporated in or accompanyin~ the Shop Drawing or sample approval; nor wilJ any approval by ENGINEER relieve CONTRACTOR from responsibility for errors or omissions in the Shop Draw- ings or from rc:sponsibility for having complied with the pro- visions of pamgraph 6.25 .1. I I I I 6.28. Where a Shop Drawing or sample is required by the Specifications. any related Work performed prior to ENGI- NEER's review and approval of the pertinent submission will be the sole expense and responsibility of CONTRACTOR. I Conlinwng th,. Work: 6.29. CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with OWNER. No Work shall be delayed or postponed pend- ing resolution of any disputes or disagreements. except as permitted by paragraph 15.5 or as CONTRACTOR and OWNER may otherwise agree in writing. I I I I niUmnijit:aJit. In: 6.30. To the fullest extent permitted by Laws and Regu- lations CONTRACTOR shall indemnify and hold harmless OWNER and ENGINEER and their consultants. agents and employees from and against all claims. damages. losses and expenses. direct. indirect or consequential <including but not limited to fees and charges of engineers. architects. attorneys and other prctfessionals and court and arbitration costs) aris. ing out of or resulting from the performance of the Work. I I I provided that any such claim. damage. loss or expense tal is attributable to bodily injury. sickness. disease or death. or to injury to or destruction of tangible property (other than the Work itselO including the loss of use resulting therefrom and (b) is caused in whole or in pan by any negligent act or omission of CONTRACTOR. any Subcontractor. any person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable. regardless oj whether or not it is caused in pan by a pany indemnified hereunder or arises by or is imposed by Law and Regulations regardless of the negligence of any such pany. 6.31. In any and all claims against OWNER or ENGI- NEER or any of their consultants. agents or employees by any employee of CONTRACTOR. any Subcontractor. any person or organization directly or indirectly employed by any of them to perform orfumish any of the Work or anyone for whose acts any of them may be liable. the indemnification obligation under paragraph 6.30 shall not be limited in any way by any limitation on the amount or type of damages. compensation or benefits payable by or for CONTRACTOR or any such Subcontractor or other person or organization under workers' or workmen's compensation acts. disability benefit acts or other employee benefit acts. 6.32. The obligations of CONTRACTOR under para- graph 6.30 shall not extend to the liability of ENGINEER, ENGINEER's consultants. agents or employees arising out of the preparation or approval of maps, drawings. opinions. reports. surveys. Change Orders. designs or specifications. ARTICLE 7-OTHER WORK Reliued Work al Sue: 7.1. OWNER may perform other work related to the Proj- ect at the site by OWNER's own forces. have other work performed by utility owners or let other direct contracts therefor which shall contain General Conditions similar to these. If the fact that such other work is to be performed was not noted in the Contract Documents. written notice thereof will be given to CONTRACTOR prior to starting any such other work: and. if CONTRACTOR believes that such perfor- mance will involve additional expense to CONTRACTOR or requires additional time and the parties are unable to agree as to the extent thereof. CONTRACTOR may make a claim -- therefor as provided in Articles II and 12. 7.2, CONTRACTOR shall afford each utility owner and other contractor who is a party to such a direct contract (or OWNER. if OWNER is performing the additional work with OWNER's employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such work. and shall properly connect and coordinate the Work with theirs. CONTRACTOR shall do all cutting, fitting and patching of the Work that may be required to make its several pans come together properly and integrate with such other work. CON- 18 I I TRACTOR shall not endanger any work of others by cutting. excavating or otherwise altering their work and will only cut or alter their \/lark with the written consent of ENGINEER and the others whose work will be affected. The duties and responsibilitie'; of CONTRACTOR under this paragraph are for :he benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of CONTRACTOR in said direct contracts between OWN ER and such utility owners and other contractors. I I I 7.3. If any part of CONTRACTOR's Work depends for proper execution or results upon the work of any such other contractor or utility owner (or OWNER>. CONTRACTOR shall inspect cLOd promptly report to ENGINEER in writing any delays. dl~fects or deficiencies in such work that render it unavailable or unsuitable for such proper execution and results. CONTRACTOR's failure so to report will constitute an acceptance: of the other work as fit and proper for integra- tion with CONTRACTOR's Work except for latent or non- apparent defects and deficiencies in the other work. I I I Coordination: 7.4. If OWNER contracts with others for the perfor- mance of other work on the Project at the site. the person or organization who will have authority and responsibility for coordination of the activities among the various prime con- tractors will be identified in the Supplementary Conditions, and the specillc matters to be covered by such authority and responsibility will be itemized. and the extent of such author- ity and responsibilities will be provided. in the Supplementary Conditions. Unless otherwise provided in the Supplementary Conditions, neither OWNER nor ENGINEER shall have any authority or responsibility in respect of such coordination. I I I I ARTICLE S--OWNER'S RESPONSIBILITIES' I 8.1. OWNER shall issue all communications 10 CON- TRACTOR through ENGINEER. I 8.2. In case of termination of the employment of ENGI- NEER. OWNER shall appoint an engineer against whom CONTRACTOR makes no reasonable objection. whose sta- tus under the Contract Documents shall be that of the former ENGINEER. Any dispute in connection with such appoinl- ment shall be' subject to arbitration. I 8.3. OWNER shall furnish the data required of OWNER - under the Contract Documents promptly and shall make pay- ments to CONTRACTOR promptly after they are due as provided in paragraphs 14.4 and 14.13. I I 8.4. OWNER's duties in respect of providing lands and easements and providing engineering surveys to establish reference points are set forth in paragraphs 4.1 and 4.4. Para- graph 4.2 refers to OWNER's identifying and making avail- able to CON TRACTOR copies of reports of explorations and tests of subsurface conditions at the site and in existing struc- I I tures which have been utilized by ENGINEER in preparing the Drawings and Specifications. 8.5. OWNER's responsibilities in respect of purchasing and maintaining liability and property insurance are set forth in paragraphs 5.5 through 5.8. 8.6. OWNER is obligated to execute Change Orders as indicated in paragraph 10.4. 8.7. OWN ER's responsibility in respect of certain inspections. tests and approvals is set forth in paragraph 13.4. 8.8. In connection with OWNER's right to stop Work or suspend Work. see paragraphs 13.10 and 1).1. Paragraph 15.2 deals with OWNER's right to terminate services of CON- TRACTOR under certain circumstances. ARTICLE 9-ENGINEER'S STATUS DURING CONSTRUCTION Owner's Representative: 9,1. ENGINEER will be OWNER's representative dur- ing the construction period. The duties and responsibilities and the limitations of authority of ENGINEER as OWNER's representative during construction are set forth in tne Con- tract Documents and shall not be extended without written consent of OWNER and ENGINEER. Visits to Site: 9.2. ENGINEER will make visits to the site at intervals appropriate to the various stages of construction to observe the progress and quality of the executed Work and to deter- mine, in general. if the Work is proceeding in accordance with the Contract Documents. ENGINEER will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. ENGINEER's efforts will be directed toward providing for OWNER a greater degree of confidence that the completed Work will conform to the Contract Documents. On the basis ot' such visits and on-site observations as an experienced and qualified design profes- sional. ENGINEER will keep OWNER informed of the prog. ress of the Work and will endeavor to guard OWNER against defects and deficiencies in the Work. Project Representation: 9,3. If OWNER and ENGINEER agree, ENGINEER will furnish a Resident Project Representative 10 assist ENGINEER in observing the performance of the Work. The duties. responsibilities and limitations of authority of any such Resident Project Representative and assistants will be as provided in the Supplementary Conditions. If OWNER designates another agent to represent OWNER at Ihe site who is not ENGINEER's agent or employee. the duties. responsibilities and limit.llions of authority of such llther person will be as provided in the Supplementary Conditions. 19 I I ClarijiCllZions llIIod lnurpnUllions: 9.4. ENGINEER will issue with reasonable promptness such wrinen chrifications or interpretations of the require- ments of the Contract Documents (in the form of Drawings or otherwise) as ENGINEER may determine necessary. which shall be consistent with or reasonably inferable from the overall intent of the Contract Documents. If CONTRACTOR believes that a wrinen clarification or interpretation justifies an increase in the Contract Price or an extension of the Contract Time and the panies are unable to agree to the amount or cxtent thcreof. CONTRACTOR may make a claim therefor as providcd in Article II or Articlc 12. I I I I AlIlhoriud Variations in Work: 9.5. ENGINEER may authorize minor variations in the Work from the ll:quirements of the Contract Documcnts which do not involve an adjustment in thc Contract Price or the Contract Time 2.nd arc consistcnt with thc overall intcnt of the Contract Documents. These may be accomplished by a Ficld Order and will bc binding on OWNER. and also on CONTRACTOR who shall perform the Work involved promptly. If CONTRACTOR bclieves that a Field Order justifies an incrc ilSe in the Contract Price or an extension of thc Contract Time and the panies arc unable to agree as to the amount or e::tent thereof. CONTRACTOR may makc a claim therefor as providcd in Articlc II or 12. I I I I Rejecling DefecliJe Work: 9.6. ENGINEER will have authority to disapprove or rejcct Work which ENGINEER believes to be defective. and will also havc authority to require special inspcction orrcsting of the Work as provided in paragraph 13.9. whether or not the Work is fabril:ated. installed or completed. I I Shop Drawings, Clumge Orden and Payments: 9.7. In conncl:tion with ENGINEER's rcsponsibility for Shop Drawings 'lnd samplcs. see paragraphs 6.23 through 6.29 inclusivc. I I 9.8. In conncc:tion with ENGINEER's rcsponsibilities as to Change Orders. sec Anicles 10. I I and 12. 9.9. In conncc:tion with ENGINEER's responsibilities in rcspect of Appli~Ltions for Payment. etc.. see Article 14. I DetermilUllions for Unit Prices: 9.10. ENGINEER wiIJ determine the actual quantities and classification!, of Unit Price Work performed by CON- TRACTOR. ENGINEER will revicw with CONTRACTOR ENGINEER's pn~liminary detcrminations on such matters before rendering II writtcn decision thcreon (by recommen- dation of an Application for Paymcnt or otherwise). ENGI- NEER's written decisions thcreon will be final and binding upon OWNER and CONTRACTOR. unless. within ten days after the date of any such decision. either OWNER or CON- TRACTOR delivel.'S to the other pany to the Agreement and I I I I to ENGINJ;:ER writtcn notice of intention to appeal from such a decision. Decisions 011 Dispuus: 9.11. ENGINEER will be the initial intcrpreter of thc requircments of the Contract Documents and judge of thc acceptability of thc Work thereunder. Claims. disputcs and othcr matters relating to the acceptability of the Work or the interpretation of the rcquirements of thc Contract Documcnts penaining to the performance and furnishing of the Work and claims under Anicles II and 12 in rcspect of changes in the Contract Price or Contract Time will be rcfcrrcd initially to ENGINEER in writing with a request for a formal decision in accordance with this paragraph. which ENGINEER will render in writing within a reasonable time. Written notice of each such claim, dispute and other matter will be delivered by the claimant to ENGINEER and the other pany to the Agreement promptly (but in no event later than thiny days) after the occurrence of thc event giving rise thereto. and written supporting data will be submittcd to ENGINEER and the other pany within sixty days after such occurrence unless ENGINEER allows an additional period of time to ascenain more accurate data in support of the claim. 9.12. When functioning as interpreter and judge under paragraphs 9.10 and 9,11. ENGINEER will not show par- tiality to OWNER or CONTRACTOR and will not be liable in connection with any interpretation or dccision rendered in good faith in such capacity. The rendering of a decision by ENGINEER pursuant to paragraphs 9.10 and 9, I I with respect to any such claim. dispute or other matter (except any which have been waived by the making or acceptance of final pay- ment as provided in paragraph 14.16) will be a condition precedent to any exercise by OWNER or CONTRACTOR of such rights or remedies as either may otherwise havc under the Contract Documents or by Laws or Regulations in respect of any such claim. dispute or other matter. LinUuuions on ENGINEER's ResponsibiIilies: 9.13. Neither ENGINEER's authority to act under this Article 9 or elsewhere in the Contract Documents nor any decision made by ENGINEER in good faith cither to cxercise or not exercise such authority shall givc rise to any duty or responsibility of ENGINEER to CONTRACTOR. any Sub- contractor. any Supplier. or any other person or organization performing any of the Work. orto any surety for any of them. 9.14. Whenever in the Contract Documents the terms "as ordered". "as directed". "as required", "as allowed", "as approved" or terms of like effect or import are used. or the adjectives "reasonable". "suitable". "acceptable". "proper" or "satisfactory" or adjectives of like effect or import are used to describe a requirement. direction. review or judgment of ENGINEER as to the Work. it is intended that such requirement. direction. review or judgment will be solcly to evaluatc the Work for compliance with the Contract Docu- ments (unless there is a specific statement indicating other- wise), The use of any such term or adjective shall not be 20 I I effective to assign to ENGINEER any duty or authority to supervise or direct the furnishing or performance of the Work or any duty Dr authority to undertake responsibility contrary to the provis ions of paragraph 9. 15 or 9. 16. I 9.15. ENGINEER will not be responsible for CON. TRACTOR'~; means. methods. techniques, sequences or pro. cedures of cl)nstruction. or the safety precautions and pro- grams incidelll thereto. and ENGINEER will not be respon- sible for CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. I I 9.16. ENGINEER will not be responsible for the acts or omissions of CONTRACTOR or of any Subcontractor. any Supplier. or of any other person or organization performing or furnishing any of the Work. I I ARTICLE IO-CHANGES IN THE WORK I 10. I. Without invalidating the Agreement and without notice to any surety. OWNER may. at any time or from time to time, order additions. deletions or revisions in the Work: these will be authorized by a Written Amendment. a Change Order. or a Work Directive Change. Upon receipt of any such document, CONTRACTOR shall promptly proceed with the Work involved which will be performed under the applicable conditions of Ihe Contract Documents (except as otherwise specifically provided). I I I \0.2. If OWNER and CONTRACTOR are unable to agree as to the exte nt. if any. of an increase or decrease in the Contract Price or an extension or shortening of the Contract Time that shollld be allowed as a result of a Work Directive Change. a claim may be made therefor as provided in Article II or Article l:~. I I 10.3. CONTRACTOR shall not be entitled to an increase in the Contracl: Price or an extension of the Contract Time with respect to any Work performed that is not required by the Contract Documents as amended. modified and supple. mented as pro\ided in paragraphs 3.4 and 3.5, except in the case of an emo:rgency as provided in paragraph 6.22 and except in the case of uncovering Work as provided in para- graph 13.9. I I 10.4. OWN ER and CONTRACTOR shall execute appr('- _ priate Change Orders (Or Written Amendments) covering: I \004.1. c:langes in the Work which are ordered by OWNER pursuant to paragraph 10.1. are required because of acceptanc: of defectil'e Work under paragr.lph 13. I.~ or correcting ,It:(ecti,'e Work under paragraph 13.14. or are agreed to by the parties: I I 1004.2. changes in the Contract Price or Contract Time which are agreed to by the parties: and I 10.4.3. changes in the Contract Price or Contract Time which embody the substance of any written decision ren- dered by ENGINEER pursuant to paragraph 9.11: provided that. in lieu of executing any such Change Order. an appeal may be taken from any such decision in accordance with the provisions of the Contract Documents and applicable Laws and Regulations. but during any such appeal. CON- TRACTOR shall carry on the Work and adhere to the prog- ress schedule as provided in paragraph 6.29. 10.5. If notice of any change alTecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to. Contract Price or COnlract Timel is required by the provisions of any Bond to be given to a surety. the giving of any such notice will be CONTRAC- TOR's responsibility. and the amount of each applicable Bond will be adjusted accordingly. ARTICLE II-CHANGE OF CONTRACT PRICE 11.1. The Contract Price constitutes the total compen- sation (subject to authorized adjustments) payable to CON- TRACTOR for performing the Work. All duties. responsibil- ities and obligations assigned to or undertaken by CON. TRACTOR shall be at his cxpense without change in the Contract Price. 11,2. The Contract Price may only be changed by a Change Order or by a Written Amendment. Any claim for an increase or decrease in the Contract Price shall be based on wrillen notice delivered by the party making the claim to the other party and to ENGINEER promptly (but in no event laterthan thirtv days) after the occurrence of the event giving rise to the ~laim and stating the general nature of the claim. Notice of the amount of the claim with supporting data shall be delivered within sixty days after such occurrence I unless ENGINEER allows an additional period of time to ascertain more accurate data in support of the claim) and shall be accompanied by claimant's written statement that the amount claimed covers all known amounts (direct. indirect and con- sequential) to which the claimant is entitled as a result of the occurrence of said event. All claims for adjustment in the Contract Price shall be determined by ENGINEER in accor. dance with paragraph 9. II if OWNER and CONTRACTOR cannot otherwise agree on the amount involved. No claim for an adjustment in the Contract Price will be valid if not submitted in accordance with this paragraph 11.2. 11.3. The value of any Work covered by a Change Order or of anv claim for an increase or decrease in the Contract Price sh~1I be determined in one of the following ways: 11.3.1. Where the Work involved is covered by unit prices contained in the Contract Documents. by applica- tion of unit prices to the quantities of the items involved (subject to the provisions of paragraphs 11.9.1. through 11.9.3. inclusivel. 21 I I 11.3.2. By mutual acceptance of a lump sum (which may include an allowance for overhead and profit not necessarily in accordance with paragraph I 1.6.2.1), I 11.3.3. On the basis of the Cost of the Work (deter- mined as providec in paragraphs 11.4 and I 1.5) plus a CONTRACTOR's Fee for overhead and profit (deter- mined as provided in paragraphs 11.6 and 11.7). I I Cost of tIu Wor/c: 11.4. The term Cost of the Work means the sum of all costs necessar::ly incurred and paid by CONTRACTOR in the proper performance of the Work. Except as otherwise may be agreed to in writing by OWNER. such costs shall be in amounts no higher than those prevailing in the locality of the Project. shall include only the foIlowing items and shall not include any of the costs itemized in paragraph 11.5: I I I 11.4.1. Payroll costs for employees in the direct employ ofCONTRA,CTOR in the performance of the Work under schedules of job classifications agreed upon by OWNER and CONTRACTOR. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shaH include, but not be limited to, salaries and wages plus the cost of fringe benefits which shall include social security contributions. unemployment. excise and payroll taxes, workers' or workmen's compensation, health and retirement b~:nefits, bonuses, sick leave, vacation and hol- iday pay appLicable thereto. Such employees shall include superintendents and foremen at the site. The expenses of performing Work after regular working hours, on Satur- day, Sunday or legal holidays, shall be included in the above to the :xtent authorized by OWNER, I I I I 11.4,2. Cost of all materials and equipment furnished and incorporated in the Work. including costs of trans- ponation and storage thereof. and Suppliers' field services required in cC1nnection therewith. All cash discounts shall accrue to CONTRACTOR unless OWNER deposits funds with CONTRACTOR with which to make payments, in which case the cash discounts shall accrue to OWNER. All trade disc:ounts, rebates and refunds and all returns from sale of slJrplus materials and equipment shall accrue to OWNER. and CONTRACTOR shall make provisions so that they lTlay be obtained. I I I I 11.4.3. Payments made by CONTRACTOR to the Subcontractors for Work performed by Subcontractors. If required by OWNER. CONTRACTOR shall obtain competitive bids from Subcontractors acceptable to CON- TRACTOR and shall delivcr such bids to OWNER who wiIl then detennine. with the advice of ENGINEER. which bids will be al:cepted. If a subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work Plus a Fee, the Subcontractor's Cost of the Work shall be detennined in the same manner as CONTRAC- TOR's Cost of the Work. AIl subcontracts shall be subject I I I to the other provisions of the Contract Documcnts insofar as applicable. 11.4.4. Costs of special consultants (including but not limited to engineers. architects. testing laboratories. sur- vcyors, attorneys and accountants) employed for services specifically related to the Work. 11.4.5. Supplemental costs including the following: 11.4.5.1. The proportion of necessary transporta- tion, travel and subsistence expenses of CONTRAC- TOR's employees incurred in discharge of duties con- nected with the Work. 11.4.5.2. Cost. including transportation and main- tenance. of all matcrials. supplies. equipment. machin- ery. appliances. office and temporary facilities at the site and hand tools not owned by the workers. which are consumed in the performance of the Work. and cost less market value of such items used but not consumed which remain the property of CONTRACTOR. 11.4.5.3. Rentals of all construction equipment and machinery and the pans thereof whethcr rented from CONTRACTOR or others in accordance with rental agreements approved by OWNER with the advice of ENGINEER, and the costs of transportation. loading, unloading, installation. dismantling and removal thcreof-all in accordance with terms of said rental agreements. The rcntal of any such equipmcnt. machin- ery or pans shall cease when the use thereofis no longer necessary for the Wone 11.4.5.4. Sales. consumcr. use or similar taxes rclated to the Work. and for which CONTRACTOR is liable, imposed by Laws and Regulations. 11.4.5.5. Deposits lost for causes other than negli- gence of CONTRACTOR. any Subcontractor or any- one directly or indirectly employed by any of thcm or for whose acts any of them may be liable. and royalty payments and fees for pcrmits and licenses. 11.4.5.6. Losses and damages (and related expenses). not compensated by insurance or otherwise, to the Work or otherwise sustained by CONTRACTOR in connection with the performance and furnishing of the Work (except losses and damages within the deductible amounts of property insurance established by OWNER in accordance with paragraph 5.9), pro- vided they have resulted from causes other than the negligence of CONTRACTOR. any Subcontractor. or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of OWNER. No such losses, damages and expenses shall be included in the Cost of the Work for the purpose of determining CONTRAC- TOR's Fee. If. however. any such loss or damage 22 I I requires reconstruction and CONTRACTOR is placed in charge thereof. CONTRACTOR shall be paid for services a fee proportionate to that stated in paragraph 11.6.2. I 11.-1.5.7. The cost of ulilities. fuel and sanitary facilities at the site. I II A.5.8. Minor expenses such as telegrams. long distanl;e telephone calls. telephone service at the site, expressage and similar petty c:lsh ilems in connection Wllh the Work. I II A 5.9. Cost of premiums for additional Bonds and insurance required because of changes in the Work and pn~miums for property insurance coverage within the limils of the deductible amounts established by OWNER in accordance with paragraph 5.9. I I 11.5. The term Cost of the Work shall not include any of the following: I 11.5. I. Payroll costs and other compensation of CON. TRACTOR's officers. executives. principals (of partner- ship and !;ole proprietorships). general managers. engi- neers. architects. estimators. attorneys. auditors. accoun- tants. purchasing and contracting agents. expeditors. timekeepe :s. clerks and other personnel employed by CONTRACTOR whether at the site or in CONTRAC. TOR's principal or a branch office for general administra- tion of the Work and not specifically included in the agreed upon schedule of job classifications referred to in para- graph 11.4, I or specifically covered by paragraph I I A..+- all of which are to be considered administrative costs covered by the CONTRACTOR's Fee. I I I I 11.5.2. Expenses 0! CONTRACTOR's principal and branch offi:es other than CONTRACTOR's office at the site. I 11.5.3. .-\ny part of CONTRACTOR's capital expenses. including i/1terest on CONTRACTOR'S capital employed for the Wurk and charges against CONTRACTOR for delinquent Dayments. I 11.504. Cost of premiums for all Bonds and for all insurance \\'hether or not CONTRACTOR is required by the Contract Documents to purchase and maintain the same le;\:ce pt for the cost of premiums covered by sub. paragraph II A.5.9 above,. I I 11.5.5. Costs due to the negligem;e of CONTRAC- TOR. any Subcontractor. or anyone directly or indirectl,' employed b~' any of i;,.:m or for who~e acts any of them may be lianle ;r..:I'.ldin!; but notlimiled to. the correction of de.f<'< ,-.:,. ': 'ork. Jisposal (If materials or equipmenl wrongly ~HJ: ~,f ". ~ .....aking good any damage 10 prop- erty. I I 11.5.6. Other overhead or general expense costs llf any kind and the costs of any item not specifically and expressly in :Iuded in paragraph II A. I CONTRACTOR's Fu: 11.6. The CONTRACTOR's Fee allowed 10 CONTRAC- TOR for overhead and profit shall be determined as follows: 11.6.1. a mutually acceptable fixed fee: or if none can be agreed upon. 11.6.2. a fee based on the following percentages of the various portions of the Cost of the Work: 11.6.2.1. for costs incurred under paragraphs IIA.1 and IIA.2. the CONTRACTOR's Fee shall be fifteen percent: 11.6.2.2. for ccsts incurred under paragraph 11.4.3. the CONTRACTOR's Fee shall be f.ve percent: and if a subcontract is on the basis of Cost of the Work Plus a Fee, the maximum allowable to CONTRACTOR on account of overhead and profit of all Subcontractors shall be fifteen percent: 11.6,2.3. no fee shall be payable on the basis of costs itemized under paragraphs II AA. IlA.5 and 11.5: ] 1.6.2.4. the amount of credil to be allowed by CONTRACTOR to OWNER for any such change which results in a net decrease in cost will be the amount of the actual net decrease plus a deduction in CONTRAC- TOR's Fee by 3'1 amount equal to ten percent of the net decrease: and 11.6.2.5. when both additions and credits are involved in anyone change. the adjustment in CON- TRACTOR's Fee shall be computed on the basis of the net change in accordance with paragraphs 11.6.2.1 through 11.6.2.-1. inclusive. 11.7. Whenever the cost of any Work is to be determined pursuant to paragraph II A or 11.5. CONTRACTOR will submit in form acceptable to ENGINEER an itemized cost breakdown together with supporting data. Cash Allowances: 11.8. It is understood that CONTRACTOR has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be done by such Subcontractors or Suppliers and for such sums within the limit of the allowances as may be acceptable to ENGI- NEER. CONTRACTOR agrees that: 11.8.1. The allowances include the cost to CON- TRACTOR (Jess any applicable trade discounts) of mate- rials and equipment required by the allowances 10 be deliv- ered at the site. and all applicable taxes: and 11.8.2. CONTRACTOR's costs for unloading and handling on the site. lahor. installation costs. overhead. profit and other e.'(penscs contemplated for the allowances have been includcd in the Contract Price and not in the 23 I I allowances. No demand for additional payment on account of any then:of will be valid. I Prior to final payment, an appropriate Change Order will be issued as recommended by ENGINEER to reflect actual amounts due CONTRACTOR on account of Work covered by allowances, and the Contract Pric.e shall be correspond- ingly adjusted. I I Unit Price WOrl': I 1.9. I. 'r\'here the Contract Documents provide that all or part of the Work is to be Unit Price Work. initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the established unit prices for each separately identified item of Unit Price Work times the estimated quantity of each item as indi- cated in the Agreement. The estimated quantities of items of UOlt PriCI: Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quan- tities and classifications of Unit Price Work performed by CONTRAC:rOR will be made by ENGINEER in accor- dance with Paragraph 9.10. I I I I 11.9.1. E.ach unit price will be deemed to include an amount considered by CO~"'TRACTOR to be adequate to cover CONTRACTOR' s overhead and profit for each sep- arately identlfied item. I 11.9.3. Where the quantity of any item of Unit Price Work performed by CONTRACTOR differs materially and significantly from the estimated quantity of such item indicated in the Agreement and there is no corresponding adjustment \l,ith respect to any other item of Work and if CONTRACTOR believes that CONTRACTOR has incurred additional expense as a result thereof. CON- TRACTOR may make a claim for an increase in the Con- tract Price in accordance with Anicle II if the parties are unable to agn:e as to the amount of any such increase. I I I I ARTICLE I2--CHANGE OF CONTRACT TIME I 12.1. The Co::uract Time may onJy be changed by a Change Orc1er or a Writt.:n Amendment. Any claim for an extension or shortening of the Contract Time shall be based on written notice delivered by the party making the claim to the other party and to ENGINEER promptly (but in no event later than thirty days) after the occurrence of the event giving rise to the claim and sta,ting the general nature of the claim. Notice of the extent of the claim with supporting data shall be deliv- ered within sixty days after such occurrence (unless ENGI- NEER allows an additional period of time to ascertain more accurate data in support of the claim) and shall be accom- panied by the claimant's written statement that the adjust- ment claimed is the entire adjustment to which the claimant has reason to believe it is entitled as a result of the occurrence of said event. All claims for adjustment in the Contract Time I I I I shall be determined by ENGINEER in accordance with para- graph 9. I 1 if OWNER and CONTRACTOR cannot otherwise agree. No claim for an adjustment in the Contract Time will be valid if not submitted in accorc1ance with the requirements of this paragraph 12.1. 12.2. The Contract Time will be extended in an amount equal to time lost due to delays beyond the control of CON- TRACI'OR if a claim is made therefor as provided in para- graph 12.1. Such delays shall include. but not be limited to. acts or neglect by OWNER or others performing additional work as contemplated by Article 7, or to fires. floods. labor disputes. epidemics. abnormal weather conditions or acts of God. 12.3. All time limits stated in the Contract Documents are of the essence of the Agreement. The provisions of this Article 12 shall not exclude recovery for damages (including but not limited to fees and charges of engineers. architects. attorneys and other professionals and court and arbitration costs) for delay by either party. ARTICLE 13-W ARRANTY AND GUARANTEE; TESTS At"lD INSPECTIONS: CORREcnON, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK Wczmuuy and GlUUTIIIlee: 13.1. CONTRACTOR warrants and guarantees to OWNER and ENGINEER that all Work will be in accor- dance with the Contract Documents and will not be defective. Prompt notice of all defects shall be given to CONTRAC. TOR. All defective Work. whether or not in place. may be rejected. corrected or accepted as provided in this Article 13. Acca.s to Work: 13.2. ENGINEER and ENGINEER's representatives. other representatives of OWNER. testing agencies and gov- ernmental agencies with jurisdictional interests will have access to the Work at reasonable times for their observation. inspecting and testing. CONTRACTOR shall provide proper and safe conditions for such access. Tesu and Inspections: 13.3. CONTRACTOR shall give ENGINEER timely notice of readiness of the Work for all required inspections, tests or approvals, 13.4, If Laws or Regulations of any public body having jurisdiction require any Work (or part thereof) to specifically be inspected. tested or approved. CONTRACTOR shall assume full responsibility therefor, pay all costs in connection therewith and furnish ENGINEER the required certificates of inspection. testing or approval. CONTRACTOR shaH also 24 I I be responsible for and shall pay all costs in connection with any inspection or testing required in connection with OWN- ER's or ENGINEER's acceptance ofa Supplier of materials or equipment proposed to be incorporated in the Work. or of materials or equipment submitted for approval prior to CON. TRACTOR'; purchase thereoffor incorporation in the Work. The cost of ~lll inspections. tests and approvals in addition to the above which are required by the Contract Documents shall be paid by OWNER (unless otherwise specifiedl. I I I 13.5. All inspections. tests or approvals other than those required by Laws or Regulations of any public body having jurisdiction :;hall be performed by organizations acceptable to OWNER and CONTRACTOR (or by ENGI:-':EER if so specified). I I 13.6. If a.ny Work (including the work of others' that is to be inspectl~d. tested or approved is covered without written concurrence of ENGINEER. it must. if requested by ENGI- N EER. be ullcovered for observation. Such unco\'ering shall be at CONTRACTOR's expense unless CONTRACTOR has given ENGINEER timely notice ofCONTRACTOR's inten- tion to cover the same and ENGINEER has not acted with reasonable promptness in response to such notic~. I I 13.7. Neither observations by ENGINEER nor inspec. tions. tests 01' approvals by others shall relieve CONTRAC- TOR from CONTRACTOR's obligations to perform the Work in accordance: with the Contract Documents. I I Uncovering Work: 13.8. If any Work is covered contrary to the written request of ENGINEER. it must. if requested by ENGI~EER. be unco\'~red for ENGINEER's observation and replaced at CONTRACTOR's expense. I I 13.9. If ENGINEER considers it necessary or advisable that covered \Vork be observed by ENGINEER or inspected or tested by others. CONTRACTOR. at ENGINEER's request. shall uncover. expo~e or otherwise make available for obs~rvati(tn. inspection ~r testing as ENGI~EER may require. that portion of the Work in question. furnishing all necessary labor. material and equipment. If it is found that such \Vork is deff!cril'e. CONTRACTOR shall bear all direct. indirect and consequential costs of such uncovering. expo- sure. observalion. inspection and testing and of satisfactory reconstructior.. (including but not limited to fees and charges - of engineers. architects. attorneys and other professionalsl. and OWN ER shall be en!itl~d to an appropriate decrease in the Contract Price, aOlL if the panies are unable tl) agree as to the amount 1 hereof. ma~ make a claim therefor as provided in Article II. If. hlm e\'er. such W'lI'k is not fl'und III [Ie "e,ft'("rin'. CO 'TRACTOR ~hall be allowed an increase in the Cllntract F'n"... . " ..il .:\..:nsion of the Contra.:t Time. llr both. diret:tl~ attrll'ulabl.: Iv such uncovering. exposure. obsen'ation. insp.:ction. testing and reconstructilln: and. it' the parties arc: unable 10 agree as to the amount llr e.'oen! I I I I I I thereof. CONTRACTOR may make a claim theret'or as pro- vided in Articles II and 12. Owner May Stop the Work: 13.10. If the Work is defecril'e. or CONTRACTOR fails to supply sufficient skilled workers or suitable materials or equipment. or fails to furnish or perform the Work in such a way that the completed Work will conform to the Contract Documents. OWNER may order CONTRACTOR 10 S!oP the Work. or any portion thereof. un!ilthe cause for such order has been eliminated: however.. this right of OWN ER to SlOp the Work shall not give rise to any duty on the part of OWNER to exercise this right for the benefit of CONTRACTOR or any other party. CoTTtction or Removal of Defective Work: 13.11. Ifrequired by ENGINEER. CONTRACTOR shall promptly, as directed. either correct all defecril'e Work. whether or not fabricated. installed or completed. or. if the Work has been rejected by ENGINEER. remove it from the site and replace it with nondefecril'e Work. CONTRACTOR shaH bear all direct. indirec~ and consequential costs of such correction or removal (including but not limited to fees and charges of engineers. architects. attorneys and other profes- sionals) made necessary thereby. One Year Correction Period: 13.12. If within one year after the date of Substantial Completion or such longer period of time as may be pre- scribed by Laws or Regulations or by the terms of any appli- cable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents. any Work is found to be deferril'e, CONTRACTOR shall promptly. without cost to OWNER and in accordance with OWNER's written instructions. either correct such defecril'e Work. or. if it has been rejected by OWNER. remove it from the site and replace it with lIondefecril'" Work. If CONTRACTOR does not promptly comply with the terms of such instructions. or in an emergency where delay would cause serious risk of loss or damage. OWNER may have the defecril'f! Work cor- rected or the rejected Work removed and replaced. and all direct. indirect and consequ~ntial costs of such removal and replacement I including but not limited to fees and charges of engineers. architects, attorneys and other professionals) will be paid by CONTRACTOR. In special circumstances where a particular item of equipment is placed in continuous service before Substantial Completion of all th~ Work, the correction period for that item may start to run from an earlier date if so provided in the Specifications or by Written Amendment. Acceptance of Defective Work: 13.13. If. instead of requiring correction or removal and replacement of ,h//!cril'" Work. OWN ER land. prior to ENGIN EER's recommendation of final payment. also ENGINEERI prefers to accept it. OWNER may do so. CON- TRACTOR shall bear all direct. indirect and cunsequential :!5 I I costs attributlble to OWNER's evaluation of and determi- nation to accept such defectiv~ Work (such costs 10 be approved by ENGINEER as to reasonablcncss and to include but not be iimited to fees and charges of engineers. architects. attor- neys and other professionals). If any such acceptancc occurs prior to ENG1NEER's recommcndation of final paymcnt. a Changc Order will be issucd incorporating thc necessary revi- sions in thc Contract Documents with respect to thc Work: and OWNER shall be cntitlcd to an appropriate decrease in the Contract Price. and. if the panies arc unabic to agree as to the amount thereof. OWNER may make a claim therefor as provided in Anicle i I. If the acceptance occurs after such recommendation. an appropriate amount will be paid by CONTRACTOR to OWNER. I I I I I OWNER May Correct Defectiw Work: i3.I4. If CONTRACTOR faiis within a reasonabie time after written nmicc of ENGINEER to proceed to correct and to correct defective Work or to remove and replace rejected Work as rcquired by ENGINEER in accordancc with para- graph i3.II, or if CONTRACTOR faiis to perform the Work in accordance with the Contract Documents. or if CON- TRACTOR faiis to comply with any other provision of thc Contract Documents, OWNER may, after seven days' writ- ten notice to CONTRACTOR, correct and remedy any such deficicncy. In lexercising the rights and remedies under this paragraph OWNER shall proceed expeditiously. To the cxtent necessary to complete corrective and remedial action. OWNER may exclude CONTRACTOR from all or pan of the site. takc possession of all or pan of the Work, and suspend CON- TRACTOR's scrvices related thereto, take posscssion of CONTRACTOR's tools. appliances. construction equipment and machinery at the site and incorporate in the Work all materials and equipment stored at the sitc or for which OWNER has paid CONTRACTOR but which arc stored elscwhere. CONTRACTOR shali allow OWNER. OWNER's rcpresen- tatives. agcnts and employecs such access to the site as may be neccssary to enabie OWNER to excrcise .the rights and remedies undcr this paragraph. All direct. indirect and con- sequential cost) of OWNER in exercising such rights and remedies will be charged ap.inst CONTRACTOR in an amount approved as to reasonablcness by ENGINEER, and a Change Order will be iSliued incorporating the nccessary revisions in the Contract Documcnts with respect to the Work: and OWNER shall be entitled to an appropriate decrease in the Contract Price. and. if the partics are unablc to agree as to thc amount thereof. OWNER may make a claim therefor as provided in Article 11. Such direct. indirect and consequen- tial costs will include but not be limitcd to fees and Charges of engineers, architects. attorneys and other professionals, all court and arbitration costs and all costs of repair and rcplacement of work of others destroyed or damagcd by correction, removal or replacement of CONTRACTOR's defective Work. CONTRACTOR shall not be allowed an cxtension of the Contract Tune because of any delay in per- formancc of the Work attributable to the excrcise by OWNER ofOWNER's rights and remedies hereundcr. I I I I I I I I I I I I ARTICLEI~PAYMENTSTOCONTRACTORAND COMPLETION SCMtbde of Values: 14.1. Thc schedule of values cstablished as provided in paragraph 2.9 will serve as the basis for progress payments and will be incorporatcd into a form of Application for Pay. ment acceptablc to ENGINEER. Progress paymcnts on account of Unit Pricc Work will bc based on the number of units completed. Application for Progress Paymeru: 14.2. At ieast twenty days before each progress payment is scheduled (but not more often than once a monthl. CON- TRACTOR shall submit to ENGINEER for review an Appli. cation for Payment filled out and signed by CONTRACTOR covering the Work completed as of the date ofthe Application and accompanied by such supporting documentation as is required by the Contract Documents. If payment is requested on the basis of materials and equipmcnt not incorporatcd in the Work but delivered and suitably stored at the site or at another location agreed to in writing. the Application for Payment shall also be accompanied by a bill of sale. invoicc or other documentation warranting that OW1':lER has received' the matcrials and equipment free and clear of alllicns. chargcs, security interests and encumbrances (which are hcreinafter in thesc General Conditions referred to as "Liens") and evidence that the materials and equipment are covered by appropriate property insurancc and other arrangements to protect OWNER's interest therein. all of which will be sat- isfactory to OWNER. The amount of retainage with respect to progress payments will be as stipulated in the Agreement. CONTRACTOR's Warranty ofTiJJ.e: 14.3. CONTRACTOR warrants and guarantees that title to all Work. materials and equipment covered by any Appli- cation for Paymcnt. whether incorporated in the Project or nOlo will pass to OWNER no Iatcr than thc time of payment frec and clear of all Licns. Re.,iew of Appliaztions for Progress Paymeru: 14.4. ENGINEER will, within ten days after receipt of each Application for Payment. either indicate in writing a rccommcndation of payment and present the Application to ..OWNER. or rcturn the Application to CONTRACTOR indi- cating in writing ENGINEER's reasons for refusing to rec- ommend payment. In the lattcr case. CONTRACTOR may make the nccessary corrcctions and resubmit thc Applica- tion. Ten days aftcr presentation of thc Application for Pay- ment with ENGINEER's recommendation. the amount rec- ommendcd will (subjcct to thc provisions of the last scntcnce of paragraph 14.7) become due and when due will be paid by OWNER to CONTRACTOR. 14,.5. ENGINEER's rccommendation of any paymcnt requested in an Application for Payment will constitute a 26 I I representalion by ENGINEER to OWNER. based on ENGI- NEER's on-site observations of the Work in progress as an experienced and qualified design prOl'essional and on ENGI. NEER's rc:view of the Application for Payment and the accompanying data and schedules that the Work has pro- gressed to the point indicated: that. to the best of ENGI. N EER' s knowledge. information and belief. the quality of the Work !s in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion. to the results of any subsequent tests called for in the Contract Documents.' to a final determination of quantities and classifications for Unit Price Work under paragraph 9.10. and 10 any other qualifi. cations stat.~d in the recommendation): and that CONTRAC- TOR is entitled to payment of the amount recommended. However. by recommending any such payment ENGINEER will not thereby be deemed to have represented that exhaus- tive or continuous on-site inspections have been made to check the quality or the quantity of the Work beyond the responsibilities specifically assigned to ENGINEER in the Contract Documents or that there may not be other matters or issues between the parties that might entitle CONTRAC. TOR to be paid additionally by OWNER or OWNER to withhold payment to CONTRACTOR. I I I I I I I 14.6. ENGINE~R's recommendation of final payment will constiwte an additional representation by ENGINEER to OWNER that the conditions precedent to CONTRAC- TOR's beinE: entitled to final payment as set forth in paragraph 14.13 have been fulfilled. I 14.7. ENGINEER may refuse to recommend the whole or any part of any payment if. in ENGINEER's opinion. it would be incorrect to make such representations to OWNER. ENGINEER may also refuse to recommend any such pay- ment. or, bl~cause of subsequently discovered evidence or the results 01' subsequent inspections or tests. nullify any such payment previously recommended. to such extent as may be necessary in ENGINEER's opinion to protect OWNER from loss because: I I I 14.7.1. the Work is defec'i1'e. or completed Work has been darr..age~ requiring correction or replacement. I 14.7.2. the Contract Price has been reduced by Writ- ten Amer.dment or Change Order. I 14.7.3. OWNER has been required to correct de.fi'c. ,hoe Work or complete Work in accordance with paragraph 13.14. or I 14.7.4. of ENGINEER's actual knowledge of the occurrenc:e of any of the events enumerated in paragraphs 15.2.1 through 15.:!.9 inclusive. I OWNER mtty refuse to make payment of the full amount recommended by ENGIN EER because claims have been made against OWNER on account ofCONTRACTOR's per- formance or furnishing of the Work or Liens have been filed in connection with the Work or there are llther items entitling I I OWNER to a set-off against the amount recommended. but OWNER must give CONTRACTOR immediate written notice (with a copy to ENGINEER) stating the reasons for such action. SubstantiDJ Completion: 14.8. When CONTRACTOR considers the entire Work ready for its intended use CONTRACTOR shall notify OWNER and ENGINEER in writing that the entire Work is substantially complete (except for items specifically listed by CONTRACTOR as incomplete) and request that ENGI- NEER issue a certificate of Substantial Completion. Within a reasonable time thereafter, OWNER. CONTRACTOR and ENGINEER shall make an inspection of the Work to deter- mine the status of completion. If ENGINEER does not con- sider the Work substantially complete, ENGINEER will notify CONTRACTOR in writing giving the reasons therefor. If ENGINEER considers the Work substantially complete. ~NGINEER will prepare and deliver to OWNER a tentative certificate of Substantial Completion which shall fix the date of Substantial Completion. There shall be attached to the certificate a tentative list of items to be completed or cor. rected before final payment. OWNER shall have seven days after receipt of the tentative certificate during which 10 make written objection to ENGINEER as to any provisions of the certificate or attached list. If. after considering such objec- tions. ENGINEER concludes that the Work is not substan- tially complete. ENGINEER will within fourteen days after submission of the tentative certificate to OWNER notify CONTRACTOR in writing. stating the reasons therefor. If. after consideration of OWNER's objections. ENGINEER considers the Work substantially complete. ENGINEER will within said fourteen days execute and deliver to OWN ER and CONTRACTOR a definitive certificate of Substantial Completion (with a revised tentative list of items to be com. pleted or corrected) reflecting such changes from the tentative certificate as ENGINEER believes justified after consider- ation of any objections from OWNER. Atthe time of delivery of the tentative certificate of Substantial Completion ENGI. NEER will deliver to OWNER and CONTRACTOR a written recommendation as to division of responsibilities pending final payment between OWNER and CONTRACTOR with respect to security. operation. safety, maintenance. heat. utilities. insurance and warranties. Unless OWNER and CONTRACTOR agree otherwise in writing and so int'orm ENGINEER prior to ENGINEER's issuing the definitive certificate of Substantial Completion. ENGINEER's afore. said recommendation will be binding on OWNER and CON- TRACTOR until final payment. 14.9. OWNER shall have the right to exclude CON- TRACTOR from the Work after the date of Substantial Com. pletion. but OWNER shall allow CONTRACTOR reasonal'1le access to complete or correct items on the tentative list. PartilJi Uti/i:.JUion: 14.10. Use by OWN ER of any finished part of the Work. which has specifically b~~n identified in the Contract Docu. 27 I I ments. or which OWNER. ENGINEER and CONTRAC. TOR agrec constitutes a separately functioning and useable pan of the Work that can be used by OWNER without sig- nificant interfcrencc with CONTRACTOR's performancc of the remainder of the Work. may be accomplish cd prior to Substantial C Dmpletion of all the Work subject to the follow. ing: I I 14.10.1. OWNER at any time may request CON- TRACTOR in writing to permit OWNER to use any such pan of the Work which OWNER believes to be ready for its intende:d use and substantially complete. If CON. TRACTOR agrees. CONTRACTOR will certify to OWNER and ENGINEER that said pan of the Work is substantially complcte and request ENGINEER to issue a certificate of Substantial Completion for that pan of the Work. CON- TRACTOR at any time may notify OWNER and ENGI- NEER in .....riting that CONTRACTOR considers any such pan of the Work ready for its intended use and substan- tially complete and request ENGINEER to issue a certif- icatc of Substantial Completion for that pan of the Work. Within a reasonable time after either such request. OWNER. CONTRACTOR and ENGINEER shall make an inspec- tion of thaI: part of the Work to detcrmine its s.ams of completion. If ENGINEER does not consider that part of the Work tl) bc substantially complete. ENGINEER will notify OWNER and CONTRACTOR in writing giving the reasons the:refor. If ENGINEER considers that part of the Work to be substantially complete. the provisions of para- graphs 14.8 and 14.9 will apply with respect to ccrtification of SubstantJ.al Completion of that part of the Work and the division of responsibility in respect thereof and access thereto. I I I I I I I 14.10.1, OWNER may at any time request CON- TRACTOR in writing to permit OWNER to take over operation of any such part of the Work although it is not substantially complete. A copy of such request will be sent to ENGINEER and within a reasonable time there- after OWNER. CONTRACTOR and ENGINEER shall make an inspection of that pan of the Work to determine its status of ,:ompletion and will prepare a list of thc items remaining to be completed or corrected thereon before final paymer.lt. If CONTRACTOR does not object in writ- ing to OWNER and ENGINEER that such part of the Work is not ready for separate operation by OWNER. ENGINEER will finalize thc list of items to be completed or corrected and will deliver such list to OWNER and CONTRAC1~OR together with a written recommendation as to the division of responsibilities pending final payment between OWNER and CONTRACTOR with respect to security. opc:ration. safety. maintenance. utilities. insur- ance. warranties and guarantees for that part of the Work which will become binding upon OWNER and CON- TRACTOR at the time when OWNER takes over such operation (unless they shall have otherwise agreed in writ- ing and so informed ENGINEER). During such operation and prior to Substantial Completion of such part of the Work. OWNER shall allow CONTRACTOR reasonable access to complete or correct items on said list and to complete other related Work. I I I I I I I I 14.10.3. No occupancy or separate operation of part of the Work will be accomplished prior to compliance with the requirements of paragraph 5.15 in respect of propeny insurance, FinDllnspeClion: 14.11. Upon written notice from CONTRACTOR that the entire Work or an agreed portion thereof is complete. ENGI- NEER will make a final inspection with OWNER and CON- TRACTOR and wiU notify CONTRACTOR in writing of all paniculars in which this inspection reveals that the Work is incomplete or defective. CONTRACTOR shall immediatcly take such measures as are nccessary to remedy such defi. ciencies. F inDl Appii&aJion for Payment: 14.12. After CONTRACTOR has completed all such cor- rections to the satisfaction of ENGINEER and delivered all maintenance and operating instrUctions. schedules. guaran- tees. Bonds. certificates of inspection. marked-up record documents (as provided in paragraph 6.19) and other docu- ments-aJ1 as required by the Contract Documents. and after ENGINEER has indicated that the Work is acceptable (sub- ject to the provisions of paragraph 14.16). CONTRACTOR may make application for final payment following the pro- cedure for progress payments. The final Application for Pay- ment shall be accompanied by all documentation called for in the Contract Documents. together with complete and legally effective releases or waivers (satisfactory to OWNER) of all Liens arising out of or filed in connection with the Work. In lieu thereof and as approved by OWNER. CONTRACTOR may furnish receipts or releases in full: an affidavit of CON- TRACTOR that the releases and receipts include all labor, services. material and equipment for which a Lien could be filed. and that all payrolls. material and equipment bills. and other indebtedness connected with the Work for which OWNER or OWNER' s property might in any way be respon- siblc. have been paid or otherwise satisfied: and consent of the surety. if any. to final payment. If any Subcontractor or Supplier fails to furnish a release or receipt in full. CON- TRACTOR may furnish a Bond or othcr collateral satisfac- tory to OWNER to indemnify OWNER against any Lien. FilUll Payment and Acceptance: 14.13. If. on the basis of ENGINEER's observation of the Work during construction and final inspection. and - ENGINEER's review of the final Application for Payment and accompanying documentation--all as requircd by the Contract Documents. ENGINEER is satisfied that the Work has been completed and CONTRACTOR's other obligations under the Contract Documents have been fulfilled. ENGI- NEER will. within ten days after receipt of the final Appli- cation for Payment. indicate in writing ENGINEER's rec- ommendation of payment and present the Application to OWNER for payment. Thereupon ENGINEER will give written notice to OWNER and CONTRACTOR that the Work is acceptable subject to the provisions of paragraph 14.16. 28 I I Otherwise, ENGINEER will return the Application to CON. TRACTOR. indicating in writing the reasons for refusing to recommend final payment. in which case CONTRACTOR shall make the necessary corrections and resubmit the Appli- cation. Thiny days after presentation to OWNER of the Application and accompanying documentation. in appropri- ate form and substance. and with ENGINEER's recommen- dation and notice of acceptability. the amount recommended by ENGINEER will become due and will be paid by OWNER to CONTRACTOR. I I I 14.14. If. through no fault of CONTRACTOR. final com. pletion of the Work is significantly delayed and if ENGI- NEER so cC1nfirms. OWNER shall. upon receipt of CON- TRACTOR's final Application for Payment and recommen. dation of Er--'GINEER. and without terminating the Agree- ment. make::layment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by OWNER for Work not fully completed or corrected is less than the retainage stipulated in the Agree- ment. and if :Bonds have been furnished as required in para- graph 5.1. th,~ written consent of the surety to the payment of the balance due for that portion of the Work fully com- pleted and accepted shall be submitted by CONTRACTOR 10 ENGINEER with the Application for such payment. Such payment shall be made under the terms and conditions gov. erning final payment, except that it shall not constitute a waiver of daims. I I I I I Contractor's Continuing Obligalion: 14.15. CONTRACTOR's obligation to perform and com- plete the Work in accordance with the Contract Documents shall be absolute. Neither recommendation of any progress or final payml~nt by ENGINEER. nor the issuance of a cer- tificate of Sllbstantial Completion. nor any payment by OWNER to CONTRACTOR under the Contract Documents. nor any use or occupancy of the Work or any part thereof by OWNER. nor any act of acceptance by OWNER nor any failure to do so. nor any review and approval of a Shop Drawing or sample submission. nor the issuance of a notice of acceptability by ENGINEER pursuant to paragraph 14.13. nor any corre':tion of Jefecril'e Work by OWNER will con- stitute an acceptance of Work not in accordance with the Contract Documents or a release of CONTRACTOR's obli- gation to perform the Work in accordance with the Contract Documents (e xcept as provided in paragraph 14.16l. I I I I I lYai~'er of Claims: 14.16. The making and acceptance of final payment will canst Ilute: I 14. /6.1. a waiver of all claims by OWNER against CO~TRACTOR. except claims arising from unsetth:d Liens. frOlTl de.f('('rin' Work appearing after final inspec- lil10 pursualt to paragraph 14.llor from failure ll) compl~' with the Ce,ntract Ducuments or the terms of any special guarantc:es specified therein: however. it will nl)t consti- tute a wai"er hy OWN ER of any rights in resp,:cl lIt' I I I CONTRACTOR's continuing obligations under the Con- tract Documents; and 14.16.2. a waiver of all claims by CONTRACTOR against OWNER other than those previously made in writ- ing and still unsettled. ARTICLE I5-SUSPENSION OF WORK AND TERMINATION Owner May Suspend Work: 15.1. OWNER may. at any time and without cause, sus- pend the Work or any portion thereof for a period of not more than ninety days by notice in writing to CONTRACTOR and ENGINEER which will fix the date on which Work will be resumed. CONTRACTOR shall resume the Work on the date so fixed. CONTRACTOR shall be allowed an increase in lhe Contract Price or an extension of the Contract Time. or both. directly attributable to any' suspension if CONTRACTOR makes an approved claim therefor as provided in Articles II and 12. Owner May TermintlJe: 15.2. Upon the occurrence of anyone or more of the following events: 15.2.1. if CONTRACTOR commences a voluntary case under any chapter of the Bankruptcy Code (Title II. United Stales Code). as now or hereafter in effect. or if CON. TRACTOR takes any equivalent or similar action by filing a petition or otherwise under any other federal or state law in effect at such time relating 10 the bankruptcy or insolvency: 15.2.2. if a petition is filed against CONTRACTOR under any chapter of the Bankruptcy Code as now or hereafter in effect at the time of filing. or if a petition is filed seeking any such equivalent or similar relief against CONTRACTOR under any other federal or state law in effect at the time relating to bankruptcy or insolvenq~: 15.2.3. if CONTRACTOR makes a general assignmenl for the benefit of creditors: 15.2.4. if a trustee. receiver. cuslodian or agent of CONTRACTOR is appointed under applicable law or under contract. whose appointment or authority 10 take charge of property of CONTRACTOR is for the purpose of enforcing a Lien against such property or for the purpose of general administration of such propeny for the benefit ofCONTRACTOR's creditors: 15.2.5. if CONTRACTOR admits in wriling an inabil- ity to pay its debts generall~' as lhey become due: 15.2.6. if CONTRACTOR persistently fails to perform the Work in accordance with the Cuntract Documents ~9 I I (including. hut not limited to. failure to supply sufficient skilled worl:ers or suitable materials or equipment or failure to adhere to the progress schedule established under paragraph 2..9 as revised from time to time): I 15.2.7. i( CONTRACTOR disregards Laws or Regu- lations of any public body having jurisdiction: I 15.2.8. if CONTRACTOR disregards the authority of ENGINEER: or I 15.2.9. if' CONTRACTOR otherwise violates in any substantial way any provisions of the Contract Docu. ments: I OWNER may. after giving CONTRACTOR (and the surety. if there be one) seven days' written notice and to the extent permitted by Laws and Regulations. terminate the services of CONTRACTOR. exclude CONTRACTOR from the site and take possession of the Work and of all CONTRACTOR's tools. appliances. construction equipment and machinery at the site and use the same to the full extent they could be used by CONTRACTOR (without liability to CONTRACTOR for trespass or conversionl. incorporate in the Work all materials and equipment stored at the site or for which OWNER has paid CONTRACTOR but which are stored elsewhere. and finish the Work as OWNER may deem expedient. In such case CONTRACTOR shall not be entitled to receive any further payment until the Work is finished, If the unpaid balance of the Contract Price exceeds the direct. indirect and consequential costs of completing the Work (including but not limited to fel:s and charges of engineers. architects. attor- neys and other professionals and coun and arbitration coSts) such excess will be paid to CONTRACTOR. If such costs exceed such un:,aid balance. CONTRACTOR shall pay the difference to OWNER. Such costs incurred by OWNER will be approved as 10 reasonableness by ENGINEER and incor- porated in a Change Order. but when exercising any rights or remedies unde:r this paragraph OWNER shall not be required to obtain the lowest price for the Work performed. I I I I I I I I I 15.3. Where CONTRACTOR's services have been so terminated by OWNER. the termination will not affect any rights or remedies of OWNER against CONTRACTOR then existing or which may thereafter accrue. Any retention or payment of moneys due CONTRACTOR by OWNER will not release CONTRACTOR from liability. 15,4. Upon seven days' written notice to CONTRAC- TOR and ENGINEER. OWNER may. without cause and without prejudice to any other right or remedy. elect to aban- don the Work and terminate the Agreement. In such case, CONTRACTOR shall be paid for all Work executed and any expense sustained plus reasonable termination expenses. which wiJI include. but not be limited to, direct. indirect and con- sequential costs (including. but not limited to. fees and charges of engineers. architects. attorneys and other professionals and court and arbitration costs). COlllnlctor May Stop Work or Termintue: 15.5. If. through no act or fault of CONTRACTOR. the Work is suspended for a period of more than ninety days by OWNER or under an order of court or other public authority. or ENGINEER fails to act on any Application for Payment within thirty days after it is submitted. or OWNER fails for thiny days to pay CONTRACTOR any sum finally deter- mined to be due. then CONTRACTOR may. upon seven days' written notice to OWNER and ENGINEER. terminate the Agreement and recover from OWNER payment for all Work executed and any expense sustained plus reasonable termination expenses. In addition and in lieu of terminating the Agreement. if ENGINEER has failed to act on an Appli- cation for Payment or OWNER has failed to make any pay- ment as aforesaid. CONTRACTOR may upon seven days' written notice to OWNER and ENGINEER stop the Work until payment of all amounts then due. The provisions of this paragraph shall not relieve CONTRACTOR of the obligations under paragraph 6.29 to carry on the Work in accordance with the progress schedule and without delay during disputes and disagreements with OWNER. I . (The remainder of this page was left blank intentionally.] I I I 30 I I I I I I I I I I I I I I I I I I I ARTIC;:..E 16--ARBITRATION 16.1 All claims, disputes and other matters in question betyeen OWNER and CONTRACTOR arising out of, or relating to, the Contract Docu- ments or the breach thereof shall be decided under Georgia Lay in the Super:Lor Court of Richmond County, Georgia. (The remainder of this page was left blank intentionally.) 31 I I I I I I I I I I I I I I I I I I I (This page was left blank intentionally.) 32 I I ARTICLE 1.7-MISCELLANEOUS I Giving Notict: 17. I. Whenever any provtSlon of the Contract Docu- ments requi:ies the giving of written notice. it will be deemed to have been validly given if delivered in person to the indi- vidual or to a member of the firm or to an officer of the corporation for whom it is intended. or if delivered at or sent by registered or certified mail. postage prepaid. to the last business address known to the giver of the notice. I I CompUUllion of Time: 17.2.1. When any period of time is referred to in the Contract Documents by days. it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction. such day will be omitted from the computa- tion. I I 17.2.2. A calendar day of twenty-four hours measured from midnight to the next midnight shall constitute a day, I General: 17.3. Should OWNER or CONTRACTOR suffer injury or damage te, person or property because of any error. omis- I I I I I I I I I I I sion or act of the other party or of any of the other party's employees or agents or others for whose acts the other pany is legally liable. claim will be made in writing to the other party within a reasonable time of the first observance of such injury or damage. The provisions of this paragraph 17.3 shall not be construed as a substitute for or a waiver of the pro. visions of any applicable statute of limitations or repose. 17.4, The duties and obligations imposed by these Gen- eral Conditions and the rights and remedies available here- under to the parties hereto. and. in particular but without limitation. the warranties. guarantees and obligations imposed upon CONTRACTOR by paragraphs 6.30. 13. I. 13. I::!. 13.14. 14,3 and 15.::! and all of the rights and remedies available to OWNER and ENGINEER thereunder. are in addition 10, and are not to be construed in any way as a limitation of. any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations. by special warranty or guarantee or by other provisions of the Contract Documents. and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty. obliga- tion. right and remedy to which they apply. All representa- tions. warranties and guarantees made in the Contract Doc- uments will survive final payment and termination or com- pletion of the Agreement. 33 I I I I I I I I I I I I I I I I I I I SUPPLEMENTARY CONDITIONS 1.1 OWNER'S LIABILITY & PROPERTY INSURANCE: Section 5.5, 5.6, 5.7, 5.8, 5.9, 5.10 of the General Conditions shall be amended as follows: No additional liability or property insurance will be purchased by Augusta-Richmond County for this project. Current insurance coverages will remain in effect for the life of this Contract. 1.2 CONTRACTOR'S LIABILITY: As indicated under Section 5.3 of the General Conditions, the: Contractor's Liability Insurance shall be in an amount not les:s than $200,000 for injuries, including accidental death, to anyone person, and subject to the same limit for each person, in an amount not less than $500,000 on account of one accident, and: Contractor's Property Damage Insurance in an amount not les:s than $100,000 for all property damage sustained by anyone person in anyone accident; and a limit of liability of not les:s than $200,000 for any such damage sustained by two or more pez'sons in anyone accident. The Contractor shall either (1) require each of his subcontractors to procure and to maintain during the life of his, subcontract, Subcontractor's Liability and Property Damage Ins,urance of the type and in the same amounts as specif ied in the, preceding paragraph, or (2) insure the acti vi ties of his subcontractors in his own policy. 1.3 SPECIAL HAZARDS: The Contractor's and his Subcontractor's Liability and prclperty Damage Insurance shall provide adequate protection aga.inst the following special hazards: (a) Work within the right-of-ways of the Augusta-Richmond County Road System. (b) Work within easements granted by property owners in connection with the construction of the project. (c) Work in close proximity to existing water lines, power lines, telephone lines, gas lines, other utilities and private structures contiguous to the job site. SC-1 I I I I I I I I I I I I I I I I I I I 1.4 TESTING LABORATORY: All testing and laboratory work in connection therewith shall be performed by an independent firm and paid for by the Contractor. Copies of all test reports shall be forwarded to Auqusta-Richmond County Public Works. There will be no separate payment for this work. 1.!) SURVEYS: The Contractor will provide surveying for construction staking, horizontal control and vertical control as necessary. 1.6 PROGRESS PAYMENT: Section 14.2 of the General Conditions shall be amended as fo:Llows: The contractor may submit monthly estimate for work completed and materials properly stored as approved by the Engineer. When an estimate includes materials stored, a bill of sale, invoice or other documentation warranting that the Owner is receiving the material free and clear of all liens, charges, security interest and other encumbrances shall be attached to the payment request. 1. 7 ENGINEER: All references to "Engineer" shall be interpreted to mean thH Augusta-Richmond County Engineer, or his official designee. (References 4.3, 1.4, 3.2) 1.B UNDERGROUND UTILITIES: The Contractor shall coordinate with all utility companies through the "one call" method or other appropriate steps to lOGate and avoid damage to all utilities that may affect or be affected by the Contractor's work. (Reference 6.20) 1.9 SAFETY: The Contractor shall use certified flagmen, barricades and siqns as necessary to notify the public, in particular those persons driving in the vicinity of the project, of the construction and its affect on traffic. SC-2 I I I I I I I I I I I I I I I I I I I SECTION P PROPOSAL Date: b - 9 - C(S Gentlemen: In compliance with your invitation for bids dated ____I 19___1 the undersigned hereby proposes to furnish all labor, equipment, and materials, and to perform all work for ~le installation of streets, and appurtenances referred to herei:n as: Resurfacing Various Roads, Phase V Project Numbers: 57-8087-098 & 59-8087-098 in s~:rict accordance with the Contract Documents and in consideration of the amounts shown on the Bid Schedule attached heretc) and totaling: Orle ?l/Iod O/Ye IIvndred ddek&1'/ 7A ot../sClrld ;7;/Ye 4rtclrecl I I C::>O/ Sc?vf'/),fy hve :f //O?;- DOLLARS($ /) I /9) 97~-, 00 The undersigned hereby agrees that, upon written accep~:ance of this bid, he will within 10 days of receipt of such I'l.otice execute a formal contract agreement with the OWNER, and th.at he will provide the bond or guarantees required by the Contrclct Documents. The undersigned hereby agrees that, if contr2lct, he will commence the work within 10 days 2lfter the date of written notice to proceed, will c:omplete the work within 180 calendar days. The undersigned acknowledges receipt of the fOllo".ring addenda: awarded the calendar and that he Respectfully Submitted APAC-creoXQ Ir,c. (Name of Fi ) ) PO. Box //2.9 .4u'jtJ-S"4) Ga. (Business A~~~es lttr By: Ifl~^<___ . Title: D I v. Pres. P-l I I I I I I I I I I I I I I I I I I I RESURFACING VARIOUS ROADS, PHASE V PROJECT NUMBERS: 57-8087-098 & 59-8087-098 DETAILED ESTIMATE ITEM NO DESCRIPTION YCL D A PH N H, 402-0016 OR 2. INCL BITUM MATL RECYCLED ASPH CONC 402-1801 PATCHING. INCL BITUM MATL RECYCLED ASPH CONC 402-1811 LEVELING. INCL BITUM MATL UNIT QTY PRICE AMOUNT TON 17,000 C706S0.00 TON 900 5. . 00 5.500 TON 413-1000 BITUM TACK COAT MILL ASPH CONC PVMT, 432-5010 VARIABLE DEPTH GAL 22.000 SY 120.000 .(,o /3 lOO.OO /. /0 /32. 000.00 EACH 275 /t.5, Of) 611.-8140 GRADE EACH 90 1.5,00 / z..s0. 00 TOTAL CONTRACT / //9 976',00 P-2 J:; (1\ -f o (1\'" C73 ~O C~ 730 ~(I\ Z." 00 .....73 (1\ 73 -fm 73(1\ .....c 073 -f." ~ o ..... Z ~ l-'l lt lt lt lt ~ N N N N N N N - - - - - - - - - - lt CD ......, 0- U1 lt (.oJ N - o~ 0- U1 J:>, W N - 0 \0 CD ......, 0- U1 J:>, W N - 0 \0 J:>, :z tl ." "'0 ~ (Jl 0 (Jl 0 a ~ (Jl 1:....4 (j') ~ f) Z I Cl Z r ~ ~ ~ to 0 r Cl Z 0 ~ c: "0 VI 3 0 0 c: 0 c: c: 0 c: 0 c: c: ~ 0 ., 3 < ., 0 :::r :::r n 0- :::r e. ~ ?i. :::s ., 3 ~ :::s <' :::s ~ :::s )( ^ VI ~ u:l 0 0 ^ ., ~ e.. ~. ~ "0 0 0 0 u:l 0 "<>;. ~ ~ 0 :::s ~ 0 ~ 3 (Jl (Jl 0;, ~ ~ ., :::r 3 ~ :::r ~ ., ~ 0 :::s 0 e.. n 7:J u:l ., ~ ::; ~ ~ ~ -< :::s 0' 0 ~ 0 ~ 0 ~ 0 (j') ~ 0 0 !!.. 0 ~ u:l r :::s 0 "'0 < ., ~ 7:J a. ~ 0 ~ :::s ., ~ ., VI a Cl ~ ~ ., 0- Cl ~ 0 ~ a. ;:z: ~ ~ :::s ~ -< VI 0 7;) ~ ..... a. ., u:l (Jl n ., :::s ~ :)l.< Cl :::s ~ ~ Cl 7:J ., .:- :::s a. ..... ~ 7;) :::s ~ VI 7:J a. 0 ~a: ., r 0 ~ a. ., a. ~ " ., :::r 7:J 0 -< 0- ~ a. .m ~ :::s n ~ 7:J ;~~ ~ ~ a. ~ :~ ~~ 0;, ~ (Jl ~ Cl ~ 7:J ~ 0;, -f -f (j') ~ Cl ~ r (j') " ~ c C I (j') ~ 7:J 7;) ~ 0 s.. r:: c c 3' ~ c 0 c 0 r:: c c 0 ~ 0 0 ~ 0 e. e. -< I 3 ., ::r c.. 0 ., 0- 0'" ., C :::s :3 ;r:;- ., c x :::s :::s ., ::r ii ~ a. c ~ 3 a. 0 n 0 0 a. ::; ~. ~ a. n 0 ~ !!.. a. ~ ., ., .. :::s ~ n 0 0 a. 0 n n 0 0 :::s .,., 0 :::r :::s N 0 ~ 0 0 I , :::s ., 7:J 0- -< n n :::s :::s u:l 0 0 :::s 0 7;} (Jl (Jl U1 :::s ~ 0 0 7;) VI Cl r Cl ., a. ^ 0 0 I ~ ~ ., I a. ~ ~ I VI a. a. a. 0 c: ., 0 Cl 7;} ., ~ ., ~ ~ 7;} 7:J 0 ~ VI ~ ~ n ~ ~ :::s 0 ., ~ c :::s a. VI ~ n ~ ~ ~ 0 ~ ~ ~ :::r Cl a. a. :::r 0 0 0 7:J ., ., ~.. 0 ~ 0 0 ~ ~ ~ -< "'0 ~ ~ 0 ~ a. 0 0 ~~ 0 ~ ., 0 ~ ~ 0 r VI VI m ~ ., Cl c: 0 0 H m Cl H ., $ ~ n H VI ~. !i~r ~ 0 0 ~ m :::s x ~ ). ., :::s a. 0 ., :::r :::s ~ II :::s c: c: ~ -< , 0 m m ~ 0 ~ n 0 3 ~ 0 :::s :::s a. :::r a. :::s ~ c: 7;} ~ :::s ~ I ~ m a. :::s :::s ~ ~ ~ 0 !!.. ~ Z u:l u:l I a. :::s 0 ~ a. a. ., ~ Cl 3 0 ., a. :::r 0 ., a. ~ u:l 0 I :::s VI 0 c: VI ., 0 :::s VI ~ ~ I ~ VI a. ~ :::s 0 ~ ~ H o' (Jl a. ~ ~ I VI 0;, Cl c: 0 n ~ :::s :::s c: n :::s ~ 7:J n VI 0 <' ., ,. n ~ c: a. I ~ ~ (Jl a. I ~ " 0 n a. ,. :::s 7;) a. ~ ~ 0 n a. 0 a. u:l ~ 0 ., 0 < ~ ~ :::s ..... a. :::s VI :::s ~ ~ , 7:J ;..: 0 , 0 VI ~ 3 VI I :::s n a. ~ VI 0 H 0 0 n ~ ~ :::s n " :::s ~ n 0 ~ ~ :::s :;.~ ., VI ~ ~ n ..... ~t':.i. 0 :::s :~ N N N N W :it:: - - - - - - - - ~,.:~. J:>, 0 N U1 N U1 U1 U1 N 0- - N 0- 0- 0- - N ...., ...., ::i1 - N ...., N \0 - U1 U1 0 0 0 0 0 0 0 0 0 0 U1 0 0 U1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 :~:~ .~~ :Q N N N N N N W W N W W N N N - N N N N :.~ 0 ...., ...., ......, ...., ...., 0 0 J:>, 0 0 CX) J:>, CD CD N 0 N .::. :~ ~:F w a- J:>, - N N 0- U1 - W 0- J:>, U1 N - W N .::. \0 - N :(Ii - 0 CX) N U1 CX) U1 0 0 0 U1 N 0- CD J:>, - 0 CX) N 0- 0 0 (.oJ 0 N N ::< .::. a- N CX) a- ...., (.oJ 0 0 0 0 0 ......, U1 0 0 0 ...., 0 \0 \0 U1 .::. 0 0 0 ::'0-: 0 0 U1 U1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ;."'!! .~~ . - a;. i:c.I~: .::. - .::. - N - N U1 J:>, CD N J:>, N N if f :~ ~~: ~~ :- ~~ - - N - U1 N N :!C:: "'-; "(fl ,)I.:; :_-~ :-=?5 m: It ~ ~t H It It N Nk. z ~ ~ ~ ~ ~ w w w W tAl W W W W N U1 ~ W N ~ 0 \0 CO ....., 0- U1 .to. w N - 0 \0 CO ....., ~~t Cl - W H ~iO n ~ j' H -l m Z (') (') (') r ~ -0 Z ?:- (') (') OJ (j) I (') (j) H 0 (j) (j) 0 Q Q Q C ;;, ~ -+ ~ ~ ~ Q' Q ;;, ". Q .., .., .., .., 3 OJ ~ OJ Q 3 < e... "'0 ." < ~ ii". I 3: 3 3 3 ~ :E ~ -+ "'0 Q ~ Q -+ ~ n ~ .., -+ 3 : . H ~ ~ .., I Q .., -+ .., 0 Q ~ ;;, 0 r n n n -+ 0 c -+ 0 ~ ~ :E -+ c:: ~I~ -0 ~ ~ ~ ;;, ;;, ~ Q ~ Cl r 0 (') 0 .., .... -+ n III H ;;, Q Q Q 7:J ;;, 0 ;;, 7:J -< I 0 Q .., III .., ~ :- !!.. !!.. ~ -+ Z (1) c.. 7:J :E 7:J c.. 7:J ~ .., Cl (j) (1) Cl III .,::.; c.. -+ III -+3: (j) Cl (') m 'J;} c.. 7:J c.. 0.. U) .., -+ .., .., -+ X 0.. 0.. ~ !) Cl Cl:~ -+ -+ .., ''OJ; III .., .., Cl 'I .., -0 n C"\ I Cl (j) ?:- C"\ (Jl ." ~ ~ B ~ ~ ~ ~ ~ ~I ;;, Q Q ~ ~ p (1) p e. ~ ~ C Q P (1) .., .., Q < OJ ;;, < .., Q 3' ." ;;, ;;, 3' ;;, . 3 3 Q -+ Q ~ ~;~; I ;;, ;;, Q C ;;, 0- :T :T ". ~ !!.. 0.. 0.. ~ U1 III ., (1) III III III III 0 n n 0- ;;, -+ ., ;;, c ;;, :;' ., 0.. 0 0 o :'.';1 :T :T OJ Q 0 0 Q .... U) U) Cl n ., .., Cl ;;, t,~~ 0 Q Q -+ .., ~ ;;, ;;, :T .... -+ -+ (j) .., .., .., ~..:..; :E !!.. (1) 0 0.. 7:J 7:J 7:J 0 0 "'0 ~ (j) U\ ~~ilti 'J;} Cl ;;, ;;, -+ "'0 "'0 -+ Cl U) 0.. 0.. 0.. .., 0 III 0 C :"J,':~ 7:J 'J;} 7:J (1) 0.. ., -+ .., ., ~ 7:J 7:J ;;, -< /:i!(: 0.. c.. 0.. Q -+ -+ -+ -+ -+ 0.. 0.. U) 3: Cl ;;, ;;, Cl -+f,.:H. -+ -+ 0.. 'J;} 0 0 0 0 0 III U) U) ~ o ..., -+ 0.. -+ -+ 0 ., Q ~_. 0 0 0 m Z CJ Cl U\ ~ 0 0 'J;} ;;, 7:J 7:J '.;;;' -+ 0.. (') :1' Cl Z H 0.. n 0.. 0.. CJ ;;, ;;, ~ ~ ;;, Cl -0 .., 0 ., i1 . ~ ~ 0.. -+ OJ 0 0 OJ -+ 0 -+ H -+ -+ m -< '.' 0 0 OJ (1) 0 0.. 0.. 0 .., ~ ., 0 ~ ;;, 0 0 ;;, ~ ;. 0.. 0.. .., .., .., (1) 0 ., .... 0.. -+ .' 0 -+ m m -+ ~ 0.. B .... < Cl Cl e... :; m .., III 0 ;;, ;;, 0 iii' ~ m -+ ~ ;;, 7:J m c Cl .., ~ (1) (') ~. ;;, ;;, 0 n ;;, 0.. 0.. ~ 0 0 ;;, Q ;;, 0.. 0.. ;;, -+ 7:J 7:J 0.. Xl .., 0.. 0.. -+~ 0.. ". (1) 'J;} 0 0.. 0.. 0 ~ III m m ;;, 0 ., III ' I 0.. ;;, ;;, . . 0.. .. , (j) Cl c.. c.. , l "'0 .., . .., ;;, U) l III 'J;} 0.. ~ N N .. ''; - - .... .... .... .... (3 .... I~"i ....., w ....., 0 ....., ....., \0 ....., ....., U1 U1 U1 0- 0- 0- \0 0 -r. 0- N 0 0- U1 0- 0 U1 0 U1 U1 \0 W N 0- 0 0 0 :~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 :~!:: :~ tAl N N N W W N W N N N N N N W W N N I~~ 0 ......, ....., ....., 0 0 0- 0 N 0- 0- CO .to. \0 0 0 .to. ....., .. ;;jif: U1 N W N U1 U1 N U1 0- .... .... .to. N U1 N N N 0- :~ CO \0 .... .... 0 CO CO 0- CO CO U1 U1 \0 ....., N N 0 .to. 0 or... ......, 0- 0 CO 0 .to. ....., 0 .to. 0 \0 \0 U1 U1 N 0 0 0 0 :~~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ::::i:.~ N U1 N .... .to. N W I.~ : ~' lJ. . '<i~ I~ .to. N - .... ~:I 1;';: .g . f-~.' . Z-ry ". ZH ". ". ". ".". ". ". NN.-_.-.-.-.-.-.--.-\O -....I "'U1~"'''' O-O\O~-....I~U1~WN-O ~ ~ WN H <""l ~ -i mroor~<<r<<""l~<r~~~~mz~ ~ 0 0 0 0 =s <: <: ~ <: ~ n <: 0 0 ~ 0 <' = _. , ^ ^ c 3 -+ 5' , ~ , =s :r :r c ^ , =s ~ iii' =s 0 ~ ~ cr 0 :r -+ ~. ~. -+ - =+ ' ~ ' III -+ 0 H3C7-,0~:r~:r,~=s0,~......~~:ra.. ~ - -+ 0 ~ - 0 ~ ro' ~~'-+ -+_ ~~~~,,-+~~ r=s ~-+ ~~ ~~~~-+<<a..o -+-+ z-+ ~ ;0-+0 o<-+~ ~~~~ C7 ~ a.. , , ~ -+ < ~ ~ , 0 0 ~ ~ <""l ;0;0 , -+ a.. a.. ~~~I~~II~~~~~~~~~~~Q~~ ^:::::I 0 0 , ., ~ (\) 0 lO =s ., ., :::::I 0 0 0 0 0 :r l:~" (\) (\) -:E -. -. 0 0 :::::I :r -+ _. -. -+ c ^ :::::I =s -"'"' l!ili. -+ a.. ^ lO lO , , -+ _ lO lO =s (\) a.. c -+ c:; III Illlli 0' ~ III :r:ra..a..~ 0 ci :r:rci -+' ~3 0 ......-+.1., -~=s~itit~~~=S-itit-~~o~=S~-+: r- 3 O-+crcr<<oa..~crcr~<<'=S:Ea..o:. H ~;o,-+oo~~=s~<oo<~~"'-+o \Ot~ (/'I ~ a.. -+ 0 ' , -+ -+ 0 < ~ , , ~ -+ -+ ~ -+ ~ ~ -+ . l' -f 0-+0 0000-+~-+00-+00,0 ~:rl' a.. 0 m:E;o~(j)"'Oo -+0 ;o~o ~~~ ~(j-+III,,'i 0 -+ I =s 0 a.. a.. "'C ~ Z 0 < a.. a.. < c ~ -+ r 0 -+ ;t.. o 0 a.. c:: -+ -+ ~ =s ~ -i ~ -+ -+ :;;: lO 3 (j :r 0 :':. ." ~ = ~ 0 0 = a.. :E ' -. 0 0 -. c 0 ~ =s ~ " C .,.. ~ ~ =s m <""l 3!!.. 0 lO <""l <""l lO III =s ~ -+ ~ ~" ,., a.. 0 -+ "'0 c :r :r -+ 0 ~ - " . .,.. 0 I O=sc=soo"'C-+~~-+o~-+ I~: ,., :E~ ,a..,< =s< 1II=s=sIll....-+-+ <a..;,: tD"""- 0- ~ ~~cr-+-+cr- 0 <::lO. - 0;0 ~<~3-+ocicio< 3 e...~ t. ~O a.. a.. ~ a.. ~ ' - - , ~ ^;o' . Z 'fA o =s 0 ~ ~ 0 ~ ~ a.. \I' , -+ ~<<;o , 0'" a..~~a.. ~ ~ HO < < (/'I .,.. ~ a.. -t ,., "J:}"XJ Hm ~~ - "J:) o ." ~ .... ~ o :m , ~ n ~_.- ~- U1 .- _ N~ 1m H U1NU1~~W~N~NU1\OO~U1~WW.-N-....I~ Z ~OWNO~-ooowO~W.-~O~OON~ ooooooOOOOOOOOOOOOOOOI~: <i' '$ ~ l~ ~ ;0 NNNNNN~NW~NNNNNWWWW~~~ OO~-....I~~~-~O~-....I~~U1~OOONW~~ ,lit" - N N N ;il!~ U1 W .- U1 .- .- 0 W .- ~ .- N W N .- ~ - .- -....I 0 :ti) OU1~O~O\O-....IWO~~.-W~OOON~_ ~ OOO~U1U10U1U1000~O~ooo~o ~ oooooo0000000U1U1000~O - - .- ~ ~ ~N.- U1 N W'-~U1~NW\O~W'-~ -N\O - - - o N Ci)NWo'- .-~ E-'1 -51 \ \ Q \~ Its I , I ~ l :~ '"0 C) )> r- (I) r"iJ (') --j () -~ ..::.- ~ ::0 > CD r ,." ~ ~ ::0 > tD r ,." ~ o - ....... en ~ ~ ." ~ ~ (") o z (") ~ ~ . ~ t '" ~ I ~ I a ( ~ I R- I j I ~ I :! CO) I I U z o M ::0 .. ~ CD "U Z -< ~ rrr -I (") ~ :r: I V'l ,..,., - -i "'z Z f"T1 C) CJ Zn.,." "'C C) f<o.- ):> - '< Zr rrt f"T1 f"T1 ~ f"T1 < 1"'"1 AI f"T1 Z . r -i - I Z "'C C) ~ -I (') o _I. CD ,- f'T1 ~ rrt -0 ,- ); ~ (") 0 f"T1 ::0 o f'T1 :l> (/) (j) ~ ~ o (') ::::tl f'T1 f"T1 (") -I f"T1 o - I I JQ / jjj :l I 5 I "- " Z-Sl ~ ,.., ::l:I ;t ~ \ I \ I \ I Y ~ I~ I ::;2 ''''0 (") )> r- (f) Pl ("') ---1 () -7 ""- ~ ;0 s> CD r- fTI ~ s> CD r- fTI ~ - o - ~ ~ "1:1 ~ .... (') o ::z: (') ::a ~ . ~ ~ ~ I ~ I S I ~ I R- I i I ~ I ~ I Z o M ;0 .. ~ co-o Z ~~ I'T'I -l(} ~ ::r::r: (/) ,...., - -i "'2 Z I'Tl C) C") Zn,.. "'0 C),.. )> - < Zr f'T'1 I'Tl f"'T1 ~ fT'1 < f'T'1 ::01'Tl Z . r -i - I Z "'0 C) ~ -l () o .'I. CD r fT'1 ~ I'T'I u r ~ ~ (') 0 I'Tl ;0 o f'T'1 )> ~ (j) ;0 ~ o () ::0 f'T'1 f"'T1 (') -l I'Tl o ~ ~ S3 :> ::a ~ I I I \ \ I ~u".~(::7 - I D-? ~ cI I I I' I I I ~~ ;N~ECTOR ~ I I I OI.D AlcDUJ:1:1~ --- -. D-3 " ~ ~J WRIGHTSBORO RD. . . 'I . I 1 I I I -r~ 1'~ ~ ~~ ~ C'l. ~ ~ ~~ \~q. ".... C). RD.. . I I I L - ~VIS RD. 6 .,.o~cco RD. PHINIZ'f RD. G''2,. "~ ~ 1><;? C"l S; 3 o % ~ ? I I . -- o 7 I 1 I I I 1 I I I I I 1 I 1 I 1 I .,"0 Js-,y~O~~1-l ~ 'Yo~~"fr '} { C'~ ,,~ :J J .!!J R ?i ~ SNOWDEN ~ 14 o 8 /> o 10 n o .- '" ~ :tI o :I: ?;j o ~ I I I I I . . <.. c: ~ .> ~ ~ VA./L DR. !C r- 0 0 TRD1'rD?S 0 t;-" ^ o IVAY 0 8' ;0 PtpPfRIDG( ;0 ~ DR. D 11 f?A.c~ c OUI!s 1 e: RD. I 1 ~ 1 1 ~v:. ~~ ~~~ o~ ~'? . ~~ . MONCRIUT ST. Vl ~ o ~ <:Ass tLL VI :-I aO'\1(IN RD. :!) '" 6 " ~ BASsw -< DR. 0-12 /' /' /' /' /' /' /' ::0 o 1 1 o ? . ~- 1 C~~S1(H OR. 'll~ o 14 I - o 15 BROWN RD. 1 " 1 I 1 I I I / 1 1_- 0-16 - I I I , 0-17 ~ z I I I I I I I I I I 1 I I 1 I I I 1 1 ci a:: ?i % ~ ~ VI PHIN\ZY RO. "10Sf>.CCO RQ. e 3 o % :;0 ? -------- D-19 / S / / / / / / CZl AVE. f z ~ M c:.ANALl. Y ST. MUt.HcRIN :z: o 6 ,." (Jl :z ;-I cr. ~ AVE. . AVE'. o 20 I I -I 1'1 I I I I I I / I I / / / / / . . 0-21 -~,,~~~ -' "" = ~ ~- s\-'lV' ...,..-; ~rr-. v..\~G. Ou 11 .\ rr-\)~ .,\\""~~ .--- ~ :r ,.., Z ,.., Vl C- o 4\1f. :r A\It, z VI ;0 0 ST. ROOSEVELT - DR. ;0 p DR. o 23 I Ul ~ ----- -- - - I\PARIS ST. iLl: :I J~..._ ~...,~Vil.Lf . !:If' I I I I 1 I 1 I I I I I I I 1 I I I 1 OR. !: o ER ST. I 1 1 I 1 1 I 1 1 I I 1 1 I 1 I I I 1 RESURFACING VARIOUS ROADS, PHASE V GENERAL NOTES ADJUs'rING MINOR STRUCTURES TO GRADE: 'rhis item consists of raising or lowering the upper portion of ,existing manholes, water valve boxes, lamp holes, gas valve 'boxes or any other miscellaneous structures wi thin the area of construction. There will be no separate payment for this work unless shown as a separate pay item. ASPHALT RAISED EDGE: Payment for asphalt raised edge is to be included in the price bid for Asphalt Concrete "H". COMPA.CTION: All compaction shall be as defined in the current edition of Georgia Department of Transportation Specifications. Special attention shall be given to the backfill of minor structures (pipe, box culverts, manholes, catch basins, drop inlets, etc.). Compaction shall be achieved using approved tamps and soil layers of approximately 6 inches (loose measure) and in accordance with Georgia Department of Transportation Standards 1030-D and 1401. BaCkfilling operations of this nature shall not begin until the Contractor has on hand all equipment in good working condition, and competent operators. The backfilling of pipe and other minor structures shall be in accordance with Georgia Department of Transportation Standard Specifications, Current Edition. Backfilling with sand using jetting and/or flooding will not be allowed in any case without the written permission of the Engineer. CONCRETE: The Contractor shall have a slump cone on the project at all times when concrete is being placed. He shall, in the Engineer'S presence, perform slump tests as directed by the Engineer. Tests shall be performed by qualified personnel with a properly cleaned slump cone. Allowable slumps are 2" minimum and 4" maximum. Class "A" concrete shall have a minimum of 611 lbs. cement per cubic yard. Class "B" concrete shall have a minimum of 470 lbs. cement per cubic yard. Concrete not meeting these requirements will be rejected by the Engineer. G-1 I I I I I I I 1 I I I I 1 I I 1 I I I CONSTRUCTION LAYOUT: CClnstruction layout work shall be performed by the Contractor. Se:e Section 149 of the Standard Specifications. DESIGN ALTERATIONS: The Commission-Council recognizes that various changes in design may be made as the project progresses. Any requests f()r additional payment will be processed based on actual work in place and the unit prices submitted as a part of this bid. I1::ems not covered in this bid shall be priced separately and no work shall be done on these items until approved, in ~~iting, by the Engineer. DRIVEWAYS: All driveways are to be paved to the right-of-way line. Ingress and egress shall be maintained at all times to adjacent properties, unless otherwise noted in the plans. The asphalt raised edge at driveways shall be constructed as follows: EROSION AND SEDIMENT CONTROL: 'l'he Contractor shall be responsible for all soil erosion and s:ediment control practices. All on-site erosion control shall c:omply with local Augusta-Richmond County erosion and sediment control ordinances. The cost of this work shall be included in the cost of the project unless shown as a separate pay item. EXCESS MATERIAL: lill excess material is to be disposed of as directed by the Engineer or as noted in Subsection 107.23 of the Specifications and page PPA-l of this contract. FINISHING AND DRESSING: .~ll unpaved and natural areas which are disturbed by the construction of this project are to be returned to the pre- existing shape and slope and then finished and dressed. No separate payment will be made for grassing, fertilizing and mulching of disturbed areas, unless specifically shown as a pay item. G-2 I 1 1 1 I I 1 1 1 1 1 I 1 1 I I 1 I 1 FLAGGING: Flaggers shall be provided as required to handle traffic, as specified in the Plans or Special Provisions, and as required by the Engineer. All flaggers shall meet the requirement of part 6F of the ~JTCD and must have received training and a certificate upon c1::>mpletion of the training from a Department approved training program. Failure to provide certified flaggers as required above shall be reason for the Engineer suspending work involving the flagger(s) until the Contractor provides the certified flagger(s). Flaggers shall wear a fluorescent orange cap or hat, and a fluorescent orange vest, shirt, or jacket, and shall use a S.top/Slow paddle meeting the requirements of Section 6F-2 of t.he MUTCD for controlling traffic. The Stop/Slow paddle shall have a shaft length of seven (7) feet minimum. In addition to t:he stop/slow paddle, a flagger may use a 24 inches square red/orange flag as an additional device to attract attention. For night work, the vest shall have reflectorized stripes on j:ront and back. Bigns for flagger traffic control shall be placed in advance C)f the flagging operation in accordance with the MUTCD. In addition to the signs required by the MUTCD, signs at regular .intervals, warning of the presence of the flagger shall be :placed beyond the point where traffic can reasonably be expected to stop under the most severe conditions for that day's work. GRASSING AND EROSION CONTROL: The Contractor shall bid on grassing, lump sum, and it shall be his responsibility to determine the actual area to be grassed. No claims will be considered for extra compensation if the Contractor relies on plan information to prepare his bid. All slope areas are to be grassed unless shown otherwise on plans. Temporary grass is required if permanent grass season is out. The Contractor shall be responsible for all soil erosion and sediment control practices including Temporary Grassing, Temporary Mulch and other temporary measures. All on-site erosion control shall comply with local erosion and sediment control ordinances. The cost of this work shall be included in the cost of the proj ect unless shown as a separate pay item. All unpaved and natural areas which are disturbed by the construction of this project are to be returned to the pre- existing shape and slope and then finished and dressed. No separate payment will be made for grassing, fertilizing and mulching of disturbed areas, unless specifically shown as a pay item. G-3 I I 1 1 I 1 1 1 I 1 1 I 1 I 1 I I 1 1 Di.scontinued roads or other areas inside or outside the project construction limits, but within the existing or rE!quired right-of-way, shall be obliterated and restored as nE!arly as possible to the original contour of the ground (See sE!ction 205 of the Standard Specifications). No separate payment will be made for this work. Where item number 700-6001 is shown as a pay item Georgia DI~partment of Transportation Specifications are modified to p:rovide that the lump sum price bid shall be full payment for all fertilizer, lime and nitrogen. No separate measurement fl:>r payment will be made for any work or materials required to a.;::complish a stand of permanent grass. INFEST.ATION: The entire project is considered to be witin the limits of an insect infested area. The Contractor's attention is called to the following sections of the Standard Specifications: (A) 155 Insect Control (B) 893 Miscellaneous Planting Materials. INSPECTION: 'I'his project will be inspected by the Engineer or his Eepresentative. LEVELING: Leveling shall be placed at the locations and in amounts as approved by the Engineer or his Representative. Measurement and payment shall be made in accordance with the Standard Specifications on a unit price basis. The quantities included in the schedule of items are approximate and subj ect to change. All changes will be made at the unit prices, as bid. MILLDm: Consists of milling existing asphaltic concrete pavement in curb and gutter sections to restore drainage, riding characteristics and a reasonable pavement crown. This work shall be kept to a bare minimum by continuing consultation with the Engineer or his Representative. Area and depths to be milled shall be agreed on by the Contractor and the Engineer or his Representative. PATCHING AND REPAIR OF MINOR DEFECTS: Where necessary, the Contractor is required to patch and repair existing potholes,- minor pavement defects and base failures in accordance with the specifications. RIGH~~-OF-WAY AND EASEMENTS: The Contractor shall not perform any work outside the limits of the right-of-way or easements. In addition, no equipment or material shall be placed outside these areas without written permission of both the property owner and the Engineer. G-4 I I I I I I 1 1 1 I 1 I I 1 I I 1 1 I I:n the event that the Contractor elects to utilize private property for any purpose connected with the project such as, but not limited to, staging areas, equipment and/or material s.torage or simply as a convenience, he shall submit a written agreement to the Engineer containing vital information such as limits of both area and time the property is to be utilized and a description of the intended use. The agreement must be signed by both the property owner and the Contractor and will be reviewed and recorded by the Engineer. Such agreements must be submitted prior to the Contractor's use of the property. SAW CUTS: When matching existing conditions, saw cuts shall be used as required by Augusta-Richmond County. Only saw cuts in Portland Cement Concrete which are shown as contract pay items will be paid for separately. No saw cuts in asphaltic concrete will be paid for separately. SHOULDER WORK: All necessary cleaning of the existing pavement including clipping of shoulders required prior to resurfacing shall be the responsibility of the Contractor. The material displaced shall be removed, lowered or spread over the shoulder to an elevation and slope which will provide adequate drainage. This shall also include backinq UP and qrassinq of the newly resurfaced street shoulders. The cost of such work shall be included in the prices bid for other items SPECIFICATIONS: This proj ect is based upon, and shall be constructed in accordance with, the State of Georgia Department of T'ransportation Standard Specifications for Construction of Roads and Bridges, current Edition and any supplements thereto. All of these specifications shall be considered as though fully contained herein. In cases where conflicts arise vdthin these specifications, they will be revised to resolve such conflict. until the conflict is resolved, the interpretation of the Engineer shall control the situation. SPECIF'ICATIONS, STANDARDS AND OTHER DATA: 1\.11 references in this document, which includes all papers, writings, documents, drawings, or photographs used, or to be used in connection with this document, to State Highway of Greorgia, State Highway Department, Highway Department, or Department when the context thereof means the Georgia Department of Transportation mean, and shall be deemed to IIlean, Augusta-Richmond County, Augusta-Richmond County Commission-Council Department of Engineering Services. 'l'he data, together with all other information shown on these plans, or indicated in any way thereby, whether by drawings or notes or in any other matter, are based upon field i.nvestigations and are believed to be indicative of actual c:ondi tions. However, the same are shown as information only, G-5 I 1 I I I I I I I I I I I I 1 I 1 1 1 are not guaranteed, and do not bind Augusta-Richmond County, GHorgia in any way. Only the actual quanti ties completed and accepted will be paid for. The attention of the bidder is specifically directed to Subsections 102.04, 102.05, and 104.03 of the Standard Specifications, of the Georgia Department of Transportation, current edition, which will be part of this contract. 'J,'his proj ect is based on and shall be constructed in accordance with the State of Georgia Department of ~['ransportation Standard Specifications for Construction of J~oads and Bridges, current Edition and any supplements .thereto. All of these specifications shall be considered as though fully contained herein. In cases where conflicts arise within these specifications, they will be revised to resolve such conflict. until the conflict is resolved, the interpretation of the Engineer shall control the situation. This project shall be constructed in accordance with current Georgia Department of Transportation Roadway Standards and Construction Details. SUBCONTRACTORS: The Contractor shall furnish the official name of all firms he proposes to use as Subcontractors in the work. This information should be furnished at the Preconstruct ion Conference. However, no work shall be done on this project by a Subcontractor until the Contractor receives written approval of his Subcontractor(s) from the Engineer. The Engineer shall notify the Contractor, in writing within 10 calendar days whether or not approval of the Subcontractor(s) is granted. The Contractor shall send copies of all proposed Subcontractors, including the company name, description of work to be done, phone number and contact person for each Subcontractor to Ms. Brenda Byrd-Pelaez at the following address: Ms. Brenda Byrd-Pelaez, Room 211 Municipal Building, 530 Greene Street, Augusta, Georgia 30911. TESTING OF THE WORK: . The Contractor shall employ a qualified materials testing laboratory to monitor more fully the quality of materials and work and to perform such tests as may be required under the contract documents as conditions for acceptance of materials and work. THE ENGINEER MAY ORDER TESTING AT ANY TIME HE DEEMS PROPER TO CONTROL THE QUALITY OF THE WORK. Concrete compressive strength project (see section 500 of Transportation Specifications). where necessary. tests are required on this the Georgia Department of Other tests may be required All test results are to be submitted to the Engineer. No separate payment will be made for employing the testing laboratory or any required tests. G-6 I 1 I I I I I I I I I I I I I I I 1 I On projects that include asphaltic concrete, cores shall be cut in the asphaltic concrete at random locations, selected by the Engineer, to verify thicknesses. A minimum of three (3) cores per mile or three (3) cores per project, whichever is greater, shall be cut by the Contractor. If all thicknesses are satisfactory, in accordance with section 400 of the De:partment of Transportation Specifications, no further cores wi.ll be required. If cores indicate an unsatisfactory thickness, additional cores, as determined by the Engineer and at: locations of the Engineer's choosing, shall be cut to dHtermine the extent of the unsatisfactory thickness. Corrections as shown in Section 400 of the Department of T:ransportation specifications shall be made where required. There will be no separate payment for cutting cores, filling c'ore holes or corrective work. Payment shall be included in the price bid for asphaltic concrete items or in the overall bid price of the. contract. TRAFFIC CONTROL: 'l'he Contractor shall provide construction signs in accordance \lri th requirements of "Manual on Uniform Traffic Control Devices for streets and Highways", current edition with added Bupplements and special provisions. ~rhe attention of the Contractor is specifically directed to Subsection 107.09 of the Standard Specifications regarding :barricades, danger, warning, and detour signs. All temporary signs, barricades, flashing lights, striping other traffic control devices required during construction project shall meet all requirements of the M.U.T.C.D., edition, as directed by the Engineer and furnished Contractor with payment in accordance with Section 150. and any of this current by the The Contractor shall so conduct his operations that there will be a minimum of interference with, or interruption of, traffic on the travelway. This applies to the initial installation and the continuing maintenance and operation of the facility. At least one-lane, two-way traffic shall be maintained at all times unless approved otherwise by the Engineer. As a minimum, the Contractor must comply with the manual on Uniform Traffic Control Devices, current edition and Georgia Standard 9102. TRAFFIC CONTROL DEVICES: The Contractor shall provide all temporary traffic control devices needed to safely direct traffic through the construction area. All temporary traffic control devices are to be placed in accordance with Georgia Department of Transportation Standards and Specifications. G-7 I I I I I I I I I I I I I I I 1 I 1 I TRAFFIC DETOURS: Wh.ere detours are required or approved and in accordance with Se:ction 150 of the Standard Specifications and any Supplements tbereto, the Contractor shall file for approval a detour plan of operation for this project. This plan shall include details of staging and rerouting of traffic including estimated length of time for use of the detours. The Contractor shall so conduct his operations that there will ba a minimum of interference with or interruption of traffic u:pon and along the roadway. This applies to the initial installation and the continuing maintenance and operation of the facility. At least one-lane, two-way traffic shall be maintained at all times unless approved otherwise by the Engineer. As a minimum, the Contractor must comply with the M:anual on Uniform Traffic Control Devices, current edition and Georgia Standard 9102. G-8 I I I I I I I 1 1 1 I I I I I I I 1 I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION SECTION 150-TRAFFIC CONTROL August 28, 1995 First Use: October 20, 1995 Modification of Special Provision Section 150 - Traffic Control (Rev. June 21, 1994) Retain Sec:tion 150 as written and add the following: For this project, all references to flags on construction warning signs in the Standard Construction Details listed below are deleted except for signs which are mounted at less than seven (7') feet in height (portable signs). Standard Construction Details · Typical By-Pass Detour for Two-Lane Highway · Typical Detour Across Median · Transition of 4-Lane Divided Highway to 2-Lane Highway · Traffic Control General Notes, Standard Legend, Miscellaneous Details In addition, G20-1, G20-2A, and W20-1 signs shown on Georgia Standards 9102, 9106, 9107, and applicable Standard Construction Details shall conform to Part VI of the MUTCD, Revision 3, dated SeptembE!r 3,1993. 150.02 WORK ZONES: Delete "Work Zones" and substitute: Temporary Traffic Control Zones. 150.02. B.2.: Delete last sentence and substitute: Channelization device spacing shall be 10 feet for 200 feet in ad.vance of the temporary gore, and 10 feet for the first 100 feet of the temporary gore. 150.03. F.1. MATERIALS - INTERIM SIGNS: Retain as written and add second paragraph. Posts for all interim signs shall be constructed to yield upon impact unless the posts are protected by guardrail, portable barrier, impact attenuator or other type of positive barrier protection. Unprotected posts shall meet the breakaway requirements of the "1985 AASHTO Standard Specifications for Structural Supports for Highway Signs, Luminaries and Traffic Signals", Unprotected post splices will not be permitted any higher than four inches above the ground line t.o lessen the possibility of affecting the underCarriage of a vehicle, 150.03.H. CONSTRUCTION WARNING SIGNS: CONSTRUCTION WARNING SIGNS THAT ARE REQUIF:ED TO BE MOUNTED AT SEVEN FEET IN HEIGHT NO LONGER REQUIRE THE USE OF WARNI:~G FLAGS. Delete first sentence of second paragraph and substitute: Constmction warning signs which are mounted at less than seven feet in height (portable signs) shall have two 18 inch x 18 inch fluorescent red-orange 01" orange-red warning flags mounted on each sign. "TC-/ 1 I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA 150.04.E.2.;a.2.:Retain as written and add: In lane shift areas skip lines are not allowed. Solid lines are required. 150.04. E.2.b.1.:Retain as written and add: In lane shift areas skip lines are not allowed. Solid lines are required. 150.05. D. TEMPORARY GUARDRAIL ANCHORAGE: Delete all references to Type 9 and substitute Type 11 {eleven}. 150.10 PAYMENT: Item No. 641 - Delete reference to Type 9 and substitute Type 11 {eleven}. SPECIAL PROVISION SECTION 1SD-TRAFFIC CONTROL June 22, 1994 First Use: July 24, 1994 Modification of Standard Specifications, 1993 Edition Retain Section 150 as written and add the following: For this project, all references in the Standard Construction Details listed below to Type I Barricades, Type II Barricades, Type "A" flashing-lights and Type "C" steady burn lights are deleted, except that Type "C" lights will be required for tapers in nighttime lane ~losures. Standard Construction Details Typical By-Pass Detour for Two-Lane Highway .' Typical Detour Across Median .. Transition of 4-Lane Divided Highway to 2-Lane Highway .. Traffic Control General Notes, Standard Legend, Miscellaneous Details In addition, G20-1, G20-2A, and W20-1 signs shown on Georgia Standards 9102, 9106, 9107, and applicable Standard Construction Details shall conform to Part VI of the MUTCD, Revision 3, dated September 3, 1993. Detail "A" as shown on Georgia Standard 4960 is deleted. SPECIAL PROVISION SECTION 1SD-TRAFFIC CONTROL Rev. June 21, 1994 First Use: July 24, 1994 Rev.: August 16, 1994 Modification of the Standard Specifications, Current Edition Delete Section 150 as written and substitute the following: 150.0'/ DESCRIPTION: This section as supplemented by the Plans, Specifications, and MUTeD shall be considered the Traffic Control Plan. Activities shall consist of furnishing, installing, maintaining, and removing necessary traffic signs, barricades, lights, signals, cones, pavement markings and other traffic control devices and shall include flagging and other means for guidance and protection of vehicular and -rc-z- I I I I I I I I I I I I I 1 1 I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA pedestrian traffic through the Work Zone. This Work shall include both maintaining existing devices (excluding Traffic Signals) and installing additional devices as necessary in construction work zones. When any provisions of this Specification or the Plans do not meet the minimum requirements of the Manual on Uniform Traffic Control Devices (MUTCD), the MUTCD controls. The 1988 Edition of the MUTCD ar.ld Revision 3, dated September, 1993, of Part VI shall be in effect for the duration of the project. A. The Contractor shall designate a qualified individual as the Worksite Traffic Control Supervisor (WTCS) who shall be responsible for selecting, installing and maintaining all traffic control devices in accordance with the Plans, Specifications, Special Provisions and the MUTCD. This individual's traffic control responsibilities shall have priority over all other assigned duties. As the rl~presentative of the Contractor, the \VTCS shall have full authority to act on behalf of the Contractor in administering the Traffic Control Plan. The WTCS shall have appropriate training in safe traffic control practices in accordance with Part VI of the MUTCD. In addition to the WTCS all others making decisions regarding traffic control must meet the training requirements of Part VI of the MUTCD. On projects where traffic control duties will not require full time supervision, the Engineer may allow the Contractor's Project Superintendent to serve as the WTCS as long as satisfactory results are obtained. The WTCS shall have a copy of the MUTCD on the job site. Copies of current MUTCD may be obtained from: U.S. Government Printing Office Superintendent of Documents Mail Stop: SSOP Washington, D,C. 20402-9328 The WTCS shall be available on a 24-hour basis as needed to maintain traffic control devices with access to all personnel, materials and equipment necessary to respond effectively to an emergency situation within forty-five (45) minutes of notification ofthe emergency, The WTCS shall supervise the initial installation of traffic control devices which will be reviewed by the Enginl~er prior to the beginning of construction. Modifications to traffic control devices as required by sequence of operations or staged construction must be reviewed by the WTCS. The WTCS shall regularly perform inspections to ensure that traffic control is maintained. B. All traffic eontrol devices used during the construction of a project shall meet the Standards utilized in the MUTCD, and shall comply with the requirements of these Specifications, Project Plans, and Special Provisions. Reference is made to Subsections 104.05, 107.07, and 107.09. C. All reflectorization for construction (black on orange) signs, object markers, and channelization devices shall meet the requirements of Section 913, Type II or III unless otherwise specified. All other signs shall meet the requirements of Type I unless otherwise specified. D. No work shall be started on any project phase until the appropriate traffic control devices have been placed in accordance with Project requirements_ Changes to traffic flow shall not commence unless all labor, materials, and equipment necessary to make the changes are available on the Project. E. The Contra.ctor shall secure the Engineer's approval of the Contractor's proposed plan of operation, sequence of work and methods of providing for the safe passage of vehicular and pedestrian traffic before it i~; placed in operation. The proposed plan of operation should supplement the approved traffic control plan. Any major changes to the approved traffic control plan, proposed by the Contractor, are to be submitted to the Department for approval in accordance with Subsection 104.03 of the Standard Specifications. /C'-3 I I I I I I I I I I I I I I I I I' I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA Some additional traffic control details will be required prior to any major shifts of traffic. The traffic control details shall include, but not be limited to, the following: 1. A detailed drawing showing traffic location and laneage for each step of the change. 2. The location, size, and message of all signs required by the MUTCD, Plans, Special Provisions, and other signs as required to fit conditions. 3. The method to be used in, and the limits of, the obliteration of conflicting lines and markings. 4. Type, location, and extent of new lines and markings. 5. Horizontal and vertical alignment and superelevation rates for detours, including cross section and profile grades along each edge of existing pavement. 6. Drainage details for temporary and permanent alignments. 7. Lo.=ation, length, and/or spacing of channelization and protective devices (temporary barrier, guardrail, barricades, ete.) 8, Starting time, duration and date of planned change. 9. Fo:r each traffic shift, a paving plan, erection plan, or work site plan, as appropriate, detailing wo'rkforce, materials, and equipment necessary to accomplish the proposed work. This will be the minimum resource allocation required in order to start the work. The above details shall be submitted to the Engineer for approval at least 14 days prior to the anticipated traffic shift. The Contractor shall have traffic control details for a traffic shift which has been a:?proved by the Engineer prior to commencement of the physical shift. All preparatory work relative to the traffic shift which does not interfere with traffic shall be accomplished prior to the designated starting time, The Engineer and the Contractor's representative will verify that all conditions have been met prior to the Contractor obtaining materials for the actual traffic shift. F. Traffic Gontrol devices shall be in acceptable condition when first erected on the project and shall be maintained in accordance with Subsection 104.05 throughout the construction period. All unacceptable traffic control devices shall be replaced within 24 hours. When not in use, all traffic control devices shall be removed, placed or covered so as not to be visible to traffic. If traffic control devices are left in place for more than ten days after completion of the Work, the Department shall have the right to remove such devices, claim possession thereof, and deduct the cost of such removal from any monies due, or which may become due, the Contractor. G, The DE:partment reserves the right to restrict construction operations when, in the opinion of the Enginel~r, the continuance of the Work would seriously hinder traffic flow on days immediately before, on, or a1ter holidays or other days in which unusual traffic conditions exist, including threatening or inclemEmt weather. 150.02 WORK ZONES: A. In addiljon to the other provisions contained herein, work zone traffic control shall be accomplished using the following means and materials: 1. Portable advance warning signs as required by the contract or meeting the requirements of the MtfTCD and Sub-Section 150.03. 2. Portable sequential or flashing arrow panels as shown in the Plans or Specifications for use on Int~rstate or multi-lane highway lane closure only, shall be a minimum size of 48" high by 96" TC-~ I I I I I I I I I I I I I I I I I' I I DEPARTMENr OF TRANSPORTATION STATE OF GEORGIA wide with not less than 15 lamps used for the arrow. The arrow will occupy virtually the entire Sizl~ of the arrow panel and shall have a minimum legibility distance of one mile. The minimum legibility distance is that distance at which the arrow panel can be comprehended by an observer on a sunny day, or clear night, Arrow panels shall be equipped with automatic dimming features for use during hours of darkness. The arrow panels shall also meet the requirements as shown in the MUTeD. The sequential or flashing arrow panels shall not be used for lane closures on two- lane, two-way highways when traffic is restricted to one-lane operations in which case, appropriate signing, flaggers and when required, pilot vehicles will be deemed sufficient. 3. Po:rl:.a.ble changeable message signs meeting the requirements of Section 632 and the MUTCD. 4. Channelization devices meeting the standards of the MUTCD and Subsection 150.05. 5. Precast concrete barrier meeting the requirements of Section 622. 6. Temporary traffic signals meeting the requirements of Section 647. 7. Pa:...ement marking materials complying with Subsection 150.04.A.. B. LANE CLOSURES: 1. All lane closures shall have prior approval of the Engineer. Lane closures that require same direction traffic w be split around the Work Area will not be approved for roadways with posted spEleds of 35 mph or greater, excluding turn lanes. 2. On multilane highways where traffic has been shifted to the inside lanes for overnight use, the entrance and exit ramps shall have channelization devices placed on both sides of the ramp. The tempora!}" ramp taper length shall be greater than, or equal to, the existing taper length. Interim EXIT gore signs shall be placed at the ramp divergence. Channelization device spacing in the first 100 feet of the temporary gore shall be 25 feet. 3. Te'rmination Area: The transition to normal or full width highway at the end of a lane closure shall be a maximum of 150 feet. 4. To provide the greatest possible convenience to the public in accordance with Subsection 107.07, thE: Contractor shall remove all signs, lane closure markings, and devices immediately when lane clo,rure work is completed or temporarily suspended for any length of time or as directed by the Engineer. C. TRAFFIC PACING METHOD: 1. PACING OF TRAFFIC: With prior approval from the Engineer, traffic may be paced allowing the Contractor up to ten (10) minutes maximum to work in or above all lanes of traffic for the foIl owing purposes: a Placing bridge members or other bridge_work. b. Placing overhead sign structures. c. Other work items requiring interruption of traffic. The Contractor shall provide a unifonned police officer with patrol vehicle and blue flashing light for each direction of pacing. The police officer, Engineer, and flaggers at ramps shall be provided with a radio which will provide continuous contact with the Contractor. TC-.s- I' I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA When 'ready to start the work activity, the police vehicle will pull into the travel lanes and act as a pilot vehicle slowing the traffic thereby providing a gap in traffic allowing the Contractor to perform the Work. Anyon-ramps between the pace and the work area shall be blocked during pacing of traffic, with a flagger properly dressed and equipped with a Stop/Slow paddle. Each ramp should be opened after fhe police vehicle has passed. Pilot vl~hicles shall travel at a safe pace speed, desirably not less than 20 mph interstate and 10 mph non-interstate. The Contractor shall provide a vehicle to proceed in front of the police vehicle and behind the other traffic in order to inform the Contractor's work force when all vehicles have cleared the area. Traffic: will not be permitted to stop during pacing except in extreme cases as approved by the Engineer. 2. METHODS OF SIGNING FOR TRAFFIC PACING: At a point not less than 1,000 feet in advance of the bel;inning point of the pace, the Contractor shall erect and cover a W -special sign (72 inch x 72 inch) with a Type "B" flashing light, with the legend "TRAFFIC SLOWED AHEAD SHORT DELAY" (See Detail 150-A). A portable changeable message sign may be used in lieu of the W-special sign. On divided highways this sign shall be double indicated. A worker with a two-way radio shall be posted at the sign, and upon notice that the traffic is to be paced shall turn on the flashing light and reveal the si~:n. When traffic is not being paced, the flashing light shall be turned off and the sign covered or removed. W-special signs are refleCtorized black on orange, Series "C"letters and border of the size specified. /c:'-c I I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA t."~ ffii ~ ~ ~ ~ ~ 10- /- ~Z" -I 10" @~(Q)I~[Q) 15",- .2" .I'~ ~~~~[Q) ~~@WJ] ..~~~! W -t.,.1. :'.' .L..:/- TYPE ... rLl.SH I IIC LI CMT [)l TRAH I C SIDE SJ- 1 '.5- 7z. 1-5''tC 1 AI. 5 1 GIl C Tt~ !lOST WCUllED I S I CH $HAl L HA VI: IL ACX L[ C[.c> AN) IQIU)[ R OM ORANG[ II[rLEC1ClUlEO aAClCJDJHD DETAIL 150-A 1- lIMRGIH 1 .'). IKAl(R ,- UDIUS ,- 12. 12. SER. -C. ,- 1%" 1'" SER. .C. '" 12" 12" S[A. .C" ~ I" I" YR. .C" '" D. The Contractor's trucks and other vehicles shall travel in the direction of normal roadway traffic unless separated by a positive barrier, or when construction activity necessitates otherwise, and shall not reverse direction except at intersections, interchanges. or approved temporary crossings. E. The Contractor shall ensure that dust. mud. and other debris from construction activities do not interfnre with normal traffic operations or adjacent properties. F. Existing street lighting shall remain lighted as long as practical and until removal is approved by the Engineer. G. Adequ.ate temporary lighting shall be provided at all nighttime work sites where workers will be immediately adjacent to traffic. H. For their own protection, workers in or adjacent to traffic during nighttime operation shall wear reflectorized vests. / t::'-7 I I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA 1. The pa.rking of Contractor's and/or workers personal vehicles within the work area or adjacent to traffic is prohibited. J. The Worksite Traffic Control Supervisor (WTCS) shall monitor the work to ensure that all the rocks, boulders, construction debris, stockpiled materials, equipment, tools and other potential hazards are kept dear of the travel way. These items shall be stored in a location, in so far as practical, where they will not be subject to a vehicle running off the road and striking them. K All existing pedestrian walkways shall be maintained. Whenever changes to the worksite necessitate change~; to existing walkways, temporary walkways shall be provided and maintained, with approptiate signs as necessary, to allow safe passage of pedestrian traffic. 150.03 SIGNS: A. When required for proper traffic control during construction of the project, all existing guide, warning, and regulatety signs shall be maintained by the Contractor in accordance with these Specifications. Existing street name signs shall be maintained at street intersections. All existing illuminated signs shall ret:lain lighted and be maintained by the Contractor. B. When not in use, all inappropriate traffic signs or portions thereof shall be removed, placed or covered so as not to be visible to traffic. All construction warning signs shall be removed within seven calendar days after time charges are stopped or pay items are complete. Subsequent pnnch-list or other work to be performed shall be accomplished utilizing temporary construction warning signs that shall be removed daily. C. The Contractor shall not remove any existing signs and supports without prior approval from the Engineer. All existing signs and supports which are to be removed shall be stored and protected as directed by the Engineer, and become the property of the Department unless otherwise specified in the contract documents. D. Interim guide, warning, or regulatoty signs required to direct traffic shall be furnished, installed, reused and maintained by the Contractor in accordance with the MUTCD, the Plans, Special Provisiom:, or as directed by the Engineer. These signs shall remain the property of the Contractor. The botto:m of all interim signs shall be at least seven feet above the level of pavement edge. E. Existing special guide signs on the Project shall be maintained nntil conditions require a change in location or legend content. When change is required, existing signs shall be modified and continued in use if the required modification can be made within existing sign borders using design requirements Oegend, letter size, spacing, border, etc.) equal to that 'of the existing signs, or of Subsection 150.03.E.S. Differing legend designs shall not be mixed in the same sign. 1. SPECIAL GUIDE SIGNS: Special guide signs are those expressway or freeway guide signs that are d~:igned with a message content Oegend) that applies to a particular roadway location, When an existing special guide sign is in conflict with work to be performed, the Contractor shall remove the conflicting sign and reset it in a new, non-conflicting location which has been approved by the EnginE:er. 2. INTEEIM SPECIAL GUIDE SIGNS: When it is not possible to utilize existing signs, either in place 01" relocated, the Contractor shall furnish, erect, maintain, modify, relocate, and remove new interim special guide signs in accordance with the Plans or as directed by the Engineer. 3. INTERIM OVERHEAD GillDE SIGN STRUCTURES: Interim overhead special guide sign structures are not required to be lighted nnless specifically required by the Plans. If lighting is required the sign shall be lighted as soon as erected and shall remain lighted, during the hours of darkness, nntil the interim sign is no longer required. The Contractor shall notify the Power Company at least thirty (30) days prior to desiring connection to the power source. -rC-B I' I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA 4. Th,~ installation of new permanent special guide signs and the permanent modification or resl:tting of existing special guide signs, when included in the contract, shall be accomplished as soon as practical to minimize the use of interim special guide signs. If lighting is required by the Plans, all new permanent overhead special guide signs shall be lighted as soon as erected, 5. Int,:rim special guide signs that may be required in addition to, or a replacement for, existing expressway and freeway (interstate) signs must be designed and fabricated in compliance with the minimum requirements for guide signing contained in Part 2E "Guide Signs Expressways" and Part 2F "Guide Signs Freeways" of the MUTeD, except that the minimum size of all letters and numerals in the names of places, streets and highways on all signs shall be 16 inches Series "E" initial upper-case and 12 inches lower-case. All interstate shields on these signs shall be 48 inches and 60 inches for two-numeral and three-numeral routes, respectively. Additionally, the exit road name or route shield shall be placed on the exit gore sign. F. MATERLli.S - INTERIM SIGNS: 1. POSTS - Posts for all interim signs shall meet the requirements of Section 911 except that green or silver paint may be used in He.u of galvanization for steel posts or structural shape posts. Wood posts are not required to be pressure treated. 2, SIGN BLANKS AND PANELS - All sign blanks and panels shall conform to Section 912 of the Specifications except that blanks and panels may be ferrous based or other metal alloys, Type 1 and Type 2 sign blanks shall have a minimum thickness of 0.08 inches regardless of the sign type used. Alternative sign blank materials (composites, poly carbonates, fiberglass reinforced plastics, recycled plastics, etd shall have a letter of approval from the Office of Materials and Research for use as interim construction signs before these materials are allowed to be incorporated into the work. Signs shall be painted to prevent rust if other metals are used in lieu of aluminum, Plywood blanks or panels will not be permitted. G. All existing, interim and new permanent signs shall be installed so as to be completely visible for an advance distance in compliance with the MUTCD. Limbs, brush, construction equipment and materials shall be kept clear of the driver's line of sight to the signs. H. Advance warning signs shall be placed ahead of construction in accordance with Part VI of the MUTeD and shall include a series of at least three advance road construction (W20-1) signs placed at the termini of the project. The series shall have the legend ROAD WORK (1500 FEET, 1000 FEET, AND 500 FEET.) In addition to the above, multi-lane divided highways shall also have the legend ROAD WORK (2 MILES, 1 MILE, AND 1/2 MILE.) On-ramps and at grade intersecting roadways shall be si,~ed with a minimum of one ROAD WORK AHEAD sign. All construction warning signs shall have two 18 inch x 18 inch fluorescent red-orange or orange-red warning flctg's mounted on each including the project construction signs (G20-1 and G20-2A.) Project mileage ir..dicated on the G20-1 sign shall be the actual project mileage rounded up to the nearest whole mile. All construction warning signs on divided highways shall be double indicated (Le., on the left and ri~:ht sides of the roadway.) 1. The sequential or flashing arrow panels shall be placed on the shoulder at or near the point where the lane closing transition begins. The panels shall be mounted on a vehicle, trailer, or other suitable support. Vehicle mounted panels shall be provided with remote controls. Minimum mounting height shall be seven feet above the roadway to the bottom of the panel, except on vehicle mounted panels which should be as high as practical. J. The portabl,~ changeable message sign, when specified, shall be placed ahead of construction activities and shall meet the requirements of Section 632 and the MUTCD. /c-~ I' I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA K. The flashing beacon assembly, when specified, shall be used in conjunction with construction warning signs, regulatory, or guide signs to inform traffic of special road conditions which require additional driver c.ttention. The flashing beacon assembly shall be installed in accordance with the requirements of Section 647. 150.04 PAVEMENT MARKINGS A Generally, full pattern pavement markings in accordance with Section 652 and in conformance with Section 3A and 3B, except 3B-3 and 3B-5, of the MUTCD are required on all courses before the roadway is opened to traffic. No passing zones shall be marked to conform to Section 150.04 E, During construction and maintenance activities on all highways open to traffic, both existing markings and marking's applied under this Section shall be fully maintained until Final Acceptance. If the pavement markings are, or become, unsatisfactory in the judgement of the Engineer due to wear, weathering, or construction activities, they shall be restored immediately. On resurfacing projects pavement markings shall be provided on all surfaces that are placed over existing markings. On widening and reconstmction projects (where the lane configuration is altered from the pre-construction layout) pavement markings will be as required by the Plans or the Engineer. On new construction projects pavement marking plans will be provided. B. MATERIALS: All traffic striping applied under this Section shall be a minimum four inches in width and shall conform to the requirements of Section 652, except as modified herein. Raised pavement markers CRPMs) shall meet the requirements of Section 654. Markings on the fInal surface course which must be removed shall be a removable type. The Contractor will be permitted to use paint, thermop:.astic, or tape on pavement which is to be overlaid as part of the project, unless otherwise directed hy the Engineer, Partial (skip) reflectorization (i.e. reflectorizing only a portion of a stripe) will not be allowed. C. USAGE: The Contractor shall sequence the work in such a manner as to allow the installation of markings in the fmallane configuration at the earliest possible stage. Inapprop riate or conflicting existing pavement markings shall be removed. When shi1ting of traffic necessitates removal of centerline, lane lines, or edge lines, all such lines shall be removed prior to, during, or immediately after any change so as to present the least interference with traffic. Before any change in traffic lane(s) alignment, marking removal equipment shall be present on the project for immediate use. If marking removal equipment failures occur, the equipment shall be repaired or replaced (includuig leasing equipment if necessary), so' that the removal can be accomplished without delay. Except for the final surface, markings on asphaltic concrete may be obliterated by an overlay course, when approved by the Engineer. When an asphaltic concrete overlay is placed for the sole purpose of eliminating conflicting markings and the in place asphaltic concrete section will allow, said overlay will be eligible for payment only if designated in the Plans. Overlays to obliterate lines will be paid for only once and further traffic shifts in the_.same area shall be accomplished with removable markings. Only the minimum asphaltic concrete thickness required to cover lines (generally 60 lbJsq. yd. of Asphaltic Concrete nHn) will be allowed. Excessive build-up will not be permitted. When an overlay for the sole purpose of eliminating conflicting markings is not allowed, the markings no longer applicable shall be removed in accordance with Subsection 656.02. The elimination of conflicting pavement markings by overpainting with paint or liquid asphalt is not acceptable. D. Raised pavnment markers CRPMs) are required as listed below for all asphaltic concrete pavements before the roadway is open to traffic. When Portland Cement Concrete is an intermediate or fmal surface and is open to traffic, one calendar day is allowed for cleaning and drying before the installation. ofRPMs is required. TC-/t? I I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA 1. On Interstate and limited access highways under construction, excluding project<; consisting primarily of asphalt resurfacing items, retro-reflective raised pavement markers (RPMs) shall be placed and/or maintained on intermediate pavement surfaces opened to traffic as follows: a SUPPLEMENTING LANE LINES: 80 foot centers on skip lines with curvature less than three degrees. (Includes tangents.) 40 foot centers on solid lines and all lines with curvature between three degrees and six degrees. 20 foot centers on curves over six degrees. :20 foot centers on lane transitions or shi.fts. b. SUPPLEMENTING RAMP GORE LINES: ~:o foot centers, two each, placed side by side. c. OTHER LINES: P..s shown on the plans or directed by the Engineer. 2. On other highways under construction RPMs shall be used and/or maintained on intermediate pavement surfaces as follows: a SUPPLEMENTING LANE LINES AND SOLID LINES: 40 foot centers except on lane shifts. (When required in the Plans or Contract.) 20 foot centers on lane shifts. (Required in all cases.) b. SUPPLEMENTING DOUBLE SOLID LINES: 40 foot centers (one each beside each line) except on lane shi.fts. (When required in the Plans or Contract.) . 20 foot centers on lane shifts. (Required in all cases.) RPMs are D.2.t allowed on right edge lines. E. EXCEPTIONS FOR INTERIM MARKINGS: Some exceptions to the time of placement and pattern of markings are permitted as noted below, however, full pattern pavement markings are required for the complet.ed project. 1. TWO-LANE, TWO-WAY ROADWAYS a. SKI.P LINES: All interim skip (broken) stripe shall conform to Section 652 except that stripes shaJl be at least four feet long with a maximum gap of 36 feet. On curves greater than six degrees, a two-foot stripe with a maximum gap of 18 feet shall be used. In lane shift areas skip lines will not be allowed. Solid Lines will be required, Interim skip lines will be permitted for a period not to exceed 14 calendar days. Interim skip lines must be replaced with markings in full compliance with Section 652 prior to expiration of the 14 calendar day period. /c-// I I I I I I I I I I I I I I I I I. I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA Interim raised pavement markers may be substituted for the interim skip (broken) stripes. Ifmised pavement markers are substituted for the four foot interim skip stripe, four markers spaced at equal intervals over a four feet distance will be required. No separate payment will be made if the interim raised pavement markers are substituted for interim skip lines. Interim raised pavement markers shall be retro-reflective, shall be the same color as the pavement markers for which they are substituted, and shall be visible during daytime, The type of interim marker and method of attachment w the pavement must be approved by the Office of Materials and Research but in no case will the markers be attached by the use of nails. The interim raised pavement markers must be maintained until the full pattern pavement markings are applied. At the time full pattern pavement markings are applied the interim raised markers shall be removed in a manner that will not interfere with application of the fUll pattern pavement markings. b. NO PASSING BARRIER: On two-lane, two-way roadways for periods not to exceed three calendar days where skip centerlines are in place, no-passing zones may be identified by using post or portable mounted DO NOT PASS regulawry signs (R4-1 24" x 30") at the beginning and at intervals not to exceed 1/2 mile within each no-passing zone. A post or portable mounted PASS WITH CARE regulatory sign (R4-1 24" x 30") shall be placed at the end of each no-passing zone, Post mounted signs shall be placed in accordance with the MUTeD. Portable signs must have a minimum vertical height of three feet above the pavement surface w the bottom of the sign and be secured in such a manner as to not be easily blown over or misaligned. c, EDGELINES: (1) Bituminous Surface Treatment Paving: Edgelines win not be required on intermediate sUlfaces (including asphaltic concrete leveling for bituminous surface treatment paving) that ar!! in use for a period ofless than 60 calendar days except at bridge approaches, on lane transitions, lane shifts, and in such other areas as determined by the Engineer. On the final swface, edgelines must be placed within 30 calendar days of the time that the final surface was placed. (2) All Other Types of Pavement: Edgelines will not be required on intermediate surfaces that . are in use for a period of less than 30 calendar days except at bridge approaches, on lane transitions, lane shifts, and in such other areas as determined by the Engineer. On the final surface, edgelines must be placed within 14 calendar days of the time that the surface was plac:ed. d. MISCELLANEOUS PAVEMENT MARKINGS: School zones, railroads, swpbars, symbols, words and other similar markings shall be placed on final surfaces conforming to Section 652 within 14 calendar days of completion of the final surface. On intermediate surfaces these markings will generally not be required..unless specified by the Engineer because of special conditions or when the intermediate surface will be in use for more than 45 calendar days. 2. MULTI-::..ANE illGHWAYS - WITH NO PAVED SHOULDER(S) OR PAVED SHOULDER(S) FOUR F~~ET OR LESS a. UNDIVIDED HIGHWAYS (INCLUDES PAVED CENTER TURN LANE) (1) Centerlines and No-Passing Barrier - Full pattern centerlines and no-passing barriers shall be reswred before nightfall. TC-/Z I I I I I I I I I I I I I I I I I. I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA (2) Lanelines - Interim skip (broken) stripe as described in Subsection 150.04.E.1.a. may be used for periods not to exceed three calendar days. (3) Edgelines - Edgelines shall be placed on intermediate and final surfaces within three calendar days of obliteration, b. DIVIDED IDGHWAYS (GRASS OR RAISED MEDIAN) (1) Lanelines - Full pattern skip stripe shall be restored before nightfall. (2) CenterlinelEdgeline - Solid lines shall be placed on intermediate and final surfaces within three calendar days of obliteration. c. Miscellaneous Pavement Markings Same as Subsection 150.04.E.1.d. 3. LIMITED ACCESS ROADWAYS AND ROADWAYS WITH PAVED SHOULDERS GREATER THAN FOUR FEET a. Same as Subsection'150.04.E.2. except as noted in (b) below. b. EDGELINES- (1) Asphaltic Concrete Pavement - Edgelines shall be placed on intermediate and fmal ~:urfaces prior to opening to traffic. (2) Portland Cement Concrete Pavement - Edgelines shall be placed on any surface open to traffic no later than one calendar day after work is completed on a section of roadway. All water and residue shall be removed prior to daily striping. F. APPLICATION OF PAVEMENT MARKINGS: The Contractor shall furnish layout, clean as necessary, and preline the surface for the placement of pavement markings applied under this Section. All existing marking tape on final surfaces shall be removed prior to placement of final marking~:. Pavemen.t markings shall re-establish No-Passing Zones in the locations and configuration that existed prior to construction. Existing No-Passing Zones shall be clearly identified as to location prior to construction by staking or erection of DO NOT PASS and PASS WITH CARE signs. On new location projects and on projects where either horizontal or vertical alignments have been modified, the location of No-Passing Zones'will be identified by the Engineer. G. MOBILE OPERATIONS: When pavement markings (centerlines, lane lines, and edge lines) are applied in a continuous operation by moving vehicles and equipment, the follOwing minimum equipmen.t and warning devices shall be required in addition to the requirements of the MUTCD: 1. A lead vehicle is required for two-way traffic conditions and shall have an approved sequential or flashing arrow panel mounted so as to be eEMiily visible to oncoming traffic. A lead vehicle is not required for low volume off-system routes and one-way traffic applications. 2. The wlork vehicle applying markings shall have a sequential or flashing arrow panel mounted on the rear. If the work vehicle is also functioning as the lead vehicle then an approved arrow panel shall :Je mounted so as to be easily visible to oncoming traffic. The work vehicle shall follow directly behind the lead vehicle, 3. The work vehicle placing cones shall follow directly behind the work vehicle applying the markings. The cone work vehicle shall have a sequential or flashing arrow panel mounted on the rear. -/ V-/3 I I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA 4. Fo'r multi-lane roadways a protection vehicle shall follow the above vehicles and the protection vehicle shall also display a prominent sign with the legend PASS ON LEFT (RIGHT). On interstate and limited access roadways, the protection vehicle shall be equipped with a truck mOW1ted attenuataI' (TMA) that is certified for impacts not less than 45 mph in accordance with NCHRP 230. 5. All vehicles shall be equipped with the official slow moving vehicle symbol sign and left and right- side rear monnted flashing yellow lights. 150.05 CHANNELIZATION A. GENERAL: Channelization should clearly delineate the travel way through the work zone and alert drivers and pedestrians to conditions created by work activities in or near the travel way. Channelization shall be done in accordance with the plans and specifications, the MUTCD, and the follo~ring requirements. 1. 'l'ypes of Devices Permitted for Channelization in Construction Work Zones: El. DRUMS: (1) DESIGN: Drums shall meet the minimum requirement of the MUTCD and shall be reflectorized as required in Subsection 150.01.C. (2) APPLICATION: Drums shall be used as the required channelizing device to delineate the full length of a lane closure, shift, or encroachment, except as modified by this Subsection. (a) TRANSITION TAPERS AND LANE CLOSURES: Drums shall be used on all transition tapers. The minimum length of the approach transition taper for a lane closure, shift, or encroachment for highways with posted speed of 45 mph or greater shall be equal to the lane width oflateral shift (Ft.) x the posted speed limit (Mph), (L = WS), but not less than 150 feet. For multiple lane closures, only one lane may be closed per taper with a minimum tangent length of 2L between tapers. The length of a closed lane, excluding the transition taper, will be limited to two mile, unless otherwise approved or directed by the Engineer. Drums shall be placed the full length of the taper spaced at maximum intervals in feet equal to the numerical speed limit (EXAMPLE: 55 Mph Speed Limit = 55 feet maximum spacing). For taper lengths on urban, residential or other streets where the posted speed is 40 mph or less, the minimumiength of the approach transition taper may be computed using the formula L = WS2/60. Greater taper length shall be used when required for individual situations. Drums with steady burning lights, for the length of the taper only, are required if the condition exists into the night. (b) LONGITUDINAL CHANNELIZATION: Drums shall be spaced as listed below for various roadside work conditions except as modified by Subsection 150.06. Spacing shall be used for situations meeting any of the conditions listed as follows: (1) 50 FOOT SPACING MAXIMUM: (a) For difference in elevation exceeding two inches. (b) For healed sections no steeper than 4:1 as shown in Subsection 150.06, Detail 150-E.. -rc- /~ I I I I I I I I I I I I I I I I I I I DEPARThffiNr OF TRANSPORTATION STATE OF GEORGIA (2) 100 FOOT SPACING MAXIMUM: (a) For difference in elevation of two inches or less. (b) F1ush areas where equipment or workers are within ten feet of the travel lane. (3) 200 FOOT SPACING MAXIMUM: Where equipment or workers are more than ten feet from travel lane. Lateral offset clearance to be four feet from the travel lane. (a) For paved areas eight feet or greater in width that are paved flush with a standard width travel lane. (b) For disturbed shoulder areas not completed to typical section that are flush to the travel lane and considered a usable shoulder. When the B.t>propriate signs are posted advising of conditions such as soft or low shoulder, droms may be removed after shoulders are completed to typical section and grassed and after guardrail or other safety devices have been installed, b. VERTICAL PANELS: (1) DESIGN: All vertical panels shall have a minimum of 270 square inches of retro-reflective area facing the traffic and shall meet the requirements of the MUTCD. (2) APPLICATION: Lane encroachment by the drum on the travelway should permit a remaining lane width often feet. When encroachment reduces the travel way to less than ten feet, vertical panels shall be used to restore the travel way to ten feet or greater. No other application of vertical panels will be permitted. c. CONES: (1) DESIGN: All cones shall be a minimum of28 inches in height regardless of application and shall meet the requirement of the MUTCD. (2) APPLICATION: For longitudinal channelizing only, cones will be permitted for daylight closures or minor shifts. (Drums are required for all tapers.) The use of cones for nighttime work will not be permitted. d.' BARRICADES: (1) DESIGN: The use of Type I and Type II barricades will not be permitted. Type III barricades shall meet the minimum requirements of the MUTeD and shall be reflectorized as required in Subsection 150.01.C. (2) APPLICATION: Type III barricades shall be placed as required by the plans, the Standards, and as directed by the Engineer. e. WARNING LIGHTS: (1) DESIGN: All warning lights shall meet the requirements of the MUTCD. (2) APPLICATION: (a) Type A low-intensity flashing lights shall be used as shown in the Plans, the Standards, and as directed by the Engineer. Flashing lights are not required for advance warning signs in Subsection ISO.03.H. -rc- /5 I I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA (b) Type C Steady-Burn lights shall be used on all tapers when the condition exist. into the night. Steady-burn lights shall also be used as shown in the Plans, the Standards, and as directed by the Engineer. . f. PORTABLE BARRIERS: (1) DESIGN: Portable Barriers shall meet the requirements of Section 622 - PRECAST CONCRETE BARRIER. (2) APPLICATION: Portable Barriers shall be placed as required by the plans. standards, and as directed by the Engineer, When Portable Barrier is located 20 feet or less from a travel lane, yellow reflectors shall be fixed to the top of the barrier at intervals not greater than 50 feet and shall be mounted approximately two inches above the barrier. The reflectors shall be either 10" x 10" square Type V (or equal) reflective sheeting mounted on flat-sheet panels, or 8" diameter center-mounted sealed prismatic reflex reflectors housed in an aluminum backing with a single grommeted hole. Approach end of Portable Barrier shall be flared or protected by an impact attenuator (crash cushion) or other approved treatment in accordance with Georgia Standard 4960, Construction Details and Standard Specifications. On interstate or other controlled access highways where lane shifts or crossovers cause opposing traffic to be separated by less than 40 ft., precast concrete barrier shall be used as a separator. B. TEMPORARY SAND LOADED ATTENUATOR MODULES 1. DESCRIPTION: This work consists of the furnishing, installation, maintenance, relocation, reuse as required, and removal of Temporary Sand Loaded Attenuator Modules for traffic impact attenuators. 2, MATERIALS: Materials used in the Attenuaror shall meet the requirements of Subsection 648.02 for Type 2 Sand Loaded Modules - Cylindrical Drums or Type 2-A Sand Loaded Modules _ E:tabilizer Drums with Wine Glass shaped Inner Containers. 3. CONSTRUCTION: Temporary Sand Loaded Attenuator Module installation shall conform to the requirements of Subsection 648.03, Manufacturer's recommendations, and Georgia Standard 1j,960 and shall be installed at locations designated by the Engineer. C. PORTABLE IMPACT ATTENUATORS: 1. DESCRIPTION: This work consists of the furnishing (including spare parts), installation, maintenance, relocation, reuse as required, and removal of Portable Impact Attenuators. 2. MATERIALS: Materials used in the Attenuator shall meet the requirements of Section 650 for Type A Portable Impact Attenuators. 3. CONSTRUCTION: Portable Impact Attenuator installation shall conform to the requirements of Subsection 650.03, Manufacturer's recommendations, and Georgia Standard 4960 and shall be installed at locations designated by the Engineer, and/or shown on the plans. D. TEMPORARY GUARDRAIL ANCHORAGE - Type 11: 1. DESCRIPTION: This work consists of the furnishing, installation, maintenance and removal of Temporary Guardrail Anchorage - Type 11 used for Portable Barrier or temporary guardrail end treatment. TC-/6 I I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA 2, MP"TERlALS: Materials used in the Temporary Guardrail Anchorage - Type 11 shall meet the requirements of Subsection 641.02 of the Standard Specifications and current Georgia Standards and may be new or used. Materials salvaged from the Project which meet the requirements of S~ndards may be utilized if available. The use of any salvaged materials will require prior approval of the Engineer. 3, CONSTRUCTION: Installation of the Temporary Guardrail Anchorage - Type 11 shall conform to the requirements of the Plans, current Georgia Standards and Subsection 641.03 of the Standard Specifications. Installation shall also include sufficient additional guardrail and appurtenances to effect the transition and connection to Temporary Concrete Barrier as required by i:he details in Georgia Standard 4960. 150.06 EXCAVATION ADJACENT TO A TRAVEL LANE: Construction work involving trenching adjacent to a travel way shall not begin until the Contractor is able to continuously place the required typical section to within two inches of the existing pavement elevation, or heal the remaining difference in elevation to the traveled way as shown in Detail ISO-E. Channeliza':ion devices and placement during the construction period shall conform to the requirements of Subsection 150.05 and Details l50-B, lSO-C, l50-D, and l50-E shown herein. In addition to the signs specified in Section 150 and the MUTCD, a W-20 sign with the legend "(LEFI') (RIGHT) LANE NARROWS" with two flags shall be kept just otTthe paving edge and 500 feet upstream of the point. where channelization devices are erected on the paving edge. A. STONE BASES, SOIL AGGREGATE BASES, AND SOIL BASES: Drop-otTs in elevation of more than two inches between surfaces carrying, or adjacent to, traffic will not be allowed for more than 24 hours. However, where the Contractor has demonstrated the ability to continuously excavate and backfill in a proficient manner, a single length of excavated area not to exceed 1000 feet may be left open as a start up area for periods not to exceed 48 hours. B. ASPlli\L T BASES/BINDERS: Drop-otTs in elevation of more than two inches between surfaces carrying or adjacent to traffic will not be allowed for more than 48 hours. C. PORTLAND CEMENT CONCRETE AND CEMENT STABILIZED BASES: Construction work adjacent to the traveled way which involves these types of bases shall be healed within 48 hours after the curing period is complete for each section placed. During the placement period, traffic control devices will be in accordance with Subsection 150.05 and Deta.il150-B. D. MISCELUNEOUS EXCAVATIONS OR DROP-OFFS ADJACENT TO TRAVELWAY: Work such as drainaJ~e structures, utility facilities, or any other work which results in a drop-off adjacent to the travelway shall be performed expeditiously so as to minimize the exposure to the hazard. As soon as practi~l, the excavation shall be backfilled to the minimum requirements of Deta.il150-E. In no case will the drop-offbe allowed to exist more than five calendar days. This may require stage construction, such as plating and backfilling the incomplete work. 7C- /7 I I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA NOTE. Drums reQUired for thIs 10ccltlon,sPoced at 50 FT. Intervols. If the traveled way wIdth Is r'educed to less than 10 1'ee1' by the use of drums. vertIcal panels shoUbe used In lieu of drum&. Location of drums when drop-off exceeds ~ Inches. F ----------\ ----~-------~\ c t NEW CONSTRUCTION + TRAVEL LANE ~ DROP-OFF GREATER THAN 4 INCHES DET AIL 150-8 Drums spaced at 50 feet Intervals. LocatIon of drums when drop-off 15 2+ Inches to 4t lnches. ;C _1_~~______~~ -----------\ c -1 NEW CONSTRUCTION + TRAVEL LANE ~ DROP-OFF OF 2+ INCHES TO 4 INCHES DET AIL 150-C -rc-/t? I I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA Drunls spaced at 100 .'eet Intervals. LocatIon of drums when drop-off Is Z Inches or less. ;= ~f~~/- ______~. -----------\ I( -1 NEW CONS TRUCTION + TRAVEL LANE ~ DROP-OFF OF 2 INCHES OR LESS DETAIL 150-0 LocatIon of drums ImmedIately after completIon of healed sectIon. spaced at 50 ft. Intervals. Compclcted or oded oooreoote,subbose mater"lalor c11rt. TOP OF DRUM TO BE LEVEL 2 ft. +/- ----------~. -----------\ NO STEEPER THAN 4:1 ~~ I( -1, NEW CONSTRUCTION + ~ TRAVEL LANE HEALED SECTION DET AIL ISO-E TC- /1 I I I I' I I I I I I I I I I I I I. I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA 150.07 FLAGGING AND PILOT CARS: A. FIaggl~rs shall be provided as required to handle traffic, as specified in the Plans'or Special Provisions, and as required by the Engineer, B, All flaggers shall meet the requirements of the MUTCD and must have received training and a certificate upon completion of the training from a Department approved training program. Failure to provide certified flaggers as required above shall be reason for the Engineer suspending work invohing the flagger(s) until the Contractor provides the certified flagger(s). C. F1aggers shall wear high-visibility clothing in compliance with the MUTCD and shall use a Stop/Slow paddll~ meeting the requirements of the MUTCD for controlling traffic, The Stop/Slow paddles shall have a shaft length of seven (7) feet minimum. In addition to the Stop/Slow paddle, a flagger may use a 24 inches square red/orange flag as an additional device to attract attention. For night work, the vest shall have reflectorized stripes on front and back. D. Pilot vehicles shall be provided if specified in the Plans or Specifications and meet the requirements of the MUTCD. E. Signs for flagger traffic control shall be placed in advance of the flagging operation in accordance with the M:JTCD. In addition to the signs required by the MUTCD, signs at regular intervals, warning of the pr,~sence of the flagger shall be placed beyond the point where traffic can reasonably be expected to stop under the most severe conditions for that day's work. 150.08 ENFORCEMENT: The safe passage of pedestrians and traffic through and around the temporary traffic control zone, while minimizing confusion and disruption to traffic flow, shall have priority over all other Contractor activities. Continued failure of the Contractor to comply with the requirements of Section 150 CTRAF'FIC CONTROL) will result in non-refundable deductions of monies from the Contract as shown in this Subsection for non-performance of Work. Failure of the Contractor to comply with this Specification shall be reason for the Engineer suspending all other work on the Project, except erosion control and traffic control, taking corrective action as specified in Subsection 105.15, and/or withholding payment of monies due the Contractor for any work on the Prc~ect until traffic control deficiencies are corrected. These other actions shall be in addition to the deductions for non-performance of traffic control. -rc- ~ 0 I I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA c:.CHEDULE DF DEDUCTIONS FOR EACH CALENDAR DAY OF DEFICIENCIES OF TRAFFIC CONTROL INSTALLATION AND/OR MAINTENANCE C ORIGINAL TOTAL CONTRACT AMOUNT I I I From More Than To and Includin~ Daily Charge $0 $100.000 $100 100,000 1,000,000 250 1.000,000 5,000,000 500 5,000,000 20,000,000 750 20,000,000 40,000,000 1,000 40,000,000 - 1,500 150.09 MEASUREMENT: A. TRAFFIC CONTROL: When listed as a pay item in the Proposal, payment will be made at the Lump Sum p'rice bid, which will include all traffic control not paid for separately, and will be paid as follows: When the first Construction Report is submitted, a payment of25 (twenty-five) percent of the Lump Sum price will be made. For each progress payment thereafter, the total of the Project percent complete shown on the last pay statement plus 25 (twenty-five) percent will be paid Qess previo':ls payments), not to exceed one hundred (100) percent and subject to normal retainage. When no payment item for Traffic Control-Lump Sum is shown in the Proposal, all of the requirements of Section 150 and the Traffic Control Plan shall be in full force and effect. The cost of complying with these requirements will not be paid for separately, but shall be included in the overall bid submittal. B. SIGNE:: When shown as a pay item in the contract, interim special guide signs will be paid for as listed below. All other regulatory, warning, and guide signs, as required by the Contract, will be paid for unc.er Traffic Control Lump Sum or included in the overall bid submitted. 1. Interim ground mounted or interim overhead special guide signs will be measured for payment by the square foot. This payment shall be full compensation for furnishing the signs, including supports as required, erecting, illuminating overhead signs, maintaining, removing, re-erecting, and final removal from the Project. Payment will be made only one time regardless of the number of moves required. 2. Remove and reset existing special guide signs, ground mount or overhead, complete, in place, will be lDeasured for payment per each. Payment-will be made only one time regardless of the number of moves required. 3. Modify special guide signs, ground mount or overhead, will be measured for payment by the square foot. The area measured shall include only that portion of the sign modified. Payment shall include materials, removal from posts or supports when necessary, and remounting as required. -rc-z/ I I I I I I I I I I I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA C. PRECAST MEDIAN BARRIER: Precast Median Barrier will be measured as specified in Section 622. D. CHANGEABLE MESSAGE SIGN, PORTABLE: Changeable Message Sign, Portable will be measured as spedfied in Section 632. E. TEMPORARY GUARDRAlLANCHORAGE, 'Type 11: Temporary Guardrail Anchorage - Type 11 will be meclSured by each assembly, complete in place and accepted according to the details shown in the plans, 'Which shall also include the additional guardrail and appurtenances necessary for transition and connection to Temporary Concrete Barrier. Payment shall include all necessary materials, equipment, labor, site preparation, maintenance and removal. F. TRAF1i'!C SIGNAL INSTALLATION. TEMPORARY: Traffic Signal Installation - Temporary will be measured as specified in Section 647. G. FLASHING BEACON ASSEMBLY: F1ashing Beacon Assemblies will be measured as specified in Section 647, H. TEMPORARY, SAND LOADED ATrENUATOR MODULES: Each Sand Loaded Attenuator Module of the type specified includes all material components, hardware, incidentals, labor, site preparation and maintenance. Each module will be measured for payment by the drum only once regardless ofilie number oflocations installed. Modules to replace those damaged or destroyed by traffic impact will also be measured by the unit for payment. Upon completion of the project, the modules shall be removed and retained by the Contractor. 1. PORTABLE IMPACT ATTENUATORS: Each Portable Impact Attenuator will be measured by the unit which shall include all material components, hardware, incidentals, labor, site preparation, and maintenance, including spare parts recommended by the manufacture for repairing minor accident damage. Each unit will be measured only once regardless of the number oflocations installed, moves require:d, or number of repairs necessary because of traffic damage. Upon completion of the project, the un'its shall be removed and retained by the Contractor. J, PAVEMENT MARKINGS: Pavement markings will be measured as specified in Section 150. 150.10 PAYMENT: When shown in the Schedule ofItems in the Proposal, the following items will be paid for separately. Item No. 150. Traffic Control. . . ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Lump Sum Item No. 150. Traffic Control, Solid Traffic Stripe _ Inch, (Color) ............. per Linear Mile Item No. 150. Traffic Control, Skip Traffic Stripe_ Inch, (Color) .............. per Linear Mile Item No. 150. Traffic Control, Solid Traffic Stripe, Thermoplastic Inch, (Color) ........... . . . . . . . . . . . . . . . . per Linear Mile - Item No. 150, Traffic Control, Skip Traffic Stripe, Thermoplastic Inch, (Color) .................. . . . . . . . . . per Linear Mile Item No. 1.50. Traffic Control, Pavement Arrow with Raised Reflectors.. . . . . . . .. . .. .. .. per Each Item No, 1.50. Traffic Control, Raised Pavement Markers - All Types. . . . . . . . . . . . . . . . . .. per Each Item No. 150, Interim Ground Mounted Special Guide Signs. . . . . . . . . . . . . . . . . . .. per Square Foot Item No. 150. Interim Overhead Special Guide Signs .......................... per Square Foot 7&ZZ I Item No. 150. I Item No. 150. I Item No. 150. I Item No. 150. Item No. 150. I. Item No. 160. I Item No. 1150. Item No. 1150. I Item No. 6:~2. Item No. 6H2. I Item No. 641 I Item No. 647. Item No. 647. I Item No. 6~t7. I I I I I I I I I DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA Remove & Reset Existing Special Guide Signs, Ground Mount, Complete in Place. . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. per Each Remove & Reset, Existing Special Guide Signs, Overhead,Complete in Place ..................................... Per Each Traffic Control, Temporazy Sand Loaded Attenuator Modules ............ per Each Traffic Control, Portable Impact Attenuator . . . . . . . . . . . . . . . . . . . . . . . . . . .. Per Each Traffic Control, Pavement Markers, Words and Symbols ........... per Square Foot Traffic Control, Pavement Arrow (Painted) With Raised Reflectors ........ per Each Modify Special Guide Sign, Ground Mount. . . . . . . . . . . . . . . . . . . . . .. per Square Foot Modify Special Guide Sign, Overhead ........................... per Square Foot Precast Concrete Median Barrier. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . per Linear Foot Changeable Message Sign, Portable .................................. per Each Temporary Guardrail Anchorage, Type 11 ............................. per Each Traffic Signal Installation, Temp ...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , Lump Sum Flashing Beacon Assembly, Structure Mounted. . . . . . . . . . . . . . . . . . . . . . . .. per Each Flashing Beacon Assembly, Cable Supported. . . . . . . . . . . . . . . . . . . . . . . . . .. per Each -rc - z. :3