Department of Public Works' and Engineering
Teresa C. Smith, P.E., Director
Room 701, 530 Greene St.
Augusta, Georgia 30911
(706) 821-1706 FAX (706) 821-1708
Clifford A. Goins, Assistant Director
Engineering Division
February 5, 2001
Mr. Patrick Nordmann
Nordmann Contracting, Inc.
P.O. Box 16103
Augusta, Georgia 30919
RE: Willis Foreman Road Drainage Improvements
Change Order #2
Project No.: 322-04-292822791
File Reference: 00-014 (A)
Dear Mr. Nordmann:
Enclosed herewith for your records is a copy of the executed Change Order #2 on the
above referenced project.
If you have any questions, please contact me at 821-1714.
Clifford . Goins
Assistant Director
Public Works - Engineering Division
CAG/dlh
Attachments
xc: . ssion, w/copy of change order
Ms. Geri Sams, Director of urc g, w/copy of change order
Ms. Teresa Smith, P.E., Director of Public Works & Eng., w/copy of change order
Ms. Donna Williams, Interim Comptroller, w/copy of change order
Mr. Douglas A. Cheek, P.E., County Engineer, w/copy of change order
Mr. Robert Clements, Assistant Pre-Construction Engineer, w/copy of change order
Ms. Linda Crawford, wi copy of change order
I
C
'.
--- - ----- ~';"c.v.:
~~~Q~\J~ M~~"^-\ ,,'-<tc:....\.~\)~ \'-\
\ - ~ 3 -0 \
Change Order Number: Two Date: December 8. 2000
Project Title: Willis Foreman Road Drainage Improvements
Original Contract Date: 10/9/00 Project Number: 322-04-292822791
Owner: Augusta-Richmond County P.O. Number: 30574
Contractor: Nordmann Contracting. Inc.
The following change order is hereby made to the proposal for the above project:
(See Attachments)
TOTAL AMOUNT OF THIS CHANGE ORDER .$9,276.25
The Contract time will be Increased/Decreased by lS calendar days as a result of
this change. The date of completion including this change order is 5/16/01.
Original Contract Amount
Previous Change Order
(Increased / Decreaoed)
$ 398,359.00
-.$ 13,415.00
This Change Order
(Increased / Dccreaoed)
$ 9,276.25
TOTAL CONTRACT WITH CHANGE ORDER(S)
$421,050.25
*************
Funding Source / Account N~~1110-5414710-292822791
Requested By: /~~ ---;-- Date: /- g"- t:J /
'\ Engineer t/ . ': /' !
Submitted By~'_? \ \~ /in ~ c:..\-;1/rFcc~-- Date: Df, I ~ c I
Department liead '
Finance Endorsement: ~17t1M~W...p~ Date: /- ~2- err
_ 9omgh"~1l r -- J
Recommended By: ~~ #: /I L" Date: lit", I~/
Administrat r
Approved By: Date:
Accepted By:~lA - Date: I - '1- 0 I
. Contractor
Cc: Purchasing, Geri Sams
Finance Department, Kakoli Basu
,
.
'>
;
Change Order Number: Two Date: December 8.2000
Project Title: Willis Foreman Road Drainage Improvements
Original Contract Date: 10/9,100 Project Number: 322-04-292822791
Owner: Augusta-Richmond Count;y P.O. Number: ~0574
Contractor: Nordmann Contracting. Inc.
JUSTIFICATION
A. The roadway ditch from 1009 to 1015 along the southerly side of Fox Den
Road is heavily silted because of sandy soils and steep grades. This ditch
will be regraded and sodded to minimize future erosion and help in
keeping existing and proposed drainage Structures open.
(Cost=$3,906.25)
B. 1. Portions of the new ditch drop inlet (structure #lC) with weir will be
removed and rebuilt as a ditch drop inlet without weir as requested by
Commissioner Cheek. This action is taken because of complaints by the
adjoining property owner. This change negates any responsibility on the
design consultant for resulting impacts caused by this change.
(Cost=$1,775.00)
2. The designer omitted restraints for the 24" water main vertical offset in the
original plans but this work would have been necessary anyway had it
been included in the original plans. The substitution of metal casing
spacers for treated wood timbers is being made at the request of the
Utilities Dept. This change is needed but is not the designers fault.
(Cost=$2,700.00)
3. The 36" plastic flared end section was also inadvertently omitted by the
designer but would have had to be paid for anyway. (Cost=$89S.00)
Totals:
A.
B.I.
2.
3.
$3,906.25
$1,775.00
$2,700.00
$ 895.00
$9,276.25
CHANGE ORDER #2 GRAND TOTAL