HomeMy WebLinkAboutWater System Interconnection Project
Augusta Richmond GA
DOCUMENT NAME: W AcT!Ut.- 'by s -r6rfl -r (l)-r6~CL>,uroE.Cn DI0 )o~
DOCUMENT TYPE: C 1+ A tV ~ 6 0 R \:) eR-
YEAR: ') C1 C, ~
BOX NUMBER: lp
FILE NUMBER: \ ~q ~ \
NUMBER OF PAGES: ~
-i'__7
;;.,--
..../ ~"
0::
--
CHANGE ORDER
"
.... -
..
PROJECT TITLE: Water System Interconnection Proiect
i
Number 1
Date: 8/24/98
ORIGINAL CONTRACT DATE: 10/31/96 PROJECT NUMBER: U-96-011
OWNER: Augusta-Richmond County Commission/Council P.O. NUMBER: 129696
CONTRACTOR: Zimmerman. Evans and Leopold. Inc.
The following change order is hereby made to the proposal for the above notedyroject
1. Additional engineering services for the revision
of plans due to existing conditions being different
from what was anticipated. Revisions required for
the tie-in located at Peach Orchard and Tubman Home
15.5 Hrs. of Surveying at $15.68/Hr. and
10 Hrs. of Engineering at $37.12/Hr.
(2.12 Factor).................................................... ...... ....$1,302.19
2. Preparation of easement plats required
Lump Sum.......... ......... .... ..... ... ... ...... .... ...... ... ...... ... .$1,853.50
3. Engineering/Construction services requested for
18 inch raw water line conversion
56.5 H~s. at $26.88/Hr. (2.12 Factor).................................$3,219.69
TOTAL AMOUNT OF TillS CHANGE ORDER:
$6.375.38
The Contract time will be increased by .Q calendar days as a result ofthis change.
ORIGINAL CONTRACT AMOUNT:
$27.900.00
PREVIOUS CHANGE ORDERS (INCREASE)
TillS CHANGE ORDER (INCREASE)
$0.00
$6.375.38
TOTAL CONTRACT WITH CHANGE ORDERS:
$34,275.38
FUNDING SOURCE / ACCOUNT NUMBER: 62-4461-00-0442
REQUESTED BY:
.
pL s.~L_
Project Manager
DATE: gP7/r13
, I
~,.... . "f~'. /:..
>'''''. ". '-
.. "r ~ "
. ./
,i' .
. SUBMITTED BY:
i! fif~ .th~ ~
FINAN~E ENDORSEMENT:
c..r;...
RECOMMENDED BY:
APPROVED BY:
("J . --:" I ~
DATE:~q
DATE: r4s1hr
rr1_ A~ ~
DATE: D/?.6./'
DATE:~f