HomeMy WebLinkAboutW K DICKSON CHANGE NUMBER 1
To: Drew Goins 11/17/08s1t
.'
ENGINEERING CONTRACT CHANGE ORDER
I co NmmFll I 1 I
DATE 10/28/2008
PROjBCI' TITLE
Spirit Creek IDlftCq)tor
. EftlaatioD Ptojea
ORIGINAL CONTRACl' DATE PROjEcr NUMBEIl
06/03/'1J)()S 80600040 ~'~
OWNER AUGUSTA-RICHMOND PO NUMBER ~; ~ _.x.,<:!l
COUNTYCOMMISSION P15271.0 -+'~~.Jo..j." 'J"
The following change is hereby D12de to the contract for the ..hove proj<<t: 'iIY',~T>~
I>esaiptiQn of Charlge (for l more detai1ed desaiption see attached propoaal): amend the cootract fnt ~!,l~
..dditiooal services for design and f!llgi~ through construction. The "amendment is for the design of the
replacement of the existing 36" saniwy sewer main loated in -6tb Street and the services of providing dose4
circuit television inspectioo of the Main Interceptor. . ",
.\ppmved Ilf r......mi..ion OD Odober 7" 2008
PAYEE WK Dicboo Engineering
TOTAL AMOUNT OF TInS CHANGE ORDER
"$
81,910.00
The contrKt time will be INCREASED by Q calc:ndar days as a result of this change..
ORIGINAL CONTRACT AMOUNT $
PREVIOUS CHANGE ORDER (DECREASE) S
TInS CHANGE ORDER (DECREASE) $
TOTAL REVISED CONTRACT AMOUNTWflli CHANGE $
ORDER
FUNDING NUMBER/ACCOUNT NUMBER
125,000.00
0.00
0.00
206,910.00
PROPOSED BY: DATE: ID~fJ
REQUESTED BY: DATE: -1~~ LI f1'
SUBMlTI'ED BY: DATE; /1 S-! If
FINANCE ENDORSEMENT: DATE: 1(-r3~
RECOMMENDED BY: DATE: It-''l-Dr'
APPROVED BY: DATE: I r I~(.:>(,
507043420/5212115-
/5212115
To: Drew Goins 11/17/08s1t
..-, ".
ENGINEERING CONTRACT CHANGE ORDER
I g~~Fll I 10/zi/2OO8 I
PROjBCI' TITLE
Spirit Creek IDlftCq)tor
, EftlaatioD Ptojea
ORIGINAL CONTRACl' DATE PROjEcr NUMBEIl
06/03/'1J)()S 80600040 ~'~
0........"'1l AUGUSTA-RICHMOND PO NUMBER ~; ~ ..x.,<:!l
W 1"1r. COUNTYCOMMISSION P15271.0 "f.~~ .Jo..j." 'J"
The following change is hereby D12de to the contract for the ..hove proj<<t: 'iIY'\~r
DescDption of Charlge (for l more detai1ed description see attached propoaal): amend the cootract fnt ~~~
additional services for design and f!llgi~ through construction. The amendment is for the design of the
replacement of the existing 36" sanitary sewer main located in ,6th Street and the services of providing ~se4
circuit television inspectioo of the Main Interceptor. . "
.\ppmved Ilf r.........i..ion OD Odober 7" 2008
PAYEE WK Dicboo Engineering
TOTAL AMOUNT OF TInS CHANGE ORDER
$
81,910.00
ORIGINAL CONTRACT AMOUNT
PREVIOUS CHANGE ORDER (DECREASE)
TInS CHANGE ORDER (DECREASE)
TOTAL REVISED CONTRACT AMOUNTWflli CHANGE
ORDER
FUNDING NUMBER/ACCOUNT NUMBER
The contrKt time will be INCREASED by Q calc:ndar days as a result of this change..
$
S
$
$
125,000.00
0.00
0.00
206,910.00
507043420/5212115-
/5212115
PROPOSED BY: DATE: ID/~fJ
REQUESTED BY: DATE: -1~~ 4 1,."
/
SUBMlTI'ED BY: DATE; /1 S-/ If
FINANCE ENDORSEMENT: DATE: 1(-r3-(j~
RECOMMENDED BY: DATE: 11- .'l-Dr'
APPROVED BY: DATE: I r I ~/.:>(,