CHANGE ORDER
NUMBER: 1
DATE: 3-13-96
PROJECT TITLE: Turpin Hill Rdwv. & Drain. Improvements. Phase 2
ORIGINAL CONTRACT DATE:
10-17-95
PROJECT NO.: 51-8402-094
OWNER: Augusta-Richmond county Commission-Council P.O. NUMBER: 119494
CONTRACTOR:
Mabus Brothers
The following change order is hereby made to the proposal for the above project:
Add:
(See Attached Sheet)
TOTAL AMOUNT OF THIS ORDER:
$49.329.21
The contract time will increasedj--------- by ~ calendar days as a result of
this change.
ORIGINAL CONTRACT AMOUNT:
$1. 349 . 703 .90
PREVIOUS CHANGE ORDERS (INCREASED/DECREASED):
.00
TOTAL CONTRACT WITH CHANGE ORDERS:
$49.329.21
$1. 399.033.11
THIS CHANGE ORDER (INCREASED/---------):
****************************************************************
REQUESTED BY: R. L. Clements. Asst. Precon. Enq. DATE: 3-13-96
SUBMITTED BY: R. L. Clements. Asst. Precon. Enq. DATE: 3-13-96
RECOMMENDED BY: blic Works Dir. DATE: 3-13-96
APPROVED BY: DATE: ~~~6
'7 ~
".~ . ,.
ADD:
(A) One each Drop Inlet, Type II @ $1,150
225 LF, 8" PVC Sanitary Sewer @ $25/LF
= $1,150.00
= $5,625.00
= $1,650.00
= $2,523.15
= $3,063.50
= $3,284.10
(B) 300 SY Graded Agg. Base @ $5.50/SY (7th Ave)
63 Tons Asphalt Cone "E" @ $40. 05/Ton (7th Ave)
557 SY Graded Agg. Base @ $5.50/SY (8th Ave)
82 Tons Asphalt Con "E" @ $40.05/Ton (8th Ave)
Lump Sum Construction for 7th & 8th Avenues (includes Grad-
ing, Erosion COntrol, Construction Layout Traffic Control,
remove and reset fences and debris removal) = $3,200.00
(C) Construct Storm drain through landfill (see attachment)
= $28,833.4"6
TOTAL
= $49,329.21
"
'': -. ......,
';::;4 - . ~
RICHMOND COUNTY PUBLIC WORKS
1815 Marvin Griffin Road
Augusta, GA 3COO6
Millard F. Gooding
Public Works Director
MEMO TO:
.,r---
Larry Sconyers ~ t r'
Mayor.d ~ . I4tl
" ;: tJ~
Millard F. ing
Public Works Director
l,
n~I~\~L~ll\~J~G~E>
""'\ 'i;i:v- ~".,,,,. "" ,
J _ ~t, ~ ""~~'" f' :':: " :,;'
""1,,:';;n:' I.AAO (" ,,1
.~nn 15 19~ =:_':,"/
(706) 796-5040
Fax:,(706) 796-5045
March 13, 1996
RICHf1l0e.'fj r'fllli~rY
BOARD OF COiM;iisc:;;;~E'v;: O'-'C""E
vh..;h 1\.... , f ;IV
FROM:
RE:
AGENDA
Turpin Hill Roadway & Drainage Improvements, Phase II
Project Number: 51-8402-094
File Reference: 87-056
Attached is Change Order Number One for the referenced project
in the amount $49,329.21.
This change order reflects (A) Addition of a Type II Drop Inlet
and 225 LF of 8" PVC Pipe for items required to accomplish the
work and alleviate a sanitary sewer problem for several
residents; (B) The addition of base and paving for 7th and 8th
Avenues on the southeasterly side of Old Savannah Road; and (C)
The additional work and delays caused by the encountering of an
old landfill through which a storm drain had to be layed. The
contractor was delayed and had to take special precautions,
monitor and protect the disturbed area, properly dispose of the
excavated materials and haul in fresh backfill materials.
Funds for this change should come from project contingencies.
Current project contingencies show a balance of $149,364.
Approval is recommended.
APPROVED
APR 2 1996
RLC/lgg
attachment
cc: Cheryl Nelson
Jack Murphy
Agenda Item
Preconstruct ion File