Loading...
HomeMy WebLinkAboutTurpin Hill Rdwy & Drain Improvement Phase 2 Augusta Richmond GA DOCUMENT NAME: /0,,'\>;'" \-t\\ R6W'-0 -+ ~~~Y"\ .~pY1)ve...rn~Y1f Vho--S~:2 DOCUMENT TYPE: Chc<()~ Oycley YEAR: l 0 0, Co BOX NUMBER: FILE NUMBER: ) ~ (p 54 NUMBER OF PAGES: --3 -, ~ '(, .. CHANGE ORDER NUMBER: 1 DATE: 3-13-96 PROJECT TITLE: Turpin Hill Rdwv. & Drain. Improvements. Phase 2 ORIGINAL CONTRACT DATE: 10-17-95 PROJECT NO.: 51-8402-094 OWNER: Augusta-Richmond county Commission-Council P.O. NUMBER: 119494 CONTRACTOR: Mabus Brothers The following change order is hereby made to the proposal for the above project: Add: (See Attached Sheet) TOTAL AMOUNT OF THIS ORDER: $49.329.21 The contract time will increasedj--------- by ~ calendar days as a result of this change. ORIGINAL CONTRACT AMOUNT: $1. 349 . 703 .90 PREVIOUS CHANGE ORDERS (INCREASED/DECREASED): .00 TOTAL CONTRACT WITH CHANGE ORDERS: $49.329.21 $1. 399.033.11 THIS CHANGE ORDER (INCREASED/---------): **************************************************************** REQUESTED BY: R. L. Clements. Asst. Precon. Enq. DATE: 3-13-96 SUBMITTED BY: R. L. Clements. Asst. Precon. Enq. DATE: 3-13-96 RECOMMENDED BY: blic Works Dir. DATE: 3-13-96 APPROVED BY: DATE: ~~~6 '7 ~ ".~ . ,. ADD: (A) One each Drop Inlet, Type II @ $1,150 225 LF, 8" PVC Sanitary Sewer @ $25/LF = $1,150.00 = $5,625.00 = $1,650.00 = $2,523.15 = $3,063.50 = $3,284.10 (B) 300 SY Graded Agg. Base @ $5.50/SY (7th Ave) 63 Tons Asphalt Cone "E" @ $40. 05/Ton (7th Ave) 557 SY Graded Agg. Base @ $5.50/SY (8th Ave) 82 Tons Asphalt Con "E" @ $40.05/Ton (8th Ave) Lump Sum Construction for 7th & 8th Avenues (includes Grad- ing, Erosion COntrol, Construction Layout Traffic Control, remove and reset fences and debris removal) = $3,200.00 (C) Construct Storm drain through landfill (see attachment) = $28,833.4"6 TOTAL = $49,329.21 " '': -. ......, ';::;4 - . ~ RICHMOND COUNTY PUBLIC WORKS 1815 Marvin Griffin Road Augusta, GA 3COO6 Millard F. Gooding Public Works Director MEMO TO: .,r--- Larry Sconyers ~ t r' Mayor.d ~ . I4tl " ;: tJ~ Millard F. ing Public Works Director l, n~I~\~L~ll\~J~G~E> ""'\ 'i;i:v- ~".,,,,. "" , J _ ~t, ~ ""~~'" f' :':: " :,;' ""1,,:';;n:' I.AAO (" ,,1 .~nn 15 19~ =:_':,"/ (706) 796-5040 Fax:,(706) 796-5045 March 13, 1996 RICHf1l0e.'fj r'fllli~rY BOARD OF COiM;iisc:;;;~E'v;: O'-'C""E vh..;h 1\.... , f ;IV FROM: RE: AGENDA Turpin Hill Roadway & Drainage Improvements, Phase II Project Number: 51-8402-094 File Reference: 87-056 Attached is Change Order Number One for the referenced project in the amount $49,329.21. This change order reflects (A) Addition of a Type II Drop Inlet and 225 LF of 8" PVC Pipe for items required to accomplish the work and alleviate a sanitary sewer problem for several residents; (B) The addition of base and paving for 7th and 8th Avenues on the southeasterly side of Old Savannah Road; and (C) The additional work and delays caused by the encountering of an old landfill through which a storm drain had to be layed. The contractor was delayed and had to take special precautions, monitor and protect the disturbed area, properly dispose of the excavated materials and haul in fresh backfill materials. Funds for this change should come from project contingencies. Current project contingencies show a balance of $149,364. Approval is recommended. APPROVED APR 2 1996 RLC/lgg attachment cc: Cheryl Nelson Jack Murphy Agenda Item Preconstruct ion File (AUGUSTA.RICHMOND COUNTY COMMISSION) District: 2nd Basin: Phinizy