Loading...
HomeMy WebLinkAboutSpirit Creek Wastewater Treatment Plant DOCUMENT NAME: DOCUMENT TYPE: YEAR: 1 ql1 w BOX NUMBER: \ Augusta Richmond GA 5?,'y\\- &ee-"?- 'p ,~{\ t- CPO-'i\~ DdUl FILE NUMBER: J 9--l-P ~ \ NUMBER OF PAGES: (0 wGSi e- W.....-t-u I ~+ \'l') ex\.+- CHANGE ORDER No. 1 NAME OF PROJECT: Engineering Services regarding the Sanitary Sewer Lift Station and Force Main from the Horseshoe Sewer Extension to the Industrial Sewer Line at Allen Station Road. OWNER: Augusta Richmond County Commission/Council ENGINEER: Southern Partners, Inc. The following additions where hereby made to the original scope of work to be performed: Provide Field Survey and drawing for the proposed route of proposed water line at a Lump Sum Cost of, $3,810.00. Original CONTRACT PRICE: Change to CONTRACT PRICE: $46,400.00 $3,810.00 , The "new" CONTRACT PRICE will be: $50,210.00 There will be Q additional days required to complete changes. Requested By: ~.~ ~4A~ )').tJ /11 ( , Date Ge rge McElveen, Director Water & Sewerage Department Approved By: Augusta Richmond County Engineering Services Committee Date Approved By: %tYe'1b Z E 1i35 Telfair Street Ted W, Ellis, P,E" Chm, of Board, Emeritus rii Augusta, Georgia 30901.2494 J, J, Tankersley, P,E., President E N GIN E E R S J, R, Armstrong, P,E" Vice-President Jorge E, Jimenez, P,E" Secretary J, T, Eubanks, P,E" Treasurer C. D, Drown, P,E, ZIMMERMAN, EVANS AND LEOPOLD, INC. (706) 724-5627 March 18, 1996 9206 Mr. George McElveen, Director Augusta-Richmond County Utilities Dept. 2760 Peach Orchard Rd, Augusta, GA 30906 Re: Change Order #2 Spirit Creek Wastewater Treatment Plant Dear George: As we discussed last week, four copies of Change Order #2 for the Spirit Creek Wastewater Treatment Plant are enclosed for signature, This change order work was completed between August 8 and August 15, 1995, The work was performed in accordance with a job site decision necessitated by the discovery that the existing 24" line was out of round, In order to install the new added valve, it was necessary to purchase adapter rings and to hold the excavation open until delivery of the necessary materials, We have checked the Contractor's support data and recommend this change order be added to the contract. Please return two signed copies to us, one of which will be sent to the contractor, Very truly yours, ZIMMERMAN, EVANS AND LEOPOLD, INC, ~~E JRA/nt Enclosures: 4 copies CO#2 ~. . 9206-001.DOC CHANGE ORDER Order No, 2 Date March 7, 1996 Agreement Date December 7, 1993 PROJECT: SPIRIT CREEK WASTEWATER TREATMENT F AClUTlES, PHASE II OWNER: BOARD OF COUNCIL-COMMISSIONERS OF AUGUST A-RICHMOND COUNTY, GEORGIA CONTRACTOR: G,E, MOORE DIVISION OF M.B, KAHN CONSTRUCTION, INC. The following changes are hereby made to the CONTRACT DOCUMENTS: JUSTIFICATION: Because the existing 24" ductile iron pipe was out-oi-round, installation of a valve in the line -between Pond lA & IE required installation of adapter rings; also closing the excavation was delayed by the time needed to obtain the appropriate rings, CHANGE TO CONTRACT PRICE: Original CONTRACT PRICE $1,488,000,00 Current CONTRACT PRICE adjusted by previous CHANGE ORDERS $1,488,562,00 The CONTRACT PRICE due to this CHANGE ORDER will be (increased) by: $ 10,903,73 New CONTRACT PRICE including this CHANGE ORDER $ 1,499,465,73 CHANGE TO CONTRACT TIME: The CONTRACT TIME will be (increased) by -1L calendar days, Requested by M,B, Kalm Construction Co, The date for completion of all work: Ordered by Accepted by Augusta-Richmond County W&S System Signature Date CQ-2 CHANGE ORDER Order No, 2 Date March 7, L996 Agreement Date December 7, L 993 PROJECT: SPIRIT CREEK W ASTEW A TER TREATMENT F ACILlTIES, PHASE II OWNER: BOARD OF COUNCIL-COMMISSIONERS OF AUGUSTA-RiCHMOND COUNTY, GEORGIA CONTRACTOR: G.E MOORE DIVISION OF M,8, KAHN CONSTRUCTION, INC. The following changes are hereby made to the CONTRACT DOCUMENTS: JUSTIFICATION: Because the existing 24" ductile iron pipe was out-of-round, installation of a valve in the line between Pond I A & 18 required installation of adapter rings; also closing the excavation was delayed by the time needed to obtain the appropriate rings, CHANGE TO CONTRACT PRICE: OriginaL CONTRACT PRICE $1.488,000,00 Current CONTRACT PRICE adjusted by previous CHANGE ORDERS $ 1.488,562,00 The CONTRACT PRICE due to this CHANGE ORDER will be (increased) by: $ 10,903,73 New CONTRACT PRiCE including this CHANGE ORDER $ L499A65,73 CHANGE TO CONTRACT TIME: The CONTRACT TIME will be (increased) by ~ calendar days, The dale for completion of all work: Januarv 26, 199_5._ Requested by M,B, Kahn Construction Co,. Inc, Ordered by Accepted by Augusta-Richmond Countv W&S System Signature Date CQ-2 CHANGE ORDER Order No, 2 Date March 7, 1996 Agreement Date December 7. 1993 PROJECT: SPIRIT CREEK W ASTEW A TER TREATMENT FACILITIES, PHASE II OWNER: BOARD OF COUNCIL-COMMISSIONERS OF AUGUST A-RICHMOND COUNTY, GEORGIA CONTRACTOR: G,E, MOORE DIVISION OF M,8. KAHN CONSTRUCTION. INC. The foUowing changes are hereby made to the CONTRACT DOCUMENTS: JUSTIFICATION: Because the existing 24" ductile iron pipe was out-of-round, instaUation of a valve in the line between Pond IA & IB required instaUation of adapter rings: also closing the excavation was delayed by the time needed to obtain the appropriate rings, CHANGE TO CONTRACT PRICE: Original CONTRACT PRICE $1.488.000,00 Current CONTRACT PRICE adjusted by previous CHANGE ORDERS $1.488,562,00 The CONTRACT PRICE due to this CHANGE ORDER ,,,ill be (increased) by: $ 10.903,73 New CONTRACT PRICE including this CHANGE ORDER $ 1.499.465,73 CHANGE TO CONTRACT THvlE: The CONTRACT TIME will be (increased) by ~ calendar days, Requested by M,B, Kahn Construction Co, The date for completion of all work: n Jan!!ElI 26;..J,2~i.-:.",,, Ordered by Accepted by Augusta-Richmond.Countv W&S Svstem Signature Date CO-2 , . CHANGE ORDER Order No, 2 Date March 7. 1996 Agrcement Date Deccmber 7, 1993 PROJECT: SPIRIT CREEK W ASTEW A TER TREA TtvlENT F ACILlTIES, PHASE II- OWNER: BOARD OF COUNCIL-COtvlMISSIONERS OF AUGUSTA-RICHMOND COUNTY, GEORGIA CONTRACTOR: G.E, MOORE DIVISION OF M.B, KAHN CONSTRUCTION, INC. The following changes are hereby made to the CONTRACT DOCUMENTS: JUSTIFICATION: Because the existing 24" ductile iron pipe was out-of-round. installation of a vah'e in the line between Pond 1A & IB required installation of adapter rings: also closing the excavation was delayed by the time needed to obtain the appropriate rings, CHANGE TO CONTRACT PRICE: Original CONTRACT PRICE $1.488,000,00 Current CONTRACT PRICE adjusted by previous CHANGE ORDERS $1.-n~8,562,OO The CONTRACT PRICE due to this CHANGE ORDER will be (increased) by: $ 10,903,73 New CONTRACT PRICE including this CHANGE ORDER S U9l),465,73 CHANGE TO CONTRACT TltvlE: The CONTRACT TItvlE will be (increased) by ----'..::L- calendar days, Requested by tvl.B, Kahn Construction Co.. 1nc, Januarv 26, 1995 The date for completion of all work: Ordered by - / -?-~ 3/rBff ( Accepted by Augusta-Richmond Countv W&S S\'stem Signature Date CO-2