Change Order
OWNER
ARCffiTECT
CONTRACTOR
FIELD
OTHER
[X]
[X]
[X]
[ ]
[ ]
AlA Document G701 -
Electronic Format
TIllS IX>CUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATIORNEY IS ENCOURAGED WITH RESPECT TO ITS
COMPLETION OR MODIFICATION. AlJTIIENTICATION OF TIllS ELECTRONICALLY DRAFfED AlA IX>CUMENT MAYBE MADE BY USING AlA
IX>CUMENT 0401,
PROJECT:
(name, address)
Augusta-Richmond County Small Business
Incubator Facility
Augusta, Georgia
TO CONTRACTOR:
CHANGE ORDER NUMBER: Five (5)
DATE: April 15, 1999
ARCHITECT'S PROJECT NO: 27611
CONTRACT DATE: July 1, 1998
(name, address)
Two State Construction Company, Inc. CONTRACT FOR: General Contracting
Post Office Drawer 239
Thomson, Georgia 30824
The Contract is changed as foUows:
Extend contract time due to delays in receiving the main mechanical unit from the manufacturer because of damage that occurred to
the unit during transit,
Not valid until signed by the Owner, Architect and Contractor.
The original (Contract Sum) (Guarllftteee ffi8:.lBffiI:lm Prise) was
Net change by previously authorized Change Orders
The (Contract Sum) (Gt.iaraateee Maximum Priee) prior to this Change Order was
The (Contract Sum) (GuarBBteed M8:xIDUJffi Priee) will be (iflereasee) (deereased)
(unchanged) by this Change Order in the amount of
The new (Contract Sum) (Gt.iar9:B.teed MaKimttm Priee) including this Change Order will be
The Contract Time will be (increased) (deereased) (uoohaagee) by N'meteen (19 ) days,
The Date of Substantial Completion as of the date of this Change Order therefore is April 30, 1999
NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed maximum Price which have been
authorized by Construction Change Directive.
$ 1,269,289.00
$ 917,16
$ 1,270,206,16
$ -0-
$ 1,270,206.16
ARCffiTECT
TSDG Architects
CONTRACTOR
Two State Construction Co., Inc.
Address
Post Office Drawer 239
B:hom~~24
DATE: 4/20(97
OWNER
~ Augusta-Richmond County
Addres
530
Au
BY:
Address
Post Office Box 277
Tho
B:
---
AlA IX>CUMENT G701 . CHANGE ORDER. 1987 EDITION' AIA . COPYRIGHT 1987. TIlE AMERICAN INSTITUTE CIDTECTS, 1735 NEW YORK
AVENUE, N,W,. WASHINGTON, D.C" 20006-5292, WARNING: Unlicensed photocopying violates U.S, copyright laws and is subject to legal prosecution, This
document was electronically produced with permission of the AlA and can be reproduced without violation until the date of expiration as noted below,
Electronic Format - 0701-1987
User Document: C05ARCINC,DOC -- 4/20/1999, AIALicense Number 109910, which expires on 7/31/1999 -- Page #1
"...
"
r
Change Order
OWNER
ARCHITECT
CONTRACTOR
FIELD
OTHER
[X]
[ X]
[X]
[ ]
[ ]
AlA Document G701 -
Electronic Format
TIIIS JX)CUMENf HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATIORNEY IS ENCOURAGED WITH RESPECT TO ITS
COMPLETION OR MODIFICATION, AurnENTlCATION OF TIIIS ELECTRONICALLY DRAFTED AIA JX)CUMENf MAYBE MADE BY USING AIA
JX)CUMENf 0401.
PROJECT:
(name, address)
Augusta-Richmond County Small Business
Incubator Facility
Augusta, Georgia
TO CONTRACTOR:
CHANGE ORDER NUMBER: Five (5)
DATE: April 15, 1999
ARCHITECT'S PROJECT NO: 27611
CONTRACT DATE: July 1,1998
(name. address)
Two State Construction Company, Inc. CONTRACT FOR: General Contracting
Post Office Drawer 239
Thomson, Georgia 30824
The Contract is changed as follows:
Extend contract time due to delays in receiving the main mechanical unit from the manufacturer because of damage that occurred to
the unit during transit,
Not valid until signed by the Owner, Architect and Contractor.
The original (Contract Sum) (Guaranteed maximum Priee) was
Net change by previously authorized Change Orders
The (Contract Sum) (Guaranteed MtOOmum Priee) prior to this Change Order was
The (Contract Sum) (Guaranteed Maximum Prioe) will be (inoreased) (deoreased)
(unchanged) by this Change Order in the amount of
The new (Contract Sum) (Guarll8teed Maximum Priee) including this Change Order will be
The Contract Time will be (increased) (deereased) (tJAeRllflged) by N"meteen (19 ) days.
The Date of Substantial Completion as of the date of this Change Order therefore is April 30, 1999
NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed maximum Price which have been
authorized by Construction Change Directive,
$ 1,269,289.00
$ 917.16
$ 1,270,206,16
$ -0-
$ 1,270,206,16
ARcmTECT
TSDG Architects
CONTRACTOR
Two State Construction Co., Inc.
Address
Post Office Drawer 239
B~o~~
~
OWNER
Augusta-Richmond County
DATE:
4/zrlf(Cf
BY:
DA
Address
Post Office Box 277
Thomso
AIA JX)CUMENT 0701 . CHANGE ORDER. 1987 EDmON . AIA . COPYRIGHf 1987 . TIlE AMERICAN INSTITlITE OF CHITECTS, 1735 NEW YORK
AVENUE, N.W" WASHINGTON, D,C" 20006-5292, WARNING: Unlicensed photocopying violates U.S, copyright laws and is subject to legal prosecution, This
document was electronically produced with permission of the AIA and can be reproduced without violation WltiJ the date of expiration as noted below,
Electronic Fonnat - G701-1987
User Document: C05ARCINC,DOC -- 4/20/1999, AlA License Number ]09910, which expires on 7/31/1999 - Page #1