Change Order
AlA Document G701 -
Electronic Format
[X]
[ X]
[X]
[ ]
[ ]
TIllS DOCUMENT HAS rMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS
COMPLETION OR MODIFICATION, AUTIIENTICATION OF TIllS ELECTRONICALLY DRAFTED AlA DOCUMENT MAY BE MADE BY USING AlA
DOCUMENT 0401,
PROJECT:
(name, address)
Augusta-Richmond County Small Business
Incubator Facility
Augusta, Georgia
TO CONTRACTOR:
(name, address)
Two State Construction Company, Inc.
Post Office Drawer 239
Thomso~Georgia30824
The Contract is changed as follows:
CHANGE ORDER NUMBER: One (1)
DATE: August 3, 1998
ARClllTECT'S PROJECT NO: 27611
CONTRACT DATE: July 1,1998
CONTRACT FOR: General Contracting
Delete detention pond, lower building pad nine (9) inches and reroute 18" RCP to new junction box
at existing 18" RCP near front north corner of site.
Add water utility boxes, check valves and backflow preventer as required
by Richmond County.
Re-route new water service around existing electrical transformer.
DEDUCT $5,453.00
ADD $2,032.00
ADD $1,773.00
TOTAL CREDIT
$1,648.00
Not valid until signed by the Owner, Architect and Contractor.
The original (Contract Sum) (Gu&rlHlteea ffilOORUiffi Price) was
Net change by previously authorized Change Orders
The (Contract Sum) (GuarlHlteed Maximum Price) prior to this Change Order was
The (Contract Sum) (Gtlaranteed I\.1fOOffiuffi Price) will be (increased) (decreased)
(uRclutflged) by this Change Order in the amount of
The new (Contract Sum) (GuarlHlteed Mwomum Price) including this Change Order will be
The Contract Time will be (increased) (deoreased) (unohaRged) by zero (0 ) days,
The Date of Substantial Completion as of the date of this Change Order therefore is April 5, 1998
$ 1,269,289.00
$ -0-
$ 1,269,189.00
$ 1,648.00
$ 1,267,641.00
AlA DOCUMENT G70 I . CHANGE ORDER. 1987 EDmON . AlA . COPYRlGill 1987 . TIlE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK
AVENUE, N,W" WASHINGTON, D.C" 20006-5292, WARNING: Unlicensed photocopying violates U,S, copyright laws and is subject to legal prosecution, This
docwnent was electronically produced with permission of the AlA and can be reproduced without violation until the date of expiration as noted below.
Electronic Format - G701-1987
User Document: CHANGEORDER1.DOC -- 8/3/1998. AlA License Number 109910, which expires on 7/31/1999 -- Page #1
..,r (. ... ..
.1'
l/2.g-i <=JGc,
I
G 2~ '11 2-&~
- -Ii -:LO.l if~ -
? 'f 0-04:)
I
'\ - .
N~TE: -:r~s summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed maximum Price which have been
autliorized by' Construction Change Directive.
OWNER ~c.c.S"', ~~~/'Clo
Auglista V.iSRm6hd CvullLy Board
ef CeffiI'lil\~ioner
ARCHITECT
Two State Design Group
Architects
Address
Post Office Box 277
Thomson, Geo .
CONTRACTOR
Two State Construction
Company, Inc.
Address
Post Office Drawer 239
B~omett3~
Address
530 Greene Street, Room 605
Augusta, Georgia 30911
BY:
DATE:
DATE:
1/!-
trln/tS
~
AlA DOCUMENT 0701 . CHANGE ORDER. 1987 EDITION. AlA . COPYRIGHT 1987 . THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK
A VENUE, NW" WASHINGTON, D.C" 20006-5292. WARNING: Unlicensed photocopying violates U.S, copyright laws and is subject to legal prosecution. This
document was electronically produced with permission of the AlA and can be reproduced without violation Wltil the date of expiration as noted below.
Electronic Format - 0701-1987
User Document: CHANGEORDERl.DOC -- 8/3/1998. AlA License Number 109910, which expires on 7/31/1999 -- Page #2
i ~
TWO STATE
THOMSON, GEORGIA
Phone 706-595-2863
706-724-1605
Fax 706-595-7134
July 31, 1998
TSDG
Attn: Phil Rhoades
P,O, Box 277
Thomson, GA 30824
Re: Proposal Request #2 '
Small Business Incubator Facility
Dear Mr. Rhoades,
Please accepfthis as our proposal request #2 for changes to the original scope of work that we
feel are nec~ssary for the Incubator Facility, The following changes are based on the new civil
drawings (by Scott Godefroy) arid conversations with Scott. These drawings (C1 and C2) show
the deletion of the retention pon~ at the front of the site alld the storm drainage from the parking
lot to the property line. New storm drain lines are shown coming from the parking lot and joining
together just before the property line at a new box in the existing storm drain line' currently
running behipd the existing apartment co~plex. The finish floor of the Incubator building has
been lowered. 9 more inches to cover the deletion 'of the pond. The cost of these changes as
described and mentioned above is a credit of $ 5,453.00.
If you have any questions or concerns please feel free to contact me at the office at your
convemence,
Sincerely,
tLL 1L-
Charlie Toburen
Two State Construction Co,
CWT /cwt
\\.t'\lew _ state\sys\Projmgt\ WP60\2703 2\I'RO I'OSAL\Prop02, wpd
2292 Washington Road / P. O. Drawer 239 / Thomson, Georgia 30824
.i ..
TWO STATE
THOMSON, GEORGIA
Phone 706-595-2863
706-724-1605
Fax 706-595-7134
July 31, 1998
TSDG
Attn:Phil Rhoades
P,O, Box 277
Thomson, GA 30824
Re: Proposal Request #1
Small Business Incubator Facility
Dear Mr. Rhoades, ,
Please accept' this as our proposal request # 1 for changes to the original scope of work that we
feel are nec~ssaryfor the Incubator Facility, The following list describes the changes requested
and provides an associated cost breakdown for each:
1) Addition of jumbo water utility boxes, check valves, and
backflow preventer as required by Richmond Co.
$ 2,032.00
2) Re.,.routing of water utility due'to interference with existing
electrical transformer box
$ 1,773.00
3) Re-route outfall structure piping away from electrical transformer
and toward property line (this item not valid if proposal #2 is
accepted)
$ 1,259.00
Total
$ 5,064.00
If you have any questions or concerns please feel free to contact me at the office at your
convemence.
Sincerely,
ell L-
Charlie Toburen
Two State Construction Co.
CWT/cwt
\\New _ statelsyslPROJMGTI WP60\27032IPROPOSAL\I'ropO 1, wpd
2292 Washington Road / P. O. Drawer 239 / Thomson, Georgia 30824