Loading...
HomeMy WebLinkAboutSmall Business Incubator Facility Augusta Richmond GA DOCUMENT NAME: 'Dr'\ ALL ~ U s i III EO S S. r NClJ ~,4T 01<. F'AC.'1 liT Y DOCUMENT TYPE: C. H f\ rJ 3 E 0 R.. u E. R.- YEAR: l 0( ~ <t BOX NUMBER: lc> FILE NUMBER: \ ~ q D~- NUMBER OF PAGES: '::) i, r. \' ". OWNER ARClllTECT CONTRACTOR FIELD OTHER Change Order AlA Document G701 - Electronic Format [X] [ X] [X] [ ] [ ] TIllS DOCUMENT HAS rMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION, AUTIIENTICATION OF TIllS ELECTRONICALLY DRAFTED AlA DOCUMENT MAY BE MADE BY USING AlA DOCUMENT 0401, PROJECT: (name, address) Augusta-Richmond County Small Business Incubator Facility Augusta, Georgia TO CONTRACTOR: (name, address) Two State Construction Company, Inc. Post Office Drawer 239 Thomso~Georgia30824 The Contract is changed as follows: CHANGE ORDER NUMBER: One (1) DATE: August 3, 1998 ARClllTECT'S PROJECT NO: 27611 CONTRACT DATE: July 1,1998 CONTRACT FOR: General Contracting Delete detention pond, lower building pad nine (9) inches and reroute 18" RCP to new junction box at existing 18" RCP near front north corner of site. Add water utility boxes, check valves and backflow preventer as required by Richmond County. Re-route new water service around existing electrical transformer. DEDUCT $5,453.00 ADD $2,032.00 ADD $1,773.00 TOTAL CREDIT $1,648.00 Not valid until signed by the Owner, Architect and Contractor. The original (Contract Sum) (Gu&rlHlteea ffilOORUiffi Price) was Net change by previously authorized Change Orders The (Contract Sum) (GuarlHlteed Maximum Price) prior to this Change Order was The (Contract Sum) (Gtlaranteed I\.1fOOffiuffi Price) will be (increased) (decreased) (uRclutflged) by this Change Order in the amount of The new (Contract Sum) (GuarlHlteed Mwomum Price) including this Change Order will be The Contract Time will be (increased) (deoreased) (unohaRged) by zero (0 ) days, The Date of Substantial Completion as of the date of this Change Order therefore is April 5, 1998 $ 1,269,289.00 $ -0- $ 1,269,189.00 $ 1,648.00 $ 1,267,641.00 AlA DOCUMENT G70 I . CHANGE ORDER. 1987 EDmON . AlA . COPYRlGill 1987 . TIlE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N,W" WASHINGTON, D.C" 20006-5292, WARNING: Unlicensed photocopying violates U,S, copyright laws and is subject to legal prosecution, This docwnent was electronically produced with permission of the AlA and can be reproduced without violation until the date of expiration as noted below. Electronic Format - G701-1987 User Document: CHANGEORDER1.DOC -- 8/3/1998. AlA License Number 109910, which expires on 7/31/1999 -- Page #1 ..,r (. ... .. .1' l/2.g-i <=JGc, I G 2~ '11 2-&~ - -Ii -:LO.l if~ - ? 'f 0-04:) I '\ - . N~TE: -:r~s summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed maximum Price which have been autliorized by' Construction Change Directive. OWNER ~c.c.S"', ~~~/'Clo Auglista V.iSRm6hd CvullLy Board ef CeffiI'lil\~ioner ARCHITECT Two State Design Group Architects Address Post Office Box 277 Thomson, Geo . CONTRACTOR Two State Construction Company, Inc. Address Post Office Drawer 239 B~omett3~ Address 530 Greene Street, Room 605 Augusta, Georgia 30911 BY: DATE: DATE: 1/!- trln/tS ~ AlA DOCUMENT 0701 . CHANGE ORDER. 1987 EDITION. AlA . COPYRIGHT 1987 . THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK A VENUE, NW" WASHINGTON, D.C" 20006-5292. WARNING: Unlicensed photocopying violates U.S, copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AlA and can be reproduced without violation Wltil the date of expiration as noted below. Electronic Format - 0701-1987 User Document: CHANGEORDERl.DOC -- 8/3/1998. AlA License Number 109910, which expires on 7/31/1999 -- Page #2 i ~ TWO STATE THOMSON, GEORGIA Phone 706-595-2863 706-724-1605 Fax 706-595-7134 July 31, 1998 TSDG Attn: Phil Rhoades P,O, Box 277 Thomson, GA 30824 Re: Proposal Request #2 ' Small Business Incubator Facility Dear Mr. Rhoades, Please accepfthis as our proposal request #2 for changes to the original scope of work that we feel are nec~ssary for the Incubator Facility, The following changes are based on the new civil drawings (by Scott Godefroy) arid conversations with Scott. These drawings (C1 and C2) show the deletion of the retention pon~ at the front of the site alld the storm drainage from the parking lot to the property line. New storm drain lines are shown coming from the parking lot and joining together just before the property line at a new box in the existing storm drain line' currently running behipd the existing apartment co~plex. The finish floor of the Incubator building has been lowered. 9 more inches to cover the deletion 'of the pond. The cost of these changes as described and mentioned above is a credit of $ 5,453.00. If you have any questions or concerns please feel free to contact me at the office at your convemence, Sincerely, tLL 1L- Charlie Toburen Two State Construction Co, CWT /cwt \\.t'\lew _ state\sys\Projmgt\ WP60\2703 2\I'RO I'OSAL\Prop02, wpd 2292 Washington Road / P. O. Drawer 239 / Thomson, Georgia 30824 .i .. TWO STATE THOMSON, GEORGIA Phone 706-595-2863 706-724-1605 Fax 706-595-7134 July 31, 1998 TSDG Attn:Phil Rhoades P,O, Box 277 Thomson, GA 30824 Re: Proposal Request #1 Small Business Incubator Facility Dear Mr. Rhoades, , Please accept' this as our proposal request # 1 for changes to the original scope of work that we feel are nec~ssaryfor the Incubator Facility, The following list describes the changes requested and provides an associated cost breakdown for each: 1) Addition of jumbo water utility boxes, check valves, and backflow preventer as required by Richmond Co. $ 2,032.00 2) Re.,.routing of water utility due'to interference with existing electrical transformer box $ 1,773.00 3) Re-route outfall structure piping away from electrical transformer and toward property line (this item not valid if proposal #2 is accepted) $ 1,259.00 Total $ 5,064.00 If you have any questions or concerns please feel free to contact me at the office at your convemence. Sincerely, ell L- Charlie Toburen Two State Construction Co. CWT/cwt \\New _ statelsyslPROJMGTI WP60\27032IPROPOSAL\I'ropO 1, wpd 2292 Washington Road / P. O. Drawer 239 / Thomson, Georgia 30824