HomeMy WebLinkAboutSkinner Road Sewer (2)
Augusta RichmondGA
DOCUMENT NAME: S"?\ (\f\CX"'( ei:d S~Gr
,
DOCUMENT ~YPE: ~c:x6a
YEAR: 0\ :
BOX NUMBER: \ l\
FILE NUMBER: \<Sld \
NUMBER OF PAGES: cf)
-..,--
. '":~
ff-'
,
CHANGE ORDER
PROJECT TITLE
Skinner Road Sewer
ORIGINAL CONTRACT DATE 8/23/01
j.
co NUMBER 1
BID ITEM
DATE 11/19/01
PROJECT NUMBER 50060
OWNER AUGUSTA COMJvlISSION
PO NUMBER
P45861
The following change order is hereby made to the proposal for the above project:
PAYEE
Blair Construction, Inc,
TOTAL AMOUNT OF TIllS CHANGE ORDER
The contract time will be INCREASED by Q calendar days as a result of this change.
$
$18,184.20
ORIGINAL CONTRACT COST
PREVIOUS CHANGE ORDER (INCREASE)
TIllS CHANGE ORDER (INCREASE)
TOTALCONIRACTWTIB CHANGE ORDER
$
578,723,34
$
$
18,184.20
596,907,54
5425210
5425210
DATE: t/?/
DATE: 10fft
1/- /0, -() t
IP/4/
,
DATE: -' z.,Jt../OI
I
FUNDING NUMBER! ACCOUNT NUMBER
509043420
$
REQUESTED BY:
SUBMITTED BY:
ENGINEER
1/ !t~~~
FINANCE ENDORSEMENT:
RECOMMENDED BY:
APPROVED BY:
...~.--
., \'. -
.... -'
-'
\
"I
Vassar Drive Change Order
ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL
1 CHARLESTOWN VILLAS LIFT STA. TIE IN 1 LS $ 11,234.20 $ 11 ,234.20
Includes: Extra depth of laying line, benching for
trench excavation, dam replacement
1-20 SANITARY LINE ASSESSMENTfTlE-IN
2 1-20 MOBILIZATION 1 LS $ 1,500.00 $ 1,500.00
Includes: Mobilizing to opposite side of 1-20 to
perform extra tasks requsted by Augusta Utilities
3 PUMP MANHOLE: equipment, labor, material, etc. 1 LS $ 450.00 $ 450.00
Includes: Pumping water from manholes and the
line under 1-20 for video and assessment purposes
4 LABOR FOR A.C. WATER MAIN CROSSING 4 EA $ 650.00 $ 2,600.00
Includes: Labor for installing materials supplied by
Augusta Utilities Department
5 SANITARY M.H. OUTSIDE DROP 2 EA $ 1,200.00 $ 2,400.00
Includes: Addition of outside drop to manholes
where line intersects 2 feet above the invert
TOTAL CHANGE ORDER COST $ 18,184_20