Loading...
HomeMy WebLinkAboutSkinner Road Sewer (2) Augusta RichmondGA DOCUMENT NAME: S"?\ (\f\CX"'( ei:d S~Gr , DOCUMENT ~YPE: ~c:x6a YEAR: 0\ : BOX NUMBER: \ l\ FILE NUMBER: \<Sld \ NUMBER OF PAGES: cf) -..,-- . '":~ ff-' , CHANGE ORDER PROJECT TITLE Skinner Road Sewer ORIGINAL CONTRACT DATE 8/23/01 j. co NUMBER 1 BID ITEM DATE 11/19/01 PROJECT NUMBER 50060 OWNER AUGUSTA COMJvlISSION PO NUMBER P45861 The following change order is hereby made to the proposal for the above project: PAYEE Blair Construction, Inc, TOTAL AMOUNT OF TIllS CHANGE ORDER The contract time will be INCREASED by Q calendar days as a result of this change. $ $18,184.20 ORIGINAL CONTRACT COST PREVIOUS CHANGE ORDER (INCREASE) TIllS CHANGE ORDER (INCREASE) TOTALCONIRACTWTIB CHANGE ORDER $ 578,723,34 $ $ 18,184.20 596,907,54 5425210 5425210 DATE: t/?/ DATE: 10fft 1/- /0, -() t IP/4/ , DATE: -' z.,Jt../OI I FUNDING NUMBER! ACCOUNT NUMBER 509043420 $ REQUESTED BY: SUBMITTED BY: ENGINEER 1/ !t~~~ FINANCE ENDORSEMENT: RECOMMENDED BY: APPROVED BY: ...~.-- ., \'. - .... -' -' \ "I Vassar Drive Change Order ITEM DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 1 CHARLESTOWN VILLAS LIFT STA. TIE IN 1 LS $ 11,234.20 $ 11 ,234.20 Includes: Extra depth of laying line, benching for trench excavation, dam replacement 1-20 SANITARY LINE ASSESSMENTfTlE-IN 2 1-20 MOBILIZATION 1 LS $ 1,500.00 $ 1,500.00 Includes: Mobilizing to opposite side of 1-20 to perform extra tasks requsted by Augusta Utilities 3 PUMP MANHOLE: equipment, labor, material, etc. 1 LS $ 450.00 $ 450.00 Includes: Pumping water from manholes and the line under 1-20 for video and assessment purposes 4 LABOR FOR A.C. WATER MAIN CROSSING 4 EA $ 650.00 $ 2,600.00 Includes: Labor for installing materials supplied by Augusta Utilities Department 5 SANITARY M.H. OUTSIDE DROP 2 EA $ 1,200.00 $ 2,400.00 Includes: Addition of outside drop to manholes where line intersects 2 feet above the invert TOTAL CHANGE ORDER COST $ 18,184_20