CHANGE ORDER
'l;
NUMBER: 2
DATE: 6-27-97
PROJECT TITLE:
Skinner Mill Road Extension/Agerton Lane
2-24-97
PROJECT NO.: 75-8379-096
ORIGINAL CONTRACT DATE:
OWNER: Augusta-Richmond County Commission-Council P.O. NUMBER: 134363
CONTRACTOR:
Mabus Brot~ers. Construction Company. Inc.
(SEE ATTACHED SHEET)
The following change order is hereby made to the proposal for the above project:
TOTAL AMOUNT OF THIS ORDER:
$ 77.769.68
The contract time will be increasedjsesl!eaS88 by --.lL calendar days as a result
of this change. (15 calendar day increase is for Marks Church Road side only.)
ORIGINAL CONTRACT AMOUNT:
PREVIOUS CHANGE ORDERS (INCREASED/---------):
THIS CHANGE ORDER (INCREASED/---------):
TOTAL CONTRACT WITH CHANGE ORDERS:
$ 1.372.854.06
$
$
232.000.00
77.769.68
$ 1.682.623.74
****************************************************************
FUNDING SOURCE/ACCOUNT NUMBER: PROJECT
REQUESTED BY: Jack F. MUrPhY~ '
Engineer
SUBMITTED BY: Drew Goins
, Department Head '
FINANCE ENDORSEMENT:G'~ .6~' ~,IV-- 7
__1(;/ - . mptroller ~
RECOMMENDED BY:
CONTINGENCIES
APPROVED BY:
Tllli dOevII.nI tpplOv.d IS
~(flf17
DATE: 6-25-97
g.[1 fl1
~o--
DATE: 6-25-97
DATE: 8)7/97
DATE: '&j)h')
DATE: 9/11/ o/,J
'"
, .
"
ITEM NUMBER 1
ADD:
Precast San. Sewer Manhole, Type 1, 2 Each @ $1,130 =
Precast San. Sewer Manhole, Type 1, Add'l Depth, 10 LF
$ 2,260.00
@ $115jLF
= $ 1,150.00
= $11,300.00
= $ 1,710.00
= $ 550.00
San. Sewer, 8" Ductile Iron Pipe, 400 LF @ $28.25jLF
Remove existing 400 j: LF of 8" VCP, Lump Sum
Remove San. Sewer Manhole, 1 Each @ $550.00
NET TOTAL ITEM NO. 1
= $16,970.00
ITEM NUMBER 2
DELETE:
Storm Drain, 48" RCP, 356 LF @ $67.17
Class A Cone., Incl. Reinf. Steel 14.22 CYS @ $380jCY= $
Type 2 Backfill Material, 98 CYS @ $15jCY = $
Catch Basin, CP 2, 1 Each @ $1,250 = $
Catch Basin, GP 2, Add'l Depth, 10 LF @ $125jLF = $
Rip Rap TP 1, 120 SY @ $22jSY = $
Filter Blanket, 6", 120 SY @ $3jSY = $
storm Sewer Manhole, TP 2, 3 @ $1,500jEach $
= $23,912.52
5,403.60
1,470.00
1,250.00
1,250.00
2,640.00
360.00
4.500.00
ITEM NO.2 DELETE TOTAL= $40,786.12
ITEM NUMBER 2
ADD:
Flared End Section, 1 Each @ $450 = $
Storm Drain Pipe, 60" RCP, H.1-10, 600 LF @ $101.67jLF
450.00
Storm Drain Pipe, 36" RCP, H 1-10, 120
= $61,002.00
$ 950.00
= $ 2,340.00
= $ 2,230.00
= $26,850.00
CYS @ $380jCY =
= $ 2,641.00
LF @ $42.69jLF= $ 5.122.80
Drop Inlet, GP 1 W/Weir, 1 Each @ $950
Drop Inlet, GP 2 W/Weir, 1 Each @ $2,340
Drop Inlet, GP 2, Add'l Depth, 10 LF @ $223
*Borrow Including Mat'l &,Haul, Lump Sum
Class A'Conc., Incl. Reinf. Steel Pipe, 6.95
ITEM NO.2 ADD TOTAL = $101,585.80
ITEM NO. 1
ITEM NO. 2
ITEM NO. 2
(ADD) + $ 16,~70.00
(DELETE) - $ 40,786.12
(ADD) + $101.585.80
(NET) = $ 77,769.68
TOTAL INCREASE IN CHANGE ORDER #2- $77,769.68
--
f
, .
~
~\)S111!. ,
~~,O
~ ,P, c.ri
~ 1..-
~ ~. .. i:-j"
\ ~Ii' - -{..1'- 0'1""
<J.. 't, ~li(:no~ c v~.....~.
~O~OAD .AUO
MABus BROTHERS CONSTRUCTION CO., INC.
920 MOLLY POND ROAD
AUGUSTA, GEORGIA 30901
706-722-8941
FAX 706-722-7521
June 30, 1997
Mr. Jack Murphy
Department of Public Works
1815 Marvin Griffin Road
Augusta, GA 30906
RE: . SKINNER MILL ROAD 1 AGERTON LANE
C.O. #2: MARKS CHURCH ROAD
Dear Mr. Murphy
Attached are prices you requested on the above referenced project. If you have any questions,
please call my office.
~ (k
T~U~ ~
Mabus Brothers Construction Co., Inc.
Attachment
kh
"
~\)s 131!.
~~o
~ P CJ")
.e=; ..
~~ 4':1
~a 'h;., .o.~ 0"
?'()..~ ~{/eno':' L: ~?'\9-'
I\'O,qOAO .p.\JV
~""
.j" ,. ~...
\.
;.
C.O. #2 ITEMS
SKINNER MILL ROAD 1 AGERTON LANE
24" Concrete flared end
60" RCP H 1-10
Precast sani sewer MH type I
Precast sani sewer MIl type I addl depth
8" Ductile iron pipe
Drop inlet, GP-I wI weir
Drop inlet, GP-2 w/weir
Drop inlet, GP 2 addl depth
Remove existing sanitary sewer VCP
*Borrow (incl mati & haul)
Class A concrete incl reinf steel
36" Rep H 1-10
Remove existing sanitary sewer MIl
1 EA @ $
600 LF @
2EA@
10 EA @
400 LF @
lEA@
1 EA@
IDEA @
1 LS
1 LS
6.96 CY@
120 LF @
1 EA@
450.00
101.67
1,130.00
115.00
28.25
950.00
2,340.00
223.00
$ 450.00
61,002.00
2,260.00
1,150.00
11,300.00
950.00
2,340.00
2,230.00
1,710.00
26,850.00
2,641.00
5,122.80
550.00
380.00
42.69
550.00
$118,555.80
It is agreed that as a result of the change order the contract time will be extended 15 calendar
~ for work south of Wheeler Road. This will in no way effect the incentive bonus provided all
work north of Wheeler Road is completed and safely open to traffic in accordance with original
agreement.
*Borrow price includes additional bond & staking.