HomeMy WebLinkAboutRTW TETRA TECH CHANGE ORDER #1 FORT GORDON REPLACE/REHABILITATE PUMP STATIONTo: Drew Goins 10 /19 /09sh
GECCc(f[IWE - 0-
OCT 1 W 2009
ENGINEERING CONTRACT CHANGE O Accounting Department -
CO NUMBER 1 1
DATE 1 10/14/09
PROJECT TITLE Fort Gordon Replace /Rehab htate Pump Stations
ORIGINAL CONTRACT DATE 11 /18/08 PROJECT NUMBER 0001
OWNER AUGUSTA, GEORGIA PO NUMBER P158643
The following change is hereby made to the contract for the above project:
The Privatization of Water /Wastewater Utilities contract between Fort Gordon and Augusta Richmond
County was awarded September 2007. Requirements of the contract include executing Initial Capital
Upgrades (ICU) and Renewal and Replacement (R & R) projects for the water and wastewater systems
throughout Fort Gordon. Augusta Utilities has requested Tetra Tech RTW, Inc. perform a radio path
survey to determine radio type, frequency and proper installations necessary to network twenty sanitary
sewer lift stations and five permanent wastewater flow meter sites which are located throughout the
installation. Augusta Utilities Department has also identified the need to replace one existing sanitary
sewer lift station. The Boardman Lake lift station is currently receiving wastewater from six residences and
pumps it to a common drain field. Augusta Commission Approved this Change Order on September
03, 2009.
$61,812.00
PAYEE
TOTAL AMOUNT OF THIS CHANGE ORDER
RTW Tetra Tech
$ 61,812.00
The contract time will be INCREASED by .Q calendar days as a result of this change.
ORIGINAL CONTRACT AMOUNT
$
PREVIOUS CHANGE ORDER (INCREASE) $
THIS CHANGE ORDER (INCREASE) $
TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $
395,863.00
0
61,812.00
437,675.00
FUNDING NUMBER /ACCOUNT NUMBER 507043410
88880074
PROPOSED BY:
REQUESTED BY-
SUBMITTED BY:
5425110
5425110
DATE: ' i0 �•
DESIGN ENGINEER
FINANCE ENDORSEMENT:!
RECOMMENDED
DATE:
o 1 1H U
DATE: /e Q
DATE:
p
DATE: 16-11-6
APPROVED BY:
DATE: