Loading...
HomeMy WebLinkAboutRTW TETRA TECH CHANGE ORDER #1 FORT GORDON REPLACE/REHABILITATE PUMP STATIONTo: Drew Goins 10 /19 /09sh GECCc(f[IWE - 0- OCT 1 W 2009 ENGINEERING CONTRACT CHANGE O Accounting Department - CO NUMBER 1 1 DATE 1 10/14/09 PROJECT TITLE Fort Gordon Replace /Rehab htate Pump Stations ORIGINAL CONTRACT DATE 11 /18/08 PROJECT NUMBER 0001 OWNER AUGUSTA, GEORGIA PO NUMBER P158643 The following change is hereby made to the contract for the above project: The Privatization of Water /Wastewater Utilities contract between Fort Gordon and Augusta Richmond County was awarded September 2007. Requirements of the contract include executing Initial Capital Upgrades (ICU) and Renewal and Replacement (R & R) projects for the water and wastewater systems throughout Fort Gordon. Augusta Utilities has requested Tetra Tech RTW, Inc. perform a radio path survey to determine radio type, frequency and proper installations necessary to network twenty sanitary sewer lift stations and five permanent wastewater flow meter sites which are located throughout the installation. Augusta Utilities Department has also identified the need to replace one existing sanitary sewer lift station. The Boardman Lake lift station is currently receiving wastewater from six residences and pumps it to a common drain field. Augusta Commission Approved this Change Order on September 03, 2009. $61,812.00 PAYEE TOTAL AMOUNT OF THIS CHANGE ORDER RTW Tetra Tech $ 61,812.00 The contract time will be INCREASED by .Q calendar days as a result of this change. ORIGINAL CONTRACT AMOUNT $ PREVIOUS CHANGE ORDER (INCREASE) $ THIS CHANGE ORDER (INCREASE) $ TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ 395,863.00 0 61,812.00 437,675.00 FUNDING NUMBER /ACCOUNT NUMBER 507043410 88880074 PROPOSED BY: REQUESTED BY- SUBMITTED BY: 5425110 5425110 DATE: ' i0 �• DESIGN ENGINEER FINANCE ENDORSEMENT:! RECOMMENDED DATE: o 1 1H U DATE: /e Q DATE: p DATE: 16-11-6 APPROVED BY: DATE: