HomeMy WebLinkAboutRock Tenn Water & Sewer Extension Augusta Richmond GA DOCUMENT NAME: ~Ce.\< "/2.oJl'3 \JmGR- ~ S:.,uJeR- (;, X'f6'(\)<;;I~N DOCUMENT TYPE: C\-\~N~ b ORy82- YEAR: , q q ~ BOX NUMBER: '1J FILE NUMBER: I Y t I D NUMBER OF PAGES: 3 ... CHANGE ORDER NUMBER 1 DATE 3/23/99 BID ITEM: 98-144 PROJECT TITLE Rock Tenn Water & Sewer Extension ORIGINAL CONTRACT DATE 07/31/99 PROJECT NUMBER OWNER Augusta-Richmond County Commission-Council P.O. NUMBER CONTRACTOR Mabus Brothers, Inc. U-98-007 163379 The following change order is hereby made to the proposal for the above project: SEE A TT ACHED CHANGE ORDER BREAKDOWN TOTAL AMOUNT OF TIllS CHANGE ORDER $ 36,339.98 The contract time will be increased/decreased by 0 Calendar days as a result of this change. ORIGINAL CONTRACT AMOUNT $ 193,163.37 PREVIOUS CHANGE ORDER (INCREASE/DECREASE) $ 0.00 THIS CHANGE ORDER (INCREASE/DECREASE) $ 36,339.98 TOTAL CONTRACT WITH CHANGE ORDER $ 229,503.35 ************************************************************************ FUNDING SOURCE/ACCOUNT NUMBER: G/L:507043420-5425210/ REQUESTED BY: James W. Rush J~ ENGINEER N. Max Hicks 1Jff' DEPARTMENT HEAD FINANCE ENDORSEMENT: 'i:. c". ~ COMPTROLLER . {J RECOMMENDED BY: ~ 1?-. ~ J/L:89800070-5425210 DATE: 03/23/99 SUBMITTED BY: DATE: 03/23/99 DATE: + I Cf I'll DATE: 4-/,-a.-/c, ~ APPROVED BY: DATE: 'f11'L/~9 Oriqinal Contract 10" Gate Valve 12" Gate Valve 12" Gate Valve & Plug 8x8 Tap Sleeve 12x10 Tap Sleeve 12x6 Tee 12x10 Tee 12x12 Tee 8x12 Reducer 1 Ox12 Reducer 8" Water Main 10" Water Main 12" Water Main Fire Hydrant 12x6 Tee 12x12 Tee 12" Gate Valve 12" Gate Valve & Plug 12" Plug 12" Water Main Jack & Bore 8" Sanitary Sewer 0-6 8" Sanitary Sewer 6-8 8" Sanitary Sewer 8-10 8" Sanitary Sewer 10-12 8" DIP Sewer Sewer Manhole Manhole Added Depth Clean out Jack & Bore Concrete Encasement Asphalt Overlay Asphalt Binder Bitum Tack Coat 8"GAB Select Backfill Lump Sum Const. CO Del. J&B Water Del. J&B Sewer Add J&B Water Add J&B Sewer Lover's Lane Water Sewer Changes Changes Completed UM Quantity Total Amount ea 0 $0.00 ea 0 $0.00 ea 0 $0.00 ea 0 $0.00 ea 0 $0.00 ea 0 $0.00 ea 0 $0.00 ea 0 $0.00 ea 0 $0.00 ea 0 $0.00 If -6 -$91.38 If -6.5 -$114.27 If 14 $282.80 ea 0 $0.00 ea 0 $0.00 ea 0 $0.00 ea 0 $0.00 ea 0 $0.00 ea 0 $0.00 If -32 -$806.40 If -49 -$4,508.00 If -26 -$368.42 If 25.5 $412.34 If 29.5 $536.02 If -20 -$403.40 If 4 $104.00 If 0 $0.00 vf -0.5 -$53.00 ea 0 $0.00 If -70 -$8,190.00 cy 0 $0.00 tn 25 $1,265.00 tn -8 -$340.00 gl 0 $0.00 tn 310.68 $3,905.25 cy 575 $3,306.25 Is 0 $0.00 -$5,063.22 If 0 $0.00 If 0 $0.00 If 30 $3,060.00 If 80 $10,160.00 $13,220.00 jr031299-quantity . , CO 12x12 Sleeve 12x1290 12x1245 12" DIP CO 12x12 Sleeve Fire Hydrants 12x12x8 Tee 8" Valve 8" Plug 12x1245 6"DIP 12" DIP 12x2 TS&V 2" Valve 2" Gal. Cap 2" Gal. Pipe CO 12" Valve 12x12x12 Tee 12x12x8 Tee 12" Plug 8" Valve 8x8 45 8x8 90 12x2 2" Valve 2x2 90 2 Galv Cap 12 PVC 12" DIP 8"DIP 2" Gal Pipe CO 1 Ox1 0 Sleeve CO Barrier Wall Lover's Lane Water Sewer Changes ea ea ea If 2 1 4 55 $346.00 $190.00 $676.00 $1,336.50 $2,548.50 ea 1 $173.00 ea 2 $3,525.20 ea 1 $209.00 ea 1 $505.00 ea 1 $175.00 ea 2 $338.00 If 19 $306.85 If 58 $1,409.40 ea 1 $95.00 ea 1 $194.00 ea 1 $7.65 If 18 $232.20 $7,170.30 ea 2 $1,738.30 ea 1 $233.10 ea 1 $209.00 ea 1 $101.15 ea 1 $505.00 ea 4 $500.00 ea 1 $125.00 ea 1 $95.00 ea 1 $194.00 ea 4 $90.60 ea 1 $22.65 If 460 $11,592.00 If 8 $194.40 If 42 $840.00 If 28 $361 .20 $16,801.40 ~ 1 $163.00 $163.00 [!] 60 $1,500.00 $1,500.00 Total $36,339.98 jr031299-quantity