Loading...
HomeMy WebLinkAboutRichmond Hill Rd. Drainage Improvements (2) Augusta Richmond GA DOCUMENTNAME:1<- IGhmond J-hl J Rd. ]) VOl./YlClse --r:r-np I'D VeY11Cn+s DOCUMENTTYPE: Chan::y~ Or-de v YEAR: WOO . BOX NUMBER: OJ FILE NUMBER: J t+ Le tp <6' NUMBER OF PAGES: V . ~ ;- .~ .' . ..' .:' ~ .. :'.~~;.:: ~: , , Change ,Order Number: Two Date: January 24. 2000 Project Title: Richmond Hill Road nr~inage Tmprovement~ Original Contract Date: Mav 31. 1999 Project Number: 321-04-296R23521 Owner: ARC P.O. Number: 034RO Contractor: Mahm: Rrother~ The following change order is hereb:y made to the proposal for the above project: ~D: Remove and dispose of damaged gabion boxes and gab ion mattresses. '1; ... ' , LUMP SUM $1,200.00 TOTAL AMOUNT OF TIDS CHANGE ORDER $ 1.200.00 The Contract time will be IncreasedlDecreased by 30 calendar days as a result of this change. The date of completion including this change order is 30 calendar days after approval of this change order. Original Contract Amount Previous Change Order (Increased / Decreased) This Change Order (Increased / Decreased $ 819.764.65 $ 24.457.00 $ 1 )0000 .. , TOTAL CONTRACT WITH CHANGE ORDER(S) $ 845,421.65 ************* Requested By: Finance End , Approved By: Accepted By: ---~--_.._~--~---- .-- . - . .....- Date: Date: Date: Date: Date: Date: -041 iLl ~/dtJ , , ~:4~ 21t'/- 100 2./ \ 'f /00 -z/If/;~ I I/Ze/DO I , , \ \ ID@ '\/' ...;. _ , ,-};tl~tji~ill~:/ ,; ,~, ;-. ~, . . -, " ; ;:":'=....;..: 'C~', ~,'.~ . " January 24, 2000 ' 'RICHMOND HILL ROAD DRAINAGE IMPROVEMENTS CHANGE NUMBER TWO . The heavy rainfall on 1-10-00 unde!JDined a portion of the gapions installed'at the intake' structure for our 84" Rep. The !1I1dermining was a result of the cemetery personnel breeching a dirt berm immediately adj acent to our intake structure. This action redirected a significant portion of the runoff coming from the cemetery causing concentration at a location different from the design point of concentration. The cemetery personnel stated that they breeched the dirt berm to prevent flooding of their maintenance building which reportedly was getting approximately two feet of water . ,into the building. Since this is not the fault of our contractor we need to pay them $1,200.00 for removing and disposing of the displaced gabions. Additional measures will be taken but will consist of pay items already in the contract. There are more than adequate funds remaining in the construction funding to accomplish the remaining required work. ADD: Remove and dispose of damaged gabion boxes and gabion mattresses. ' LUMP SUM $1,200.00 .. \ Page 2 of 2 .".' .. ;: ..-....- ,