Loading...
HomeMy WebLinkAboutResurfacing Various Roads,Phase V .Augusta Richmond GA DOCUMENT NAME: RI: S.UR:FAQ1I\ld V'RRIOlJS RO~O$)PH I'lS~::~C POCUMENTTYPE: C.HAN5e. ~R~eR YEAR: 'C1~<6 BOX NUMBER: Lo \ '~qY<6 FILE NUMBER: NUMBER OF PAGES: ~ ~' 7' .- r ~7'~'#.'-; ,....:1"--;'1 "'4 ~ CHANGE ORDER ~~ I",~- Change Order Number: 1 Date: October 12, 1998 proj ect Ti tle-:Resu"Tfacinq. .various Roads, Phase V Original Contract Date: December 17,1996 Project Number: 88-075(98) Owner: Augusta Commission P.O. Number: 130702 Contractor: APAC,Inc. The following change order is hereby made to the proposal for the above proj ect: Resurf€Ici!igof additional roads as shown on sheets two and three. TOTAL AMOUNT OF THIS CHANGE ORDER ( $146 , 8 02 . 5 0 ) The Contract time will be Increased/Decreased by ~ calendar days as a result of this change. Original Contract Amount $ 1,119,975.00 Previous Change Order (Increased/Decreased) $ -0- This Change Order (Increased/Decreased) $ 146,802.50 TOTAL CONTRACT WITH CHANGE ORDER(S) $ 1,266,777.50 * * * * * * * * * * * * * * * Funding 57-8087-(098)& 59-8087-(98) Requested By: Date: to/2-d/ 1& , Submitted BY: Date: Finance Endorsement: Date: lo;J~( (O/l--I /~ 8 Recommended By: ~~ Date: Approved By: Date: l/jV(ff /J-~ rJ - II Accepted By: Date: Contractor 8S-01S(9Bl,paving'variOUB Rd.,PhaBeV ChangeOR " " . ,~ j' 0 -'To, . ~ :'Y i,~HA'NGE ORDER #1 RESURFACING VARIOUS ROADS PHASE V IQUANITY UNIT PRICE COST HIGHLAND AVENUE WHEELER ROAD TO WALTON WAY Raise Manholes to Grade (each) 12 $ 165.00 $ 1,980.00 Raise Water Valves to Grade (each) 6 $ 124.00 $ 744.00 Bituminous Tack Coat (Gal.) 600 $ 0.60 $ 360.00 Asphaltic Concrete Leveling (Tons) 100 1$ 36.00 I $ 3,600.00 1" Type "H" Asphalitc Concrete (Tons) 550 $ 39.45 $ 21,697.50 Sub Total I 1$ 28,381.50 I TOBACCO ROAD WEST BOUND ACCELERATION LANE TOBACCO ROAD AT WINDSOR SPRING ROAD Bituminous Tack Coat (Gal.) 25 $ 0.60 $ 15.00 1" Type "H" Asphalitc Concrete (Tons) 20 $ 125.00 $ 2,500.00 Sub Total I $ 2,515.00 I HILLWOOD CIRCLE WHEELER ROAD TO WHEELER ROAD Raise Manholes to Grade (each) 8 $ 165.00 I $ 1,320.00 Raise Water Valves to Grade (each) 6 1$ 124.00 I $ 744.00 Bituminous Tack Coat (Gal.) 400 1$ 0.60 $ 240.00 Asphaltic Concrete Leveling (Tons) 80 $ 36.00 $ 2,880.00 1" Type "H" Asphalitc Concrete (Tons) I 380 $ 39.45 $ 14,991.00 Milling (Sq,Yd.) I 6500 $ 1.10 $ 7,150.00 Sub Total I $ 27,325.00 CARMICHAEL ROAD TO NORTH BARTON CARMICHAEL ROAD TO DEAD END CARMICHAEL CT. Bituminous Tack Coat (Gal) 775 $ 0.60 $ 465.00 Type one Patching (Sq.Yd.) 470 $ 21.651$ 10,175.50 Geotextile Fabric (Sq.Yd.) 6500 1$ 2.55 $ 16,575.00 1 1/2" Type "E" Asphalitic Concrete (Tons) 550 1$ 39.50 I $ 21,725.00 Sub Total $ 48,940.50 AUGUSTA WEST PARKWAY Geotextile Fabric (Sq.Yd.) 2500 $ 2.55 $ 6,375.00 Bituminous Tack Coat (Gal.) 900 $ 0.60. $ 540.00 Asphaltic Concrete Leveling (Tons) 100 $ 36.00 $ 3,600.00 1 1/2" Type "E" Asphalitic Concrete (Tons) 225 $ 44.00 $ 9,900.00 French Drain (L.F. 6" underdrain per GA. DOT STD9029b 1200 1$ 12.00 $ 14,400.00 Storm Drain Pipe 12" HDPE(L.F.) 157 $ 26.50 $ 4,160.50 Traffic Control (Lump Sum) 1 $ 665.00 $ 665.00 Sub Total $ 39,640.50 TOTAL $ 146,802.50 88-075(98) PRICE FORM.CHANGE ORDER #1 VARIOUS ROADS PHASE V