Change Order Number: 1 Date: October 12, 1998
proj ect Ti tle-:Resu"Tfacinq. .various Roads, Phase V
Original Contract Date: December 17,1996 Project Number: 88-075(98)
Owner: Augusta Commission P.O. Number: 130702
Contractor: APAC,Inc.
The following change order is hereby made to the proposal for the
above proj ect: Resurf€Ici!igof additional roads as shown on sheets two and
three.
TOTAL AMOUNT OF THIS CHANGE ORDER
( $146 , 8 02 . 5 0 )
The Contract time will be Increased/Decreased by ~ calendar days as
a result of this change.
Original Contract Amount
$ 1,119,975.00
Previous Change Order
(Increased/Decreased)
$ -0-
This Change Order
(Increased/Decreased)
$ 146,802.50
TOTAL CONTRACT WITH CHANGE ORDER(S)
$ 1,266,777.50
* * * * * * * * * * * * * * *
Funding
57-8087-(098)& 59-8087-(98)
Requested By:
Date:
to/2-d/ 1&
,
Submitted BY:
Date:
Finance Endorsement:
Date:
lo;J~(
(O/l--I /~ 8
Recommended By:
~~
Date:
Approved By:
Date:
l/jV(ff
/J-~ rJ - II
Accepted By:
Date:
Contractor
8S-01S(9Bl,paving'variOUB Rd.,PhaBeV ChangeOR
"
"
.
,~
j' 0
-'To,
. ~
:'Y
i,~HA'NGE ORDER #1 RESURFACING VARIOUS ROADS PHASE V
IQUANITY UNIT PRICE COST
HIGHLAND AVENUE
WHEELER ROAD TO WALTON WAY
Raise Manholes to Grade (each) 12 $ 165.00 $ 1,980.00
Raise Water Valves to Grade (each) 6 $ 124.00 $ 744.00
Bituminous Tack Coat (Gal.) 600 $ 0.60 $ 360.00
Asphaltic Concrete Leveling (Tons) 100 1$ 36.00 I $ 3,600.00
1" Type "H" Asphalitc Concrete (Tons) 550 $ 39.45 $ 21,697.50
Sub Total I 1$ 28,381.50
I
TOBACCO ROAD WEST BOUND ACCELERATION LANE
TOBACCO ROAD AT WINDSOR SPRING ROAD
Bituminous Tack Coat (Gal.) 25 $ 0.60 $ 15.00
1" Type "H" Asphalitc Concrete (Tons) 20 $ 125.00 $ 2,500.00
Sub Total I $ 2,515.00
I
HILLWOOD CIRCLE
WHEELER ROAD TO WHEELER ROAD
Raise Manholes to Grade (each) 8 $ 165.00 I $ 1,320.00
Raise Water Valves to Grade (each) 6 1$ 124.00 I $ 744.00
Bituminous Tack Coat (Gal.) 400 1$ 0.60 $ 240.00
Asphaltic Concrete Leveling (Tons) 80 $ 36.00 $ 2,880.00
1" Type "H" Asphalitc Concrete (Tons) I 380 $ 39.45 $ 14,991.00
Milling (Sq,Yd.) I 6500 $ 1.10 $ 7,150.00
Sub Total I $ 27,325.00
CARMICHAEL ROAD TO NORTH BARTON
CARMICHAEL ROAD TO DEAD END
CARMICHAEL CT.
Bituminous Tack Coat (Gal) 775 $ 0.60 $ 465.00
Type one Patching (Sq.Yd.) 470 $ 21.651$ 10,175.50
Geotextile Fabric (Sq.Yd.) 6500 1$ 2.55 $ 16,575.00
1 1/2" Type "E" Asphalitic Concrete (Tons) 550 1$ 39.50 I $ 21,725.00
Sub Total $ 48,940.50
AUGUSTA WEST PARKWAY
Geotextile Fabric (Sq.Yd.) 2500 $ 2.55 $ 6,375.00
Bituminous Tack Coat (Gal.) 900 $ 0.60. $ 540.00
Asphaltic Concrete Leveling (Tons) 100 $ 36.00 $ 3,600.00
1 1/2" Type "E" Asphalitic Concrete (Tons) 225 $ 44.00 $ 9,900.00
French Drain (L.F. 6" underdrain per GA. DOT STD9029b 1200 1$ 12.00 $ 14,400.00
Storm Drain Pipe 12" HDPE(L.F.) 157 $ 26.50 $ 4,160.50
Traffic Control (Lump Sum) 1 $ 665.00 $ 665.00
Sub Total $ 39,640.50
TOTAL $ 146,802.50