HomeMy WebLinkAboutResurfacing Various Roads Phase 5
Augusta Richmond GA
DOCUMENT NAME: 1(~'SURfAC.\(\!d V Y-IRI DDS eOItOS pl.1lfS6 S-
DOCUMENT TYPE: CUANl) E: C) R"be<..
YEAR: ,qg9
BOX NUMBER: 7
FILE NUMBER- J L{ ? 7 g'
NUMBER OF PAGES: ...3
Change Order Number: 2 Date: April 5. 1999
Project Title: Resurfacing Various Roads, Ph V ~ :1CQ:lJ
Original Contract Date: August 3. 1998 Project Number: 323-04-2968230 ~ \!!J
. . /
Owner: Augusta-RIchmond County P.O. Number: 11100'; 1
Contractor: A P AC-Ga Tnc
The following change order is hereby made to the proposal for the above project:
See attachment
TOTAL AMOUNT OF THIS CHANGE ORDER
$ 28.732.25
The Contract time will be Increased by 45 calendar days as a result of this change. The date of
completion including this change order is April 29. 1999.
Original Contract Amount
$1,119,975.00
Previous Change Order
(Increased / Decreased)
$ 146,802.50
This Change Order
(Increased / Decreased)
$ 28,732,25
TOTAL CONTRACT WITH CHANGE ORDER(S) $1,295,509.75
*************
D
Requested By: Date: #P/99
Submitted By: Date: ~U~1
Finance Endo Date: ~717 /97
Recommended By: Date: ~/\8! q <;
Approved By: Date: tJ/~( /?c;
I J
Accepted By: Date: ~/z~/??
Resurfacing Various Roads, Ph. V
Project Number: 57-8087-098 & 59-8087-098
Change Order Number Two
1) Level & overlay John C. Calhoun Expressway off-ramp at Fifteenth Street.
Asphaltic Concrete H = 85 Tons @ $39.45/Ton. = $ 3,353.35
Bitum. Tack Coat = 150 Gals. @ $.60/Gal = $ 90.00
Total = $ 3,443.25
2) Mill and overlay Leslie Circle.
Milling Variable Depth = 2500sq. yds. @ $2.75/sq,yds.
"H" overlay 2500 sq.yds. @ 135lbs/sq.yd. = 175 tons@ $39.45/ton
Bitum. Tack coat = 125 Gals, @ $.60/Gal Total
= $ 6875.00
= $ 6903.75
= $ 75.00
= $13,853.75
3) Mill and overlay Lumpkin Road @ Richmond Hill Road.
Milling Variable Depth = 1800 sq.yds. @ $2.75/sq.yd. = $ 4950.00
"H" Overlay 1800 sq.yds. @135lbs/sq.yds. = 125 Tons @ $39.95sq.yds= $ 4931.25
Bitum. Tack Coat 1800 sq. yds. @ 0.05 GaV sq.yd. = 90 Gal @ 0.60/Ga1.= $ 54.00
= $ 9935.25
4) Mobilization For 1), 2) & 3) = $ 1500.00
Lump Sum $ 1,500.00
= $1500.00
1) + 2) + 3) + 4) = $28,732.25
CHANGE ORDER NUMBER TWO GRAND TOTAL
=$28.732.25
'"
.,
Department of Public Works and Engineering
Jack F. Murphy, Director of Public Works
Room 701,530 Greene Street
Augusta, Georgia 30911
(706) 821-1706 FAX (706) 821-1708
Clifford A. Goins, Interim Assistant Director
Public Works - Engineering Division
July 1, 1999
Mr. Don Holley
AP AC-Georgia, Inc.
P. O. Box 1129
Augusta, GA 30913
RE: Resurfacing VariollS Roads - Phase V
File Reference: 88-075(98)
Project Reference: 323-04-296823087
Dear Mr. Holley:
Enclosed herewith for your records is a copy ofthe executed Change Order #2 on the above
referenced project.
Please proceed with the additional work in accordance with the Change Order.
If you have any questions, please contact me at 821-1714.
"
Clifford . Goins
Interim ssistant Director
Public Works - Engineering Division
cc: Mr. Jack Murphy, Director of Public Works
Ms. Lena Bonner, Clerk of Commission, w/copy of change order
Ms. Geri Sams, Director of Purchasing, w/copy of change order
Ms. Teresa Smith, Pre-Construction Engineer, w/copy of change order
Mr. Robert Clements, Assistant Pre-Construction Engineer, w/copy of change order
CAG/cjv