HomeMy WebLinkAboutResurfacing Various Roads Phase 5 Augusta Richmond GA DOCUMENT NAME: 1(~'SURfAC.\(\!d V Y-IRI DDS eOItOS pl.1lfS6 S- DOCUMENT TYPE: CUANl) E: C) R"be<.. YEAR: ,qg9 BOX NUMBER: 7 FILE NUMBER- J L{ ? 7 g' NUMBER OF PAGES: ...3 Change Order Number: 2 Date: April 5. 1999 Project Title: Resurfacing Various Roads, Ph V ~ :1CQ:lJ Original Contract Date: August 3. 1998 Project Number: 323-04-2968230 ~ \!!J . . / Owner: Augusta-RIchmond County P.O. Number: 11100'; 1 Contractor: A P AC-Ga Tnc The following change order is hereby made to the proposal for the above project: See attachment TOTAL AMOUNT OF THIS CHANGE ORDER $ 28.732.25 The Contract time will be Increased by 45 calendar days as a result of this change. The date of completion including this change order is April 29. 1999. Original Contract Amount $1,119,975.00 Previous Change Order (Increased / Decreased) $ 146,802.50 This Change Order (Increased / Decreased) $ 28,732,25 TOTAL CONTRACT WITH CHANGE ORDER(S) $1,295,509.75 ************* D Requested By: Date: #P/99 Submitted By: Date: ~U~1 Finance Endo Date: ~717 /97 Recommended By: Date: ~/\8! q <; Approved By: Date: tJ/~( /?c; I J Accepted By: Date: ~/z~/?? Resurfacing Various Roads, Ph. V Project Number: 57-8087-098 & 59-8087-098 Change Order Number Two 1) Level & overlay John C. Calhoun Expressway off-ramp at Fifteenth Street. Asphaltic Concrete H = 85 Tons @ $39.45/Ton. = $ 3,353.35 Bitum. Tack Coat = 150 Gals. @ $.60/Gal = $ 90.00 Total = $ 3,443.25 2) Mill and overlay Leslie Circle. Milling Variable Depth = 2500sq. yds. @ $2.75/sq,yds. "H" overlay 2500 sq.yds. @ 135lbs/sq.yd. = 175 tons@ $39.45/ton Bitum. Tack coat = 125 Gals, @ $.60/Gal Total = $ 6875.00 = $ 6903.75 = $ 75.00 = $13,853.75 3) Mill and overlay Lumpkin Road @ Richmond Hill Road. Milling Variable Depth = 1800 sq.yds. @ $2.75/sq.yd. = $ 4950.00 "H" Overlay 1800 sq.yds. @135lbs/sq.yds. = 125 Tons @ $39.95sq.yds= $ 4931.25 Bitum. Tack Coat 1800 sq. yds. @ 0.05 GaV sq.yd. = 90 Gal @ 0.60/Ga1.= $ 54.00 = $ 9935.25 4) Mobilization For 1), 2) & 3) = $ 1500.00 Lump Sum $ 1,500.00 = $1500.00 1) + 2) + 3) + 4) = $28,732.25 CHANGE ORDER NUMBER TWO GRAND TOTAL =$28.732.25 '" ., Department of Public Works and Engineering Jack F. Murphy, Director of Public Works Room 701,530 Greene Street Augusta, Georgia 30911 (706) 821-1706 FAX (706) 821-1708 Clifford A. Goins, Interim Assistant Director Public Works - Engineering Division July 1, 1999 Mr. Don Holley AP AC-Georgia, Inc. P. O. Box 1129 Augusta, GA 30913 RE: Resurfacing VariollS Roads - Phase V File Reference: 88-075(98) Project Reference: 323-04-296823087 Dear Mr. Holley: Enclosed herewith for your records is a copy ofthe executed Change Order #2 on the above referenced project. Please proceed with the additional work in accordance with the Change Order. If you have any questions, please contact me at 821-1714. " Clifford . Goins Interim ssistant Director Public Works - Engineering Division cc: Mr. Jack Murphy, Director of Public Works Ms. Lena Bonner, Clerk of Commission, w/copy of change order Ms. Geri Sams, Director of Purchasing, w/copy of change order Ms. Teresa Smith, Pre-Construction Engineer, w/copy of change order Mr. Robert Clements, Assistant Pre-Construction Engineer, w/copy of change order CAG/cjv