Loading...
HomeMy WebLinkAboutResurfacing Various Phase VIII Augusta Richmond GA DOCUMENT NAME: \K E' "<:>va..Q I\CII))d V Ai<IOl.lS, RM'l>S ~\\A SIO V II J DOCUMENT TYPE:,- C+/ A (\J~ e: 0(2.1)\32- YEAR: ~DOY BOX NUMBER: ;;< L\ FILE NUMBER: 17 S- c> 0 NUMBER OF PAGES: :3 ~'.. .... Ji;:,""~...: Change Order Form Change Order Number: Five Date: 10-29-04 Project Title Resurfacing Various Roads Ph VIII Original Contract Date: 10-27-03 Project Number: 324-04-203824045 Owner: ARC P.O. Number: P81369 Contractor: Beams Construction Co. The following change order is hereby made to the proposal for the above project: See Attached TOTAL AMOUNT OF THIS CHANGE ORDER $ 0.00 The Contract time will be Increased/Decreased by ~additiona1 calendar days as a result of this change. Original Contract Amount $ 1.048.941.00 Previous Change Order (Increased / Deoreased) This Change Order (Increased 1 Deoreased) $ 98.713.25 $ 0.00 TOTAL CONTRACT WITH CHANGE ORDER(S) $ 1.147.654.25 ************* Funding Source/Account Number: No additional funding required Date: J()I;J.tJlo~ It/o/Iov / Requested By: Submitted B)'I. Date: Finance Endorsement: Date: Recommended By: Date: lJ Ijlt) , Approved By: Date: Accepted By: It~~ ta~ Contractor / lJ -;2 7-- ot/' Date: COPIES: Errick Thompson, P.E. Assistant Director-Engineering Purchasing, Geri Sams Kako1i Basu, Accountant, Public Works Pre Construction File ere: ,_ .... .t~f': ....~ Project: Resurfacing Various Roads - Phase vrn Project No.: 324-04-203824045 Location: Spring Street Date: 1 0/28/04 An existing 12" RCP storm drain pipe within the construction area failed due to pore substructure conditions. Silt & debris filled portions of the pipe and catch basin. Pipe separation had occurred at the catch basin. Change Order # 5 is needed for the amount of $2,388.00 to replace the existing 12" RCP with 15" RCP storm drain pipe. Item # Item Description Unit ~ Unit Price Total 550-1150 Storm Drain Pipe, LF. 48 $31. 00 $1,488.00 15 IN, H 1-10 Tie to Existing Storm EA 2 $450.00 $900.00 Boxes Total: $2.388.00 Amount needed for Change Order # 5 will be taken from project construction account in the amount of $2,388.00. Total Amount of Contract - Work Performed To Date = Amount Left on Contract $1,147,654.25 - $977,626.14 = $170,028.11 Item # 402-1812 Under Run Item Recycled Asph. Conc. . Leveling. Incl. Bitum. MatI & H Lime Unit TN ~ 65.371 Unit Price $36.53 Total $2,388.00 Amount needed from construction account: -$2,388.00 $2.388.00 Amount requested:$O.OO Comment: No additional funds required. No additional time required. 10/11/2004 15:31 8038271858 BEAMS CONTRACTING D~IVI ;:, ....v.... ~'""' ~1~\,2,II~w. PROPOSAL CHANGE ORDER PAGE 02/03 -... ~ j PROJECT: 'mSURFACING VARIOUS ROADS~ PHASE VIII LOCATION; ]~IGUSTA, GEORGIA - SPRING STREET CUSTOMER: 1,llGUSTA.R/CHMOND COUNTY, GA. ITEM NO. ESTIMAT R: BuddY Rowland .. ITEM UNIT TOTAL DESCRIPTION UNIT QUANTITY PRICE BID AMOUNT .. - I ~ iAllED 15" R.C.PIPE TO REPI..ACE EXISrlNG '2' RoC.PIPE LN. FT. 48 $31.00 $1.48a.OO I:!! TO EXISTING STORM BOXES EACH 2 $450.00 $900.00 - .. ~!l r AL AMOUNT FOR PROPOSED CHANGE ORDER $2.388.00 - - .. - - .. BEAM'S CONTRACTING, INC~ -Z j)() ? J_ .fJ .. _ ~.s-lo :'~.~~/:l r' Jo II/"Jr) c.; .. . - - m:rE: - - - I BID DATE: ESTIMATE DATE: o 10/11/2004 .. .;..:...;;;.~C~