Change Order Form
Change Order Number: Five Date: 10-29-04
Project Title Resurfacing Various Roads Ph VIII
Original Contract Date: 10-27-03 Project Number: 324-04-203824045
Owner: ARC P.O. Number: P81369
Contractor: Beams Construction Co.
The following change order is hereby made to the proposal for the above project:
See Attached
TOTAL AMOUNT OF THIS CHANGE ORDER
$ 0.00
The Contract time will be Increased/Decreased by ~additiona1 calendar days as a result
of this change.
Original Contract Amount
$ 1.048.941.00
Previous Change Order
(Increased / Deoreased)
This Change Order
(Increased 1 Deoreased)
$ 98.713.25
$ 0.00
TOTAL CONTRACT WITH CHANGE ORDER(S)
$ 1.147.654.25
*************
Funding Source/Account Number: No additional funding required
Date:
J()I;J.tJlo~
It/o/Iov
/
Requested By:
Submitted B)'I.
Date:
Finance Endorsement:
Date:
Recommended By:
Date:
lJ Ijlt)
,
Approved By:
Date:
Accepted By:
It~~ ta~
Contractor
/ lJ -;2 7-- ot/'
Date:
COPIES: Errick Thompson, P.E. Assistant Director-Engineering
Purchasing, Geri Sams
Kako1i Basu, Accountant, Public Works
Pre Construction File
ere: ,_ ....
.t~f': ....~
Project: Resurfacing Various Roads - Phase vrn
Project No.: 324-04-203824045
Location: Spring Street
Date: 1 0/28/04
An existing 12" RCP storm drain pipe within the construction area failed due to pore
substructure conditions. Silt & debris filled portions of the pipe and catch basin. Pipe
separation had occurred at the catch basin. Change Order # 5 is needed for the amount of
$2,388.00 to replace the existing 12" RCP with 15" RCP storm drain pipe.
Item # Item Description Unit ~ Unit Price Total
550-1150 Storm Drain Pipe, LF. 48 $31. 00 $1,488.00
15 IN, H 1-10
Tie to Existing Storm EA 2 $450.00 $900.00
Boxes
Total: $2.388.00
Amount needed for Change Order # 5 will be taken from project construction account in
the amount of $2,388.00.
Total Amount of Contract - Work Performed To Date = Amount Left on Contract
$1,147,654.25 - $977,626.14 = $170,028.11
Item #
402-1812
Under Run Item
Recycled Asph. Conc. .
Leveling. Incl. Bitum.
MatI & H Lime
Unit
TN
~
65.371
Unit Price
$36.53
Total
$2,388.00
Amount needed from construction account: -$2,388.00
$2.388.00
Amount requested:$O.OO
Comment: No additional funds required. No additional time required.
10/11/2004 15:31
8038271858
BEAMS CONTRACTING
D~IVI ;:, ....v.... ~'""' ~1~\,2,II~w.
PROPOSAL
CHANGE ORDER
PAGE 02/03
-...
~ j
PROJECT: 'mSURFACING VARIOUS ROADS~ PHASE VIII
LOCATION; ]~IGUSTA, GEORGIA - SPRING STREET
CUSTOMER: 1,llGUSTA.R/CHMOND COUNTY, GA.
ITEM
NO.
ESTIMAT R: BuddY Rowland
..
ITEM UNIT TOTAL
DESCRIPTION UNIT QUANTITY PRICE BID AMOUNT
..
-
I ~ iAllED 15" R.C.PIPE TO REPI..ACE EXISrlNG
'2' RoC.PIPE LN. FT. 48 $31.00 $1.48a.OO
I:!! TO EXISTING STORM BOXES EACH 2 $450.00 $900.00
-
..
~!l r AL AMOUNT FOR PROPOSED CHANGE ORDER $2.388.00
-
-
..
-
-
.. BEAM'S CONTRACTING, INC~
-Z j)() ? J_ .fJ
..
_ ~.s-lo :'~.~~/:l r'
Jo II/"Jr) c.;
.. .
-
-
m:rE:
-
-
-
I
BID DATE:
ESTIMATE DATE:
o
10/11/2004
..
.;..:...;;;.~C~