Loading...
HomeMy WebLinkAboutResurfacing Carious Roads Augusta Richmond GA DOCUMENT NAME: ~esu,(-wQ\~ \h'(\()J~ ~ DOCUMENT TYPE: CrArYj~ D'(dex- YEAR: OL\ BOX NUMBER: dd FILE NUMBER: \ 1 'dl19 NUMBER OF PAGES: 2) Change Order Form Change Order Number: Two Date: 06/22/04 Project Title Resurfacing Various Roac.Is Ph VIII Original Contract Date: 10-27-03 Project Number: 324-04-203824045 . Owner: ARC P.O. Number: P81369 Contractor: Beams Construction Co. The following change order is hereby made to the proposal for the above project: See Attached TOTAL AMOUNT OF THIS CHANGE ORDER $ 65.053.25 The Contract time will be IncreasedIDecreased by 45 calendar days as a result of this change. The date of completion including this change order is. 8-22-04 Original Contract Amount Previous Change Order (Increased 1 Deoreased) This Change Order (Increased 1 Decreased) $ 1.048.941.00 $ 33.660.00 $ 65.053.25 TOTAL CONTRACT WITH CHANGE ORDER(S) ************* Requested By: Submitted By: Recommended Accepted By: $ 1.147.654.25 Date: ~JV ~- ZZ ....09- b/G'1(~ '7/(.1-0 y Date: Date: Date:~ Date: 7/"l.G /of , , Date: b -;Jf -0 f COPIES: Errick Thompson, P.E. Assistant Director-Engineering Purchasing, Geri San1s Kakoli Basu, Accountant, Public Works Pre Construction File BEAM'S CONTRACTING,INC. PROPOSAL CHANGE ORDER PROJECT: RESURFACING VARIOUS ROADS LOCATION: SARING STREET CUSTOMER: AUGUSTA-RICHMOND COUNTY GA. BID DATE: ESTIMATE DATE: June 1st,2004 Revised June 22nd, 200l ITEM ITEM UNIT TOTAL NO. DESCRIPTION UNIT QUANTITY PRICE BID AMOUNT 1. LUMP SUM CONSTRUCTION: Mobilization Lump Sum 1 $1,275.00 $1,275.00 Traffic Control Lump Sum 1 $3,750.00 $3,750.00 Grading - Dirt Removal Lump Sum 1 $13,900.00 $13,900.00 Remove ExistinQ Asphalt Pavement Lump Sum 1 $1,828.00 $1,828.00 Remove Existng Concrete Pavement Lump Sum 1 $434.00 $434.00 Remove Existino Curb & Gutter Lump Sum 1 $873.00 $873.00 Construction Stakino Lump Sum 1 $1,275.00 $1,275.00 Compaction Testino Lump Sum 1 $690.00 $690.00 Demobilization Lump Sum 1 $1,275.00 $1,275.00 TOTAL AMOUNT LUMP SUM $25,300.00 2. Install 18" Suroe Stone Base TON 625 $23.95 $14,968.75 3. Install 6" Aggregate Base Crs. TON 215 $26.80 $5,762.00 4. Install 6"x30" Cone. Curb& Gutter Ln.Ft. 250 $11.10 $2,775.00 5. Install 19mm Asphalt,3" Thick TON 120 $52.40 $6,288.00 6. Install Tack Coat GAL 35 $2.70 $94.50 7. Reconstruct Catch Basins EACH 2 $2,195.00 $4,390.00 8. Adjust Existing Water Main Ln.Ft. 180 $15.00 $2,700.00 9. Install 6" Gate Valve & Box EACH 3 $625.00 $1,875.00 10. Relocate ExistinQ Fire Hydrant EACH 1 $900.00 $900.00 TOTAL CONSTRUCTION COST $65,053.25 BEAM'S CONTRACTING, INC. Signed By: Title: Date: June 22nd, 2004 Beam's Contracting, Inc. will need 45 more Calendar Days to complete this work. THIS LOCATION HAS EXPERIENCED A LOT OF GROUND WATER AND WOULD NOT SUPPORT THE WEIGHT OF THE MILLING AND/OR PAVING EQUIPMENT. TO PROPERLY REP AIR THIS AREA WILL REQUIRE REMOVAL OF THE UNSTABLE MATERIAL AND THE ADDITION OF DRAINAGE STONE, CURB&GUTTER, DRAINAGE BOXES AND PAVING.