Change Order Form
Change Order Number: Two Date: 06/22/04
Project Title Resurfacing Various Roac.Is Ph VIII
Original Contract Date: 10-27-03 Project Number: 324-04-203824045 .
Owner: ARC P.O. Number: P81369
Contractor: Beams Construction Co.
The following change order is hereby made to the proposal for the above project:
See Attached
TOTAL AMOUNT OF THIS CHANGE ORDER
$ 65.053.25
The Contract time will be IncreasedIDecreased by 45 calendar days as a result of
this change. The date of completion including this change order is. 8-22-04
Original Contract Amount
Previous Change Order
(Increased 1 Deoreased)
This Change Order
(Increased 1 Decreased)
$ 1.048.941.00
$ 33.660.00
$ 65.053.25
TOTAL CONTRACT WITH CHANGE ORDER(S)
*************
Requested By:
Submitted By:
Recommended
Accepted By:
$ 1.147.654.25
Date:
~JV
~- ZZ ....09-
b/G'1(~
'7/(.1-0 y
Date:
Date:
Date:~
Date: 7/"l.G /of
, ,
Date: b -;Jf -0 f
COPIES: Errick Thompson, P.E. Assistant Director-Engineering
Purchasing, Geri San1s
Kakoli Basu, Accountant, Public Works
Pre Construction File
BEAM'S CONTRACTING,INC.
PROPOSAL
CHANGE ORDER
PROJECT: RESURFACING VARIOUS ROADS
LOCATION: SARING STREET
CUSTOMER: AUGUSTA-RICHMOND COUNTY GA.
BID DATE:
ESTIMATE DATE:
June 1st,2004
Revised June 22nd, 200l
ITEM ITEM UNIT TOTAL
NO. DESCRIPTION UNIT QUANTITY PRICE BID AMOUNT
1. LUMP SUM CONSTRUCTION:
Mobilization Lump Sum 1 $1,275.00 $1,275.00
Traffic Control Lump Sum 1 $3,750.00 $3,750.00
Grading - Dirt Removal Lump Sum 1 $13,900.00 $13,900.00
Remove ExistinQ Asphalt Pavement Lump Sum 1 $1,828.00 $1,828.00
Remove Existng Concrete Pavement Lump Sum 1 $434.00 $434.00
Remove Existino Curb & Gutter Lump Sum 1 $873.00 $873.00
Construction Stakino Lump Sum 1 $1,275.00 $1,275.00
Compaction Testino Lump Sum 1 $690.00 $690.00
Demobilization Lump Sum 1 $1,275.00 $1,275.00
TOTAL AMOUNT LUMP SUM $25,300.00
2. Install 18" Suroe Stone Base TON 625 $23.95 $14,968.75
3. Install 6" Aggregate Base Crs. TON 215 $26.80 $5,762.00
4. Install 6"x30" Cone. Curb& Gutter Ln.Ft. 250 $11.10 $2,775.00
5. Install 19mm Asphalt,3" Thick TON 120 $52.40 $6,288.00
6. Install Tack Coat GAL 35 $2.70 $94.50
7. Reconstruct Catch Basins EACH 2 $2,195.00 $4,390.00
8. Adjust Existing Water Main Ln.Ft. 180 $15.00 $2,700.00
9. Install 6" Gate Valve & Box EACH 3 $625.00 $1,875.00
10. Relocate ExistinQ Fire Hydrant EACH 1 $900.00 $900.00
TOTAL CONSTRUCTION COST $65,053.25
BEAM'S CONTRACTING, INC.
Signed By:
Title:
Date: June 22nd, 2004
Beam's Contracting, Inc. will need 45 more
Calendar Days to complete this work.
THIS LOCATION HAS EXPERIENCED A LOT OF GROUND WATER AND WOULD NOT
SUPPORT THE WEIGHT OF THE MILLING AND/OR PAVING EQUIPMENT. TO PROPERLY
REP AIR THIS AREA WILL REQUIRE REMOVAL OF THE UNSTABLE MATERIAL AND THE
ADDITION OF DRAINAGE STONE, CURB&GUTTER, DRAINAGE BOXES AND PAVING.