, Change Order Form
I
Change Order Number: ONE Date: September 7,2003
Project Title Replacement of Municipal Building Hydraulic Elevator
Original Contract Date: January 28. 2003 Project Number: 324-05-201150500
Owner: ARC P.O. Number: 9<7<,Od.D'7 ~
Contractor: Montaomery KONE
SEE ATTACHED
TOTAL AMOUNT OF THIS CHANGE ORDER
$
133.293.00
The contract time for completion of work on the east elevator will remain
November 30, 2003. Completion for the West Elevator will be February 25,2004.
Original Contract Amount
Previous Change Order(s) Total
This Change Order (Increased)
TOTAL CONTRACT WITH CHANGE ORDER(S)
Recommended By:
Approved
Accepted By:
CC: Purchasing Department, Geri Sams
Finance Department, Kakoli Basu
Accountant, Public Works and Engineering
Agenda File
1 of 2
J 121.167.00
J 0.00
J 133.293.00 ~
$ 254,460.00 3~()4b2.\\
011'- - I 5:41 '? 12 0)
:Zi!co c::, Ot) 001
Date:~ /ftt lo:.~ Slt/3/z-o
-- Date:JO 117/ 0 ~
Date: LO)~'i 163
Date:~
Date:/o/~~
Date: r)~3
~
"
~~
Change Order Form
Change Order One
Project No. 324-05-201060011
Justification
Since the time of the initial award for replacement of the East Elevator, we have
experienced frequent failure of components on the west elevator. Many of the
replacement parts required are no longer available due to the age of the
equipment. Thus far, we have been able to keep this unit operational by
scavenging parts from the east elevator, but these parts are the same age as
those replaced and the supply is finite. There is a distinct possibility that any of
these parts could fail rendering the unit non-functional with no source for
replacement parts.
Montgomery KONE was the single respondent to the RFP for replacement of the
east elevator.
2of2