CHANGE ORDER
'i
r
l~
~
Change Order Number: L Date: May 10, 2000
Project Tiltle: Raw Water Pumping Facility Corrective Action Environmental Site Assessment
Original Contract Date: April 26, 1999 Project Number: 88-057
Owner: Augusta Commission P,O. Number: P06465
Contract(]lr: Environmental Management Associates
The following change order is hereby made to the proposal for the above project:
TOT AL AMOUNT OF THIS CHANGE ORDER
($6,700.00)
The Contract time will be Increased/Decreased by _calendar days as.u result of this change. The
date of completion including this Change Order is Feb. 28, 2002
Original Contract Amount
Previous Change Order
(Increased/Decreased)
This Change Order
(In,creased/I?ecreased)
. ..
TOTAL CONTRACT WITH CHANGE ORDER(S)
* * * * * * * * *.* * * * * *
$2,600.00
$0.00
$6,700.00
$9,300.00
Funding Source/Account Numbers: 507043490-5425310/89900100-5425310
Requested By: ~'II.A'rtitrf' Date: !J11~
Proje t na r. j} .
Submitted BY: ~ Date: 5~~tl
Date:S r;i".-~
Date: ~/f 'i rro
~'/oo
Finance Endorsement: f,).){~
Comptroller I
~e.~
Recommended By: .
JAnis at
Acc~pted By:
Approved By: :.
Date: S-/(p-<fZ)
Contractor
/hum
';i,
'-',
"
.,.
-rD.; !kma:P M.ALllL 5"11z./e1O
r.
Clifford A. Goins, Assistant Director
Engineering Division
Environmental En~. Section
Dr. Hameed Malik, P.E.
Environmental Engineer
Room 701, 530 Greene Street
Augusta, Georgia 30911
(706) 821-1706 FAX (706) 821-1708
MEMORANDUM
TO:
Charles R. Oliver, Administrator
Hameed Malik, Environmental Engineer #1M
FROM:
SUBJECT:
AUGUSTM~t~NQ CQ'WfV
AOMINJSfRAa'a ~
RE:
DATE:
May 10, 2000
Raw Water Pumpm tatlOn
Site Monitoring A a Corrective Action
Project File Referen : 88-057
~?p(Zo~ .
" ~~ Oc~~
. ~/q/crO
The 12,000-gallon UST was removed fyom the Site on September 2, 1999. Follow-up environmental
assessment at the tank location, as required by Federal and State UST regulations, confimled
presence of soil .& groundwater contamination and warranted Corrective Action at the Site.
However, the site is already under Corrective Action to address 1993 diesel fuel release. Therefore,
an approach was adopted that will address recently observed contaminatiqn and, 1993 diesel fuel
release contamination under one Corrective Action. A comprehensive summary of environmental
site assessment and remedial activities were prepared by Environmental Management Associates on
behalf of Augusta-Richmond County and sybmitted to Georgia Environmental Prote<;t~<?n Division
on February 3, 2000. As a Corrective Action, we propose to continue existing Con-ective Action
Plan of Monitoring Only (no active remedial actiqn). Under Monitoring Only Plan, we proposes two
years of semiannual monitoring of groundwater at existing selective groundwater monitoring points
to evaluate the effectiveness of natural attenuation on the groundwater contamination. Semiannual
monitoring will be perfonned during the months of June 2000, December 2000, June 2001 and
December 2001. Proposed Corrective Action is the cost-effective plan to_comply with Federal and
State UST regulations. Change Order 1 will cover the cost to complete the activities proposed under
Corrective Action Plan. Environmental Management Associates (EMA) is perf011l1ing ongoing
Correction Action activities. Therefore, EMA was contacted to submit a proposal to complete the
proposed additional activities. EMA personnel past involvement to address the groundwater quality
assessment issues at the Raw Water Pumping Station Facility and interaction with the EPD on our
behalf will help to address EPD concel1lS (if any) with regard to residual contamination and also
keep the proposed work cost minimum.
c,
'.
..
"
,-
,
.,
Change Order 1 .
Raw Watl~r Pumping Station Facility
Subsurface Contamination
Site Monitoring As a Corrective Action
May 10, 2:000
Page 2
Estimated cost to complete the additional work is $6,700.00. This change order brings the total cost
to complete this project to $9,300.00. Please approve Change Order Number One. Funds are
available in Utility Department Account 507043490-5425310/89900100-5425310.
/HUM
Attachment: Change Order Form
xc: My. N. Max Hicks, Utilities Department
My. Clifford A. Goins, Department of Public Works and Engineering
','
EMAL Environmental Management Associates, LLC
22;11) Hricktl'11 ~1:11 j<1'.l
Buford. Ct~{jl'~:icl :~O~;.l S
1",.I<'f'hol1t: 7(1).271.7i1'),"
FilS 7i'O-271-55SU
March 2:1, 2000
Reference No. 100
Mr. Hameed Malik, P.E.
Augusta.-Richmond County
530 Greene Street, Room 701
Augusta, Georgia 30911
Dear Mr.. Malik:
Re: Request for Proposal
Raw Water PumpingStation ..
Augusta, Georgia
EPD Facility 1.0. No. 9121080
Pursuantto Our recent conversation, Environmental Management Associates (EMA) is pleased
to submit the following cost estimate to complete the proposed semiannual groundwater
sampling and reporting requirements for the above referenced facility.
In accordance with the report entitled "Summary of Analytical Results" dated February 3, 2000,
EMA will complete the semiannual groundwater monitoring activities in June and December
2000 and 2001. The semiannual groundwater monitoring events will consist of the sampling of
two existing monitoring wells (CRAMW-1 and CRAMW-2) and an additional monitoring well
(MW-4) f<>r benzene, toluene, ethylbenzene,and xylenes (BTEX) and polynuclear aromatic
hydrocarbons (P AH). To demonstrate that natural attenuation is occurring, EMA also
recommends that these wells be measured in the field for dissolve~ oxygen (D.O.),
oxidation/reduction potential, and pH. Monitoring well MW-4 will be used to monitor the
backgrowld concentrations of the target and geochemical parameters.
The result5 of the sampling and analysis events will be reported to EPD and Augusta-
Richmond County in a semiannual groundwater monitoring report. The reports will be
submitted:,in July 2000 and 2001 and January 2001 and 2002. The reports will include a brief
summary i)f the Facility background, astj.mmary of findings that will include tabulated data
and a pot~rtiometric surface map,a site ranking, and an evaluation to determine if a CAP-Part
B will be r(~quired for this Facility or if the Facility qualifies for a "No Further Action" status.
Based on the Scope of Work described above, EMA's estimated annual cqst to complete these
activities'is $3,350 ($1,675 per event). The costs for two years would be $6,700. A breakdown of
the total costs is as follows:
.'
,
, .
~...... -;," -.
'.
r,
March 31, 2000
Reference No. 100
-2-
Task
Cost
Groundwater Sampling
(2 sampl1ng events)
$900
Analytical
(2 Sampling Events)
$1,150
Report Preparation (2 Reports)
_ Annual Total
(x2 years)
$1,300
$3,350
$6,700
EMA appreciates the opportunity to submit this proposal to Augusta-Richmond County.
Should you have any questions related to our proposal, please contact the undersigned at (770)
271-7098. We look forward to working with you on this project.
Yours truly,
Environmental Management Associates, LLC
t~- eW~- ,
Brent Cortelloni, CHMM
BC/bc/13