HomeMy WebLinkAboutR W ALLEN CHANGE ORDER 24 MAIN LIBRARY $19,353.00
Contract Change Order
CHANGE ORDER NUMBER: 24
DATE: 11/9/2009
CONTRACTOR:
RW Allen, LLC
1015 Broad St.
PROJECT NAME: ARC - Task 05 - Main library
PROJECT NO: 0400101 - Task 05
REFERENCE:
COP# '33 3' 40
J .
Au usta, GA 30901
Project Description: Construction of a new 95,000 GSF, three-story, main library in downtown Augusta.
Description of Change to the Scope of Work: 1. Installation of break metal along west elevation of 2nd floor.
2. Drain and steel modifications at the entrance canopies.
3. Additional Blind/Shade scope.
Project Duration:
Number of Days added to the Substantial Completion Date
as a result of this Change to the Scope of Work:
The original Contract amount
Net change by previous change orders
The previous Contract amount
Add
0.0000 Days
$ $16,287,000.00
$ $419,892.74
$ $16,706,892.74
$ $19,353.00
$ $16,726,245.74
Total amount of this change order
Current Contract amount
All terms and conditions of the Contract Agreement between the OWner and the Contractor apply to this Change Order.
Recommended for Accep'
5AM.I4.e.L
DATE:
Recommended for Acceptance by the Project Manager.
DATE:
Recommended for Acceptance by the Owner:
DATE:
Memorandum
Request for Change Order
1- ]
Studio 3 Design Group
1617W~_ ~"""GA309lI4 _
To: Jacques Ware (Duke, Edwards and Duke, Inc.)
From: Samuel D. Beaird, Jr., AlA
Date: October 29 , 2009
Project Name: East Central Georgia Regional Ubrary
Project .: 200607 (Architect's Number)
RE: Change Order Proposal #38
CC: Bob Munger (Heery International)
File: document1
Attached, please find a change order proposal from the Contractor requesting additional
compensation for.
DescrIption of Changes:
Add break metal cladding to conceal edge of concrete slab, between first and second floors,
at curtain walls on west elevation of building
Why is this change nec:eaeary? This change Is required for an Improved appearance
Who requested this change? Architect and Owner
Is th.... an altematJveto doing this work and what impact does it have?The alternate
would be a painted finish. Long term, the painted finish would be a maintenance concern.
What will happen If this change is not made? A. painted finish would be the only other
option. The overall appearance would be compromised.
Impact of Project Sc~u": No Impact.
Reason for Change:
~ Unforeseen Conditions
181 Oivner Request
o life Safety
~ Errors and/or OmIssions
o Code Requirement
181 Other(spedfy)
ArchItect
~:~~.~A
Date: October 29. 009
Comments:
We hereby certify that we haw reviewed the Contr8ctor'e propoeal and we have determined thet the coal
that we have recommended Is fair and relIIIOn8b1e COII1pen88IIon for the scope of work described.
Contractor Change Request
Page 1 of 1
Contractor Change Request
Project [0400101 - Task 05) - ARC - View Date 11/12/2009
Task 05 - Main Library
RwAllen
RW Allen, LLC
1015 Broad St.
Augusta, GA 30901
Phone: (706) 733-2800
Fax: (706) 733-3879
Contractor Change
Request No. 00071
To
Submitted By
Description
Jacques Ware (Heery International, Inc. (Dukes Edwards & Dukes - Subconsultant))
RW Allen, LLC Date 9/22/2009
Break Metal at 9th St Storefront Status Approved
State Approved
Referenced CCO No. 24
Estimated Effects of Request
ITime
Amount
10 days
$8,897.00
Work Description
This proposal is for breakmetal to block the 2nd floor slab from being seen.
Recommendation
Response By
Response
Jacques Ware
Linked Documents
Document Type
Doc
Description
gsc storefront bm
Date
9/22/2009
http://heery.constructware.com/CommonNiewlDocwnent_Display.asp?DocwnentType=33&ItemID=20...11/1212009
Jim Cely
From:
Sent
To:
Subject:
Chip lvey [glassaug4@bellsouth.net]
Tuesday, September 22, 20097:44 AM
Jim Cely
Library CO's
Jim,
Please find the change order breakdowns below
Brake metal detail at 2nd floor/shade boxes
Material
Tax
Total MatITax
labor
Total MaULabor
Sales Commission
Total w/Commission
10% Overhead
Total w/Overhead
10% Profit
Total Change Order
$ 3,B82.00
$ 271.74
$4,153.74
$ 2.419.20
$ 6,572.94
$ 262.91
$ 6,B35.85
$ 683.58
$ 7,519,44
$ 751.94
$ 8,271.38
(total of 76 pieces, .063 brake metal @ $ 51.07).
(72 hours @ $ 33.60)
Chip Ivey
Glass Service Center
1230 Reynolds Street
Augusta, GA 30901
706.722.7395
706.724-5951 Fax
mai Ita: slassa llg4(W bellsoutll. net
. '. . .... .. . ,. , . . ... .... ..',',....... . ..... ........ ,... ..... ...... ....... ..... ~ ,_._. ........ .. ~'.'.' .... ,.. ...... .... .... ........ ...... ,.........._~............~..~'......~.~..,........ ,_~...'.'.I'.......,............... 1_..,'\"......... .... ....... ~ .... , ,', ",.......' ."., >.... ,'. .. '.'.' ........,
1
Memorandum
Request for Change Order
I~~: I
Studio 3 Design Group
1617 WaIIDn Way ""'_. GA 30904 .
To: Jacques Ware (Duke, Edwards and Duke, Inc.)
From: Samuel D. Beaird, Jr., AlA
~: ~r29,2oo9
Project Name: East Central Georgia Regional library
Project II: 200607 (Architect's Number)
RE: Change Order Proposal #39
CC: Bob Munger (Heely International)
File: document1
Attached, plea8e find a change order proposal from the Contractor requesting additional
compensation for.
Description of Changes:
Add mlaceJlaneous steel framing and miscellaneous draIn lines to the entrance canopies at
The Telfair and '" Street entrances.
Why IS this change neceuary? The mlsceUaneous steel framing Is added to provide
Improved framing of the concealed gutter system. The misceUaneous drain lines are added
to connect the concealed gutters to concealed roof drain lines.
Who l'lKluested this change? Architect
18 there an alternative to doing this work and what Impact does It have? The aItemate Is
to keep with the original architectural plans. These ~enges ere improvements for long term
operation.
VVhat will happen If this change Is not made? Final product would be compromised.
Impact of Project Schedule: No Impact.
Reason for.Change:
181 Unforeseen CondItions
00 Owner Request
life Saf8ty
o Errors atidlor Omissions
o COde ReqtMement
o Other(speclfy)
s_~
Date: October 29,
Comments:
We hereby cerIIfY that we haV8 nwIewed the Contractor's propoaal and we have delerrMledihat Ihe met
that we have recommended 18 fair end I'UlICNIble compell88tiOn for the IlCOp8 of work m.aa1bed.
Contractor Change Request
Page 1 of I
Contractor Change Request
Project [0400101 - Task 05] - ARC -
Task 05 - Main Ubrary
View Date 11/12/2009
RwAllen
RW Allen, LlC
1015 Broad St.
Augusta, GA 30901
Phone: (706) 733-2800
Fax: (706) 733-3879
Contractor Change
Request No. 00072
To
Submitted By
Description
Jacques Ware (Heery International, Inc. (Dukes Edwards & Dukes - Subconsultant)}
RW Allen, LLC Date 10/13/2009
AS 131 - Porch at main entrance Status Approved
State Approved
Referenced CCO No. 24
Estimated Effects of Request
ITime
Amount
10 days
$6,663.00
Work Description
This proposal is for the drain and steel associated with ASI 131
Recommendation
Response By
Response
Jacques Ware
Linked Documents
Document Type
Doc
Date
10/13/2009
http://beery.constructware.com/CommonIView/DocumenCDisplay.asp?DocumentType=33&ItemID=20... 11/12/2009
BILL JAMES AND SONS, INC
MECHANICAL CONTRACTORS
P.O. BOX 178
AUGUSTA, GEORGIA 30903
GA. REG 1lCU-401679
sc. UC #M-2133
PHONE -706-724.2142
FAX -706-724-0421
CHANGE ORDER
TO:
FROM:
DATE:
JIM CELY
MICHAEL JAMES
10/112009
REFERENCE:
EAST CENTRAL GEORGIA REGIONAL LIBRARY
CANOPY ROOf DRAINS AND PIPING
TO PROVIDE (2) 3" CANOPY GUmR DRAINS, (2) 1" STAINLESS STEEL OVERFLOW PIPES, ASSOCIATED PIPING,
INSULATION ALONG WITH TIE-INS TO EXISTING ROOF DRAIN LEADERS AS INDICATED ON DRAWINGS SOAS.2.1,
50,0.5.2.2. SOAS.2.3,sDAS.Z.4, 50,0.11.2.2 AND SOAll.2.3 DATED 9/25/2009. WE DO NOT INCLUDE ANY FlASHING OF
DRAINS AND OVERFLOW PIPES OR CUTTING OF HOLES THROUGH EXTERIOR STONEWORK IN THIS PRICING.
TOTAL $3,145.00
COST INCREASE
MATERIAL
TAX
LABOR
PRT
SUBTOTAL
15% 0 & p
TOTAL
1390.11
97.31
960.00
288.00
2735.42
410.32
3145.74
If you have any questions please do not hesitate to call the office.
Thank you,
Michael James
MACUCH STEEL PRODUCTS, INC.
P.O. Box 3285 1527 Augusta Ave. Phone: (706) 396.6129 Fax: (706) 396.6199
Augusta. GA 30901
CHANGE ORDER PROPOSAL # 19 10/09/09
Contractor: R WAllen & Associales Job Name: East Central Ga Regiorull Library
AUentlan: Jim CeJy Job Location: Augusta, GA
Address: Job Number G4TI
Proposal No. 19
Submitted By: Jay Smith
Fax # Attachments: yes
Work to be Performed Amount
Malerial S1.491.00
Tax @ 7% $105.00
Sub-Total $1,596.00
Furnish & install per ASI No. 0131
Revisions; 10 the (2) Glass Enlrl1l1al Canopies Erecl/on $1,175.00
Sub- T alaI $2,771.00
Profit 10% $276.00
Sub-Total $3,049.00
Please sign below Indicating approval to proceed.
N.Il me & ntle Date
Sub Total 3,049.00
Delailed Drawings Included Ei5 YES LJ NO
Delivered 10 Jobsile YES D NO
Sales Tax Included GJ YES 0 NO
MISC
Alternates, Exclusions Or Qualifications
Adjusted Total 3,049.00
Memorandum
Request for Change Order
I~- I
Studio 3 Design Group
1617 Walton Way Augusta. GA 30904
To: Jacques Ware (Duke. Edwards and Duke, Inc.)
From: Samuel D. BeaIrd, Jr., AlA
Date: October 29 . 2009
Project Name: East Central Georgia Regional Library
Project N: 200607 (ArchItect's Number)
RE: Change Order Proposal #40
CC: Bob Munger (Heery International)
File: document1
Attached, please find a change order proposal from the ConIractor requesting additional
,compensation for:
Description of Changes:
Miscellaneous changes to manual shades and blinds
Why is this change 118C88..ry? Owner request
Who requeatect this change? Owner
Is there an alternative to doing this work and what Impact does It have? The altemate Is
to not do this work. The Impact would adversely affect usability of the affected spaces
What will happen If this change Is not made? UsablUty would be compromised.
Impact of Project Schedule: No Impact.
Reason for Change:
EJ Unfonsseen Conditions
~ Owner Req\Je8t
o Life Safety
o Errors and/or OmIssions
o Code Requlremelit
o Other(specIfy)
~A
Comments:
We hereby certify that we have reviewed the Contractor's propOsal and we have delennlned that the cost
that we have recommended Is fall' and reaeonable compenaadon for the 8COp8 of work desGrlbed.
Contractor Change Request
Page 1 of 1
Contractor Change Request
Project [0400101 - Task 05] - ARC -
Task 05 - Main Ubrary
View Date 11/12/2009
RwAllen
RW Allen, LLC
1015 Broad St.
Augusta, GA 30901
Phone: (706) 733-2800
Fax: (706) 733-3879
Contractor Change
Request No. 00074
To
Submitted By
Description
Jacques Ware (Heery International, Inc. (Dukes Edwards & Dukes - Subconsultant))
RW Allen, LLC Date 11/2/2009
Blind Changes Status Approved
State Approved
Referenced CCO No. 24
Estimated Effects of Request
~ime
Amount
10 days
$3,793.00
Work Description
added / changed blinds. Not including electrical
Recommendation
Response By
Response
Jacques Ware
Linked Documents
Document Type
Doc
Document
0400101 - Task 05-02459
Description
Blinds
Date
11/2/2009
http://heery.constructware.comlCommonNiew/Document_Display.asp?DocumentType=33&ItemlD=21... 11/1212009
- ....
~N~~~
THE H R-ENCE IS BLINDING
--
BARTIMAEUS, INC.
BLINDS-SHADES
Augusta Library changes in blinds and shades
Change order
Agreed changes per owner.
Area
Change "V" wIndow8 on east wallin room 201 from
bOnds to manual shadeS
Change binds to manual shades on east wan of
room 207
Add new room on 3rd ftoor manual shades
Changes sub total
Total Change order
Credit for Change
New product old product order total
$ 1.122.00 $ (296.00) $ 826.00
$ 795.00 $ (226.00) $ 569.00
$ 2,098.00 $ $ 2,098.00
$ 4,015.00 $ (522.00)
$ 3,493.00