HomeMy WebLinkAboutR D BROWN CONTRACTORS CHANGE ORDER 1 Augusta Richmond GA DOCUMENT NAME: [)~ 5\-(ee\- \ \~ S\"Qt\CXl ~b\ \r\-o..-non DOCUMENT TYPE: cro~ o'(o.e:x' YEAR: 0 ~ BOX NUMBER: \C\ FILE NUMBER: \LY?s'Clst NUMBER OF PAGES: 3 " CONSTRUCTION CONTRACT CHANGE ORDER co NUNffiER 1 BID ITEM 02-206 DATE 06/24/03 PROJECT TITLE ORIGINAL CONTRACT DATE OWNER AUGUSTA, GEORGIA 2nd Street Lift Station Rehabilitation OS/21/2003 PROJECT NUMBER PO NUMBER 50260 P 69764 The following change is hereby made to the contract for the above project: Description of Change (for a more detailed description see attached proposal): Commission letter dated February 3, 2003 item #48 was for the upgrade of the Second Street lift station, This change order is for additional work which would include cutting in a new plug valve while bypass pumping and replacing suction valves on the pwnps in the lift station, PAYEE TOTAL AtYfOUNT OF THIS CHANGE ORDER $ R. D, Brown Contractors, Inc 53,682.51 The contract time will be INCREASED by.a calendar days as a result of this change, ORIGINAL CONTRACT MvIOUNT $ PREVIOUS CHANGE ORDER (INCREASE) $ THIS CHANGE ORDER (INCREASE) $ TOTAL REVISED CONTRACT Ai'vIOUNT \VITH CHANGE ORDER $ FUNDING NUl\1BER/ ACCOUNT NUl\-ffiER PROPOSED BY: REQUESTED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: 509043420 DATE: DATE: DATE: DATE: DATE: DATE: 416,074,00 0,00 53,682.51 469,756,51 5425210 ~'1flJ 5425210 blJ-1 Jt}J- , &127~) 6/Z7P3 cVc3~o3 0/743 Y/7/(J~ f ~.> , ~G 'A_B!:;')>/>. '(q~~~~.p .f~.~f. ~Ir . il\~ ~\ '} t7 '~ ..Ji~ ~~a1.f"F Stevenson&PaImer . Engineering INCORPORATED Albany Augusta Savannah Smyrna June 19, 2003 Hand Delivered Mr. Joe Holley, P.E., Engineering Superintendent 360 Bay Street, Suite 180 Augusta, Georgia 30901 Re: 2nd Street Lift Station Rehabilitation, AUD Project #50260 Change Order #1 Dear Mr. Holley: As you are aware, the contractor's first attempt to change the discharge plug and check valves on the station's pumps was aborted due to the failure of the existing 14-inch gate valve on the force main to seal tightly. We have spoken to the contractor regarding options that would allow the work to proceed. The first option is to cut in a new plug valve while bypass pumping, attempting to deal with leakage through the existing valve by pumping from the excavation back into the wetwelL There is risk associated with this option because the leakage rate through the existing valve is not known and there is the potential for a spill occurring. The cost of this option is $16,672.89. The contractor will not assume responsibility for any spill that occurs under this scenario. The second option is to install a new plug valve while performing a line stop on the force main. While this option is more costly, it minimizes the risk of a spilL The cost of this option is $28,432.27. We recommend this option. The intent of this project was to enhance the reliability of the station until the new Columbia Nitrogen force main is constructed, which will serve to significantly reduce flow to this station. Once the force main is constructed, further rehabilitation was planned, and at that time the suction valves for the 4 pumps would be replaced. The bypass system set up by the contractor was able to reliably handle the flow to the station, and this affords the opportunity to change the suction valves at this time. The cost for this change would be $25,250.24. We have reviewed this price and find it to be reasonable. We recommend that this work be included in project. 360 Bay Street, Suite 400 / Augusta, Georgia 30901/706-261-4040/ Fax 706-261-4042 . , ~ .. June 19, 2003 AUD Project #50260 Change Order No.1 Page 2 The total cost of the work described above is $53,632.51. Please contact me if you have questions or comments. Sincerely, STEVENSON & PALMER ENGINEERING, INC. ,,-;;;,.. 'D . W ~ Tom D. Wiedmeier, P.E. Vice President TDW:mrc cc; Jeff Henderson/CH2M Hill, Inc.