Loading...
HomeMy WebLinkAboutPOTTS OCO 016 ASI 6,7,8,9,10 JUDICIAL CENTER , f MP Owner Change Order a 3 r s u r :: Project [28073C] - Augusta Date 7/30/2010 Richmond County Judicial Center HEERY '"'- '"'T"Tt• .,A= n• The Potts Company 981 East Freeway Drive Conyers, GA 30094 OCO No. 016 Phone: 770-483-9299 Fax: 770-483-9317 Date 7/30/2010 Description RCO's 30, 32, 33, 34, 35 & 36//ti-4i (i, 7, «, `3 t O From Chris Webb To Leslie Wright The Potts Company Turner Associates Architects & Planners, Inc. 981 East Freeway Drive 280 Elizabeth St. NE Conyers, GA 30094 Suite A -110 Phone: 770 - 483 -9299 Atlanta, GA 30307 Fax: 770-483-9317 Phone: (404) 681 -3214 x3129 Fax: (404) 880 -7914 Schedule Change 0 days RCO 030, 032, 033, 034, 035, 036 Scope of Work Provide changes per RCO's 30, 32, 33, 34, 35 and 36. Owner PO /Incumbrance Record No. Items No. Budget Contact Description Submitted Approved Code 1 16- 16000 -0- David Dean (Dean Electric CR 12 - Bulletin #5 $45,114.00 - Co., Inc.) (ASI #6) 2 16- 16000 -0- David Dean (Dean Electric CR13 - Display Monitor $6,555.00 - Co., Inc.) per RFI 385 3 16- 16000 -0- David Dean (Dean Electric CR14 - Card Reader at $2,752.00 - Co., Inc.) Door 253 4 16- 16000 -0- David Dean (Dean Electric CR15 - Data & Voice $7,656.00 Co., Inc.) Cabling Chgs 5 16- 16000 -0- David Dean (Dean Electric CR 16 - Chgs per ASI $15,254.00 - Co., Inc.) #9 6 16- 16000 -0- David Dean (Dean Electric CR 17 - Chgs per ASI $8,855.00 - Co., Inc.) #10 7 05- 05720 -0- Ronnie Lewis (R.F. Knox 4th Floor Wall Anchors $9,355.00 - Company, Inc.) per Sketch AT -059 and AT -064 8 08- 08000 -0- Alan Fambrough (John Make revisions to $18,934.00 - Oat ley Builders Hardware, doors, frames and Inc.) hardware per the Owner and Architect and door /hardware schedule submitted on March 18, 2010. 9 08- 08000 -0- Alan Fambrough (John Furnish revised door $2,563.00 - Oat ley Builders Hardware, frames and doors for Inc.) openings 003B and 108A. 10 15- 15500 -A- Joe McMahon (Gold Mech, Roof Drain Plumbing $11,000.00 - Inc.) Revisions per RFI 342 11 15- 15500 -A- Joe McMahon (Gold Mech, Revised Plumbing per $3,830.00 - Inc.) RFI 334 12 05- 05120 -0- Jason Griffin (Jonquil Steel Steel Changes per ASI $3,667.00 - & Construction Company, #7 Inc.) 13 05- 05120 -0- Jason Griffin (Jonquil Steel Add tube steel columns $3,020.00 - & Construction Company, per Sketch S -013 Inc.) 14 08- 08710 -0- David Foucher (Foucher Install Hardware per $6,452.00 - Door Company, Inc.) ASI #6 15 08- 08710 -0- David Foucher (Foucher Hardware Installation $540.00 - Door Company, Inc.) per ASI #10 16 08- 08410 -0- Bob Lacey (Glass Systems, Aluminum Door $10,724.00 - Inc.) Hardware Changes per ASI #10 17 01- 01020 -A- Chris Webb (The Potts Various Costs per ASI $5,241.00 - Company) #6, 7, 8, & 9 18 16- 16000 -0- David Dean (Dean Electric CR 22 - Electrical $856.00 - Co., Inc.) Changes to Room 240 per sketches E -037 and E -038 19 16- 16000 -0- David Dean (Dean Electric Electrical Changes per $26,038.00 - Co., Inc.) RFI #426, ASI #11 & Sketches E -033 thru E- 036 20 Chris Webb (The Potts Fire Alarm System (562,157.00) - Company) Conduit Credit 21 06- 06240 -0- Robert Dehner (Augusta Add muttons at ceiling $2,614.00 - Sash & Door Co.) fixtures 22 12- 12500 -0- Mark Johnson (Marietta Install Mecho Shades at $7,893.00 - Drapery & Window Lobby Entry Curtainwall 1 Coverings Co., Inc.) Markups No. Budget Description Rate ( %) Submitted Approved Code 1 Fee 7.00 $7,701.00 - 2 Material Fee 15.00 $4,011.00 - Submitted Approved ,! Items $136,756.00 - Markups $11,712.00 - Tota l $148,468.00 - The Potts Company Augusta, Georgia Turner Associ. e Ar it - & Planners, i c. Signed: CC Signed: CO ✓L Signed: i A. ' By: Chris Webb, Project By• �tff ` Deke Copenhaver, By: Leslie Wright, Mr. Manager L 0Mayor Date: - I3c t‘-- Date: tv (z....1" f c Date: