Owner Change Order
Project [28073C] - Augusta Richmond County Judicial Date 2/1/2010
- Center
HEERY ASSOCIAM Turner Associates Architects & Planners, Inc.
'Y;t,7car,^r2bPJAMMMNC. 280 Elizabeth St. NE
Suite A -110 OCO No. 015
Atlanta, GA 30307
Phone: (404) 681-3214
Fax: (404) 880-7914
Date 2/1/2010 Budget Status Pending Approval
Description Undercut Parking area between Talcot & Fenwick Streets
From David Bitter
Turner Associates Architects & Planners, Inc.
280 Elizabeth St. NE
Suite A -110
Atlanta, GA 30307
Phone: (404) 681-3214
Fax: (404) 880-7914
To John G. Lukens
The Potts Company
981 East Freeway Drive
Conyers, GA 30094
Phone: (770) 483 -9299
Fax: (770) 483 -9317
iZi 0 i]
Scope of Remove unsuitable materials from the parking area parallel to 10th Street between Talcot & Fenwick
Work Streets. Area to be undercut to suitable soils and backfilled with select imported fill, all under the
direction of the Owner's Geotechnical Engineer, Graves Engineering, Inc.
Items
No. Budget Code Contact Description Submitted Approved
1 Undercut Parking area between Talcot & Fenwick Streets $66,588.00 $66,588.00
Submitted Approved
Items $66,588.00 $66,588.00
M a rk ups - -
Total $66,588.00 $66,588.00
Turner Associates Architects & Augusta, Georgia The Potts Company
Planners, Inca
Signed: Signed: S igned:
Signed: � - 4 4
By: David Bitte , AIA By: By: n G. Lukens, Sr. Project
/
Manager
Date: 3�g /° Dater 17,1 l I Date: 2 - - Z- -(0
Page 1 of 1
Fb9ts
Request For Change Order
R G 1 n
Project [28073C] - Augusta Richmond Date 6/30/2009
County Judicial Center
HE 7 tfRMTR /�ssocmTrs
1i T1RaT 2i NF AW..Vfr-. (w
The Potts Company
981 East Freeway Drive
Conyers, GA 30094
Date 6/30/2009 Budget Status Pending Approval
Cost Event
No.
Description Undercut Parking area between Talcot & Fenwick Streets
From John G. Lukens
The Potts Company
981 East Freeway Drive
Conyers, GA 30094
RCO No. 010
To David Bitter
Turner Associates Architects & Planners,
Inc.
280 Elizabeth St. NE
Suite A -110
Atlanta, GA 30307
Scope of Remove unsuitable materials from the parking area parallel to 10th Street between Talcot &
Work Fenwick Streets. Area to be undercut to suitable soils and backfilled with select imported
fill, all under the direction of the Owner's Geotechnical Engineer, Graves Engineering, Inc.
Work was done on a Unit Cost basis not to exceed $75,000.00. Costs are calculated per the
attached breakdown referencing Graves reports.
Owner PO No.
Submitted
Items
$66,588.00
Markups _
Total $66,588.00
The Potts Company Augusta, Georgia Turner Associates Architects &
Planners, Inc.
SignedJohn Signed: Signed:
By: G. Lukens, Sr. Project By: Fred Russell, City By: David Bitter, AIA
Manager Manager
Date: (o - 3 - 0 1 Date: Date:
Augusta Richmond County Judicial Center
RCO # 010
Haul -off Unsuitable Materials and Haul -in Replacement Fill
Calculated Quantities per Graves Engineering Reports
Date
Haul -off CY
Notes
39,948.16
$
66,588.16
5/1/2009
448
Graves Report # Fl 045
5/8/2009
512
Graves Report # FI 049
5/13/2009
192
Graves Report # Fl 051
5/15/2009
384
Graves Report # Fl 053
5/20/2009
272
Graves Report # 171 054
5/28/2009
240
Graves Report # Fl 058
5/29/2009
64
Graves Report # Fl 059
6/2/2009
32
Graves Report # Fl 061
6/15/2009
98
Graves Report # Fl 068
6/16/2009
98
Graves Report # Fl 070
6/17/2009
28
Graves Report # Fl 072
Total
2,368
Haul -Off qty = 2,368 CY at $ 11.25 per CY =
Haul -In Qty = 2,368 CY at $ 16.87 per CY =
Unit prices per Contract.
$
26,640.00
$
39,948.16
$
66,588.16
10 RCO Unsuitables 5 of Fenwick NTE.iclsx
GRAVES
ENGINEERING SERVICES, INC.
FIELD INSPECTION REPORT
PROJECT: Augusta Judicial Center LOCATION: Augusta, GA
CLIENT: Augusta - Richmond Co. REPORT DATE: 05/04/2009
GRAVES REPORT NO.: FT- 091732 -045 GRAVES PROJECT NO: CS- 091732
GENERAL DATA
DATE OF INSPECTION: 05/01/2009
GRAVES REPRESENTATIVE: Nelson Williams, P.E.
WEATHER: Clear and Warm
TYPE OF INSPECTION SPECIFIED / REQUESTED: Unsuitable Soil Removal - West Central Section of-Site
INSPECTION REQUESTED BY / REQUIRED BY Client
RESULTS OF FIELD INSPECTION
As requested, our representative observed the undercutting; of the unsuitable soil in the parking area in the west- central section
of the site. On this date, twenty-eight(28) tri -axle dump truck loads of material were removed from the site_ Each truck
contained approximately 16 cubic yards of material. Therefore, approximately 448 cubic yards were removed on this date.
Respectfully Submitted,
Gra s Engineering Services, Inc.
cc: Beery lntemational
Turner Associates
The Woodhurst:Partnership
The Cranston Engineering Group
Potts Construction
Construction Perfected, Inc.
Richard W. Swanson, P.E.
Principal Engineer / President
05 /11/20U 08:20 FAX 706 651 0810 GRAVES ENG.
FIELD INSPECTION )REPORT
1a002/002
l]ri—A— r ES
tN61NE=NG Srmvicm, mc.
PROJECT: Augusta Judicial Center LOCATION: Augusta, GA
CLIENT: Augusta- Richmond Co. REPORT DATE: 05/11/2009
GRAVIES REPORT NO.: FI- 091732 -049 GRAVES PROJECT NO: CS- 091732
GENERAL DATA
DATE OF INSPECTION: 05/08/2009
GRAVES REPRESENTATIVE: Nelson Williams, P.E.
WEATHER: Partly Cloudy and Warm
TYPE OF INSPECTION SPF- CIFIED / REQUESTED: Unsuitable Soil Removal - West Central Section of Site
INSPECTION REQUESTED BY / REQUIRED BY: Client
RESULTS OF FIELD INSPECTION
As requested, our representative observed the undercutting of additional unsuitable soil in the parking area in the west - central
section of the site. On this date, thirty- two(32) tri -axle dump truck loads of material were removed from the site. Each truck
contained approximately 16 cubic yards of material. Therefore, approximately 512 cubic yards were removed on this date.
The area undercut on this date was proofrolled and then backfrlled with imported fill such that positive drainage would be
maintained due to the recent intermittent rainy weather.
Respectfully Submitted,
Graves Engineering Services, Inc.
cc: Hccry International
Turner Associates
The Woodhurst Partnership
The Cranston Engineering Group
Potts Construction
Construction Perfected, Inc.
7r <_
chard W. Swanson, P.E.
incipal Engineer / President•
GRAVES
ENGINEERING SERVICES. INC.
>crFr .n Ym1zPr-rTinN RRPORT
PROJECT: Augusta Judicial Center LOCATION: Augusta, GA
CLIENT: Augusta - Richmond Co. __ REPORT DATE: 05/14/2009
GRAYS REPORTNO.: Fi- 091732 -051 GRAVES PROJECT NO: CS- 091732
GENERAL DATA
DATE OF INSPECTION: 45/13/2009
GRAVES REPRESENTATIVE: Nelson Williams P.E.
WEATHER: Clear and Mild
TYPE OF INSPECTION SPECIFIED /REQUESTED: Proofroll & Unsuitable Soil Removal
INSPECTION REQUESTED BY / REQUIRED BY: Client
RESULTS OF FIELD INSPECTION
As requested, our representative visited the above referenced project to conduct a proofrool inspection. Proofrolling was
conducted with a loaded dump truck on the west parking area between the former Fenwick and Talcott Streets and between
the circular drive and storm line "A ". Three(3) small soft/wet areas were noted and contractor elected to undercut. A total of
32 cubic yards were removed from the above areas on this date. The areas were again proofrolled and proved to be stable and
firm with no pumping encountered and were approved to receive backfil1.
Our representative also observed the removal of additional unsuitable rubblelsoil in the north and west parking areas from the
lighting and irrigation trenches. On this date, tweive(12) tri -axle dump truck loads of material were removed from the site.
Each truck contained approximately 16 cubic yards of material. Therefore, approximately 192 cubic yards were removed
from these areas on this date.
Our representative then conducted field density testing of the parking lot and trench backfill in accordance with plans and
specifications.
cc: Heery International
Turner Associates
The Woodhurst Partnership
The Ctgttston Engineering Group
Potts Construction
Construction Perfected, Inc.
Respectfully Submttteo,
Graves Engineering Services, Inc.
Richard W. Swanson, P.E.
Principal Engineer / President
GRAVES
ENGINEERING SERVICES, INC.
FIELD INSPECTION REPORT
PROJECT: Augusta Judicial Center LOCATION: Augusta, GA
CLIENT: Augusta - Richmond Co. REPORT DATE: 05/18/2009
GRAVES REPORT NO.: F1- 091732 -053 GRAVES PROJECT NO: CS- 091732
GENERAL DATA
DATE OF INSPECTION: 05/15/2099
GRAVES REPRESENTATIVE: Nelson Williams, P.E.
WEATHER: Partly Cloudy and Warm
TYPE OF INSPECTION SPECIFIED / REQUESTED: Unsuitable /Unstable Soil Removal - W. Central Section of Site
INSPECTION REQUESTED BY / REQUIRED BY: Client
RESULTS OF FIELD INSPECTION
As requested our representative observed the continued undercutting of unsuitable/unstable soil in the parking area in the
west - central section of the site. On this date, twenty- four(24) tri -axle dump truck loads of material were removed from the
site, Each tnlck contained approximately 16 cubic yards of material. Therefore, approximately 384 cubic yards were
removed on this date. The area undercut on this date was proofrolled and then backfilled with imported rill and on -site
material such that positive drainage would be maintained due to the recent intermittent rainy weather,
cc: Heery I ntemational
Turner Associates
The Woodhurst Partnership
The Cranston Engineering Group
Potts Construction
Construction Perfected, Inc.
Respectfully Submitted,
Graves Engineering Services, Inc.
Richard W. Swanson, P.E.
Principal Engineer 1 President
GRAVES
ENGINEERnNG SERVICES. INC.
FIELD INSPECTION REPORT
PROJECT: Augusta Judicial Center LOCATION: Augusta, GA
CLIENT: Augusta - Richmond Co. REPORT DATE: 05/2112009
GRAVES REPORT NO.: FI -091732 -054 GRAVES PROJECT NO: CS- 091732
GENERAL DATA
DATE OF INSPECTION: 0512012009
GRAVES REPRESENTATIVE: Nelson Williams. P.E.
WEATHER: Partly Cloudy and Mild
TYPE OF INSPECTION SPECIFIED/ REQUESTED: Slab Suberade Inspection - Unsuitable Soil Removal
INSPECTION REQUESTED BY / REQUIRED BY: Client
RESULTS OF FIELD INSPECTION
As requested, our representative visited the above referenced site. to inspect the slab subgrade between column lines A to EA
and 1.6 to 5. The area was noted to be &cc of deleterious materials and was in an area in which fill had been previously
placed and tested. The exposed soil was noted to generally be a red -tan, slightly clayey. silty fine to medium sand. The slab
subgrade was noted to be stable and firm with nominal penetration to the probe rod indicating that these soils are acceptable
for placement of the drainage layer, vapor barrier and concrete slab on grade. We also observed the placement and
compaction of the sand drainage layer.
While on -site, our representative also observed the removal of additional unsuitable rubble/soil in the north parking areas
from the lighting and irrigation trenches. On this date, ten(t0) tri -axle dump trick loads of material were removed front the
site. An additional seven(7) tri -axle dump truck loads of material were removed from the utility line excavation from
structures B5 and B6. Each truck contained approximately 16 cubic yards of material. Therefore, approximately 272 cubic
yards were removed from these areas on this date.
Respectfully Submitted,
Graves Engineering Services, Inc.
cc: Heery International
Turner Associates
The Woodhurst Partnership
The Cranston Engineering Group
Potts Construction
Construction Perfected, Inc.
Carter Concrete
Richard W. Swanson, P.E.
Principal Engineer / President
GRAVES
FNGINEERING SERVICES. INC.
FIELD INSPECTION REPORT
PROJECT: Augusta Judicial Center LOCATION: Augusta, GA
CLIENT: Augusta - Richmond Co. REPORT DATE: 05129/2009
GRAVES REPORT NO.: FI- 091732 -058 GRAVFS PROJECT NO: C:S- 091732
GENERAL DATA
DATE Of INSPECTION: 05/28/2009
GRAVES REPRESENTATIVE: Nelson Williams
WEATHER: Sutut) anti Mild
TYPE OF INSPECTION SPECIFIED 1 REQUESTED: Unsuitable Soil /Rubble Removal
INSPECTION REQUESTED BY I REQUIRED BY: Client
RESULTS OF FIELD INSPECTION
As requested, our representative observed the undercutting of additional rubblehmsuitablc soil in the lighting trenches and
north parking area. O.n this date, fifteen(15) tri -axle dump truck loads of material were removed from the site. Each truck
contained approximately 16 cubic yards of material. Therefore, approximately 240 cubic yards were removed on this date..
Respectfully Submitted,
Graves Engineering Services, Inc.
cc: Heery International
Turner Associates
The Woodhurst Partnership
The Cranston Engineering Group
Potts Construction
Construction Perfected, Inc.
Richard W. Swanson, P.E.
Principal Engineer /President
GRAVES
1INGINEEMING SERVICES, INC.
FIELD INSPEC REPORT
PROJECT: Augusta Judicial Ccnter LOCATION: . Augusta, GA
CLIENT: Augusta - Richmond Co. REPORT DATE: 06/0112009
GRAVES REPORT NO.: FI -091732 -059 GRAVES PROJECT NO: CS- 09173
GENERAL DATA
DATE OF INSPECTION: 45129/2009
GRAVES REPRESENTATIVE: Nelson Williams
WEATHER: Sunny and Warns
TYPE OF .INSPECTION SPECIFIED /REQUESTED: UnsuitableSoiltRubble Removal
INSPECTION REQUESTED BY J REQUIRED BY: Client
RESULTS OF FIELD INSPECTION
As requested. our represeotative observed the undercutting of additional rubble/unsuitable soil in the lighting trenches in the
north parking area. On this dale, four(4) tri -axle dump truck loads of material were removed from the site. Each truck
contained approximately 16 cubic yards of nrrateriat. Therefore, approximately 64 cubic yards were removed on this date.
cc: Heery International
Turner Associates
The Woodhurst Partnership
The Cranston Engineering Group
Potts Construction
Construction Perfected, Inc.
.Respectfully Submitted,.
Graves Engineering Services, Inc.
Richard W. Swanson, P.E.
Principal Engineer / President
GFAVES
ENIGINERRIING MVICES. INC.
FTF :F.i) INSPF.f'TION REPORT
PROJECT: Augusta Judicial Center LOCATION: Augusta, GA
CLIENT: Augusta- Richmond Co. REPORT DATE:: 06103/2009
GRAVES REPORT NO.: FI- 091732 -061 GRAVES PROJECT NO: CS- 091732
GENERAL DATA
DATE OF INSPECTION: 06102/2009
GRAVES REPRESENTATIVE: Nelson Williams
WEATHER: Sunnv and Warm
TYPE OF INSPECTION SPECIFIED / REQUESTED: Unsuitable Soil /Rubble Removal
INSPECTION REQUESTED BY / REQUIRED BY: Client
RESULTS OF FIELD INSPECTION
As requested, our representative observed the undercutting of additional rubble /unsuitable soil in the lighting trenches in the
north parking area. On this date, txvo(2) tri -axle dump truck loads of material were removed from the site. Each truck
contained approximately 16 cubic yards of material. Therefore, approximately 32 cubic yards were removed on this date.
RespectWiiy Submitted,
Grayes Engineering Services, Inc.
CC'. Beery International
Turner Associates
The \yt)()dIhurst Partnership
The Cranston Engineering Grnup
Potts Cunsu uction
Construction Perfected, Inc.
Picbard W. Swanson, P.E.
Principal Engineer / President
GRAVES
ENONT:ERIM, SERVICES, INC.
FIELD INSPECTION REPORT
PROJECT: Augusta Judicial Center LOCATION: Augusta, GA
CLIENT: Augusta-Richmond Co. REPORT DATE: 06/16/2009
GRAVES REPORT NO.: FI- 091732 -068 GRAVES PROJECT NO: CS- 091732
GENERAL DATA
DATE OF INSPECTION: 06/15/2009
GRAVES REPRESENTATIVE: Nelson Williams
WEATHER: Sunny and Warm
TYPE OF INSPECTION SPECIFIED/ RE-QUESTED: Wet SoiliRubble Removal
INSPECTION REQUESTED BY / REQUIRED BY: Client
RESULTS OF .FIELD INSPECTION
As requested, our representative observed the undercutting of wet soil around the storm drain inlets. Some light rubble was
also noted in this material. On this date, seven(7) tandem -axle dump truck loads of material were removed from the site.
Each truck contained approximately 14 cubic yards of material. Therefore, approximately 98 cubic yards were removed on
this date.
Respectfully Submitted,
Graves Fngineering Services, Inc.
cc: Heery International
Turner Associates
The Woodhurst Partnership
The Cranston Engineering Group
Potts Construction
Construction Perfected, Inc.
Richard W. Swanson, P.E.
Principal Engineer / President
GRAVES
[INGINMING HUMUS. INC.
FIELD iNCPP.C'TION RRPtIRT
PROJECT: Augusta Judicial Center LOCATION: Augusta, GA
CLIENT: Augusta - Richmond Co. REPORT DATE: 06/17/2009
GRAVES REPORT NO, Ft- 091732 -070 GRAVES PROJECT - NO: CS- 091732
GENERAL DATA
DATE OF INSPECTION: 06/16/2009
GRAVES REPRESENTATIVE: Nelson Williams
WEATHER: Sunny and Warm.
TYPE OF INSPECTION SPECIFIED I REQUESTED: Wct SoillRubbic Rcmoval
INSPECTION REQUESTED BY," REQUIRED BY: Client
RESULTS OF /FIELD INSPECTION
As requested, our representative observed the undercutting of wet soil around the storm drain inlets. Some light rubble was
also noted in this material. On this date, sevenM tandern -axle dump truck loads of material vVere removed from the site.
Each truck contained approximately 14 cubic yards or material. Therefore, approximately 98 cubic yards were removed on
this date.
cc: Heery international
Turner Associates
The Woodhurst Partnership
"/lie Cranston Engineering Group
Potts Construction
Construction Perfected, Inc.
Respectfully Submitted,
Graves Engineering Services, Inc.
Richard W. Swanson, P.E.
Principal Engineer ( President
GRAVES
ENGINEERING SERVICES, INC.
FIELD IN 1 R.PF1`T10N, OFFPCWT
PROJECT: Augusta Judicial Center LOCATION: Augusta, GA
CLIENT: Augusta- Richmond Co. REPORT DATE: 06 '18/2009
GRAVES REPORT NO.: F.I- 091732-072 GRAVES PROJECT NO: CS- 021732
GENERAL DATA
DATE OF INSPECTION: 06/17/2009
GRAVES REPRESENTATIVE: Nelson Williams
WEATHER: Sunny and Warm
TYPE OF INSPECTION SPECIFIED/ REQUESTED: Unsuitable Soil/Rubble Removal
INSPECTION REQUESTED BY /REQUIRED BY: Client
RESULTS OF FIELD INSPECTION
As requested, our representative observed the undercutting of additional rubbleiwlsuitable soil in the lighting trenches in the
parking areas. On this date, two(2) tandem -axle dump truck loads of material were removed from the site. Each trick
contained approximately 14 cubic yards of material. Therefore, approximately 28 cubic yards were removed on this date.
ac: Beery International
Turner Associates
The Woodhurst Pvtnership
The Cranston Engineering Group
Potts Construction
Construction Perfected, Inc.
Respectfully Subnutted,
Graves,,;Engineering Services, Inc.
Richard W. Swanson, P.E.
Principal Engineer /President