RICHMOND COUNT'{ PlJBLIC WORKS
Millard F. Gooding
Public Works Director
Memo To:
1815 Marvin Griffin Road
Augusta, GA 3croS
December 27, 1995
" rr'J~~l1~lID
"',~ \ !.;.I &!, i,j \. "
" ! '..,,'..:./',.;.J." 1,,,./
l',~;;'~;I'; ',~.,. 6) 796-5040
, , .~ " '6) 796-5045
....,ll DEe 28 1995
From:
Linda W. Beazley, Administrator
1Iw1f"V /'
Millard F. Gooding, Dir~c~br
RICHM(JNU CiJ(jNTY
BOARD Of COMMISSIONERS OFFICE
Re:
AGENDA ITEM
pine Log Road Drainage Improvements
Project Number: 55~8707-095
Reference: 87-056
Attached is Change Order Number 'rT,o/O and Capital Project Budget
Amendment Number two from Beam's Pavement Maintenance Company,
Incorporated in the amount of $27', 000 to perform miscellaneous
small projects around the ar(~a. ,These funds are available in
County Forces Drainage Speciar 1% Sales Tax, Phase II.
This change order includes the following:
1) Behind one of the retaining wall~ along the Rae's Creek
culvert, the drainage around the weep holes has caused sink holes
to develop. To correct this prcoblem burJ'.ap bags filled with rocks
are to be placed at the bottom of each weep hole and the area
backfilled and sodded.
2) six trees need to be removed in a property owners yard along
the construction perimeter of the Avondale Drainage project. They
have died due to excess dirt left atter t,he project was completed.
This excess dirt has also caused. wati:!r to back up onto the
property. A french drain will be installed and the low places
filled in and regrassed.
3) Five large pine trees need to be removed along Walton Way at
Tripps Court. These trees are, leaning p:::-ecariously over the road
and power lines. An ice storm 'would: certainly cause either
numerous limbs to fall or the trees themselves onto those power
lines and into traffic. It will be necessary to partially close
Walton Way traffic while these trees are taken down as the power
company will not allow the lines to be t~rned off.
4) The Construction of a catwalk is needed at the retention pond
in Cannon Gate Subdivision. This wi,ll allow access to the control
gate for adjusting the pond level before storms.
Approval of Change Order Number TWo ant=' Capital Proj ect Budget
Amendment Number two with funding are re;:::ommended.
JFM/ld
Attachments
CC: Cheryl Nelson
Agenda File
Preconstruct ion File
District: ,7th
Bas{n: Rfie' s Creek
December 11, 1995
Richmond County, 08
Attn: Mr. Jack Murphy
Dear Mr. MUlphy,
We are pleased to of:l.e:r you the following quote:
1. Berckman Rd. Culvert
Install burlap sacks tilled with rocks behind each weep hole. ,
Fill low areas with dirt and replace !tod at low areas. '
2. Mr. VlUlover's Residence
Remove 6 trees, remove & replace 100 if of chain lilnk fence.
Bring in 5 loads of dirt and spread.
InBtall 125 If of french drain and regras9,
3. Walton Way @ Tripp Court
Remove 5 tre'es and grind stumps. Price indudes traffic COTJtrol.
4. Davil Rd.
Build catwalk to outlet structure for retention pond;
No removal of vegetat.ion off pond, :
Total Price ..... $27,000,00
Please call1.fyou have any questiong,
,~
,
Beam's Pavement Maintenance Company, Inc,
7:(:1 ':!t:',tI.-1
II..t-:JI/,I':!M-i,-1 c: 1...1\7-:<0
OCP~ T .' 7or--no
h~ .7"':'"' '-:1-:1.' T ,'.-:- T ,'";"" T
CHANGE ORDER
NUMBER: -2-
DATE: 12-28-95
PROJECT TITLE: Pine Log Road Drairlage Im'Jrovements
ORIGINAL CONTRACT DATE: August7, 1995
PROJECT NO.: 55-8707-095
OWNER: Augusta-Richmond County Commission/Council
P. O. NUMBER: ] 17402
CONTRACTOR: Beam's Pavement Maintenance Company, Incorporated
The following change order' is hereby made to the proposa'l for the above project:
See attached quote from Beam's Pavement J\I1ainten2.:nce Company, Incorporated
TOTAL AMOUNT OF THiS CHANGE ORDER:
$27,000,00
The contract time will be increased by 45 calendar days as a result of this change,
ORIGINAL CONTRACT AMOUNT:
$63,499,00
PREVIOUS CHANGES ORDERS (INCREASE):
$ 4,495,55
THIS CHANGE ORDER (INCREASE):
$27.000,00
TOTAL CONTRACT WITH CHANGE ORDERS:
$94.994,55
******************************************************************************
REQUESTED BY: Jack F, Murphy, Precon~tructi6h EngiJ'(~'er DATE: 12/28/95
SUBMITTED BY: Jack F, Murphy, Precot,:struction Engineer DATE: 12/28/95
RECOMMENDED BY : DATE: 12/28/95
APPROVED BY:
DATE: ~
Augusta-Richmond County, Georgia
'I
~
CAPITAL PROJECT BUDGET AMENDMENT
PINE LOG ROAD DRAINAGE IMPROVEMENTS
CHANGE NUMBER TWO
CURRENT
SORCE OF FUNDS CPB
Special 1 % Sales Tax, Phase II
55-3131-00-0000 ($84,000)
County Forces Drainage
55-8081-00-0882
TOTAL SOURCES
USE OF FUNDS
Advertising
55-8707-00-0254
Construction
55-8707 -00-0832
TOTAL USES
($84,000)
$1 ,000
$83.000
$84,000
CPB NEW
CHANGE CPB
CPB# 55-8707-095
1996 GIL
AMOUNT
($27,000)($111,000)
($27,000) ($111,000)
$1 ,000
$27.000
, $110.000
$27,0(0
$1 I ],000
($27.000)
$27.000
$27,000
...~-
Augusta-Richmond County, Georgia
CPB# 55-8707-095
CAPIT AL PROJECT BUDGf~T AMENDMENT
PINE LOG ROAD DRAINAGE IMPROVEMENTS
CHANGE NUMBER TWO
BE IT ORDAINED by the Commission/Couni;il of Augusta~Richmond County, Georgia that the
following capital project budget is hereby amended:
Section 1. The project change authorized is to CPB# 55:-8707-095 adopted April 18, 1995, This
change is for the addition of several small projects throu'ghout the county. These are as follows: 1)
correct sink hole problem behind weep holes in r'etainiri~ wall a',ong Rae's Creek culvert on
Berckman's Road; 2) install french drain and le,rel excess dirt fn Avondale Subdivision at the
Vanover residence; 3) remove 5 pine trees along Walton Way @ Tripp Court; and, 4) build a
catwalk in the Cannon Gate Subdivision retention pond, Estimated cost of this change order is
$27,000 which is to be funded by the County Forces Drr-inage funds in Special 1% Sales Tax, Phase
11,
Section 2. The project director is hereby directed to proceed with the project within the tenns of the
funds appropriated herein,
Section 3, The following revenues are anticip'ated to be available to the Commission/Council to
complete the project:
Special 1% Sales Tax, Phase II $111,000
Section 4, The following amounts are appropriated for the project:
BY BASIN
Spirit $84,000
Rae's $27.000
$111,000
BY DISTRICT
8th $84,000
7th $27.000
$111,000
Section 5, Copies of this capital project btidget' atnendm~'nt shall be made available to the
Comptroller for direction in carrying out this pr~ject.
Adopted this 2nd day of January, 1996,
Linda W, Beazley, Administrator