CHANGE ORDER
co NU1v1BER 1
BID ITEM
DATE 11/16/2001
PROJECT TITLE
National Hills Sanitary Sewer
ORIGINAL CONTRACT DATE August 24, 2001
PROJECT NUMBER S-12J
OWNER AUGUSTA COMMISSION
PO NUMBER
P44458
The following change order is hereby made to the proposal for the above project:
PAYEE
W. A. Barnett Construction
TOTAL AMOUNT OF TIllS a-IANGE ORDER
$
0.00
The contract time will be INCREASED by 28 calendar days as a result of this change.
ORIGINAL CONTRACT COST
$
314,605.80
PREVIOUS CHANGE ORDER (INCREASE)
$
0.00
TIllS CHANGE ORDER (NO mANGE)
$
0.00
TOTAL CONTRACT WTIH a-IANGE ORDER
$
314,605.80
FUNDING NU1v1BER/ ACCOUNT NU1v1BER
k
71d ~
D~ HEAD
508043420
5425210
REQUESTED BY:
DA~E:
I~/ol
o/~(r; I
SUB:MITTED BY:
DATE:
FINANCE ENDORSEMENT: Ot0'Vn (;.6' W J.C?t ~ ~
COMP1ROllER
DATE:
/t/J- 29- o(
// ,/i~/
I( / Ze,/ol
,
APPROVED BY:
DATE:
RECOMMENDED BY:
DATE:
0-
~
'..
~"
Augusta Utilities Department
Douglas A. Cheek, P.E., Assistant Director
Engineering and Construction Division
360 Bay Street, Suite 180
Augusta, Georgia 30901
(706) 312-4132 Fax (706) 312-4133
N. Max Hicks, P.E., Director
MEMORANDUM
TO:
Walter Hornsby, Deputy Administrator
vb:UglaS A. Cheek, PE, Assistant Director-Engineering and Construction Division
FROM:
DATE:
November 20,2001
SUBJECT: National Hills Sanitary Sewer- Project S-12J
Change Order Number 1- Time Extension
Attached for your review and signature is the fonn for Change Order Number 1 to the subject
contract. The change order involves extending the contract duration by 28 days from the original
90 days for a revised total contract duration of 118 calendar days.
The original contract duration for the construction phase of this project was established during the
design phase of the project and was established with the intent of completing the project prior to
October 1, 2001. When the project duration was set, October 1, 200 1 was believed to be the latest
date a 1996 bond project could be completed in order to financially reconcile the bond before the end
of 2001. The scheduled duration was originally shortened in an attempt to complete the project
early. We have since learned that the bond projects did not have to be completed by October and
more accurate contract duration could have been established.
During the bidding phase, difficulties were encountered in obtaining easement agreements with
property owners along the pipe route creating the need for some re-design. The re-design was
accomplished quickly, but not quickly enough to complete the project before October. We believe
a time extension of28 calendar days will allow the contractor, W. A. Barnett, to complete the project
in a reasonable time period, and there is no monetary adjustment required as a result of this time
extension.
If additional information is'needed, please contact me at 312-4132.
Attachment
Cc:. N. Max Hicks, ,PE, Director
Bob Davis, PE, Bond Program Construction Manager, CH2M H.ill