Loading...
HomeMy WebLinkAboutNational Hills Sanitary Sewer (5) Augusta Richmond GA DOCUMENTNAME:(\Oi\\CXDl \\\\\3 ~Q\)\to.\~ S~ DOCUMENT TYPE: c.XtQ~ CXdeJ( YEAR: 0\ BOX NUMBER: l L...\ FILE NUMBER: \5"( \15> NUMBER OF PAGES: cO ;.'" fA, \ :- ~. .... Or.' ., CHANGE ORDER co NU1v1BER 1 BID ITEM DATE 11/16/2001 PROJECT TITLE National Hills Sanitary Sewer ORIGINAL CONTRACT DATE August 24, 2001 PROJECT NUMBER S-12J OWNER AUGUSTA COMMISSION PO NUMBER P44458 The following change order is hereby made to the proposal for the above project: PAYEE W. A. Barnett Construction TOTAL AMOUNT OF TIllS a-IANGE ORDER $ 0.00 The contract time will be INCREASED by 28 calendar days as a result of this change. ORIGINAL CONTRACT COST $ 314,605.80 PREVIOUS CHANGE ORDER (INCREASE) $ 0.00 TIllS CHANGE ORDER (NO mANGE) $ 0.00 TOTAL CONTRACT WTIH a-IANGE ORDER $ 314,605.80 FUNDING NU1v1BER/ ACCOUNT NU1v1BER k 71d ~ D~ HEAD 508043420 5425210 REQUESTED BY: DA~E: I~/ol o/~(r; I SUB:MITTED BY: DATE: FINANCE ENDORSEMENT: Ot0'Vn (;.6' W J.C?t ~ ~ COMP1ROllER DATE: /t/J- 29- o( // ,/i~/ I( / Ze,/ol , APPROVED BY: DATE: RECOMMENDED BY: DATE: 0- ~ '.. ~" Augusta Utilities Department Douglas A. Cheek, P.E., Assistant Director Engineering and Construction Division 360 Bay Street, Suite 180 Augusta, Georgia 30901 (706) 312-4132 Fax (706) 312-4133 N. Max Hicks, P.E., Director MEMORANDUM TO: Walter Hornsby, Deputy Administrator vb:UglaS A. Cheek, PE, Assistant Director-Engineering and Construction Division FROM: DATE: November 20,2001 SUBJECT: National Hills Sanitary Sewer- Project S-12J Change Order Number 1- Time Extension Attached for your review and signature is the fonn for Change Order Number 1 to the subject contract. The change order involves extending the contract duration by 28 days from the original 90 days for a revised total contract duration of 118 calendar days. The original contract duration for the construction phase of this project was established during the design phase of the project and was established with the intent of completing the project prior to October 1, 2001. When the project duration was set, October 1, 200 1 was believed to be the latest date a 1996 bond project could be completed in order to financially reconcile the bond before the end of 2001. The scheduled duration was originally shortened in an attempt to complete the project early. We have since learned that the bond projects did not have to be completed by October and more accurate contract duration could have been established. During the bidding phase, difficulties were encountered in obtaining easement agreements with property owners along the pipe route creating the need for some re-design. The re-design was accomplished quickly, but not quickly enough to complete the project before October. We believe a time extension of28 calendar days will allow the contractor, W. A. Barnett, to complete the project in a reasonable time period, and there is no monetary adjustment required as a result of this time extension. If additional information is'needed, please contact me at 312-4132. Attachment Cc:. N. Max Hicks, ,PE, Director Bob Davis, PE, Bond Program Construction Manager, CH2M H.ill