HomeMy WebLinkAboutMCKNIGHT CONSTRUCTION CO CHANGE ORDER NO20 $150,000.00 TERMINAL AREA IMPROVEMENTS AUGUSTA REGIONAL AIRPORT AT BUSH FIELD CHANGE ORDER NO. - 20 June 15,2008 MODIFICATIONS TO THE CONTRACT ARE AS FOLLOWS: See Attached Change Order #20 Summary Original Contract Sum ...................................$ 25254.193.00 Change by Previous Change Order.... .. .. . . .. .. .. .....$ 1.099.682.66 Contract Sum Prior to this Change Order. . . . . . . . . . . ..$ 26.353.875.66 This Change Order........ ............................ ...$ 150.000.00 New Contract Sum .................................... ...$ 26.503 .875.66 Contract Time will be as follows: 0 Calendar Days are added to the duration of the Proiect Signed by: ~ JCKnight Construction Co., Inc. ~~ - 7.1".0<\ DATE The LP A Group, Inc. U~A.~ Mayor of August ct/1lcR ~~~ DATE at:~ Must be signed bv Construction Manager. Architect. Owner. Mayor and Contractor Cc: All Signers Item No. Item Description A Exterior Signage Package Change Order #20 Summary May 1, 2008 Quantity Unit Unit Cost ($) LS $150,000.00 Total $150.000.00 Total ($) $150,000.00 $150,000.00 Time Extension (Days) o o S:ICM FileslCa 20 Augusta Regional Airport Exterior Sign Package Sign Type A-1 A-2 A-4 8-1 8-2 8-3 Quantity 2 Unit Cost Total Cost $34,937.00 $34,937.00 $17,888.00 $35,776.00 $13,640.00 $13,640.00 $4,394.00 $39,546.00 $2,301.00 $13,806.00 $849.00 $2,547.00 $473.00 $946.00 Sub-Total $141,198.00 McKnight Mark-Up (7%) $9,883.86 Total $151,081.86 USE NOT-TO-EXCEED $150,000.00 9 6 3 2 . ' Augusta Regional Airport Exterior Signage Package April 24, 2008 Background The Augusta Regional Airport Terminal Construction Project was bid as a base bid package with a total oftwo (2) Additive Alternates. The first additive alternate included an Exterior and Site Signage Program. The second additive alternate was for Long Term Parking Expansion. The purpose for including these alternates was to add either or both of the alternate packages as the bid results permitted. The bid results received did not permit acceptance of either of the additive alternates, so neither was exercised as a part of the Terminal Contract. As the project has progressed, the Airport Administration and the Aviation Commission determined a certain portion of the Exterior and Site Signage Program would be required. These signs were primarily located on the curbside drop-off and pick-up areas of the Terminal and along the main entry road to the Terminal. These signs were fabricated and installed in time for the Terminal opening in December of2007. Over the past several months of operation, the Airport Administration has determined that additional directional signage would add to the clarity to traveling public. The signage would be of the same design and fabrication as the signs of the Terminal curb front and unify the entire package from entry to the airport grounds until they depart the facility. The Exterior and Site Signage Program was initially bid at a cost of$296,639.00. The Construction Manager on behalf of the Aviation Commission and the Airport has gone through a value engineering process. This process included identifying specific signs that would be required in the final Exterior Signage Package presented. In addition, discussions were conducted with the signage fabricator and the signage designer to develop ways to construct the signs and minimize the end costs of the signs. This process has resulted in the sign types shown on the attached spreadsheet. The signs shown represent signage on the main loop to the Terminal and then back to Doug Barnard Parkway. The final quantity, types and value of all signs will be negotiated by the airport staff and the Contractor. The total cost will not exceed $150,000.00. Office Of1he Administrator Frederick l. Russell, Administraror Room 801 . Municipal Building 530 Greene Street - AUGUSTA, GA. 30901 (706) 821-2400. FAX (7(6) 821-281' www.lIugUSQlgll.gOV TlImeka Allen, Interim Deputy Administr..ror Robert Leverett, Interim Deputy Administrllror May 20, 2008 Ms. Tammy Strange Interim Director - Augusta Regional Airport 1501 AViation Way Augusta, GA 30906 Dear Tammy: The Augusta-Richmond County Commission, at their regular meeting held on Tuesday, May 20,2008, took action on the following items. 10. Approved the reclassification of the Airport Oirector's position. The change in job description and classification upgrades the position to a pay grade 65 from a pay grade 61. - -- -- 20. fApproved Termin,al Construction Project Change Order #20 - Exterior-Signage~Package;-(Approved. b>q c..public Services Committee May 12, 2008) f L J~ 29. Approved to adopt ;:I proposed ordinance to regulate off airport rental car concessions at the Augusta Regional Airport; to amend the Augusta-Richmond County Code; to repeal all ordinances and partS of ordinances in conflict therewith; to provide for severability; to provide an effective date therefore and for other purposes as stated In said ordinance. (Approved by Finance Committee May 12, 2008) If you have any Questions, please contact me. Yours truly, Frederick l. Russell Administrator cc: Ms. Donna Williams Ms. Gerl Sams Mr. Mike Blanchard 05-20-Q8: 1110, '20, #29