Original Contract Sum ... ...... ...... ... ... ...... ........$
25,254,1 92.45
Change by Previous Change Order............... ... ...$
81,277.32
Contract Sum Prior to this Change Order... . . . . . . . . ..$
25,335,469.77
() 49,744.84
This Change Order.. . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . $
New Contract Sum .......................................$
25,385.214.61
Contract Time wifl be as follows: 0 Calendar Days are added to the duration of Phase 1
and the Total Contract Duration
Signed by:
~~
5.'~ tOb
DATE
~ Ss
McKnight Construction Co., Inc. DA
The LP A Group, Inc.
g~:i1~ ~t~1;h
Must be signed by Construction Manager, Architect, Owner, Mayor and Contractor
Cc: All Signers
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
'/11- 5 f 7 Cj:)
'loti' (JL'/
/~~.,'\"'v1
\.........-. ;
J _
FOUNDERS:
Mason McKnight, Sr. 1900-1973
Mason McKnight, Jr. 1930-1994
William D. McKnight - President
Mason McKnight, III - Vice President
Huey E. Carter - Sec. - Treasurer
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: [706] 863-7784
Fax: [706] 863-2031
February 7, 2006
Parsons Brinckerhoff Construction Services Inc.
1510 Hanger Road, Suite A
Augusta, GA 30906
Attn: Matt McCoy
RE: Augusta Regional Airport
Augusta, GA
:1t-;2,\
Gentlemen:
Per the attached letter, Smith Brothers is having to provide a second type of diffuser to fit properly
into the thinline grid. As noted, this new diffuser will cost additional money and has to be ordered,.
Granted, McKnight has a responsibility to build the project per the plans and specs; but the engineers
and architect must specifY the products to be used in a timely manner. Hopefully, this order and the
(21) day delivery will not create an impact on the completion. ~;:-
..~ /00
Please issue a change order for the additional cost: J:+Qt;.~ \ \(J~\ ole> -
(olL~ 0 'J..
\\:.~
\l~~ ,,^J t^
~6L..
Smith Brothers
McKnight 7% DIP
Subtotal
$382.63
26.78
409.41
Please advise.
Sincerely,
MCKNIGHT CONSTRUCTION CO., INC.
PCLi f~tci/ilcL 15d!jL
Pat Patrick
Project Manager
'ib@'ib'i1'W'ib\
t rEI.'> 0 8 lUUG
PP:sdr
cc: 10bsite
Pat020706. wpd
---....--....-
6'(" ...-------.
FiLt" 10.< B
G
Smith Bros. Mechanical Contractors, Inc.
Post Office Box 15547 · Telephone (706) 733-9473
AUGUSTA. GEORGIA 30919-1547
February 3, 2006
McKnight Construction
1503 Cargo Rd.
Augusta, Ga. 30906
Re: Augusta Regional AiTJXlrt
Gentlemen:
The specitied diffusers for the above referenced project are a Price frame style # 31 for tbinline grid.
Although all of the grid is thin line, there are two different types of this grid on the job. Most ofthe diffusers
will be installed in the "Fineline" grid which will result in the face oftbe diffuser being above the ceiling
line.
I have spoken to the-Engineer and he told me that the diffusers should be flush with the ceiling which
would require a frame style #17. This frame has an offset flange which allows the face of the grille to be
flusb with the ceiling. However, this grille is not in stock and must be manufactured. 11 is also more
expensive: with an additional cost of$382.63.Please issue a change order in this amount and reflecting the
21 additional calendar days needed fOf this.
lfyou bave any questions, please call me.
Sincerely.
I<-~
Ken Smith
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
77/- ~3/-) (fl
'c..,
~ I) f;!).{~
cJr '(j
William D. McKnight - President
Mason McKnight, 1II - Vice President
Huey E. Carter - Sec. - Treasurer
FOUNDERS:
Mason McKnight, Sr. 1900-1973
Mason McKnight, Jr, 1930-1994
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: [706] 863-7784
Fax: [706] 863-2031
February 10,2006
Parsons Brinckerhoff Construction Services Inc.
1510 Hanger Road, Suite A
Augusta, GA 30906
Attn: Matt McCoy
Gentlemen:
RE: Augusta Regional Airport
Augusta, GA
Cost Proposal- IR-119
\\r~Y
The following is a cost proposal for the fixtures described in IR-119. This proposal is based on (12)
fixtures, for only the A-building. A separate proposal will need to be issued for the remaining
buildings.
Smith Brothers
McKnight Construction 7% DIP
Total
$720.00
50.40
$770.40
Please provide a reply by 2-15-06 to avoid any delays.
Sincerely,
MCKNIGHT CONSTRUCTION CO., INC.
PoX PatAKL !-~---
Pat Patrick
Project Manager
PP:sdr
--<J \I-.\S-(~LL
1)\fJ;("'\\()~ \ Ce)-1) 1D
;t.h~\()(., .
P~Lt)\)\OCv
cc: 10bsite
pat021 006b. wpd
_M:JM.
lID ~cg~1I\W~1ID
llil FEB 1 6 2006 lliJ
B Y: _E~_l-tvJ}_-';;.-----
hu:,:\02.S
::e.b
10 06 12:58p
UUU::'
McKnight Construction Co. 706-772-8283
p.2
..L~6"" &. '-'.JI. ..
Subj: Faxing Copy to You
Date: 2/9/2006 4:36:20 PM Eastern Standard Time
From: jpsbm@knology.net
To: AGSAirport@AOL.com
February 9,2006
McKnight Construction Co.
PO Box 204718
Augusta, Ga. 3091 7
Attn: Pat Patrick / Lee Mooney
Re: Augusta Regional Airport
Lavatory Faucet
Sirs, .
The IR119 response did not necessarily answer my question. Those are indeed options that are available
on my submittal sheets but they are not mandatory.
At present time I have at least two other projects ongoing that have cold water only to the lavatory.
It would be my recommendation that the temperature mixing valve be supplied (p6900-MV) as this
would be both adjustable and provide a consistent water temperature.
The mixing tee (P6900-MT) has no temperature mixing control and will provide the most water of
which ever line (hot or cold) has the greatest flow.
My cost: $44.85
Tax 3.14
UPS 4.00_
$51.99 ea.
15% O&P n_7,.J~Q
Total $60.00 ea.
If they will issue a change order, I will provide these for $60.00 each with no additional labor charges.
Perhaps they will do this for this building and explore other avenues for the remaining buildings.
Twelve are required for the Holding Bldg. and a prompt response is required.
Please call with any questions,
Jimmy Pardue
/^o b_V I
l1J .e A..c)./\
y ,7...- l 0 LCLh-OV"--s
~ 12o~ ~~
Thursday, February 09, 2006 America Online: AGSAIRPORT
v
'et
.
10 06 12:57p
--
McKni~ht Construction Co. 706-772-8283
p. 1
"
l\tlcKnight Construction Co.
GENERAL CONTRACTORS
FOUNDERS:
Mason McKnight, Sr 1900-1973
Mason McKnight, Jr. 1930-1994
William D, McKnight - President
Huey E. Carter - Sec, - Treasurer
PO Box 204718
Augusta, GA 30917
Office [7061 863-7784
Fax [706] 863-2031
February 10, 2006
Parsons Brinckerhoff Construction Services, lne,
151 0 Hanger Road
Suite A
Augusta, GA 30906
Attn: Matt 'McCoy
Re: Augusta Regional Airport .
IR - 119 P-3 & P-3A Faucets
Dear Matt:
Please review attached and advise if this is an acceptable solution, Pat Patrick will
fonvard this as a change order, however a prompt response is required to avoid delays,
Sincerely,
J. ~/(/ '. A jlc1:C
/~--G,- 1// tvy~)_. /~
Lee Mooney
McKnight Construction Co.
Cc: Mike Leath; The LP A Group
Pat Patrick, McKnight Construction
File
McKnight Construction Co. 706-772-8283
p.2
f
eb 06 .06 11: 23a
~
~\
PROJECT NU!\{8ER: AR209024
TERJ\tIINAL AREA IMPROVEMENTS
AUGUSTA REGIONAL AIRPORT AT BUSH FIELD
INFORMATION REQUEST No. IR-119
SUBJECT: P-3 & P-3A faucets
SPECIFICATION REF,: ]5440
DRAWING REF.:
DESCRIPTION:
Faucet specified for P-3 and P-3A lavatories (Z6915) has a single supply connection, V./e have
both hot and cold supplies pcr drawings,
PROPOSED SOLUTION:
Advise ho\v to proceed
COMP ANY NAME: Smith Brothers/McKnight
Submitted by: J. ParduclL. Mooney
Datc: 2/6/06
RESPONSE:
Signed by:
Architect
Signcd by:
Construction
Manager
Date:
Date:
If this response causes allY cost or time impact to your work, do not proceed; submit a Cost Proposal (CP)
for changes in Contract Sum and/or Time within len (10) days. If tlris response indicates no change to tllC
Work or a minor change to the Work consistent with the Contract Documents, indicate your acceptance of
this response in the space indicated belo\v and return a copy prior to procceding.
Accepted by:
Date:
Contraclor Signature
Cc: COC;STRUCTION M/u"l AGER
ARCHITECT
OWNER'S REPRESENTATIVE
CONTRACTOR
TERMINAL AREA IMPROVEMENTS CONTRACT MODIFICATION FORMS
AUGUSTA REGIONAL AIRPORT, AUGUSTA, GEORGIA 01250-3
eb' 06 06 11:23a
McKnight Construction Co. 706-772-8283
p.3
u -
416 ~
~ [137j [122jlleiJ~
-ACA PLUG-IN 7' . I . I 4ti
POWER CONVERTER
TYPICALZ6915 ~
AquaSense Battery
Powered Faucet_1 -, L '931
IS [le2~-l- ~ -
\/(/i I '
.b!d :, j_
/~ .
::i:.."~::T cPOUT /., 4D
. ~,~; :.c ~ ----/ " 16
HI S=-I',~:)-; j: [, 22J
EL:::::T~OI'lICS :.AODiJLE ____/ ,
Wi SOLEr"OID i
5~ [1::> 7]
TYPICAL Z6915-ACA
AquaSense Plug-In
Powered Faucet7d [182
~ -
-
TYPICAL Z6915-CWB
AquaSense Hardwire
Powered Faucet
Optional:
.. Optional -MJ mini junction box
for connecting up to 8 faucets
4 [93)
sg [137]
~
i
,
413
10
[ 122J
r~6 [152J
I ;21 r- 4 [1 C2} _
I \' 'i [<<' J
i/~\t:S- ~'
~~:-r
( . ~
1=1"" 1
\-'.~ 1_ -IJ
: 'Vi.13
:- , "'15 [123J
m6 [152)
L [lC2=
! :. J ", \ r 2 [5 i )
:.Y' J
[ 123)
Optional ~rring ~~Ives
", 8 CCPPE~
m .ltJ3E
e \(5''"' :T-:[RS~
<;=8IHI~]~,
L aRr.SO:: ....l~~ltlC iE( \:
I Ai
."., CC~?;-<CSS'Orl N':-"'" ~'"
, '8::)$$ Ft:~':\v~( I
[f~-rILTE" H:L'S""; ::
:;l, .0
e '-EACK CHE.er: iP1
II FILi'::R~
~P"'STIC rERPU:.t: l!t<
W' UJi
P6900-MT
Mi~~ng Te~e ~;J
I ' .
\' ' I
.'
.IS ~
-'!.L t'~~'\ ,
L-l.i f
P690Q-MV
Temperature Mixing Valve
+ 6VDC
r (BLACK wi STRIPE)
P690Q-HW6
~PO'!VERS UP
~ TO 8 FAUCETS
. =:3 EOUIP. GNO
~(GREEN)
~NEUTRAL
(WHITE)
~ 1 S VAC
(BLACI<)
1',5 VAC
(BLACK)
'\~WIRES
.<l~ [123J
BY OTHERS
-ev,'s CONNECTING WIRE
(LENGTH 7ft.)
ZURN INDUSTRJES, INC. , COMMERCIAL BRASS OPERA TlON , 5900 elWiN BUCHANAN DRNE , SANFORD NC 27330
P'hOrlf): 1-SQ()..997.387/J , Fax: 918-775-3541 , World Wide Web: www.zum.com
In Canada: ZURN INDUSTRIES UMITED , 3544 Nashua Drive, Misslssauga, Oomrie L4V1L2 , Phone: 90S-405-82n Fax: g()5-405.1292
AquaSensea is a registered trademark of Zum Industries, Inc,
el:::l 06 .06 11:23a
McKnight Construction Co. 706-772-8283
p.4
PROJECT NUMBER: AR209024
P-2A Urinal: Wall hung, Stanwell, 17" finish floor to top of rim, urinal carrier.
Fixture: Kohler, K-4972-T.
Valve: Zum, model ZER 6003 A V-WS1, battery sensor type flush valve.
2.4 LA V ATORlES:
A. Minimum connections shall be 3/8".
B. Enameled cast iron unless stated otherwise,
C, Handicapped. Fixtures provide TrueBro Modell 02W (White) p-trap, hot ,vater and cold
water angle valve insulation and fasteners. Handi Lav-Guard insulation kit. (Provide
No. 105W accessory with No. 102 for offset p-trap.)(Approved Equal: McGuire Pro-
Wrap Model PW 2125 (White).
D. La'vatories mounting heights shall be as listed for each fixture:
P-3 Lava1ol-Y: Undercounter, 19-114" x i6-1/4", Ca..xton.
FLxture: Kohler, K-221 0, with rear drain outlet.
Fitting: Zurn, model Z6915, sensor battery faucet.
Drain: Kohler, K-7715 perforated strainer 1-1/4" tailpiece.
Supply: Kohler, K-7607 LK.
P-Trap: Kohler, K-9000 1-114" p-trap.
P-3A Lavatory (Handicapped): Wall hung, 19"x 17", Hudson, mounting height 29" from finish floor
to bottom of apron (maximum 34" finish floor to rim of lavatory).
Fixtu re: Kohler, K-2861 plate anchor 4" center.
Fitting: Zurn, model Z6915, sensor battery faucet.
-
Drain: Kohler, K-7715 perforated strainer 1-1/4" tailpiece.
Supply: Kohler, K-7607 LK.
P-Trap: Kohler, K-9000 1-1/4" P-trap.
Remarks: See 2.4 Lavatories item C. p-trap, cold and hot water angle valve insulation and
fasteners.
2.5 UTILITY SINKS AND SERVICE SINKS:
A. Utility sink minimum connections shall be 3/8 inch.
B. Service sinks minimum connection shall be 3/4 inch,
TERNUNAL AREA IMPROVEMENTS
AUGUSTA REGIONAL AIRPORT, AUGUSTA, GEORGIA
PLUMBING FIXTURES
15440 - 6
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
Lf pOffS
William D. McKnight - President
Mason McKnight, III - Vice President
Huey E. Carter - Sec. - Treasurer
FOUNDERS:
Mason McKnight, Sr. 1900-1973
Mason McKnight, Jr. 1930-1994
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: [706] 863-7784
Fax: [706] 863-2031
March 15,2006
Parsons Brinckerhoff Construction Services Inc.
1510 Hanger Road, Suite A
Augusta, GA 30906
Attn: Matt McCoy
Gentlemen:
RE: Augusta Regional Airport
Augusta, GA
PR32
72
/
The following is a cost proposal to relocate, and prep for long term storage, the jetway loading bridge
at the US Air building.
AERO Bridgeworks, Inc.
McKnight 7% OH&P
Total
$13,900.00
973.00
$14,873.00
Please issue a change order for this amount.
Sincerely,
MCKNIGHT CONSTRUCTION CO., INC.
WP{)}Jvi.L~
Pat Patrick
Project Manager
PP:sdr
cc: 10bsite
lID 2b cg ~ )IW' ~ 1m
llil MAR 2 0 2006 lliJ
pat031506.wpd
BY: --------------------
(02/5
MRR-14-2006 02:58P FROM:PRRSOHS BRIHClCERHOFF
TO: 8632031
P.2
February 21, 2006
~!ill
"', .
Mr. Matt McCoy
Parsons Brinkerhoff
Augusta. Georgia
Reference:
Passenger Boarding Bridge Project
Augusta Regional Ailport
TBkedown and storage of PBB
ABW Projc:-ct #; 20662BPARAGS
Dear Mr. McCoy:
Per your requ~t, ~ERO BridgeWorlcs, Inc., is pleased to offer our proposal for the coDBtruction servioes
fOT the referenced project for your review and consideration.
SCOPE OF WORK:
The scope of work is delineated as follows:
Gates Unknown
1. Takedown one Jetway Telerndial passenger boarding bridge, transport to storage locBtron, offload
unit to storage and prep for long term storage.
PrQPOllal:
ABW agrees to perform the proposed services on a lump sum basis for THIRTEEN THOUSAND NINE
mJNDRED and no/l00'st dollars ($13,900.00).
Qualifications:
1. ABWts proposal does Dot include port authority approvals.
2. Permits have been excluded.
3. Security badges have been excluded.
4. No foundation demolition has been included.
5. Disconnection of power & phone services from Building located disconnects and/or junction boxes
to bridge located junction box or disconnects is to be performed by others.
H:\BridgeWorks\Jebs\206628 P ARAOS\206628_ PmonsQuote_022106:wpd
Page t on
ATLANTA
P.O. BOX 5137 +- MARIETTA. GA 30061-5137 + (770) 423.4200 + FAX (770) 423-4203
DALLAS KANSAS CITY ORLANDO SALT LAKE CITY
SAN DIEGO
MRR-14"'2006 02: S8P FROM: PRRSONS BRINCfCERHOFF
TO: 8632031
P.3
6. Any security devices that require removal will be the responsibility of others.
7. Any glycol systems that may be incorporated into the equipment must be drained and disposed of
by others.
8. ABW's scope ofworlc in AGS will be as outlined herein. Additional scope of work requested by
the Owner, or otherwise required, may have cost impacts.
9. ABW has not included fees which may be charged by the local authority for witnessing or testing
functions required by their own processes. Should these fees be required, ABW would expect to be
compensated accordingly.
10. The terms Owner, Client, and Persons shall be synonymous as used throughout our, proposal and
the contract documents.
11. We have considered this project to be taxable on materials only. Labor and professional design fees
and management services have not been taxed on this project. If these fees or other applicable
charges are subject to, or become subject to, sales or gross receipts tax, we will bill any such
applicable taxes, in addition to the fees or other charges proposed herein, and the Client will be
responsible for reimbursing ABW for same. '
12. We will perfoIlD our services in a manner consistent with that level of care and skill ordinarily
exercised by members of our profession currently practicing in the same locality under similar
conditions. No other warranty, expressed or impiied, is included or intended by this agreement.
13. Our liability to tbe Client relating to this agreement or our services under this agreement, whether
based on negligence, breach of contract, strict liability or otherwise, sball not exceed, in the
aggregate. ABW's total fee for services under this agreement or applicable work letter.
14. Our proposal does .not include payment and performance bonds.
15. Night time operations or delays caused by others and beyond our control, may have cost impacts.
16. Notwithstanding anything contained in the contract documents to the contrary, any broad form
indemnitication requirements of the Owner' 5 contract will be enforceable only to the extent that such
language or requirements are statutory, available through common law, or insurable through ABW' s
current insurance coverages.
17. We have included insurance coverages to $10,000,000.00 general liability. Additional insurances
can be provided if required, but may have cost impacts.
18. ABW is currently unaware of any existing requirements for separate plan check or review fees,
tenant alteration application fees or deposits, other than those routinely required to be paid by the
project's construction contractors forbuildingpennits. We have, therefore excluded them from our
proposal. Should any fees of this nature subsequently be required, ABW will pay such fees if
included in the contract through the change order process.
H:\BridgcWorks\Jobs\2066:!8P^RAQS\206628 _ ~nsQuole _022106. wpd
Poge 2 00
ATLANTA
P.O. BOX 5137 + MARIETTA, GA 30061-5137 + (770) 423,4200 + FAX (770) 423-4203
DALLAS KANSAS CITY ORLANDO SALT LAKE CITY
SAN DIEGO
MAR-14-2006 02:S9P FROM:PARSONS BRIt--jCKERHOFF
TO: 8632031
P.4
19. ABW is not an environmental engineering flml, and we are currently unaware of any existing
asbestos, hazardous or toxic substances, located in the vicinity of the work at any of the referenced
locations. Notwithstanding anything contained in the contract documents to the contrary, ABW has
not included any fees to test or confirm any existing asbestos, hazardous or toxic substance
conditions during-the design phase of the project. We have not included any fees associated with any
abatement, abatement design service or the like. Should any such services be required, we can
include them through. the subcontract process which may have cost impacts. Client agrees to hold
ABW hannless to the extent permitted by law for all claims, liabilities, and expenses (including
reasonable attorneys' fees and expenses) related to any hazardous ortoxic substances at the site.
20. Our proposal is valid for thirty (30) days. Our proposal is based on the negotiation of an acceptable
contract and acceptable fmancial terri1s between Parsons and ABW.
21. The storage location and the route to the location must be suitable for the purpose of transporting
and storing passenger boarding bridges.
22. Our proposal is based on free and clear access to the equipment and the site.
23. Payment terms are net 30 days.
We trust you will find our proposal in order and look forward to hearing from you in the very near future.
In the mean time~ should you have any questions. or require additional information, please feel free to calL
Sincerely.
;;;~~4L
Michael W. Madlock
Vice President
H:\BridgeWorlcs\Job~\206628P ARAGS\206628_PBIEonsQuote_022106. wpd
Page3 on
ATLANTA
P.O. BOX 5137 + MARlEITA, GA 30061-5137'" (770) 423'\4200'" FAX (770) 423-4203
DALLAS KANSAS CITY ORLANDO SALT LAKE CLTY
SAN DLBGO
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
William D. McKnight - President
Mason McKnight, III - Vice President
Huey E. Carter - Sec. - Treasurer
FOUNDERS:
Mason McKnight, Sr. 1900-1973
Mason McKnight, Jr. 1930-1994
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: [706] 863-7784
Fax: [706] 863-2031
April 21, 2006
Parsons Brinckerhoff Construction Services Inc.
1510 Hanger Road, Suite A
Augusta, GA 30906
Attn: Matt McCoy
RE: Augusta Regional Airport
Augusta, GA
PR 8 (Revised)
Utility Conflicts
Gentlemen:
Attached is the revised summary of costs for the delays to the site utility contractor due tot he
conflicts caused by unforseen conditions.
Barnett Construction
McKnight
Total
$27,709.88
1,939.69
$29,649.57
Please add (12) days to the contract because of these delays.
Please issue a change order for this amount, and the additional time.
Sincerely,
MCKNIGHT CONSTRUCTION CO., INC.
f(JJ:;~/s~
Pat Patrick
Project Manager
lID ~(g~JrW~1ffi
1Ql APR 2 5 2006 lliJ
PP:sdr
BY: ____________________
cc: 10bsite
pat0421 06. wpd
B
DATE:
TO:
FROM:
BARNETT SOUTHERN
CORPORATION
April 21. 2006
McKnight Construction Company
Attn: Pat Patrick
P.O. Box 204718
Augusla. G~orgin 30917
Burnet[ Southern Corporation
P.O. Box 704
WlIShin~ton, Geor~ia 30673
PROJECT: Au~usta Regiona.l Airporl
LOST PRODUCTION & UTILITY CONFLICTS (REVISED)
Item No. Description Quantity Unit Price
8/17/2005 1.00 Ls $269.89
8/18/2005 1.00 Ls $1,066.35
8/24/2005 1.00 Ls $633.00
8/25/2005 l.00 Ls $689.58
8/26n006 1.00 Ls $633.00
8/31/2005 1.00 Ls $0.00
91612005 1.00 Ls $537.59
9/8/2005 1.00 Ls $1,308.5 I
9/1 5/2005 1.00 Ls $2.282.14
9/20/2005 1.00 Ls $400.32
9/29/2005 1.00 Ls $3,136.60
9/30/2005 1.00 Ls $1.920.46
1 0/3/2005 1.00 Ls $700.26
10/412005 1.00 Ls $1,400.52
10/5/2005 1.00 Ls $1.560.2\
10/1112005 1.00 Ls $1,152,64
10/1112005 1.00 Tws $\,750.65
10/12/2005 1.00 Ls $1,197.53
10/13/2005 1.00 Ls $828.00
10/1312005 1.00 Ls $283.98
10/13/2005 1.00 Ls $684.30
11/10/2005 l.00 Ls $5,274.35
NET CHANGE TO CONTRACT:
Notes:
I. DeLails I'or a.bove wMk on m1llilhed force accounr sheets,
BARNETT SOUTHERN CO~RATlr
BY: ~~~
{ilutnorized SllItmlul1:)
TITLE: Estimator. Barnett Southern Corporl:l.tion
POSt Offke Box 704 WashiIlgluIl. Georgia 30673
Tdcphune: 70&-678-1507 Fax: 706.678-1697
WIJ..l_IAM ASH BARNETt
PI'c:Miclcl1l
AMES M. BARNETI'
Vice ""'~sidcnt
Total
$269.89
$1,066.35
$633.00 '
$689.SlI
$633.00
$0.00
$537.59
$1,308.51
$2.282.] 4
$400.32
$3.136.60
$1,920.46
$700.26
$1,400.52
$1,560.21
$1,152.64
$1,750.65
$1.197.53
$828.00
$283.98
$684.30
$5,274.35
$27,709.88
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
L(r>>fS
William D. McKnight - President
Mason McKnight, III - Vice President
Huey E. Carter - Sec. - Treasurer
FOUNDERS:
Mason McKnight, Sr. 1900-1973
Mason McKnight, Jr. 1930-1994
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: [706] 863-7784
Fax: [706] 863-2031
April 7, 2006
Parsons Brinckerhoff Construction Services Inc.
1510 Hanger Road, Suite A
Augusta, GA 30906
Attn: Matt McCoy
RE: Augusta Regional Airport
Augusta, GA
PRdl Trench drain
Gentlemen:
The following are the costs associated with providing the underground plumbing required for the
drainage at the trench drains in the ramps. The trenches were show on the architectural, but there
was no drainage pipe show on the plumbing drawings for these trench drains.
Smith Brotliers
McKnight 7% DIP
Total
3,778.00
264.46
4,042.46
Please issue a change order for this amount.
Sincerely,
MCKNIGHT CONSTRUCTION CO., INC.
PcdfcdAidjS~
Pat Patrick
Project Manager
PP:sdr
lID ~cg~TI\W~Tffi
llil APR 1 0 2006 JID
cc:
Jobsite
BY: --------------------
pat040706a.wpd
PROJECT NUMBER: AR209024
TERMINAL AREA IMPROVEMENTS
AUGUSTA REGIONAL AIRPORT AT BUSH FIELD
COST PROPOSAL No. CP - 4\
DATE:
ArnL"7 ?ob 6
NOTICE OR REQUEST: IN or IR No.
SUBJECT:
u./G
~~~~~
~~~
DESCRIPTION OF PROPOSED MODIFICATIONS:
(~~ let\-W ') -r{"~ cIJvr.<:~ s.~ cJV' Av~k~
. ~ I ~ I'\O~'- r ,'^) 4- Wo.:""':f ? \w..a< eM -tl...,
~\~~:J ~~
REFERENCE:
list any attached documents
_Within 10 days of recelvmg a related Information Notice or Response to Information ReQuest,
, submit an itemized proposal for changes in the Contract Sum and/or the Contract Time for the proposed
modifications, or notify the Architect in writin of the date on which you antici ate submittin a ro osal.
THIS IS NOT A CONSTRUCTION CHANGE DIRECTIVE. THIS IS NOT A CHANGE ORDER.
DO NOT CONSIDER THIS AS INSTRUCTION OR DIRECTION TO EITHER STOP WORK IN
PROGRESS OR TO EXECUTE THE PROPOSED MODlFICA TIONS.
NO PAYMENT WILL BE MADE FOR WORK WHICH IS NOT PRIOR APPROVED IN WRITING.
Adjust Contract Time for this change ( Increase I Decrease calendar days )
t 1rD4z -~
r6
.
Adjust Contract Sum for this change ~cr~ B"",,,JSC ) . . . . . . . . . ., ..$
Signooby ~~~
Print Name
andTitle~-t 4t,^vL
Date:
4/7/Otp
(CONTRACTOR)
cc: CONSTRUCTION MANAGER
ARCHITECT
CONTRACTOR
OWNER'S REPRESENTATIVE
TERMINAL AREA IMPROVEMENTS
AUGUSTA REGIONAL AIRPORT, AUGUSTA, GEORGIA
CONTRACT MODIFICATION FORMS
01250-5
r KUM ~M I I H bKV I HtKQ IYlt\"l1l\l~ I vl\L
\ I n U) IVI t\ n L v L U V U I j 'v f- I v I' I I . i... V I I' v' V V j V V I'~......' '.,' l
"
G
Smith Bros. Mechanical Contractors, Inc.
Post Office Box 15547 · Telephone (706) 733-9473
AUGUSTA, GEORGIA 30919-'547
March 22, 2006
McKnight Construction Co.
PO Box 204718
Augusta, Ga. 30917
Artn: Pat Patrick
Re: Augusta Regional Airport
. Additional Trench Drain Installation
Dear Mr. Patrick,
As you are aware the-trench drains in the ramps at Ground Loading of the Holding Bldg.
were not shown on the plumbing drawings. Per your instructions we ordered the
additional trench and below is our cost incurred for the installation of these 8 (eight)
trench drains.
The area in which this piping was required had previously been roughed~in , tested and
backfilled and tamped. In order to provide pipe for these additional drains, we had to
ex.cavate and remove previously installed pipe and insert the additional fittings.
200tlo O&P
Change Order Amount
1030.00
62.00
1088.00
282.88
40.00
520.00
90.00
35.00
3148.00
630.00
$3778.00
Rough Material
Tax
Labor - 64 man hrs. @ 17.00
Labor.Burden@26%
Truck / Tools
Tractor - 8 hrs. @ 65.00
Tamp - 2 days @ 45.00
Supervision
. h any questions,
~
y Pardue
(see attached material list )
rnVl'1 '.JI'I! lit UI,Vllll..llV 1'1...'....111111jVjl~
,
Additional materials required for installation:
Priced at today) s replacement price.
10' - 6 x 5 sgl. hub cast iron pipe @ 15.74 per ft.
10' - 4 x 5 dbl. hub cast iron pipe @ 9. 12 per ft.
25' - 2 x 5 sgl. hub cast iron pipe @ 5.78 per ft.
35' - 2 x 5 dbL hub cast iron pipe @ 6.44 per ft,
2 - 6 x 2 cast iron wyes @37.85
2 - 4 x 2 cast iron wyes @ 20.10
4 - 2 x 2 cast iron wyes @ 10.50
9 - 2" cast iron sweeps @ 8.00
7 - 2" cast iron 1/8 bend @ 5.85
4 - 6" gaskets @ 4.10
4 - 4" gaskets @ 2.55
51 - 2" gaskets @ 1.45
8 - 11/2)) X 6" galv. Nipples @ 4.38
1 - qt. lube @ 5,55
157.40
91.20
144.50
225.40
75.70
40.20
42.00
72.00
40.95
16.40
10.20
73.95
35.04
5,55
$1030.00