HomeMy WebLinkAboutMCKNIGHT CONSTRUCTION CHANGE ORD 6
.. ,.,. _.l
TERMINAL AREA IMPROVEMENTS
AUGUSTA REGIONAL AIRPORT AT BUSH FIELD
CHANGE ORDER NO. - 6
May 15,2006
MODIFICATIONS TO THE CONTRACT ARE AS FOLLOWS:
See Attached Change Order #6 Summary
Original Contract Sum...................................$ 25,254,1 92.45
Change by Previous Change Order................. ....$ 81.277.32
Contract Sum Prior to this Change Order ......... ....$ 25.335.469.77 -
This Change Order .......................................$-1 49.744.84
New Contract Sum .......................................$ 25.385.214.61
Contract Time will be as follows::"" 0 Calendar Days are added to the duration of Phase 1
and the Total Contract Duration
Signed by:
f ./ tl/111. -S/J~:;J(i,
McKnight Construction Co., Inc.' DATE
~
..
~.'O).oG.
DATE
The LP A Group, Inc.
}
011; li~r1, ~ - r-(,.,(""
(f) MaYo.rOfA~ .A. J DATE
f1/JJA~ ~1Wf/
Must be signed by Construction Manager. Architect. Owner. Mayor and Contractor
Cc: All Signers
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
~. '-j I !:'
'77/- !J ( (If-
In{Jilt~
r~:;L-1V' ? I
"-/ ~ j
FOUNDERS:
Mason McKnight, Sr. 1900-1973
Mason McKnight, Jr. 1930-1994
William D. McKnight - President
Mason McKnight, III - Vice President
Huey E. Carter - Sec. - Treasurer
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: [706] 863-7784
Fax: [706] 863-2031
February 7, 2006
Parsons Brinckerhoff Construction Services Inc.
1510 Hanger Road, Suite A
Augusta, GA 30906
Attn: Matt McCoy
RE: Augusta Regional Airport
Augusta, GA
~ :2,1
Gentlemen:
Please issue a change order for the additional cost:
Per the attached letter, Smith Brothers is having to provide a second type of diffuser to fit properly
into the thinline grid. As noted, this new diffuser will cost additional money and has to be ordered:
Granted, McKnight has a responsibility to build the project per the plans and specs; but the engineers
and architect must specify the products to be used in a timely manner. Hopefully, this order and the
(21) Gay delivery will not create an impact on the completion. ~'l^,
...~ /00
\ \ alP
~Qt:.~ \C)~
fov..~ 01-
, \~v->
\l~\J ,,^J t^
~6L..
Smith Brothers
McKnight 7% OIP
Subtotal
$382.63
26.78
409.41
Please advise.
Sincerely,
MCKNIGHT CONSTRUCTION CO., INC.
IJ /'\ !.
.' J..' . 7
11_ 1"1-)' 4---rL, .-} } / / 1/ , {;. ,
V u\..- '- , L' / V u.. LJL UL.\::./L
Pat Patrick
Project Manager
~@~'iI'W~\
t rEI\ 0 8 1006
PP:sdr
cc: 10bsite
Pat020706. wpd
..-.......
'( ....--..-
a . ......
u ..-
hU::,.. 10.< B
G
Smith Bros. Mechanical Contractors, Inc.
Post Office Box 15547 · Telephone (706) 733-9473
AUGUSTA. GEORGIA 30919-1547
February 3, 2006
McKnight Construction
1503 Cargo Rd.
Augusta, Ga. 30906
Re: Augusta Regional Airport
Gentlemen;
The specified diffusers for the above referenced project arc a Price frame style # 31 lor thillline grid.
Although all of the grid is thin line, there are two different types of this grid on the job. Most of the diffusers
will be installed in the "Finetine" grid which will result in the lace ofllie diffuser being above the ceiling
line.
I have spoken to the Engineer and .he told me that the diffusers should be flush with the ceiling which
would require a frame style -# 17. This frame has an offset flange which allows the face of the grille to be
flush with the ceiling. However, this grille is not in stock and must be manufactured. 11 i!'O also more
expensive: with an additional cost of$382.63.Please issue a change order in this amount and reflecting the
21 additional calendar days needed for this.
if you have any questions, please call me.
Sincerely,
I<-~
Ken Smith
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
77/-/~/7lv
(}i c,
I!J(J~\ \~
(O{ ()
William D. McKnight - President
Mason McKnight, III - Vice President
Huey E. Carter - Sec. - Treasurer
FOUNDERS:
Mason McKnight, Sr. 1900-1973
Mason McKnight, Jr. 1930-1994
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: [706] 863-7784
Fax: [706] 863-2031
February 10,2006
Parsons Brinckerhoff Construction Services Inc.
1510 Hanger Road, Suite A
Augusta, GA 30906
Attn: Matt McCoy
Gentlemen:
RE: Augusta Regional Airport
Augusta, GA
Cost Proposal- IR-119
*1;V
The following is a cost proposal for the fixtures described in IR-119. This proposal is based on (12)
fixtures, for only the A-building. A separate proposal will need to be issued for the remaining
buildings.
Smith Brothers
McKnight Construction 7% OIP
Total
$720.00
50.40
$770.40
Please provide a reply by 2-15-06 to avoid any delays.
Sincerely,
MCKNIGHT CONSTRUCTION CO., INC.
PoJc Pa1J:~cL }d.___
Pat Patrick
Project Manager
PP:sdr
-0 \1--l)"lN..L
1>\j~G<--\\CiI-J. \ Co'l~ 10
:Lhro \6(., .
pl1..~)'J\l)CO
pat021006b. wpd
_MJrV\
lID ~@~~W~1ffi
llil FEB 1 6 2006 Jill
B Y: _E~_I-^!J}--~-----
hu:, '. \ 02.. S
cc: Jobsite
~eb 10 06 12:58p
.1J a.v;;'
McKnight Construction Co. 706-772-8283
p.2
...L "6..... &. .......... &.
Subj: Faxing Copy to You
Date: 2/9/20064:36:20 PM Eastern Standard Time
From: jpsbm@knology.net
To: AGSAirport@AOL.com
February 9,2006
McKnight Construction Co.
PO Box 204718
Augusta, Ga. 30917
Attn: Pat Patrick / Lee Mooney
Re: Augusta Regional Airport
Lavatory Faucet
Sirs, .
The IRl19 response did not necessarily answer my question. Those are indeed options that are available
on my submittal sheets but they are not mandatory.
At present time I have at least two other projects ongoing that have cold water only to the lavatory.
It would be my recommendation that the temperature mixing valve be supplied (P6900-MV) as this
would be both adjustable and provide a consistent water temperature.
The mixing tee (P6900-MT) has no temperature mixing control and will provide the most water of
which ever line (hot or cold) has the greatest flow.
My cost: $44.85
Tax 3.14
UPS 4.00_ -
$51.99 ea.
15% O&P._.1..J~Q
Total $60.00 ea.
If they will issue a change order, I will provide these for $60.00 each with no additional labor charges,
Perhaps they will do this for this building and explore other avenues for the remaining buildings.
Twelve are required for the Holding Bldg. and a prompt response is required.
Please call with any questions,
Jimmy Pardue
!^o D_V I
lJ) .e tA...C>""
y \ l..- l 0 Lah-()V\.s
~ /2Q~ ~~
Thursday, February 09, 2006 America Online: AGSAIRPORT
v
'et 10 06 12:57p
McKnight Construction Co. 706-772-8283
IVlcKnight Construction Co.
GENERAL CONTRACTORS
William D. McKnight - President
Hucy E. Carter - Sec. - Trcasurcr
FOUNDERS:
Mason McKnight, Sr 1900-1973
Mason McKnight, Jr. 1930-1994
PO Box 204718
Augusta, GA 30917 .
Office [7061 863-7784
Fax [706] 863-203 1
February 10,2006
Parsons Brinckerhoff Construction Services, Inc.
1510 Hanger Road
Suite A
Augusta, GA 30906
Attn: Matt McCoy
Re: Augusta Regional Airport
IR - 119 P-3 & P-3A Faucets
Dear Matt:
Please review attached and advise if this is an acceptable solution. Pat Patrick will
forward this as a change order, however a prompt respon.se is required to avoid delays,
Sincerely,
J . ~/I// . .. j' !r1L
/~--<-i.... 11/ dT''Y'J-/_. Ic-
Lee Mooney
McKnight Construction Co,
Cc: Mike Leath, The LP A Group
Pat Patrick, McKnight Construction
File
p. 1
McKnight Construction Co. 706-772-8283
p.2
f
eb 06 06 11:23a
~
~\
PROJECT NUTvmER: AR209024
TERJ\UNAL AREA IMPROVEMENTS
AUGUSTA REGIONAL AIRPORT AT BUSH FIELD
INFORMATION REQUEST No. IR - 119
SUBJECT: P-3 & P-3A faucets
SPECIFICATION REF.: ]5440
DRAWING REF.:
DESCRIPTION:
. Faucet specified for P-3 and P-3A lavatorics (Z691S) has a single supply connection. 'Ne have
both hot and cold supplies pcr drawings.
PROPOSED SOLUTION:
Advise ho\'\.' to proceed
COMPANY NAME: Smith Brothers/McKnight
Submitted by: J. ParduclL. Mooney
Date: 2/6/06
RESPONSE:
Signed by:
Architect
Signcd by:
Construction
Manager
Date:
Date:
If this TCsponse causcs any cost or time impact to your work, do not procced; submit a Cost Proposal (CP)
for changes in Contract Sum and/or Time within ten (10) days. If Uris response indicates no change to U1C
Work or a minor ch:mge to the Work consistent ,\lith the Contract Documents, indicate your acceptance of
this response in the space indicated belo'v and return a copy prior to proceeding.
Accepted by:
Date:
Contractor Signature
Ce: CO"STRUCTION MAL'1 AGER
ARCHITECT
OWNER"S REPRESENTATIVE
CONTRACTOR
TERMINAL AREA IMPROVEMENTS CONTRACT MODIFICATION FOR1vlS
AUGUSTA REGIONAL AIRPORT, AUGUSTA, GEORGIA 01250-3
eb 06 06 11:23a
McKnight Construction Co. 706-772-8283
TYPICALZ6915. ~
AquaSense Battery
Powered Faucet 1 - L :9'1
7S (1B2~.---J.- ~~-
I; ("! I .
n~-
:-,,~C::T SPOUT /~. \ 4f-2 J
,,' / S-I C"'~ -, 1 b
" / :. '. ~..1 -; .-1 . [ ~ :;: 2 J
EL::::T~CI'J1CS :.~CDiJLE -/'/ .
'/I'I SOLEh:OID
5~ [1::;7]
TYPICAL Z6915..ACA
AquaSense Plug-In
Powered Faucet7~ [182J
I ' 6 (152]
I t ~, ~- 4 [102!
I \' '/ [5~J
i/~\r s -
~\!
F~);=dJ
. "-r-=A 13
,- -16 [1 2'::; J
1 "\
416 -r
&,l [137J' i [122j~eCJ~
-ACA PLUG-IN/ . 1. I 4~ [123)
POWER CONVERTER
TYPICAL Z6915-CWS'
AquaSense Hardwire
Powered Faucet
Optional:
.. Optional -MJ mini junction box
for connecting up to 8 faucets
4 [93J
5g [137J
~
i
,
413
10
[122]
p.3
optiona'\ifing ~~Ives
". S C(PPEP.
cD -lLl3E
e \(~'" :T-:[I1S~
/;::8a~]~..
L arit.s: 1..m~It1G TE[ \;
::r:: ;.g
61., CCIJ?;-'\'(SS,Otl N'_'~.J ~
'~>'-Bq'$' ,.;"vcr ~
lil.....--..rlLTE:;, HJ._'SIH~ LJ
... Cl
~"-EA':' CH[(K IVl
F1li':::~~
~~USTlC rERPLlJ: (!t<
W' cd!
P6900-MT
Mi~~ng Te~e ~;J
I ' ,
~~I
~ :I:\(~\ 19; .
L-l.-i
P6900-MV
Temperature Mixing Valve
+ 6VDC
r (BLACK wi STRIPE)
P690Q-HW6
fi PO\^JERS UP
TO 8 FAUCETS
~ EQUIP. Gt'-iD
.
V-- (GREEN)
~ NEUtRAL.
(WHITE)
~ 1 5 w..C
(BLACI<)
115 VAC
(BLACK)
\ ~ WIRES BY
I1ti [123]
OTHERS
-CWB CONNECTING WIRE /
(LENGTH 7ft.)
ZURN INDUSTRlES, INC. . COMMERCIAL BRASS OPERA TION . 5900 ELININ BUCHANAN ORNE. SANFORD NC 27330
Phone: 1-8011-997-3875 I Fax: 919-775-3541 . World Wide Web: www.zum.com
In Canada: ZURN INDUSTRIES UMlrED .35-44 Nashua Drive I Misslssauga, Onrnrio l4V1L2 .; Phone: 90S-405-B2n Fax: go5-405-1292
AquaSense- is a registered trademark of Zum Industries, Inc.
eb 06 06 11:23a
McKnight Construction Co. 706-772-8283
p.4
PROJECT NUMBER: AR209024
P-2A Urinal: Wall hung, Stanwell, 17" finish floor to top of rim, urinal carrier.
Fixture: Kohler, K-4972-T.
Valye: Zum, model ZER 6003 A V-WS1, battery sensor t)'pe flush valve.
2.4 LA V ATORlES:
A. Minimum connections shall be 3/8".
B. Enameled cast iron unless stated otherwise.
C. Handicapped. Fixtures provide TrueBro Model 102W (White) p-trap, hot water and cold
water angle valve insulation and fasteners. Handi Lav-Guard insulation kit. (Provide
No. 105W accessory with No. 102 for offset p-trap.)(Approved Equal: McGuire Pro-
Wrap Model PW 2125 (White),
D. Lavatories mounting heights shall be as listed for each fixture:
P-3 Lavatory: Undercounter, 19-1/4" X 16-1/4", Ca.xton..
Fi..'(ture: Kohler, K-221 0, with rear drain outlet.
Fitting: Zum, model Z6915, sensor battery faucet,
Drain: Kohler, K-7715 perforated strainer 1-1/4" tailpiece.
Supply: Kohler, K-7607 LK.
P-Trap: Kohler, K-9000 1-1/4" p-trap.
P-3A Lavatory (Handicapped): Wall hung, 19"xI7", Hudson, mounting height 29" from finish floor
to bottom of apron (maximum 34" finish floor to rim of lavatory).
Fixture: Kohler, K-2861 plate anchor 4" center.
Fitting: Zurn, model Z6915, sensor battery faucet.
-
Drain: Kohler, K-771S perforated strainer 1-1/4" tailpiece.
Supply: Kohler, K-7607 LK.
P-Trap: Kohler, Kc9000 1-1/4" P-trap.
Remarks: See 2.4 Lavatories item C. p-trap, cold and hot water angle valve insulation and
fasteners.
2.5 UTILlTY SINKS AND SERVICE SINKS:
A. Utility sink minimum connections shall be 3/8 inch.
B. Service sinks minimum connection shall be 3/4 inch.
TERMINAL AREA IMPROVEMENTS
AUGUSTA REGIONAL AIRPORT, AUGUSTA, GEORGIA
PLUMBING FIXTURES
15440-6
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
Lfp~S
William D. McKnight - President
Mason McKnight, III - Vice President
Huey E. Carter - Sec. - Treasurer
FOUNDERS:
Mason McKnight, Sr, 1900-1973
Mason McKnight, Jr. 1930-1994
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: [706] 863-7784
Fax: [706] 863-2031
March 15,2006
Parsons Brinckerhoff Construction Services Inc.
1510 Hanger Road, Suite A
Augusta, GA 30906
Attn: Matt McCoy
Gentlemen:
RE: Augusta Regional Airport
Augusta, GA
PR32
?2
The following is a cost proposal to relocate, and prep for long term storage, the jetway loading bridge
at the US Air building.
AERO Bridgeworks, Inc.
McKnight 7% OH&P
Total
$13,900.00
973.00
$14,873.00
Please issue a change order for this amount.
Sincerely,
MCKNIGHT CONSTRUCTION CO., INC.
WPoJ;uiL~
Pat Patrick
Project Manager
PP:sdr
cc: Jobsite
1~@~lbW~\ffi
MAR 2 0 2006 lliJ
pat031506.wpd
BY: --------------------
/02/5
t'1AR-14-2006 02: S8P FROM: PARSOt'-lS BRINClCERHOFF
TO:B632031
P,2
February 21, 2006
/-...,~.~
\ --~
~!iQ
"'. .
Mr. Matt McCoy
Parsons Brinkerhoff
Augusta. Georgia
Reference:
Passenger Boarding Bridge Project
Augusta Regional Airport
TakedowD and storage of PBB
ABW Project #: 206628PARAGS
Dear MT. McCoy:
Per your request, AERO Bridg~Wo.!lcs, Inc., is pleased to offer our proposal for the CODBtructiOD services
fOT the referenced project for your review and consideration.
SCOPE OF WORK:
The scope of work is delineated as follows;
Gates Unknown
1.
Take:down one Jetway Teleradial passenger boarding bridge, transport to storage location, offload
unit to storage and prep for long term storage,
Proposal:
ABW agrees to perform the proposed sCIVices on a lump sum basis for THIRTEEN THOUSAND NiNE
HUNDRED and no/100'&~ dollars ($13.900.00).
Qualifications:
1. ABW's proposal does Dot include port authority approvals_
2. Permits have been excluded.
3. Security badges have been excluded,
4. No foundation demolition has been included.
5. Disconnection of power & phone services from Building located disconnects and/or junction boxes
to bridge located junction box or disconnects is to be performed by others.
H:\BridgeWcru\Jobs\206628P ARAOS\206628_PmoruQucre_022106.wpd
hge I 00
ATLANTA
P.O. BOX 5137 or MARIETTA. GA 30061-5137 or (770) 423.4200 or FAX (770) 423-4203
DALlAS KANSAS CITY ORLANDO SALT LAKE CITY
SAN DIEGO
MAR -14"' 2006 02: S8P FROM: PARSONS BR I NCKERHOFF
TO: 8632031
P.3
6. Any security devices that require removal will be the responsibility of others.
7. Any glycol systems that may be incorporated into the equipment must be drained and disposed of
by others.
8. ABW's scope of work in AGS will be as outlined herein. Additional scope of work requested by
the Owner, or otherwise required, may have cost impacts.
9. ABW bas not included fees which may be charged by the local authority for witnessing or testing
functions required by their own processes. Should these fco& be required, ABW would expect to be
compensated accordingly.
10. The terms Owner, Cllent, and Parsons shall be synonymous as used throughout oW' proposal and
the contract documents.
11. We have considered this project to be taxable on materials only. Labor and professionaJ design fees
and manag~ent services have not been taxed on this project. If these fees or other applicable
charges are subject to, or become subject to, sales or gross receipts tax. we will bill any such
applicable taxes, in addition to the fees or other charges proposed herein, and the Client will be
responsible for reimbursing ABW for same, .
12. We will perform OUT services in a manner consistent with that level of care and skill ordinarily
exercised by members of our profession CU1Tently practicing in the same locality under similar
conditions. No other warranty, expressed or implied, is included or intended by this agreement.
13. Our liability to tbe Client relating to this agreement or our services under this agreemeht, whether
based on negligence. breach of contract. strict liability or otherwise, shall not exceed, in the
aggregate. ABW's total fee for services under this agreement OT applicable work letter.
14. OUT proposal does not include payment and performance bonds.
15. Night time operations or delays caused by others and beyond our control, may have cost impacts.
16. Notwithstanding anything contained in the contract documents to the contrary, any broad form
indemnification requirements of the Owner's contract will be enforceable oniyto the extent that such
language or requirements are statutory, available tbroughcomrnon law, or insurable through ABW' s
current insurance coverages.
17. We have included insurance coverages to $10,000,000,00 general liability. Additional insurances
can be provided if required, but may have cost impacts.
18. ABW is currently unaware of any existing requirements for separate plan check or review fees,
tenant alteration application fees or deposits, other than those routinely required to be paid by the
proj ect's construction contractors for building pennits. We have, therefore excluded them from our
proposal. Should any fees of this nature subsequently be required, ABW will pay such fees if
included in the contract through the change order process.
H:\BridgeWork5\lobs\206628PARAGS\206628 _ ~nsQuole _022106. wpd
Page 2 of 3
ATLANTA
P.O. BOX 5137 + MARIETTA, OA 3006]-5137 + (770) 423-,4200 + FAX (770) 423-4203
DALLAS KANSAS CITY ORLANDO SALT LAKE CITY
SAN DIEGO
MAR-14-2006 02: 59P FROM: PRRSOt...JS BRmCKERHOFF
TO:B632031
P.4
19. ABW is not an environmental engineering flnll, and we are currently unaware of any existing
asbestos, hazardous or toxic substances, located in the vicinity of the work at any of the referenced
locations, Notwithstanding anything contained in the contract documents to the contrary, ABW has
not included any fees to test or confirm any existing asbestos, hazardous or toxic substance
conditions during the design phase of the project. We have not included any fees associated with any
abatement, abatement design service OT the like. Should any such services be required, we can
include them through the subcontract process which may have cost impacts. Client agrees to hoid
ABW hannless to the extent permitted by law for all claims, liabilities, and expenses (including
reasonable attorneys' fees and expenses) related to any hazardous or toxic substances at the site.
20, Our proposal is valid for thiny (30) days. Our proposal is based on the negotiation of an acceptable
contract and acceptable fmancial terri1s between Parsons and ABW.
21. The storage location and the route to the location must be suitable for the purpose of transporting
and storing passenger boarding bridges,
22, Our proposal is based on free and clear access to the equipment and the site.
23. - Payment tems are net 30 days.
We trust you will find our proposal in order and look fOlWard to hearing from you in the very near future.
In the mean time, should you have any questions. or require additional information, please feel free to call.
Sincerely,
;;~~4L
Michael W. Madlock
Vice President
H:\BridgeWorIcs\Job5\20662BP ARAGSi20662BJ1l1'1ionsQuote_022106. wpd
Page 3 of3
ATLANTA
P.O. BOX 5137 + MARlEITA, GA 30061-5 J 37 + (770) 423..4200 + FAX (770) 423-4203
DALLAS KANSAS CITY ORLANDO SALT LAKE CLTY
SAN DiEGO
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
William D. McKnight - President
Mason McKnight, III - Vice President
Huey E. Carter - Sec. - Treasurer
FOUNDERS:
Mason McKnight, Sr. 1900-1973
Mason McKnight, Jr. 1930-1994
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: [706] 863-7784
Fax: [706] 863-2031
April 21, 2006
Parsons Brinckerhoff Construction Services Inc,
1510 Hanger Road, Suite A
Augusta, GA 30906
Attn: Matt McCoy
RE: Augusta Regional Airport
Augusta, GA
PR 8 (Revised)
Utility Conflicts
Gentlemen:
Attached is the revised summary of costs for the delays to the site utility contractor due tot he
conflicts caused by unforseen conditions.
Barnett Construction
McKnight
Total
$27,709.88
1,939.69
$29,649.57
Please add (12) days to the contract because of these delays.
Please issue a change order for this amount, and the additional time.
Sincerely,
MCKNIGHT CONSTRUCTION CO., INC.
f (J:1;RIituLis~
Pat Patrick
Project Manager
lID ~(g~llW~lID
illl APR 2 5 2006 JID
PP:sdr
BY: ____________________
cc: 10bsite
pat042106. wpd
B
DATE:
TO:
FROM:
BARNETT SOUTHERN
CORPORATION
April 21. 2006
McKnight Construction Company
Atln: Pal Patrick
P.O, Box 204718
Augusla. Georgia 30917
Burnett Southern Corporation
P.O. Box 704
WlISrunglOn, Geor~ill 30673
PROJ~CT~ Augusta Regional Airport
LOST PRODUCTION & UTILITY CONFLICTS (REVISED)
Item No. Description Quantity Unit Price
8/17/2005 1.00 Ls $269,89
8/18/2005 1.00 Ls $1,066.35
8/24/2005 1.00 LoS $633.00
8/25/2005 1.00 Ls $689..~8
8/26/2006 1.00 Ls $633.00
8/31/2005 1.00 Ls $0.00
9/6/2005 1.00 Ls $537,59
9/812005 1.00 Ls $1,308.51
9/1 5/2005 1.00 Ls $2.28:2..14
9/20/2005 1.00 Ls $400.32
9/29/2005 1.00 Ls $3.136.60
9/30/2005 1.00 Ls $1.920.46
1 0/3/2005 1.00 Ls $700.26
10/4/2005 1.00 Ls $1,400.52
10/5/2005 1.00 Ls $1.560,21
1011112005 1.00 Ls $1,152.64
10/1112005 1.00 T~~ $1,750,65
10/1212005 1.00 Ls $1.197,53
I 0/13/2005 1.00 Ls $828,00
10/1312005 1.00 Ls $283.98
10/13/2005 1.00 Ls $684,30
11/10/2005 1.00 Ls $5,274.35
NET CHANGE TO CONTRACT:
Noles:
I. DeLail9 fOr above wMk on nltached force accounI sheets.
BARNETT SOUTHERN CO~RA Tlr
BY: ~~~
(lluthori:z:cQ gi~TmluT<:)
TITLE: Estimator. Barnett Southern CorpoTl1lion
POSt OtIlce Box 704 Washinglun, Georgia 30673
Tdephone: 70&-678-1507 Fax: 706-678-1 (-)97
WIl.l,IAM ASH BARNE'rt
J>l'c~jclcl1l
AMES M. BARNETI
Vice "rc~jdcnt
Total
$269.89
$1,066.35
$633,00
$689.511
$633.00
$0.00
$537,59
$1,308.51
$2.282,]4
$400.32
$3.136,60
$1,920.46
$700.26
$1,400.52
$1,560,2\
$1,152.64
$],750,65
$1.197,53
$828.00
$283.98
$684.30
$5,274.35
$27,709.88
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
L(r>>fS
William D, McKnight - President
Mason McKnight, III - Vice President
Huey E, Carter - See, - Treasurer
FOUNDERS:
Mason McKnight, Sr, 1900-1973
Mason McKnight, Jr, 1930-1994
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: [706] 863-7784
Fax: [706] 863-2031
April 7, 2006
Parsons Brinckerhoff Construction Services Inc.
1510 Hanger Road, Suite A
Augusta, GA 30906
Attn: Matt McCoy
RE: Augusta Regional Airport
Augusta, GA
PR41 Trench drain
Gentlemen:
The following are the costs associated with providing the underground plumbing required for the .
drainage at the trench drains in the ramps. . The trenches were show on the architectural, but there
was no drainage pipe show on the plumbing drawings for these trench drains.
Smith Brothers
McKnight 7% O/P
Total
3,778.00
264.46
4,042.46
Please issue a change order for this amount.
Sincerely,
MCKNIGHT CONSTRUCTION CO., INC
pcdfaixickjS~
Pat Patrick
Project Manager
PP:sdr
lID ~cg~TIW~lffi
llil APR 1 0 2006 IDJ
cc:
10bsite
BY: --------------------
pat040706a. wpd
PROJECT NUMBER: AR209024
TERMINAL AREA IMPROVEMENTS
AUGUSTA REGIONAL AIRPORT AT BUSH FIELD
COST PROPOSAL No. CP - 4\
~l I '70(:)6
NOTICE OR REQUEST: IN or IR No,
DATE:
SUBJECT:
ll/G
~~~ Qv ~~ cWa.M-~
DESCRIPTION OF PROPOSED MODIFICATIONS:
C see. ~ l-etl'w ') -rr~ c\iva.:~ s.iA."'-<fV' V'^ AvJ..:.k;It.wJ.
~"!iJ' I kit 1'\0 ~<'y\~ 4- W"':~ ",k",M "" -tl...,
~\\J.Ifl\'v:~J ~~
REFERENCE:
list any attached document\'
Within 10 days of recelvmg a related Information Notice or Response to Information ReQuest,
submit an itemized proposal for changes in the Contract Sum and/or the Contract Time for the proposed
modifications, or notify the Architect in writin of the date on which ou antici ate submittin a ro osaI.
THIS IS NOT A CONSTRUCTION CHANGE DIRECTIVE. THIS IS NOT A CHANGE ORDER.
DO NOT CONSIDER THIS AS INSTRUCTION OR DIRECTION TO EITHER STOP WORK IN
PROGRESS OR TO EXECUTE THE PROPOSED MODIFICATIONS.
NO PAYMENT Wll..L BE MADE FOR WORK WHICH IS NOT PRIOR APPROVED IN WRITING.
Adjust Contract Time for this change ( Increase I Decrease calendar days)
t 4D4z-~
o
.
Adjust Contract Sum for this change ~cr:;;Y ~",,,asc ) . . . . . . . . , .. . ,$
Signed by:
Date:
~/7/0(o
(CONTRACTOR)
cc: CONSTRUCTION MANAGER
ARCHITECT
CONTRACTOR
OWNER'S REPRESENT A TlVE
TERMINAL AREA IMPROVEMENTS
AUGUSTA REGIONAL AIRPORT, AUGUSTA, GEORGIA
CONTRACT MODIFICATION FORMS
01250-5
rHOM ~MIIH ~KUIHtK~ IVltGHAI~IGAL
\ 1 n U) 1'111 r\ Lv L U U U I I . \!L./ v I, I I d. V / "v. V V I '" '" -. v..._ - .
G
Smith Bros. Mechanical Contractors, Inc.
Post Office Box 15547 · Telephone (706) 733-9473
AUGUSTA, GEORGIA 30919-1547
March 22, 2006
McKnight Construction Co.
PO Box 204718
Augusta, Ga, 30917
Artn: Pat Patrick
Re: Augusta Regional Airport
Additional Trench Drain Installation
Dear Mr. Patrick,
As you are aware the trench drains in'theramps at Ground Loading of the Holding Bldg,
were not shown on the plumbing drawings, Per your instructions we ordered the
additional trench and below is our cost incurred for the installation of these 8 (eight)
trench drains.
The area in which this piping was required had previously been roughed~in , tested and
backfilled and tamped. In order to provide pipe for these additional drains, we had to
excavate and remove previously installed pipe and insert the additional fittings,
200,10 O&P
Change Order Amount
1030,00
62,00
1088,00
282.88
40.00
520.00
90,00
35.00
3148,00
630.00
$3778.00
Rough Material
Tax
Labor - 64 man hrs. @ 17.00
Labor Burden @ 26%
Truck / Tools
Tractor - 8 hrs. @65.00
Tamp - 2 days @ 45.00
Supervision
. h any questions,
~
y Pardue
(see attached material list)
rKVIVI..~IVllln DIIVlllLllv l'ILvIIIi11IvliL.
Additional materials required for installation:
Priced at today's replacement price,
10' - 6 x 5 sgl. hub cast iron pipe @ 15,74 per ft.
to' - 4 x 5 dbl. hub cast iron pipe @ 9,12 per ft.
25' _ 2 x 5 sgl. hub cast iron pipe @ 5,78 per ft.
35' - 2 x 5 dbL hub cast iron pipe @ 6,44 per ft.
2 - 6 x 2 cast iron wyes @ 37.85
2 - 4 x 2 cast iron wyes @ 20.10
4 - 2 x 2 cast iron wyes @ 10.50
9 - 2" cast iron sweeps @ 8,00
7 - 2" cast iron 1/8 bend"@ 5,85
4 - 6" gaskets @ 4.10
4 - 4" gaskets @ 2.55
51 - 2" gaskets @ 1.45
8 - 11/2" x 6" galv. Nipples @ 4.38
1 - qt. lube @ 5,55
157.40
91.20
144,50
225.40
75.70
40.20
42,00
72,00
40,95
16.40
10,20
73,95
35,04
5.55
$1030,00