HomeMy WebLinkAboutMABUS BROTHERS CHANGE ORDER 8 Augusta Richmond GA DOCUMENTNAME ~~~e. Oydey RvvY) DOCUMENT TYPE c... YlOcVi (~f 0 v---a\ -e V YEAR: wo~ BOX NUMBER: L- \ FILE NUMBER: \ I \ I 4 NUMBER OF PAGES: 3 '1." "'..".. ,. ... ~ '\ Change Order Form , Change Order Number: Eight Date: 03-18-04 Project Title Laney Walker Blvd. Reconstruction Original Contract Date: 09-15-02 Project Number:326-04-288811 0 18 Owner: ARC P.O. Number: P63427 Contractor: Mabus Brothers Construction Co. The following change order is hereby made to the proposal for the above project: See Attached TOT AL AMOUNT OF THIS CHANGE ORDER $ 9,958.60 The Contract time will be IncreasedlDecreased by ~ calendar days as a result of this change. The date of completion including this change order is . Original Contract Amount Previous Change Order (Increased / Decreased) This Change Order (Increased / Decreased) TOTAL CONTRACT WITH CHANGE ORDER(S) $ 2,505,808.35 $ 290,1 54.65 $ 9,958.60 $ 2.805.921.60 ************* .~~ Funding Source/Account Number: 327041110-5414110/201812018-5414110 ~V' ~~ Requested By: /~t ~ Date: J-I'P-QC}- )Y " ~ <\.... E~neer Submitted By: C( F ') C---. ~ 7?S Date: "5 /2Z/0'( epart t Head 1 Finance Endorsement: /\.. Date: ]' _)....2... -";'1./ er . Approved By: Date: Recommended By: Date: Date: Accepted By: COPIES: Errick Thompson, P.E. AssistantDirector-Engineering Purchasing, Oeri Sams Kakoli Basu, Accountant, PWE Pre Construction File , ~ Page 1 of 1 ,j'- '\ ;: Kakoli Basu From: Robert Clements Sent: Thursday, March 18, 2004 11 :46 AM To: Kakoli Basu Subject: LANEY WALKER BLVD. RECONSTRUCTION LANEY WALKER BLVD. RECONSTRUCTION: EXPLANATION OF CHANGE ORDER NO._? A DRIVEWAY FROM LANEY WALKER TO A PRIVATE PARKING LOT IS TOO STEEP FOR DESIRABLE VEHICULAR ACCESS TO THE PARKING LOT. THIS CHANGE ORDER WILL PROVIDE FOR THE REMOVAL, REGRADING, REPAVING AND FINISHING OF ANY DISTURBANCES RELATED TO THIS DRIVEWAY WORK. THE ORIGINAL CONTRACT DOCUMENTS DID NOT PROVIDE REQUIRED RW/EASEMENT FOR THE DESIRED DRIVEWAY GRADE ALTHOUGH IT IS NOT AS STEEP NOW AS IT WAS PRIOR TO CONSTRUCTION. THE PROPERTY OWNER HAS DONATED ADDITIONAL EASEMENT FOR THIS PROPOSED WORK. ADDITIONAL CONTRACT TIME IN THE AMOUNT OF SEVEN(7) CALENDAR DAYS .IS REQUIRED FOR THIS PROPOSED WORK. . 3/18/2004 03/1~/2004 10:54 7067227521 MABUS BROS CONST CO PAGE 02 ..- MABus BROTHERS CONSTRUCTION CO., INC. 920 MOLLY POND ROAD AUGUSTA. GEORGIA 30901 706-722"894 I FAX 706-722-7521 March 3, 2004 Mr. Errick Thompson Public Works and Engineering 1815 Marvin Griffin Road Augusta, GA 30906 RE: LANEY WALKER BOULEVARD Dear Mr. Thompson Below is a revised price to reconstruct drive at the office located at 1124 Laney Walker Boulevard. The drive was constructed according to plans and specifications. Occupant states drive is too steep for the clientele. Mabus Brothers has made every effort to cover all items that may be encO\D'ltered while reconstructing "this drive, however, if Mabus Brothers encounters unknown utility conflicts there will be additional cost. Any conf]jct with utilities will be the ovmers' responsibility. Mabus Brothers will not be responsible for any structural failures of the brick retaining wall during construction of the drive. Our price does not include any shoring, bracing or removing and replacing of the brick retaining wall. Sod has been placed along drive since quote was given. Any sod that is damaged due to drive removal and has to be replaced will be added to original contact quantity and invoiced at the bid price. Any additional easement required to reconstruct the drive will be the responsibility of Public Works. Seven additional contract days will be required for drive reconstruction. Price includes removing the drive to obliterate as much of the slope as possible and reconstructing the drive. Lump Sum $9,958.60 Items of construction include the following: bond., traffic controL staking, concrete sawing, removal of existing drive, regrade existing drive, construct 8" concrete valley gutter and 4" concrete sidewalk. If you have any questions, please call. Larry Goolsby, V' -President Mabus Brothers Construction Co., Inc. Cc: Robert Clements Brian Franklin