Loading...
HomeMy WebLinkAboutLaney Walker Blvd. Reconstruction Augusta Richmond GA DOCUMENTNAME:CJr1o..~C Ovde.r l=OlrvYl DOCUMENTTYPE:CJro.~-e. ordev YEAR: 1-004 BOX NUMBER: LJ FILE NUMBER: ,','2-JO NUMBER OF PAGES: 3 '-t ~ Change Order Form Change Order Number: Nine Date: 04/19/04 Project Title Laney Walker Blvd Reconstruction Original Contract Date: 9-15-02 Project Number: 326-04-288811018 Owner: ARC P.O. Number: P63427 Contractor: Mabus Brothers Construction The following change order is hereby made to the proposal for the above project: See Attached TOTAL AMOUNT OF THIS CHANGE ORDER $ <33.73> The Contract time will be Increased/flu! ~-W by ~ calendar days as a result of this change. Original Contract Amount $ 2,505,808.35 Previous Change Order (Increased / Decreased) This Change Order (Increases / Decreases) $ 300.1 13.25 $ 33.73 TOTAL CONTRACT WITH CHANGE ORDER(S) ************* $ 2.805.887.87 Funding Source/Account Number: no funds required - this is a net deductive change Requested By: Date: 'iIUJ~'i Date: 0 t/70 h' c/ / Date: 'II z.I:) (;; i Date: i }~of ~ y Submitted B : Recommended By: Approved By: Accepted By: ~ ~ Contractor COPIES: Errick Thompson, P.E. Assistant Director-Engineering Purchasing, Geri Sams Kakoli Basu, Accountant, Public Works Pre Construction File Date: Date: 'f - 20 - () '( ;; '1 Laney-Walker Change Order Nine A 6" concrete median proposed at the corner of Laney-Walker and R.A. Dent Boulevards was not included in the original contract. The original contract included 10" striping for crosswalks and did not include adequate striping for all necessary crosswalks. The current standard used by Augusta for crosswalks uses 8" striping. This change order adds 6,818 LF of 8" striping to the contract in order to complete the project and provide consistency with the rest of Augusta in terms of crosswalk striping width. The contract price for 10" striping is $2.00 /LF and the contractor's price for 8" striping is $1.90 /LF. The original quantity of 8" striping is being deleted. A quantity of 24" reinforced concrete pipe originally set up in the contract but not used is being deleted from the contract as well. This change order includes: .:. deleting 213 LF of 24" RCP at $52.93/LF for a total of $11,274.09 .:. deleting 1830 LF of 10" White Thermoplastic striping at $2/LF for a total of $3,660.00 .:. adding 6818 LF of 8" White Thermoplastic striping at $1.90/LF for a total of $12,954.20 .:. adding 34 SY of 6" concrete median at $57.24/SY for a total of $1,946.16 The net result of this change order is a deduction in the contract amount of $33.73 .,~ if Ernck Thompson From: Sent: To: Subject: Larry Goolsby [lgoolsby.mbc@comcast.net] Tuesday, April 13, 2004 5:42 PM ERRICK THOMPSON (E-mail) LANEY WALKER Errick, Below is the price for the one 298 square foot 6" Reinforced Concrete Median on R.A. Dent Blvd. that includes the three wheel chair ramps that are shown on the Traffic Signal Installation No. 1 plan. This median paving will be installed on existing concrete paving and will require dowels be drilled into the existing concrete along with reinforcing steel. Mabus Brothers request that 3 days be added to our contract time for traffic control, layout, striping and installation of the median. I have included the price for the Thermoplastic Solid Traffic Stripe White 8" that will installed in lieu of the Thermoplastic Solid Traffic Stripe White 10". This should be all of the C.O. IS. I will have fax a hard copy and mail the original of this to you. 6" Reinforced Median Concrete Median 34 sy @ $57.24 sy $1,946.16 Thermoplastic Solid Traffic Stripe 8" $1. 90 Lin. Ft. Thanks, Larry 1