Change Order Form
Change Order Number: Ten Date: 07-06-04
Project Title Laney Walker Blvd. Reconstruction
Original Contract Date: 09-15-02 Project Number:326-04-288811018
Owner: ARC P.O. Number: P63427
Contractor: Mabus Brothers Construction Co.
The following change order is hereby made to the proposal for the above project:
See Attached
TOTAL AMOUNT OF THIS CHANGE ORDER $ -174,918.25
Original Contract Amount $ 2.505,808.35
Previous Change Order
(Increased / Decreased) $ 300,079.52
This Change Order
(lnereased / Decreased) $ -174,918.25
TOTAL CONTRACT WITH CHANGE ORDER(S) $ 2.630.969.62
*************
Date:
Date:
.,f Date:
Date:
Date:
Date:
Submitted By:
Approved By:
Accepted By:
CC: Errick Thompson, P.E. Assistant Director-Engineering
Purchasing, Geri Sams
Kakoli Basu, Accountant, PWE
Pre Construction File
~~
7-1 --tJ1-
7/6/01
'J--,rvV
\\\\()~
7 /~{, /,'f
, f
'7- (p~t)f
,
....
. .
This change order is the result of items under running as noted below:
1) Storm Drain Pipe, 18" = 1751 LF(@,$46.61 =$81,614.11/
2) " " "24" = 753 LF @ $52.93 = $39,856.29 ,/...
3) " 36" = 747 LF @$71.55 = $53,447.85",,/
TOTAL
= $174,918.2/,
The reason for the under runs is a decision was made to delete a significant portion of this project in order
to construct a new sports stadium in the adjoining areas of the Mill and Mauge Streets portion of the Laney
Walker Blvd. Reconstruction. To have continued with our originally proposed project in this area would
not have been cost effective because most of the proposed work would have to be removed in the near
future.