Loading...
HomeMy WebLinkAboutKemp Drive Sanitary Sewer Improvements Project Change Augusta Richmond GA DOCUMENT NAME: )( t;."l P t>R \" I;;'" ~ A '" ",-rAil. 'I ~ ~ lrJ l,; ~ ::r "'~o V lit"'" EN r..s p ~f) \ €CT C.\-\AtV 96" DOCUMENT TYPE: C \\ ~ t0Cj e 0 Q. ~ e. R- YEAR: ~ DO R BOX NUMBER: llo FILE NUMBER: I ~ d ~ NUMBER OF PAGES: ~ .. ;, CONSTRUCTION CONTRACT mANGE ORDER co NUMBER 2 BID ITEM 02-078 DATE 7-18-02 PROJECf TITLE Kemp Drive Sanitaty Sewer Improvements Proiect ORIGINAL CONTRACf DATE 5-7-02 PROJECf NUMBER 50040 OWNER AUGUSTA-RICHMOND PO NUMBER P59453 COUNTICOMMISSION The following change is hereby made to the contract for the above project: Description of Change , Transition sanitary sewer laterals were required for this project due to DIP in the original design. A new line item for standard sewer lateral in the roadway was not established in the original contract. The new line item is being established for the purpose of providing a standard sanitary sewer lateral in the roadway for the Kemp Drive project. PAYEE TOTAL AMOUNT OF TIllS a-IANGE ORDER $ Blair Omstnlction, Inc. -14,000.00 The contract time will be INCREASED byQ calendar days as a result of this change. ORIGINAL CON1RACf AMOUNT $ PREVIOUS a-IANGE ORDER (DECREASE) $ TIllS a-IANGE ORDER (DECREASE) $ TOTAL REVISED CON1RACf AMOUNT WIlli OfANGE ORDER FUNDING NUMBER! ACCOUNT NUMBER $ 509043420 CON1RACfOR DATE: REQUESTED BY: DATE: SUBMITIED BY: DATE: FINANCE ENDORSEMENT: RECOMMENDED BY: APPROVED BY: 382,670.10 -8,948.28 -14,000.00 359,721.82 5425210 ..j" '1fJ If 5425210 7-/9'" 0", 7.lq~O ~ 7/~'L 1'/1 tip 'L- r/(~~7/' I , ... t" Augusta Utilities Department N. Max Hicks, P.E., Director Engineering and Construction Division 360 Bay Street, Suite 180 Augusta, Georgia 30901 (706) 312-4132 Fax (706) 312-4133 Douglas A. Cheek, P.E., Assistant Director MEMORANDUM TO: George Kolb, Administrator ~ouglas A. Cheek, P .E., Assistant Director FROM: DATE: June 10, 2002 SUBJECT: Augusta Capital Improvements Program Project 50040-Kemp Drive Sanitary Sewer hnprovements Project Request for Administrative Change Order Number One As discussed on Friday, May 24, 2002, it is necessary to request an administrative change order for the Kemp Drive Sanitary Sewer hnprovements Project that will change most of the originally bid Ductile Iron Pipe to PVC pipe. The justifications are as follows: · The cost of the ductile iron piping (DIP) in relation to the PVC piping allows a cost savings of $8948.28 by using PVC piping and eliminating the DIP from the project. · DIP with special epoxy coatings required for sewage, creates a potential delay for the project due to the need to send the DIP to a coatings manufacturer. · Maintenance of the DIP will be more labor intensive than maintenance ofPVC piping, which will drive future maintenance costs higher. · Maintenance material costs for DIP will be higher than maintenance material costs for PVC pIpmg. · Transition couplings from ductile iron to PVC service cleanouts will hamper low-pressure air testing per Uni-Bell PVC Pipe Association testing requirements. Low-pressure air testing of completed sewer systems is required by The Augusta Utilities Department Standards and Specifications. Air testing of the completed system is critical to ensure the piping will not allow infiltrationlexfiltration of the line. By utilizing PVC piping materials the transition coupling required for DIP to PVC transition will not be needed, and low pressure air testing can be performed as per AUD Standards and Specifications. · Due to numerous underground utilities in the project area, the path for the DIP placement is in close proximity to an Atlanta Gas Company gas main. Due to electro-magnetic fields created by these two systems being in close proximity to one another, an explosion hazard and corrosive situation can be minimized by utilizing PVC piping. .. ;.' ~ ., ~ Augusta Capital Improvements Program Project 50040-Kemp Drive Sanitary Sewer Improvements Project Request for Change Order June 10,2002 Page 2 Attached is the associated Change Order Form indicating the $8948.28 deduction in the contract. If additional information is needed please contact me at 312-4132. Attachment Cc: Max Hicks, P.E., Director Bob Davis, P.E., Bond Program Construction Manager, CH2M Hill Gerald Wall, Inspection Operations Manager Jay Blair, Utilities Inspector J.R. Holland, Construction Manager " . ( .#/ J~ CHANGE ORDER CO NUMBER 1 BID ITEM 02-078 DATE 6-10-02 PROJECT TITLE Kemp Drive SanitaJ;y Sewer Im..provements Project ORIGINAL CONTRACT DATE PROJECT NUMBER ~ OWNER AUGUSTA COMMISSION PO NUMBER E52ill The following change order is hereby made to the proposal for the above project: PAYEE Blair Construction, Inc. TOTAL AMOUNT OF THIS CHANGE ORDER $ - 8948.28 The contract time will be INCREASED by Q calendar days as a result of this change. ORIGINAL CONTRACT COST $ 382,670.10 PREVIOUS CHANGE ORDER (INCREASE) $ 0.00 THIS CHANGE ORDER (QECREASE) $ - 8,948.28 TOTAL CONTRACT WITH CHANGE ORDER $ 373,721.82 FUNDING NUMBER/ACCOUNT NUMBER. 509043420 5425210 ~111tJ SUBMlTIED BY: 5425210 DATE: ,(Io-o~ 6/; I/O l r " REQUESTED BY: EPARTMENTHEAD .vI AI: ,/tHK n7 G,.. .J FlNANCE ENDORSEMENT: L7C1'\t\.M("~A ( A. ).JLfh aM b/ ,,/-C07,~O R 1 ()/, RECOMMENDED BY: '~~/~ ADMINISTRA DATE: Co-/3-0d-. ~/~z DATE: APPROVED BY: DATE: MAYOR