Loading...
HomeMy WebLinkAboutIndoor Aquatics Center Damacus Road Augusta Richmond GA DOCUMENT NAME: :r N 'OODlZ. A'lY ,</71C ~ (:,e.vT6 R 'bA (Yl BCu ~ ROl\tl DOCUMENT TYPE: C ~ A'rJ ~ e: DR\> (..R. YEAR: 'l~q~ BOX NUMBER 4:> FILE NUMBER: ,) LI () io 3 NUMBER OF PAGES: ~ 1- -.., '\'- l " Change Order OWNER ARCHITECT CONTRACTOR FIELD OTHER [ x ] [ x ] [x ] [ ] [ ] AlA Document G701 - Electronic Format TI-fIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION, AUTHENTICATION OF TI-fIS ELECTRONICALLY DRAFTED AlA DOCUMENT MAYBE MADE BY USING AlA DOCUMENT D401. PROJECT: (name, address) Indoor Aquatics Center Damacus Road Augusta, Georgia TO CONTRACTOR: CHANGE ORDER NUMBER: Two (2) DATE: 21 December, 1998 ARCHITECT'S PROJECT NO: 9706 CONTRACT DATE: 7 April, 1998 (name, address) Two State Construction Co" Inc, CONTRACT FOR: Indoor Aquatics Center p, 0, Drawer 239 Thomson, GA 30824 The Contract is changed as follows: L Change Proposal # 2: Time extensions for wet soils 2, Change Proposal # 3: Add water cooler $ 1,636,94 3, Change Proposal # 4b: Reconfigure back flow preventor { $ 4,400,OO} CREDIT 4, Change Proposal # 5: Add irrigation sleeve $ 704,00 5, Change Proposal # 6: Bleacher extension $ 8,437,00 6, Change Proposal # 7: Add 100' of bent plate angle $ 1,219,00 7, Change Proposal # 9: Add fire rated doors and block $ 724,50 8, Change Proposal # 10: Dehumidification units delivery day 9, Change Proposal # 14: Bypass 8" water line, 10, Change Proposal # 24: Add concrete block fire wall $ 29,250,00 Not valid until signed by the Owner, Architect and Contractor. The original (Contract Sum) (GuaraAteed maximum Price) was Net change by previously authorized Change Orders The (Contract Sum) (Guarliflteea Mwciml:lffi Prioe) prior to this Change Order was The (Contract Sum) (Guaranteed Maximum Priee) will be (increased) (decreased) (unoflliflged) by this Change Order in the amount of The new (Contract Sum) (Guaranteed Maximum Prioe) including this Change Order will be The Contract Time will be (increased) (deoreased) (unchanged) by twenty eight (28 ) days, The Date of Substantial Completion as of the date of this Change Order therefore is 19 April, 1999 NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed maximum Price which have been authorized by Construction Change Directive, $ 4,325,582,00 $ 1,925,00 $ 4,327,507.00 $ 37,571.14 $ 4,365,078,14 ARCHITECT AlA DOCUMENT 070 I . CHANGE ORDER. 1987 EDITION. AlA . COPYRIGI-IT 1987 . THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK A VENUE, N. W., WASHINGTON, D.C" 20006-5292, WARNING: Unlicensed photocopying violates U,S. copyright laws and is subject to legal prosecution, This document was electronically produced with permission of the AlA and can be reproduced without violation Wltil the date of expiration as noted below, Electronic Format - 0701-1987 User Document: G701.CON -- 12/22/1998, AlA License Number 109910, which expires on 7/31/1999 -- Page #1 ( " . ~ \ ~ Virgo Gambill Architects Address 1168 Broad Street Augusta, GA 30901 BY: ~':Y'~ DATE: l "I~ .,~ CONTRACTOR Two State Construction Co" Inc, Address p, 0, Drawer 239 Thomson, GA 30824 BY: ~tt6~ DATE: /2-lz$/9f OWNER Augusta-Richmond County Address 530 Greene Street, Room 606 Municip, Building, Augusta, GA 30911 AlA DOCUMENT 070 I 'CHANGE ORDER' 1987 EDITION, AlA ' COPYRIGHT 1987 ' TI-IE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N,W., WASHINGTON, D.C" 20006-5292, WARNING: Unlicensed photocopying violates u.~:, copyright laws and is subject to legal prosecution. This document was electronically produced with permission of the AlA and can be reproduced without violation until the date of expimtion as noted below. Electronic Format - 0701-1987 User Document: G701.CON -- 12/22/1998, AIALicense Number 109910, which expires on 7/31/1999 -- Page #2