Loading...
HomeMy WebLinkAboutHorsepen Sewer Extension Augusta Richmond GA DOCUMENT NAME: 'nO'(se~ sewe:, e..xte.n s \ Cf) DOCUMENT TYPE: cYD(\~ Drde( YEAR:O-\ BOX NUMBER: dd FILE NUMBER: \ 1 dl~ NUMBER OF PAGES: \.~ , . CHANGE ORDER PROJECf TITLE CO NUMBER 1 BID I1EM NA DA1E 4/5/04 HORSEPEN SEWER EXTENSION PHASE II ORIGINAL CONTRACf DATE 4/5/04 PROJECf NUMBER 50202 OWNER AUGUSTA COMMISSION PO NUMBER P82257 The following change order is hereby made to the proposal for the above project: PAYEE JOHNSON LASCHOBER & ASSOCIATES, p.e TOTAL AMOUNT OF THIS mANGE ORDER The contract time will be INCREASED by Q calendar days as a result of this change. $ 19,824.00 ORIGINAL CONIRACfCOST PREVIOUS mANGE ORDER (INCREASE) THIS mANGE ORDER (INCREASE) TOTAL CONIRACf WIlli mANGE ORDER $ 192,300.00 $ 0.00 $ 19,824.00 $ 2U,124.00 FUNDING NUMBER! ACCOUNT NUMBER 510043420 5212115 ~tfllW 80250202 REQUES1ED BY: J: L. 4. ~tA-IPto/ONr- ENGINEER ttl!1c DEP D SUBMITTED BY: FINANCE ENDORSEMENT: RECOMMENDED BY: APPROVED BY: 5212115 DA1E: DAlE: 4-!b/O~ I I DATE: cr(2- g/ go{ DATE: 1/ ~~I tJ~ DATE: Iff:'> /0 'f - , L .' J~ ENGINEERS. DESIGNERS. CONSULTANTS. LANDSCAPE ARCHITECTS FEE PROPOSAL PROPOSAL #: 204A DATE: 3/11/04 (Revised) By: D PHONE (706) 312-4140 D FAX (706) 312-4133 D EMAIL makpo-sanni@augustaga.gov To: Mag Akpo-Sanni Augusta Utilities Dept. Augusta, GA RE: Project - 50202-Horsepen Phase 2 Sewer Collection System- Change Order NO.1 SUBMITTED By: Richard J. Laschober, P.E., Project Manager PARTICULARS: I. Change Order Item 1: Add additional sanitary sewer along Karleen Road to provide direct service to houses located along the east and west sides of Karleen Road thus eliminating the cost of laterals and associated jack and bores or open cut and pavement patch and overlay. Total add to original estimated footage of collector sewer: 0 LF and 30 additional easements. II. Change Order Item 2: Add additional sanitary sewer to serve houses along the east side of Crest Drive from the backside of houses instead of as originally proposed on Horsepen Phase 1 plan drawings 27 and 28. Total add to original estimated footage of collector sewer 2,200 LF and 24 additional easements. This line will provide service to 20 houses. III. Summary of Changes to original proposal A. Total estimated length of sewer -32,000 LF (original) plus 2,200 LF (added) = 34,200 LF (total) B. Total estimated service laterals - 385 (original) plus 20 (additional) = 405 services (total) C. Total estimate easements 130 (original) + 54 (added) = 184 (total) IV. Basic Professional Services and Compensation (See appended Attachment A - Scope of Services and Attachment B - Compensation): A. Engineering 1. Perform field survey for approximately 32,000 LF (original)+2,200 LF (added) = 34,200 LF (total) of sanitary sewer. 2. Prepare bid documents (constructions drawings and specifications for approximately 34,200 LF of sanitary sewer. Provide between one (1) and two (2) separate bid tabulations per available funding as determined in later Johnson, Laschober and Associates, PC 1296 Broad Street PO Box 2103 Augusta, GA 30903 Telephone: 706-724-5756 Fax: 706-724-3955 Web Site: www.jla-engineers.com Email: info@jla-engineers.com r.:\nor.llmpnt, ~nrl SP.Hinn,lm~7R?1\1 nr.'" Spltinn,\Tpmnnr~rv Inlpmp! Filp_,IOI Kn\n7I?04~ho"l\P.n?~ rlnr. 'prop~sal # 204-A · -;: 3/4/04 Page 2 phases of design. In addition, provide a separate addition bid tabulation for Change Order Item 2, above. 3. Provide necessary permitting related to GA DOT utility encroachments, wetlands, etc. 4. Provide bid and construction phase services for the initial phase which may represent all or a portion of the 34,200 LF of sanitary sewer. 5. Total Fee Engineering Fee - Lump Sum $163,370 (original) plus $10,630 (added) = $174,000 (total) B. Soil Borings (By QORE Property Sciences): 1. Provide 16 (original) + 2 (added) = 18 soil borings to an average depth of 12 feet throughout the project area to provide an adequate representation of sub-surface conditions in the bid document and to aid in determining contingency quantities (over-excavation, refill, bedding, and select backfill) in the bid tabulation. 2. Work to be performed for a Lump Sum of $4,000 (original) + $500 (added) = $4,500. C. Easements (By George L. Godman & Associates, P.C.) 1. Research and prepare up to 130 (original) + 54 (added) = 184 total easement plats for permanent and/or temporary (construction) easements. 2. Work to be performed on a time and expense basis not to exceed $20,930 (original) + $8,694 (added) = $29,624 (total). 3. Work will be invoiced within the on a per unit basis for small tracts at $161 per easement plat and for large tracts (2 acres and over) at $260 per easement plat. O. Total Compensation for Basic Professional Services: 1. Engineering (See line item 1.A5, above) $163,370 (original) + $10,630(added) = $174,000 (total) 2. Soil Borings (See line item I.C.2, above) $4,000 (original) + $500 (added) = $4,500. 3. Easements (See line item 1.0.2, above) $20,930 (original) + $8,694 (added) = $29,624 (total) 5. Total Fee $192,300 (original) + $19,824 (added) = $212,124 (total) 6. Total Change Order NO.1 = $19,824