CHANGE ORDER
CO NUMBER 2
BID ITEM
DATE March 14, 2001
PROJECT TITLE
Groundwater Treatment Plant No, 3 and 4
ORIGINAL CONTRACT DATE
PROJECT NUMBER W-3B
OWNER AUGUSTA COMMISSION
PO NUMBER
E.Q.6.812
The following change order is hereby made to the proposal for the above project:
PAYEE
ZEL Engineers
TOTAL MIOUNT OF THIS CHANGE ORDER
$
12,861.43
The contract time will be INCREASED by Q calendar days as a result of this change.
ORIGINAL CONTRACT COST
$
282,000.00
PREVIOUS CHANGE ORDER (INCREASE)
$
3,865.52
THIS CHANGE ORDER (INCREASE)
$
12,861.43
TOTAL CONTRACT WITH CHANGE ORDER
$
298,726.95
FUNDING NU1-IDER/ ACCOUNT NUMBER
508043410
5212115
REQUESTED BY: ~:{2-- DATE: .9 /;s ft; /
E EER , ,
SUB11ITTED BY: -II ;tj !k4 DATE: 3//5/fJ!
4MBNT HEAD . .
il(,''''~ '3/I~/OI
FINANCE ENDORSEj'yffiNT: ISJon:n.rA-A eM O~O~ DATE: I.{-q -Of
COMP'mOLLER i t?~Y ~a4
RECOMMENDED BY: DATE:
APPROVED BY: DATE: V 19 ~ J
,-
. ,
_~ "II
'"' .
2: E ~35 Telfair Street
.,. WEll' P E Ch f B dE' ~ Augusta, Georgia 30901-2494
led . IS,.., m.o oar, mentus
Joseph J. Tankersley, P.E., President E N GIN E E R S
Jorge E. Jimenez, P.E., Vice-President
Charles D. Drown, P.E., Treasurer ZIMMERMAN, EVANS AND LEOPOLD, INC.
(706) 724-5627
'ww'w.ZELENGINEERS.COM
Kenneth E. Green, P.E., Secretary
John R. Evans, P.E.
R. Nelson Williams, P.E.
John R. Armstrong, P.E., Retired
March 5, 200 I
Mr. N. Max Hicks, P. E., Director
Augusta-Richmond Utilities Department
360 Bay St, Suite 180
Augusta, Ga. 30906
RE: Water Plant NO.3 and 4 Engineering Services
Dear Mr. Hicks:
The design work and construction engineering services have proceeded and Ground Water Plant 4 is
nearly complete. However, there are a number of items which were beyond the scope of our work
that we'd like for the Department to consider. These are:
1. The site selection of both plants have proceeded with many false starts and relocation because
the site acquisition has been more difficult than anticipated. This condition caused additional
work in Plant 3 by. The first site chosen was found unsuitable and we had to redo work for
the second site. We request $5,500 to compensate us for the work done relative to the site
selection.
2. The Site design was complete for Groundwater plant 4 when we were asked to redesign the
road entrance to accommodate the needs of the Development Authority. The costs of the
redesign is $1,971.43.
3. We were directed to continue to provide resident inspection for Contracts 1 and 2 at
Groundwater plant 3 after the allocation authorized was reached. The total additional
inspection provided is $5,390.
The total for these items is $12,861.43. Our total fee for Basic Services for both plants is estimated to
be 4.7% of the construction cost. We would appreciate the Department's concurrence to approve
these additional services on the project.
Sincerely
ZIMMERMAN, EVANS AND LEOPOLD, Inc.
L---/
9905 Additional Services .doc