Loading...
HomeMy WebLinkAboutGround Water Plant # 4 Wellfield Investigation Augusta Richmond GA DOCUMENT NAME: G:.<<C>l)>>0 WATCQ ()u.,v,ft ~ WElL~leL\) r NY e:-S T ~ '3 ,ATI'O~ DOCUMENT TYPE: L\-\ A r-JDj ~ e:> (ZVC~ YEAR: ~DD6 BOX NUMBER: I ~ FILE NUMBER: 1 ~ it> S- c;- NUMBER OF PAGES: ~ ,. r-- . ... f " CONSTRUCTION CONTRACT CHANGE ORDER CO NUMBER 1 BID ITEM DATE PROJECT TITLE Ground Water Plant #4 Wellfield Investigation ORIGINAL CONTRACT DATE 03/05/2002 PROJECT NUMBER OWNER AUGUST A-RICHMOND COUNTYC011MISSION PO NUMBER 30150 P51814 The following change is hereby made to the contract for the above project: Description of Change (for a more detailed description see attached proposal): Contractor made two additional video inspections from the original plans of the investigation of the existing well. In the process of the inspections, the well was found to have gravel in the bottom twenty feet of the well and this material was removed to complete the video investigation of the-entIre_depth. Material was removed and holes were found in the casing screens in the area of the gravel. The contractor backfilled and capped the lower segment of the well to eliminate any subsidence into the well casing from thetavel pack region of the well. PAYEE TOT AL AMOUNT OF THIS CHANGE ORDER $ Graves Water Services, Inc. 21,300.00 The contract time will be INCREASED by 348 calendar days as a result of this change. ORIGINAL CONTRACT AMOUNT $ PREVIOUS CHANGE ORDER (INCREASE) $ THIS CHANGE ORDER (INCREASE) $ TOTAL REVISED CONTRACT AMOUNT \XfITH CHANGE ORDER $ FUNDING NUMBER! ACCOUNT NUMBER PROPOSED BY: REQUESTED BY: SUBMITTED BY: FINANCE ENDORSEMENT: RECOMMENDED BY: APPROVED BY: 509043410 ~~~~30150 7( n4o.,:;.;.-:,-;t, /VI Ic.-e:5 DATE. C7RI41/t:"'5 WI'InJt SOli/Iccs. /wc- . CONTRACTOR ~ ,"7ER Jf ti~ ~ ~ DATE PTROLL R cA4 DATE: DATE: DATE: DATE: 145,000,00 0.00 21,300.00 166,300.00 5425110 5425110 ,/ ~o /03 ~~).5 3/3/03 I r .1-(.;' .-- oD 3 3/ lv/eo J 1h.h/o' I I a3A13Q3l:J (OOZ 8 0 83:1 SelV IIIHW~HO . .: