CHANGE ORDER
. NUMBER: 1
DATE: 4-1-97
PROJECT TITLE:
General Drainaqe Improvements. Phase I
ORIGINAL CONTRACT DATE:
1-20-97
PROJECT NO.: 55-8035-096
OWNER: Augusta-Richmond County Commission-Council
P.O. NUMBER:
.
/30853
CONTRACTOR:
Beam's Pavement Maintenance
The following change order is hereby made to the proposal for the above project:
1) Remove & Reset 42" Flared End Sec. at Detention Pond = $400
Place 127.10 tons of Rip Rap @ $26/ton @ Wylds Rd = $3.304.60
2)Remove existinq asphalt and regrade swale @ Monroe Moving
driveway (additional work not shown in contract) = $800
3) Asphaltic Cone. Base: 190 tons @ $39.50/ton = $7.505
Variable Type Asphaltic Cone: 70 tons @ $44/ton = $3.080
4) Drainaqe Improvements @ Bolton st (Bel Air Hills Est)
(see attached sheet) = $29.317.50
TOTAL AMOUNT OF THIS ORDER:
$ 44.407.10
The contract time will be increasedj--------- by ~ calendar days as a result
of this change.
ORIGINAL CONTRACT AMOUNT:
$ 309.766.00
PREVIOUS CHANGE ORDERS (INCREASED/DECREASED):
THIS CHANGE ORDER (INCREASED/---------):
$ .00
TOTAL CONTRACT WITH CHANGE ORDERS:
$ 44.407.10
$ 354.173.10
****************************************************************
FUNDING SOURCE/ACCOUNT NUMBER:
PROJECT CONTINGENCIES
REQUESTED BY:
Jack F. MurphY
DATE:
4-24-97
SUBMITTED BY:
DATE:
4-24-97
RECOMMENDED BY:
DATE:
3/d71fJ
G/7 /q ,
.5 c:X/-ff
FINANCE ENDORSEMENT:
DATE:
APPROVED BY:
DATE:
. '1'
_J...,
... :".
~}.
-..
,.. ;....,;;
;
-::;;;
.'
April 10, 1997
2335 Atomic Rd. . P.O. Box 398
Beech Island, South Carolina 29842
Telephone (803) 827-0136
Fax (803) 827-1868
Augusta-Richmond County
Utilities Department
1815 Marvin Griffin Rd.
Augusta, Ga 30906
Attn: Mr. Robert Clements
Re: Bolton Street/BelAir Hills Estates
Dear Mr. Clements,
We are pleased to offer you the following quote on the above referenced project.
1. Yard drain 1 ea
2.12" RCP 50 If
3. 24" RCP 481 If
4.18" RCP 40 If
5.24" FES 1 ea
6. 12" Rip rap 20 sy
7. D WT I ea
8. Drop inlet 3 ea
9. Lump sum construction
Total
$ 300.00
812.50
12,025.00
720.00
400.00
210.00
1,100.00
2,850.00
10,900.00
$29,317.50
Notes: 1. No testing, fees or permits
2. Lump sum construction includes:
a. Traffic control
b. Remove existing asphalt flume
c. Reshape ditch/backfill existing ditch
d. Clearing
e. Replace yard sprinkler as encountered
f. Grassipg
g. Furnish labor, equipment and material
to complete work on drawing and as
discussed with Mr. Robert Clements
I
nc.
~
_0'.
..::.\
.;~,....
i,
;-
~
.'
2335 Atomic Rd. . P.O. Box 398
. Beech Island, South Carolina 29842
Telephone (803) 827-0136
Fax (803) 827-1868
March 28, 1997
Augusta-Richmond County utilities
Attn: Mr. Robert Clements
Re: R C General Drainage Improvements, Phase I
Dear Mr. Clements,
We are pleased to offer you the following change order quote on the
above referenced project.
1. Remove and reset flared end section at Forest Creek
2. Rip rap atWylds Rd 127.10 tons @ $26.00 ton
3. Monroe Moving: Remove existing asphalt and regrade
swale not shown on plans (1/2 day crew cost)
$ 400.00
3,304.60
800.00
Total through 3/21/97
$4,504.60
Please call if you have any questions.
. cO. -7, ..~'. "
"-
<>.
RECOMMENDATION:
Approve Change Order with funding for all items. Please
return a copy of signed Change Order to this office for further
processing.
DEPARTMENT
DIRECTOR:
~~
Michael Greene
FUNDS ARE AVAILABLE
FOLLOWIN ACCOUNTS
1
ADMINISTRATOR ~ i2. o~
~J7 Ie, 1
F-INANCE:
~A:;5
COMMITTEE ACTION:
attachment