Loading...
HomeMy WebLinkAboutGeneral Drainage Improvements (2) Augusta Richmond GA DOCUMENT NAME: OfDex'"QL d.\'~ \\Y1~yUJe:mem-~ DOCUMENTTYPE:~~ ()~C\(0( YEAR: ~'\ . BOX NUMBER: O~ FILE NUMBER: \~\o5 NUMBER OF PAGES: L\ " ~... ~. .. - -.:; "\ ," CHANGE ORDER . NUMBER: 1 DATE: 4-1-97 PROJECT TITLE: General Drainaqe Improvements. Phase I ORIGINAL CONTRACT DATE: 1-20-97 PROJECT NO.: 55-8035-096 OWNER: Augusta-Richmond County Commission-Council P.O. NUMBER: . /30853 CONTRACTOR: Beam's Pavement Maintenance The following change order is hereby made to the proposal for the above project: 1) Remove & Reset 42" Flared End Sec. at Detention Pond = $400 Place 127.10 tons of Rip Rap @ $26/ton @ Wylds Rd = $3.304.60 2)Remove existinq asphalt and regrade swale @ Monroe Moving driveway (additional work not shown in contract) = $800 3) Asphaltic Cone. Base: 190 tons @ $39.50/ton = $7.505 Variable Type Asphaltic Cone: 70 tons @ $44/ton = $3.080 4) Drainaqe Improvements @ Bolton st (Bel Air Hills Est) (see attached sheet) = $29.317.50 TOTAL AMOUNT OF THIS ORDER: $ 44.407.10 The contract time will be increasedj--------- by ~ calendar days as a result of this change. ORIGINAL CONTRACT AMOUNT: $ 309.766.00 PREVIOUS CHANGE ORDERS (INCREASED/DECREASED): THIS CHANGE ORDER (INCREASED/---------): $ .00 TOTAL CONTRACT WITH CHANGE ORDERS: $ 44.407.10 $ 354.173.10 **************************************************************** FUNDING SOURCE/ACCOUNT NUMBER: PROJECT CONTINGENCIES REQUESTED BY: Jack F. MurphY DATE: 4-24-97 SUBMITTED BY: DATE: 4-24-97 RECOMMENDED BY: DATE: 3/d71fJ G/7 /q , .5 c:X/-ff FINANCE ENDORSEMENT: DATE: APPROVED BY: DATE: . '1' _J..., ... :". ~}. -.. ,.. ;....,;; ; -::;;; .' April 10, 1997 2335 Atomic Rd. . P.O. Box 398 Beech Island, South Carolina 29842 Telephone (803) 827-0136 Fax (803) 827-1868 Augusta-Richmond County Utilities Department 1815 Marvin Griffin Rd. Augusta, Ga 30906 Attn: Mr. Robert Clements Re: Bolton Street/BelAir Hills Estates Dear Mr. Clements, We are pleased to offer you the following quote on the above referenced project. 1. Yard drain 1 ea 2.12" RCP 50 If 3. 24" RCP 481 If 4.18" RCP 40 If 5.24" FES 1 ea 6. 12" Rip rap 20 sy 7. D WT I ea 8. Drop inlet 3 ea 9. Lump sum construction Total $ 300.00 812.50 12,025.00 720.00 400.00 210.00 1,100.00 2,850.00 10,900.00 $29,317.50 Notes: 1. No testing, fees or permits 2. Lump sum construction includes: a. Traffic control b. Remove existing asphalt flume c. Reshape ditch/backfill existing ditch d. Clearing e. Replace yard sprinkler as encountered f. Grassipg g. Furnish labor, equipment and material to complete work on drawing and as discussed with Mr. Robert Clements I nc. ~ _0'. ..::.\ .;~,.... i, ;- ~ .' 2335 Atomic Rd. . P.O. Box 398 . Beech Island, South Carolina 29842 Telephone (803) 827-0136 Fax (803) 827-1868 March 28, 1997 Augusta-Richmond County utilities Attn: Mr. Robert Clements Re: R C General Drainage Improvements, Phase I Dear Mr. Clements, We are pleased to offer you the following change order quote on the above referenced project. 1. Remove and reset flared end section at Forest Creek 2. Rip rap atWylds Rd 127.10 tons @ $26.00 ton 3. Monroe Moving: Remove existing asphalt and regrade swale not shown on plans (1/2 day crew cost) $ 400.00 3,304.60 800.00 Total through 3/21/97 $4,504.60 Please call if you have any questions. . cO. -7, ..~'. " "- <>. RECOMMENDATION: Approve Change Order with funding for all items. Please return a copy of signed Change Order to this office for further processing. DEPARTMENT DIRECTOR: ~~ Michael Greene FUNDS ARE AVAILABLE FOLLOWIN ACCOUNTS 1 ADMINISTRATOR ~ i2. o~ ~J7 Ie, 1 F-INANCE: ~A:;5 COMMITTEE ACTION: attachment cc: Robert Clements .Cheryl Nelson Agenda File Main File Preconstruct ion File