Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Fleming Heights Water and Sewer Improvements
Augusta Richmond GA DOCUMENT NAME:r LE-n I "";9 /-JC; ''';) H'''' W'Yftft. a ~(;We;~ r'Y>l fl'O V 6" '" or;; AIl S DOCUMENT TYPE: Cl-\ A(\J~ t5 C)"~\)SR- YEAR: l 99'1 BOX NUMBER: \.p FILE NUMBER: 1 Y D<6 D NUMBER OF PAGES: '-I "'" "', ;,' i' r' CHANGE ORDER NUMBER 1 DATE 02101199 PROJECT TITLE Flemin~ Hei~hts Water & Sewer Improvements ORIGTI'lAL CONTRACT DATE . 12/2/97 PROJECT NUMBER OWNER Augusta-Richmond County Commission-Council P.O. NUMBER CONTRACTOR Beam's Pavement Maintenance Company, Inc. U-96-013 148848 The following change order is hereby made to the proposal for the above project: See attached breakdown of costs for this project TOTAL AMOUNT OF THIS CHANGE ORDER $ 298,148.81 The contract time will be increased/decreased by 0 Calendar days as a result of this change, ORIGIJ'lAL CONTRACT AMOUNT $ 1,003,075.85 PREVIOUS CHANGE ORDER (INCREASEIDECREASE) $ 0.00 THIS CHANGE ORDER (INCREASEIDECREASE) $ 298,148.81 TOTAL CONTRACT WITH CHANGE ORDER $ 1,301,224.66 .************************************************************************ FUND1NG SOURCE/ACCOUNT NUMBER James W. Rush S?- 507043410/5425110(89600130) REQUESTED BY: DATE: 02/01199 ENGINEER SUBMj[TTED BY: N. Max Hicks DEPART T HEAD DATE: 02/01199 FINANCE ENDORSEMENT: DATE: '- , 111<1 <t DATE: 'L/. ~ I c:;~ DATE: ~1/(P1?9 RECOMMENDED BY: ~. 12 ~ ~ APPROVED BY: '02/01/99 " t; i' " FLEMING HEIGHTS FINAL CHANGE ORDER Sanitary Sewer ChanQe Unit Unit Cost Cost ChanQe 1 8" PVC Sewer (0-6) -310 LF $14.50 -$4,495.00 2 8" PVC Sewer (6-8) -2472 LF $15.75 -$38,934.00 3 8" PVC Sewer (8-10) 1070 LF $16.95 + $18,136.50 4 8" PVC Sewer (10-12) 1687 LF $19.00 + $32,053.00 5 8" PVC Sewer (12-14) 25 LF $22.25 + $556.25 6 1 0" PVC Sewer (8-1 0) 50 LF $21 .00 + $1,050.00 7 12" PVC Sewer (8-1 0) -182 LF $23.60 -$4,295.20 8 12" PVC Sewer (10-12) 181 LF $24.50 + $4,434.50 9 12" PVC Sewer (12-14) 1 LF $26.00 + $26.00 10 8" DIP Sewer (0-6) 41 LF $21 .00 + $861.00 11 8" DIP Sewer (6-8) -38 LF $22.00 -$836.00 12 10" DIP Sewer (0-6) -34 LF $25.65 -$872.10 13 10" DIP Sewer (6-8) 34 LF $28:25 + $960.50 14 Manholes (0-6) -1 EA $1,000.00 -$1,000.00 15 Manholes (6-8) -9 EA $1,150.00 -$10,350.00 16 Manholes (10-12) 5 EA $1,800.00 + $9,000.00 17 Manholes (12-14) 2 EA $2,200.00 + $4,400.00 18 Plug Existing Sewer -2 EA $900.00 -$1,800.00 .19 6" Sewelf Service <25 14 EA $175.00 + $2,450.00 20 6" Seweli Service >25 89 EA $275.00 + $24,475.00 21 6"Sewer (exist-new) 32 EA $100.00 + $3,200.00 22 6" Clean out 4 EA $125.00 + $500.00 23 Conflict Manhole B -1 EA $5,700.00 -$5,700.00 Subtotal $33,820.45 Water & Misc. ChanQe Unit Unit Cost Cost ChanQe 23 6"PVC Water Main 1137 LF $6.85 + $7,788.45 24 6" Gate Valves -9 EA $380.00 -$3,420.00 25 8" PVC Water Main 286 LF $8.85 + $2,531.10 26 8" Gate Valves 2 EA $535.00 + $1,070.00 27 Cut & Plug Exist Mains -12 EA $200.00 -$2,400.00 28 6x6 T.S. & Valve -4 EA $1,450.00 -$5,800.00 29 8x12 T.S. & Valve -1 EA $2,150.00 -$2,150.00 30 Water Svc. Adjustment 63 EA $150.00 + $9,450.00 31 24" RCP -52 LF $25.00 -$1,300.00 32 Asph. Pvmt.Rem/Rpl -3862.67 .SY $23.00 -$88,841.41 33 3/4 Asph Overlay -53418 SY $2.20 -$117,519.60 I 34 Select Bj3Ckfill .9003 -CY $6.00 + $54,018.00 35 Concrete Drive Rem/Rpl 38.22 SY $25.00 + $955.50 36 Asph: D~ive Rem/Rpl .280 SY $25.00 + $7,000.00 37 C&G Rem/Rpl -6126 LF $8.50 -$52,071.00 Subtotal -$190,688.96 2/1/99 Fleming .. ;- FLEMING HEIGHTS FINAL CHANGE ORDER EXTRA WORK ChanQe Unit Unit Cost Cost ChanQe 37 10X6 Tee 1 EA $400.00 + $400.00 38 8x8x6 MJ Tee 6 EA $350.00 + $2,100.00 39 6x12 Tapping Sleeve & Valve 2 EA $2,000.00 + $4,000.00 40 6" DIP Water Main 167 LF $20.00 + $3,340.00 41 6" Inline Tee 3 EA $150.00 + $450.00 42 6" Backfilow Prevention Device 1 EA $50.00 + $50.00 43 2" MJ V~llve 1-1/2" Service 1 EA $45.00 + $45.00 44 3/4" Old. Existing Long Service 2 EA $325.00 + $650.00 45 3/4" Old Existing Short Service 4 EA $250.00 + $1,000.00 46 6" 90 Degree Bends 3 EA $35.00 + $105.00 47 6x6 Tapping Sleeve & Valve 3 EA $1,500.00 + $4,500.00 48 6x6x6 Tee 3 EA $300.00 + $900.00 49 . 6x8 'Reducer 1 EA $225.00 + $225.00 50 8" 90 Degree Bends 1 EA $35.00 + $35.00 51 8x8x8 Tee 4 EA $400.00 + $1,600.00 52 8"Cap 7 EA $135.00 + $945.00 53 8x18 Tapping Sleeve & Valve 1 EA $2,300.00 + $2,300.00 54 Surge 32.71 TN $25.00 + $817.75 55 CRS 142.35 TN $20.00 + $2,847.00 56 1 " Type IH Overlay 55262 SY $2.95 + $163,022.90 57 Sewer Donuts ,92 EA $50:00 + $4,600.00 58 8" 45 Degree Bends 2 EA $100.00 + $200.00 59 12x12x8 Tee 2 EA $500.00 + $1,000.00 60 12" DIP 111 LF $125.00 + $13,875.00 61 Extra Manhole 1 EA $2,200.00 + $2,200.00 . . 62"" 8" T.8p. '. 1 EA $2,500.00 + $2,500.00 63 C.oncreto Thrust Blocks 7 EA $150.00 + $1,050.00 64 . Extra Valve Box ' 1 EA $95.00 + $95.00 65 Storm Box Tops 2 EA $525.00 + $1,050.00 66 . Storm Box Th roats 2 EA $525.00 + $1,050.00 67 12x8 Reducer 1 EA $375.00 + $375.00 68 3/4" Tap 1 EA $200.00 + $200.00 69 Traffic Control 2 DAY $1,500.00 + $3,000.00 70 Locate. Verify Valves l' EA $1,700.00 + $1,700.00 71 Conflict Box (Harold Rd.) 1 EA $2,850.00 + $2,850.00 72 2" PVC (Circular Dr. Ext) 240 LF $6.00 + $1,440.00 73 Services 2 EA $350.00 + $700.00 74 6x2 Tapping Sleeve & Valve 1 EA $1,800.00 + $1,800.00 75 8" DIP Water 100.5 LF $40.00 + $4,020.00 76 3" Water Service 1 EA $500.00 + $500.00 77 3" Gate Valve 1 EA $300.00 + $300.00 78 8x8x4 Toe 1 EA $150.00 + $150.00 79 4x3 RedllJcer 1 EA $175.00 + $175.00 80 3" Wheel Valve 1 EA $275.00 + $275.00 81 3" Blind IFlange 1 EA $75.00 + $75.00 82 2" Blind IFlange 1 EA $75.00 + $75.00 83 Meter Spud 1 EA $100.00 + $100.00 211/99 Fleming ~ ."i' I .. i _ FLEMING HEIGHTS FINAL CHANGE ORDER 84 18" Nipple 1 EA $250.00 + $250.00 85 Built Road Crown (Ruby/Fleming) 71.95 TN $40.00 + $2,878.00 86 Asphalt I~aised Edge 862 LF $4.00 + $3,448.00 87 2" Services 1 EA $350.00 + $350.00 88 10" Cap 1 EA $150.00 + $150.00 89 Asphalt Removal Replacement 2222.55 CY $95.95 + $213.253.67 Subtotall $455,017.32 Tota' $298.148.81 2/1/99 Fleming