Loading...
HomeMy WebLinkAboutFleming Heights Water and Sewer Improvements Augusta Richmond GA DOCUMENT NAME:r LE-n I "";9 /-JC; ''';) H'''' W'Yftft. a ~(;We;~ r'Y>l fl'O V 6" '" or;; AIl S DOCUMENT TYPE: Cl-\ A(\J~ t5 C)"~\)SR- YEAR: l 99'1 BOX NUMBER: \.p FILE NUMBER: 1 Y D<6 D NUMBER OF PAGES: '-I "'" "', ;,' i' r' CHANGE ORDER NUMBER 1 DATE 02101199 PROJECT TITLE Flemin~ Hei~hts Water & Sewer Improvements ORIGTI'lAL CONTRACT DATE . 12/2/97 PROJECT NUMBER OWNER Augusta-Richmond County Commission-Council P.O. NUMBER CONTRACTOR Beam's Pavement Maintenance Company, Inc. U-96-013 148848 The following change order is hereby made to the proposal for the above project: See attached breakdown of costs for this project TOTAL AMOUNT OF THIS CHANGE ORDER $ 298,148.81 The contract time will be increased/decreased by 0 Calendar days as a result of this change, ORIGIJ'lAL CONTRACT AMOUNT $ 1,003,075.85 PREVIOUS CHANGE ORDER (INCREASEIDECREASE) $ 0.00 THIS CHANGE ORDER (INCREASEIDECREASE) $ 298,148.81 TOTAL CONTRACT WITH CHANGE ORDER $ 1,301,224.66 .************************************************************************ FUND1NG SOURCE/ACCOUNT NUMBER James W. Rush S?- 507043410/5425110(89600130) REQUESTED BY: DATE: 02/01199 ENGINEER SUBMj[TTED BY: N. Max Hicks DEPART T HEAD DATE: 02/01199 FINANCE ENDORSEMENT: DATE: '- , 111<1 <t DATE: 'L/. ~ I c:;~ DATE: ~1/(P1?9 RECOMMENDED BY: ~. 12 ~ ~ APPROVED BY: '02/01/99 " t; i' " FLEMING HEIGHTS FINAL CHANGE ORDER Sanitary Sewer ChanQe Unit Unit Cost Cost ChanQe 1 8" PVC Sewer (0-6) -310 LF $14.50 -$4,495.00 2 8" PVC Sewer (6-8) -2472 LF $15.75 -$38,934.00 3 8" PVC Sewer (8-10) 1070 LF $16.95 + $18,136.50 4 8" PVC Sewer (10-12) 1687 LF $19.00 + $32,053.00 5 8" PVC Sewer (12-14) 25 LF $22.25 + $556.25 6 1 0" PVC Sewer (8-1 0) 50 LF $21 .00 + $1,050.00 7 12" PVC Sewer (8-1 0) -182 LF $23.60 -$4,295.20 8 12" PVC Sewer (10-12) 181 LF $24.50 + $4,434.50 9 12" PVC Sewer (12-14) 1 LF $26.00 + $26.00 10 8" DIP Sewer (0-6) 41 LF $21 .00 + $861.00 11 8" DIP Sewer (6-8) -38 LF $22.00 -$836.00 12 10" DIP Sewer (0-6) -34 LF $25.65 -$872.10 13 10" DIP Sewer (6-8) 34 LF $28:25 + $960.50 14 Manholes (0-6) -1 EA $1,000.00 -$1,000.00 15 Manholes (6-8) -9 EA $1,150.00 -$10,350.00 16 Manholes (10-12) 5 EA $1,800.00 + $9,000.00 17 Manholes (12-14) 2 EA $2,200.00 + $4,400.00 18 Plug Existing Sewer -2 EA $900.00 -$1,800.00 .19 6" Sewelf Service <25 14 EA $175.00 + $2,450.00 20 6" Seweli Service >25 89 EA $275.00 + $24,475.00 21 6"Sewer (exist-new) 32 EA $100.00 + $3,200.00 22 6" Clean out 4 EA $125.00 + $500.00 23 Conflict Manhole B -1 EA $5,700.00 -$5,700.00 Subtotal $33,820.45 Water & Misc. ChanQe Unit Unit Cost Cost ChanQe 23 6"PVC Water Main 1137 LF $6.85 + $7,788.45 24 6" Gate Valves -9 EA $380.00 -$3,420.00 25 8" PVC Water Main 286 LF $8.85 + $2,531.10 26 8" Gate Valves 2 EA $535.00 + $1,070.00 27 Cut & Plug Exist Mains -12 EA $200.00 -$2,400.00 28 6x6 T.S. & Valve -4 EA $1,450.00 -$5,800.00 29 8x12 T.S. & Valve -1 EA $2,150.00 -$2,150.00 30 Water Svc. Adjustment 63 EA $150.00 + $9,450.00 31 24" RCP -52 LF $25.00 -$1,300.00 32 Asph. Pvmt.Rem/Rpl -3862.67 .SY $23.00 -$88,841.41 33 3/4 Asph Overlay -53418 SY $2.20 -$117,519.60 I 34 Select Bj3Ckfill .9003 -CY $6.00 + $54,018.00 35 Concrete Drive Rem/Rpl 38.22 SY $25.00 + $955.50 36 Asph: D~ive Rem/Rpl .280 SY $25.00 + $7,000.00 37 C&G Rem/Rpl -6126 LF $8.50 -$52,071.00 Subtotal -$190,688.96 2/1/99 Fleming .. ;- FLEMING HEIGHTS FINAL CHANGE ORDER EXTRA WORK ChanQe Unit Unit Cost Cost ChanQe 37 10X6 Tee 1 EA $400.00 + $400.00 38 8x8x6 MJ Tee 6 EA $350.00 + $2,100.00 39 6x12 Tapping Sleeve & Valve 2 EA $2,000.00 + $4,000.00 40 6" DIP Water Main 167 LF $20.00 + $3,340.00 41 6" Inline Tee 3 EA $150.00 + $450.00 42 6" Backfilow Prevention Device 1 EA $50.00 + $50.00 43 2" MJ V~llve 1-1/2" Service 1 EA $45.00 + $45.00 44 3/4" Old. Existing Long Service 2 EA $325.00 + $650.00 45 3/4" Old Existing Short Service 4 EA $250.00 + $1,000.00 46 6" 90 Degree Bends 3 EA $35.00 + $105.00 47 6x6 Tapping Sleeve & Valve 3 EA $1,500.00 + $4,500.00 48 6x6x6 Tee 3 EA $300.00 + $900.00 49 . 6x8 'Reducer 1 EA $225.00 + $225.00 50 8" 90 Degree Bends 1 EA $35.00 + $35.00 51 8x8x8 Tee 4 EA $400.00 + $1,600.00 52 8"Cap 7 EA $135.00 + $945.00 53 8x18 Tapping Sleeve & Valve 1 EA $2,300.00 + $2,300.00 54 Surge 32.71 TN $25.00 + $817.75 55 CRS 142.35 TN $20.00 + $2,847.00 56 1 " Type IH Overlay 55262 SY $2.95 + $163,022.90 57 Sewer Donuts ,92 EA $50:00 + $4,600.00 58 8" 45 Degree Bends 2 EA $100.00 + $200.00 59 12x12x8 Tee 2 EA $500.00 + $1,000.00 60 12" DIP 111 LF $125.00 + $13,875.00 61 Extra Manhole 1 EA $2,200.00 + $2,200.00 . . 62"" 8" T.8p. '. 1 EA $2,500.00 + $2,500.00 63 C.oncreto Thrust Blocks 7 EA $150.00 + $1,050.00 64 . Extra Valve Box ' 1 EA $95.00 + $95.00 65 Storm Box Tops 2 EA $525.00 + $1,050.00 66 . Storm Box Th roats 2 EA $525.00 + $1,050.00 67 12x8 Reducer 1 EA $375.00 + $375.00 68 3/4" Tap 1 EA $200.00 + $200.00 69 Traffic Control 2 DAY $1,500.00 + $3,000.00 70 Locate. Verify Valves l' EA $1,700.00 + $1,700.00 71 Conflict Box (Harold Rd.) 1 EA $2,850.00 + $2,850.00 72 2" PVC (Circular Dr. Ext) 240 LF $6.00 + $1,440.00 73 Services 2 EA $350.00 + $700.00 74 6x2 Tapping Sleeve & Valve 1 EA $1,800.00 + $1,800.00 75 8" DIP Water 100.5 LF $40.00 + $4,020.00 76 3" Water Service 1 EA $500.00 + $500.00 77 3" Gate Valve 1 EA $300.00 + $300.00 78 8x8x4 Toe 1 EA $150.00 + $150.00 79 4x3 RedllJcer 1 EA $175.00 + $175.00 80 3" Wheel Valve 1 EA $275.00 + $275.00 81 3" Blind IFlange 1 EA $75.00 + $75.00 82 2" Blind IFlange 1 EA $75.00 + $75.00 83 Meter Spud 1 EA $100.00 + $100.00 211/99 Fleming ~ ."i' I .. i _ FLEMING HEIGHTS FINAL CHANGE ORDER 84 18" Nipple 1 EA $250.00 + $250.00 85 Built Road Crown (Ruby/Fleming) 71.95 TN $40.00 + $2,878.00 86 Asphalt I~aised Edge 862 LF $4.00 + $3,448.00 87 2" Services 1 EA $350.00 + $350.00 88 10" Cap 1 EA $150.00 + $150.00 89 Asphalt Removal Replacement 2222.55 CY $95.95 + $213.253.67 Subtotall $455,017.32 Tota' $298.148.81 2/1/99 Fleming