Loading...
HomeMy WebLinkAboutFairington Sewer (2) Augusta Richmond GA DOCUMENT NAME: ~o.',(\"3ta'" ~e.~ DOCUMENT TYPE: ct\o.~ O'(deY YEAR: OQ BOX NUMBER: l~ FILE NUMBER: \ l.o \ L\\ NUMBER OF PAGES: L\ '\ .... CHANGE ORDER r co NUMBER 1 BID IlEM DAlE 5/20/02 PROJECt TITLE Fairington Sewer (Spirit Creek Basin) ORIGINAL CONTRACt DATE 1/23/01 PROJECt NUMBER 50200 OWNER AUGUSTA COMMISSION PO NUMBER P37974 The following change order is hereby made to the proposal for the above project: PAYEE Southern Partners TOTAL AMOUNT OF nns CHANGE ORDER $ 34,965.00 The contract time will be INCREASED by Q calendar days as a result of this change. ORIGINAL CONTRACt COST $ PREVIOUS CHANGE ORDER (INCREASE) $ nns CHANGE ORDER (INCREASE) $ TOTAL CONTRACtWI1H CHANGE ORDER $ 5212115 FUNDING NUMBER! ACCX>UNTNUMBER 509043420 REQUESlED BY: ~ 0 )fl~ DAlE: ~NGlNEER DAlE: ~AI.'~",Hlc.fOU DEPAR1MENfHEAD SUBMITTED BY: FINANCE ENDORSEMENT: A.CJorlA'l~ W~ dta~ DAlE: COMPlROLLER JI!7 0 I L /L.-.Jf DAlE: S'rnATOR RECOMMENDED BY: DAlE: APPROVED BY: 181,350.00 0.00 34,965.00 216,315.00 5212115 5' /J.D/t)~ I I 420~~ . , S ...2o-0L- 6 ~ .. . Southern Partners, Inc. Engineering - Surveying - Planning G.P.S. Control Surveys ,A May 15,2002 Mr. Max Hicks, P.E. Augusta Utilities Department 360 Bay Street, Suite 180 Augusta, Georgia 30901 Attn: Mr. Russell Thies RE: Town and Country Sanitary Sewer Extension Adjacent to Fairington Sewer Extension Dear Mr. Hicks: Southern Partners, Inc. is pleased to submit this proposal to provide professional services for the design of approximately 4,300 linear feet of sanitary sewer, 46 services and necessary appurtenances to serve properties in the Town and Country area near Fairington Subdivision. The coverage area for this project is based on your preliminary layout, which may need adjustment based on field conditions. More particularly: - Connector line from Elaine Court to one or two areas in the proposed project; - Lincolnton Parkway from 150 feet west of Windsor Spring Road to 120 feet west of Sylvania Court; - Lincolnton Parkway from Allendale Court to 100 feet west of Allendale court; - Allendale Court, N. from Lincolnton Parkway to the dead end; - Allendale Court, S. from Lincolnton Parkway to the dead end; - Overland from Allendale Court, S. to Elaine Court; - Sylvania Court, N. from Lincolnton Parkway to the dead end; - Sylvania Court, S. from Lincolnton Parkway to the dead end; - Overland from Sylvania Court, S. to Elaine Court; - Overland from Sylvania Court, S. to rear of property on Windsor Spring Road; - Overland from Lincolnton Parkway, north along rear property lines of three houses on Windsor Spring Road. Our fee for these services is Thirty Four Thousand Nme Hundred Sixty Five Dollars and No Cents ($34,965.00). We propose to furnish the fullowing services: I 1. Conduct field surveys of the proposed sanitary sewer route to determine property boundaries, line and grade, utilities and other physical encroachments. 1233 Augusta West Parkway Augusta. GeorgIa 30909 Phone (706) 855-6000 Fax (706) 869-9847 " .. Y' _ Mr:'MaxHicks May 15, 2002 Page 2 2. Prepare conceptual plans (30% submittal) for detennining routing, sizing and design considerations unique to this project. 3. Prepare preliminary plans (60% submittal) for the installations of these lines. Preliminary plans will be reviewed with Augusta Utilities Department and the Program Manager before work is started on the final plans. Actual plan percentage will be 85% and will include draft easements. 4. Prepare final construction plans (90% submittal) and bid documents, including a construction cost estimate. 5. Discuss bid results with the program manager to determine any items that may cause the selection of a contractor other than the low bidder. 6. Prepare easement plats as needed for lines that cross private property. 7. Monitor the general progress (surveillance) of the project and review all job submittals. Our costs include 30 review copies of the drawings and 6 review copies of the specifications. It also includes 12 copies of the full bid documents. We have added research for all properties affected by this project, including names, addresses and tax parcel numbers. Augusta Utilities Department will provide all available maps and plans for sanitary sewer and water lines in and adjacent to the project area, all GIS information (digital and paper) and all other pertinent information available in the public records. This project can be rea~y for concept review within 90 days of receipt of your purchase order and-authorization to proceed. Payment for services will be based on percentages compl~t.ed. IJivoices will be submitted in accordance with a mutually agreed upon schedule to allow time for review by the Program Manager. We appreciate this opportunity to be of service to Augusta Utilities. If you have any questions,"please call me. l SIDcer;(? 10 ~ W. Simonea Senior Engineer Attachment . . .":f" PROPOSAL WORKSHEET PROJECT: FAIRINGTON SUBDIVISION SANITARY SEWER ESTIMATED CONSTRUCTION COST: $450,000.00 Days Hoon Rate Cost FIELD CREW: 5 45 $135.00 $ 6,075.00 DRAFT FIELD WORK: 2 18 $ 55.00 $ 990.00 EASEMENT DRAFTING AND SURVEY SUPERVISION: 5 45 $ 80.00 $ 3,600.00 DESIGN: 30 270 $ 90.00 $24,300.00 TOTAL $34,965.00 PERCENT OF CONSTRUCTION 7.77 %