HomeMy WebLinkAboutFairington Sewer Augusta Richmond GA DOCUMENT NAME: h:c ,r- ;:::)ton 5 ,,""cO <"1" DOCUMENT TYPE: C,kGlJ o rJ. c:ir YEAR: 0 2 BOX NUMBER: )"1 FILE NUMBER: I Gt:-.127 NUMBER OF PAGES: L..\ ... 7 ./ i' CHANGE ORDER CO NUMBER 2 BID ITEM DATE 10/17/02 PROJECT TITLE Fairington Sewer (Spirit Creek Basin) ORIGINAL CONTRACT DATE 1/23/01 PROJECT NUMBER 50200 OWNER AUGUSTA COMMISSION PO NUMBER P37974 The following change order is hereby made to the proposal for the above project: PAYEE Southen Partners, Inc. TOTAL AMOUNT OF THIS mANGE ORDER $ 15,210 The contract time will be INCREASED by Q calendar days as a result of this change. ORIGINAL CONTRACT COST $ 181,350.00 PREVIOUS mANGE ORDER (INCREASE) $ 34,965.00 THIS mANGE ORDER (INCREASE) $ 15,210.00 TOTAL CONTRACT WITH mANGE ORDER $ 216,350.00 FUNDING NUMBER! ACCOUNT NUMBER 509043420 5212115 APPROVED BY: ~ < ,80150200 5212115 ~ " .JJ~A~ /0//7 /0;1, 11 JI1. ENG~ DA1E' ;~1t8~~ DEit1MENf HEAD . ,. I Q~ f~ DATE: 4r~~&DA1E 11/" / J ~ (] tyMINIS1RAT \ ftihvlt-v, 6 DATE -,YOR I 6/1 ~ I "'--. REQUESTED BY: SUBMITTED BY: FINANCE ENDORSEMENT: 1Yt~ RECOMMENDED BY: {I (" J 01/ I / -,,--.., ~.. '" -.' ..".:/ J' Southern Partners, Inc. Engineering - Surveying - Planning G.P.S. Control Surveys October 15, 2002 Mr. Max Hicks, P ,E, Augusta Utilities Department 360 Bay Street, Suite 180 Augusta, Georgia 30901 Attn: Mr. Russell Thies RE: Fairington Sanitary Sewer Extension Modifications Dear Mr. Hicks: Southern Partners, Inc, is pleased to submit this proposal to provide 'professional services for the revision of the design of The Fairington Sanitary Sewer Extension to utilize existing sewer connections and reduce the depth of cut through one part of the project. The coverage area for this project is based on your preliminary layout, which may need adjustment based on field conditions and capacity calculations, More particularly the project includes: - ComlectorJine fromFairington Drive to th~ existing sewer in the adjacent subdivision; - Connectoi' from' Spirit Creek Road t'o an 'existing 'offsite sewer on the adjacent property; - Elimination of the offsite liile '20nilectiilg; the' eastern 'portion of F airingto'n Drive to the off site line planned through Pinnacle Place property; - Evaluate and revise, if feasible, to connect the line on Highpointe Drive to an existing manhole on Bowen Drive; , , - Revise other sheets within the existing plans to reroute the sewer to accommodate the above changes, -__ _ _ _ Durfee fOLthese_servicesjs_Fjft.e.enIhousand TwgJJ!J@red Ten D()Jlars and No Cents ($15,210,00), We propose to furnish the following services: 1, Conduct field surveys of the proposed sanitary sewer route to determine property boundaries, line and grade, utilities and other physical encroachments, - 2, . Prepare conceptual, plans' (30% submithii) for determining routing; sizing and, , ' ." :design con~iderati?Q,(uruq,ue to thi~ project. '. ',' I 1,.:,., ' ; , . . ,1 "" ., t '. . ; " .... ...: :. '_ ~ ~ :. '" _'...:'. ;". t_,;... ,:.: I . .' ,~ ..'. .." '. " " , '. ~ ' . 1 .1,' .:." , . .- ." ,. ( 1233 Augusta West Parkway Augusta, Georgia 30909 Phone (706) 855-6000 Fax (706) 869-9847 " .;. ~...,,> " '1 .' i' Mr. Max Hicks October 15, 2002 Page 2 3, Prepare preliminary plans (60% submittal) for the installations of these lines, Preliminary plans will be reviewed with Augusta Utilities Department and the Program Manager before work is started on the final plans. Actual plan percentage will be 85% and will include draft easements, 4, Prepare final construction plans (90% submittal) and bid documents, including a construction cost estimate, This stage will be compiled with the existing plans to provide a single consolidated set. 5, Prepare easement plats as needed for lines that cross private property, 6, Prepare an electronic version of the contractor's red-lined as-builts in conjunction with the original project. Our costs include 20 review copies of the drawings, The specifications are part of the original project. We have added research for all properties affected by this project, including names, addresses and tax parcel numbers, Augusta Utilities Department will provide all available maps and plans for sanitary sewer and water lines in and adjacent to the project area, all GIS information (digital and paper) and all other pertinent information available in the public records. This project can be ready for concept review within 90 days of receipt of your purchase order and authorization to proceed, Payment for services will be based on percentages completed, Invoices will be submitted in accordance with a mutually agreed upon schedule to allow time for review by the Program Manager. We appreciate this opportunity to be of service to Augusta Utilities, If you have any questions, please call me, / Sincerely, '(\ ~~~~ ,~, Simoneau, P.E. Senior Engineer Attachment ;;. . ,. ~> . - ,. :) r; " ,t - -~.~ . . . 'I .' PROPOSAL WORKSHEET PROJECT: FAIRINGTON SUBDIVISION SANITARY SEWER (REVISIONS) ESTIMATED CONSTRUCTION COST: NtA Days Ho III rs Rate Cost FIELD CREW: 3 27 $135,00 $ 3,645.00 DRAFT FIELD WORK: 1 9 $ 55.00 $ 49,5,00 EASEMENT DRAFTING AND SURVEY SUPERVISION: 3 27 $ 80,00 $ 2,160,00 DESIGN: 11 99 $ 90.00 $8,910.00 TOTAL $15,210.00 PERCENT OF CONSTRUCTION Nt A