Change Order Number:' Three Date: March 31. 2000
Project Title: CSO Inner City Basin. Phase I-B
Original Contract Date: 12/21/95 Project Number: 327-04-296812012
Owner: ARC P.O. Number: 123130
Contractor: Beam's Pavement MaintenaiJ.ce
The following change order is hereby made to the proposal for the above project:
This change order will provide for separating storm water from a sanitary sewer line along
Heard Avenue. See attached sheet for quantities.
TOTAL A.l\10UNT OF THIS CHANGE ORDER
$ 81.385.00
The Contract time will be IncreasedlDecreased by 75 calendar days as a result of
this change. The date of completion including this change order is 75 calendar days
after the notice to proceed on this additional work.
Original Contract Amount
$ 741.215.12
Previous Change Orders
(Increased 1 Decreased)"
$ 707.455.65
This Change Order
(Increased 1 Decreased)
$ 81.385.00
TOT AL CONTRACT WITH CHANGE ORDER(S)
$ 1.530.055.77
*************
CoO, \\ \Q 2ct Co <6;;(3CJ ~ \ - (oCJ \ \ \ \ CJ
Funding Sourcel Account Number: 323-04-1110-X)LX.X.XXX-2-9,gU~n 9. " ~ L--"
Approved By:
Date:
Date: 0
Date:
~ Date:
Date:
Date:
Accepted By:
Recommended By:
, rJotu~<=R~~-"::?un~~
-:~~....:~~\~q~~ocm4.... ..;!~~~.i::::.:7.'
:. ,"~"...d.. a -~e.('(\~c.~ ~~~-:.~'~~...,:."
i ~.~
-:'
/>
. .,.
7
;-
ATTACHMENT
March 31, 2000
CSO INNER CITY BASIN, PHASE I-B
CHANGE NUMBER THREE
Descriotion Unit Unit Cost Total . Total
OuantitY Amount
1 18" Perforated HDPE LF $37.65 500 $18,825.00
2 Silt Fence/Hay Bales LF $4.00 500 $2,000.00
3 RemovelReplace 6" LIS $2,160.00 1 $2,160.00
Concrete Drive
4 RemovelReplace LIS $2,400.00 1 $2,400.00
Asphalt Drive
5 RemovelReplace Curb LF $25.00 155 $3,875.00
& Gutter
6 Type II Backfill CY $24.00 150 $3,600.00
7 Restoration of LIS $4,535.00 1 $4,535.00
Grass/Sob/Shrubbery
8 12" Under Drain LF $30.00. 55 $1,650.00
9 Interference Boxes EA $2,500.00 2 $5,000.00
10 Weir Drop Inlet EA $1,700.00 2 $3,400.00
11 Lump Sum LS $24,640 1 $24,640.00
Construction
12 Construct Manhole EA $2,000.00 2 $4,000.00
over existing line
13 Storm Manhole EA $1,800.00 1 $1,800.00
14 Remove 25' EA $3,500.00 1 $3,500.00
Oak Tree
Change Order
Amount $81,385.00
][>age'2 of 2
I' .)j\ ~- .;"~I~
..
." ~
2335 AJomic Rd. · P.O. 80. 398
Beech Island. South Caro'ina 298'2
relepftone (803) 827.0136
Fax (80J) 827-1864
We are pleased to offer you the following quote on the above referenced project.
1) IS" perforated HOPE 500 If@ S 37.65
2) Silt fence/hay bales 500 If @ 4.00
3) Remove/replace 6" concrete drive .. LIS
4) Remove/replace asphalt drive US
5) Remove/replace curb & gutter 155 If @
6) Type U backfill 150 cy @
7) Restoration of grass/sod/shrubbery LIS
8) 12" under drain 55 If @
9) Interference boxes 2 ea @
10) Weir drop inlet 2 ea @
t t) Lump Sum ConstruCtion "",....
12) COnstruction manhole over existing line 2 ea @
13) Stonn manhole 1 ea @
. Toral
December 15, 1999
Mr. Robert Clements
Augusta Richmond County
Re: Heard Ave.
Dear Mr. Clements,
Extra work if ordered by engineer.
1) Remove 25' oak ttee
lea @
Notes: 1. No testing, fees, or permits. .
2. No mucking of unsuitable material.
:. Please call if you have any questions.
25.00
24.00
$18,825.00
2,000.00
2,160.00
2,400.00
3,875.00
3,600.00
4,535.00
1,650.00
5,000.00
3,400.00 /J..f) C
24,640.00 K;, ,
a,ean.mr '1; () 00 -06
1.800.00
$77,885.00 ...--
30.00
2500.00
1700.00
...........
2000.00
1800.00
$3500.00
$ 3,500.00
/~ 7/9t
. 1 8~3e.s:lJtJ
Beam's Pavemept Maintenance Company Inc
T'Cl -::::O......J
1...1,"=I.r:^t-f..J co 1..J..,~a
I") <":!I 0 T I ;"'Or."'t"\C\
C~.~~ ~~~~,~?,~~