Loading...
HomeMy WebLinkAboutCSO Inner City Basin (2) Augusta Richmond GA DOCUMENT NAMEL~O -:r:::nncY C '\ ~~:S\n DOCUMENTTYPE Ch::tV12)C Ovdt'Y YEAR: ?DeD BOX NUMBER: Of NUMBER OF PAGES: \415~ 3 FILE NUMBER: "," .....~ '." ,.";.".... , r, " Change Order Number:' Three Date: March 31. 2000 Project Title: CSO Inner City Basin. Phase I-B Original Contract Date: 12/21/95 Project Number: 327-04-296812012 Owner: ARC P.O. Number: 123130 Contractor: Beam's Pavement MaintenaiJ.ce The following change order is hereby made to the proposal for the above project: This change order will provide for separating storm water from a sanitary sewer line along Heard Avenue. See attached sheet for quantities. TOTAL A.l\10UNT OF THIS CHANGE ORDER $ 81.385.00 The Contract time will be IncreasedlDecreased by 75 calendar days as a result of this change. The date of completion including this change order is 75 calendar days after the notice to proceed on this additional work. Original Contract Amount $ 741.215.12 Previous Change Orders (Increased 1 Decreased)" $ 707.455.65 This Change Order (Increased 1 Decreased) $ 81.385.00 TOT AL CONTRACT WITH CHANGE ORDER(S) $ 1.530.055.77 ************* CoO, \\ \Q 2ct Co <6;;(3CJ ~ \ - (oCJ \ \ \ \ CJ Funding Sourcel Account Number: 323-04-1110-X)LX.X.XXX-2-9,gU~n 9. " ~ L--" Approved By: Date: Date: 0 Date: ~ Date: Date: Date: Accepted By: Recommended By: , rJotu~<=R~~-"::?un~~ -:~~....:~~\~q~~ocm4.... ..;!~~~.i::::.:7.' :. ,"~"...d.. a -~e.('(\~c.~ ~~~-:.~'~~...,:." i ~.~ -:' /> . .,. 7 ;- ATTACHMENT March 31, 2000 CSO INNER CITY BASIN, PHASE I-B CHANGE NUMBER THREE Descriotion Unit Unit Cost Total . Total OuantitY Amount 1 18" Perforated HDPE LF $37.65 500 $18,825.00 2 Silt Fence/Hay Bales LF $4.00 500 $2,000.00 3 RemovelReplace 6" LIS $2,160.00 1 $2,160.00 Concrete Drive 4 RemovelReplace LIS $2,400.00 1 $2,400.00 Asphalt Drive 5 RemovelReplace Curb LF $25.00 155 $3,875.00 & Gutter 6 Type II Backfill CY $24.00 150 $3,600.00 7 Restoration of LIS $4,535.00 1 $4,535.00 Grass/Sob/Shrubbery 8 12" Under Drain LF $30.00. 55 $1,650.00 9 Interference Boxes EA $2,500.00 2 $5,000.00 10 Weir Drop Inlet EA $1,700.00 2 $3,400.00 11 Lump Sum LS $24,640 1 $24,640.00 Construction 12 Construct Manhole EA $2,000.00 2 $4,000.00 over existing line 13 Storm Manhole EA $1,800.00 1 $1,800.00 14 Remove 25' EA $3,500.00 1 $3,500.00 Oak Tree Change Order Amount $81,385.00 ][>age'2 of 2 I' .)j\ ~- .;"~I~ .. ." ~ 2335 AJomic Rd. · P.O. 80. 398 Beech Island. South Caro'ina 298'2 relepftone (803) 827.0136 Fax (80J) 827-1864 We are pleased to offer you the following quote on the above referenced project. 1) IS" perforated HOPE 500 If@ S 37.65 2) Silt fence/hay bales 500 If @ 4.00 3) Remove/replace 6" concrete drive .. LIS 4) Remove/replace asphalt drive US 5) Remove/replace curb & gutter 155 If @ 6) Type U backfill 150 cy @ 7) Restoration of grass/sod/shrubbery LIS 8) 12" under drain 55 If @ 9) Interference boxes 2 ea @ 10) Weir drop inlet 2 ea @ t t) Lump Sum ConstruCtion "",.... 12) COnstruction manhole over existing line 2 ea @ 13) Stonn manhole 1 ea @ . Toral December 15, 1999 Mr. Robert Clements Augusta Richmond County Re: Heard Ave. Dear Mr. Clements, Extra work if ordered by engineer. 1) Remove 25' oak ttee lea @ Notes: 1. No testing, fees, or permits. . 2. No mucking of unsuitable material. :. Please call if you have any questions. 25.00 24.00 $18,825.00 2,000.00 2,160.00 2,400.00 3,875.00 3,600.00 4,535.00 1,650.00 5,000.00 3,400.00 /J..f) C 24,640.00 K;, , a,ean.mr '1; () 00 -06 1.800.00 $77,885.00 ...-- 30.00 2500.00 1700.00 ........... 2000.00 1800.00 $3500.00 $ 3,500.00 /~ 7/9t . 1 8~3e.s:lJtJ Beam's Pavemept Maintenance Company Inc T'Cl -::::O......J 1...1,"=I.r:^t-f..J co 1..J..,~a I") <":!I 0 T I ;"'Or."'t"\C\ C~.~~ ~~~~,~?,~~