CHANGE ORDER
~}
NUMBER 1
DATE 06/10/99
PROJECT TITLE Crockett Rd. Water Improvements. (8" DIP)
ORIGINAL CONTRACT DATE 3/99 PROJECT NUMBER U-99-004
OWNER Augusta-Richmond County Commission-Council P,O, NUMBER P04224
CONTRACTOR Albert Enterprises, Inc.
The following change order is hereby made to the proposal for the above project:
8" 450 bend EA $250,00 0 $0,00 4 $1,000,00 $1,000,00
2 8" 900 bend EA $250,00 0 $0,00 4 $1,000.00 $1,000,00
3 8" Sleeve EA $250,00 0 $0,00 2 $500,00 $500,00
4 8" Gate Valve EA $450,00 ' 0 $0,00 $450,00 $450,00
5 1" Four Piece EA $350,00 0 $0,00 3 $350,00 $1050,00
Service - Long
Side
6 1" Four Piece EA $250,00 7 $3,150,00 12 $3,000,00 (-$150,00)
Service - Short
Side
7 Removal and LS $4,200,00 0 $0,00 1 $4,200,00 $4,200,00
Relocation of 6x6
TS&V
8 8" Concrete LS $4,670,00 0 $0,00 1 $4,670,00 $4,670,00
Patching & Asphalt
Overlay
9 8" DIP Water Line LF $15,00 1337 $20,055,00 1320 $19,800,00 (-$255,00)
10 Jack & Bore 16" LF $15,00 60 $900,00 40 $600,00 (-$300,00)
Steel Casing wI 8"
Water Main
Change ' $12,165.00
Order
Amount
TOTAL AMOUNT OF THIS CHANGE ORDER $ 12,165.00
The contract time will be increased/decreased by o Calendar days asa result of this change,
ORIGINAL CONTRACT AMOUNT $ 39,115.00
PREVIOUS CHANGE ORDER (INCREASEIDECREASE) $ 0.00
06/22/99
1
,
.,-.
r... "
\. 1~;;
THIS CHANGE ORDER (INCREASE/DECREASE)
$
12,165.00
TOTAL CONTRACT WITH CHANGE ORDER $ 51,280.00
************************************************************************
FUNDING SOURCE/ACCOUNT NUMBER
REQUESTED BY:
James W. Rush
ENGINEER
507043410-5425110
89900040-5425110
DATE: 06/10/99
SUBMITTED BY:
N. Max Hicks
DEP MENT HEAD
DATE: 06/10/99
FINANCE ENDORSEMENT:
LJ.Yv\
COMPTRO
DATE:
? /1/99
ER
APPROVED B
12.~
TRATOR
DATE: ,jgjc;q
DATE:
06/22/99
GKETT RD. WA TEK IMJ-iKUVt:Mt:N I ~
T
):'. e r" a" Water Une Extensions
< [ ,:
It~! Description t Unit I Qu.antjtv~. . Unit ~rice Total Amount
I
1 6 x 6 Tapping Sleeve and Valve EA 1 000.00 I .s', ~ CO. ~O
/ /Install 8" DIP (Class 350) Waterline /jlV .j \ <11 5'00 0,-7
2 LF +nr ~ D O.J'J: lJ
I 3 8 x 6 MJ Tee EA 2 ~ S't..1. 0 () j'OO.DO .'
4 Hydrant - Complete wI valve EA 2 I ~QO. 01) 3 tJoO.OO
5 Repair Asphalt Driveways EA 5 ; S" ()., OD /~ .J O. ()l)
'6 Select Backfill CY 1 I D. 06
t* .) S'~. OD /75"(
.,. 1" Four Piece SeNice-Short side EA ~ Q
I ~.
8 6 X a MJ Reducer EA. 1 .5' O. OD . ~ ~ (). ()(j
9 Jack and Bore 16" Steel Casing LF ..&G- . / .:;- Ia Do. uC;
with a" MJ Water Main 4-0 l rY&-:-c-o 900. 00
10 Lump Sum Construction: LS 1
to include grassing
---.
1! '-....,. / ,- f"'t)-"
'" I b L - \ -r"loo. "'/ ..5/ /. 7 .7, ,
Submitted by: N. -.e'rT'S l=" ,--tV,o\"'IJ\" 'j ....I::!.,lC. c
1 \0 S fYI'r'\<1 lC\kes -cY','v't' ,tY1 c\.}..b ne2. ~.A-. ..10 1CJ~
Date: -; I'~o. ~ 8
3'7 /5'0. DO
I
. ~"'Y <1-
(\"""I\~ ~ 0 tU '
. I I ~!\ 0 0
\ '-I \-1""""'. v _____
-S:'\-,;; 0, DO
/0
,1,'"
f.., .
cc: Mr. Max Hicks, Director
crockett schedule
11/13/98
.)fi:.':;.. ..'
fP-
-
'( :,!.< ..,.., ~.
..'
I
Albert's Enterprise's Inc. 6 -04 -99
110 Springlakes Drive
Martinez Ga. 30907
TO: Richmond County Utilities Dept.
Crockett Rd. Water ImprovementS
CHANGE ORDER:
1 8" 45 EA. 4 250.00 EA. 1,000.00
2 8" 90 EA. 4 . 250.00 EA. 1,000.00
3 8" Sleeve EA. 2 250.00 EA. 500.00
4 8" Gate valve EA. 1 450.00 EA. 450.00
5 1" Four Piece Service - Long Side 3 350,00 EA. 1,050.00
6 I" Four Piece Service- Short Side 5 250.00 EA. 1,250.00
7 Installed 6x6 Tapping Sleeve & Valve,
Revomal of6x6 Tapping Sleeve & Valve, . .
To New Location By Inspector. 4,200.00
8 8" Concrete Patching (appr. 4100)
I" Asphalt Overlay ( appro 12 x 100 ) Lump Sum'
18x 6 Aspahlt Raised Edge ( appro 100 !in. ft.) 4,670.00
TOTAL
14,120.00
.--.
~bert'~.erprise's In,'
:W~ "
en Grill eatary
--.