Loading...
HomeMy WebLinkAboutClearwell Braffling and Chemical Feed Replacement Project Augusta Richmond GA DOCUMENT NAME: (jm,we...\\'t)o.08\n~.ord ~'(Y\\~ teed \ep\o.~~ pffi~&\- DOcUMENTTYPE: ~~~ CJrcl~ YEAR: C\9 BOX NUMBER: 'D FILE NUMBER: \ ~ -0'05 NUMBER OF PAGES: ~ i' "9 " ' ~\ ,., \ 7 CHANGE ORDER C.O. NUMBER: BID NUMBER: DATE 11/16/99 PROJECT TITLE: Clearwell Baffling & Chemical Feed Replacement Project ORIGINAL CONTRACT DATE 06/99 PROJECT NUMBER (W-1) OWNER Augusta-Richmond County Commission-Council P,O, NUMBER P08635 CONTRACTOR AquaSouth Construction, Inc. Repair of high service pum ps 2 and 4 Clean m ed. Voltage MCC $11,495,00 2 3 4 R epa if 30~ line at post flash mixer $7,66500 Replace 30" line, clean and reuse fillings $38,618,00 14 Replace aill/alves 2-5 and 2.7. Place in 8x8 vaults $65,862,00 14 5 6 7 8 9 Install additional cribbing, tern p. rem ove duel bank, sub. 6' precast m snhole for vault. $12,487.00 Rem 0 II e and 0 is P 0 5 e 0 foil con I. soil. $1,79100 Replace 30~ street ell wllh 30. MJ ell $4,08400 Inspect. drain and dispose of gear oil in oillubricaled valves $2,484,00 Replace oil Valve 1-2 $28,689,00 1 4 New stuffing box for horizontal Mixer. Startup services from o US Filter, $4,931.30 1 1 Diver and crew standby at 20. junction box. $2,369,00 1 2 Replace leak.ing Valve 1-1 $31,355,00 14 1 3 Install duel manhole in Central Avenue $3,82500 $215,655.30 56 TOTAL AMOUNT OF THIS CHANGE ORDER $ 215,655.30 The contract time will be increased/decreased by 54 Calendar days as a result of this change. ORIGINAL CONTRACT AMOUNT $ 2,026,969.00 PREVIOUS CHANGE ORDER (I~JCRE/\SE!.'DECRE/'.SEl) $ 0.00 THIS CHANGE ORDER (INCREASE/D~CREJlSE:i) $ 215,655.30 TOTAL CONTRACT WITH CHANGE ORDER $ 2,242,624.00 **************************************************************************************************************** FUNDING SOURCE/ACCOUNT $ 215,655.30 from 508043410/5425110 NUMBER REQUESTED BY: James W, Rush DATE: 11/16/99 ENGINEER SUBMITTED BY: N. Max Hicks '1111 DATE: 11/17/99 DEPARTMENT HEAD Created on 11/16/99 12:37 PM ~ ~ C;' " ,', ,I~ , ~.': 0 . FINANCE ENDORSEMENT: RECOMMENDED BY: APPROVED BY: t t... ~~"'" COMPTRO R ~'K.~ o NISTRATOR -;- DATE: , ~I ~ fer;- DATE: \'1./1 ~ fq~ DATE: I !l(ler/ r9 71!1 Created on 11/16/99 12:37 PM ,;'-. -/' MEMORANDUM CH2MHILL W-l, Clearwell Baffling and Chemical Addition Project- Change Order No. 1 TO: Max Hicks/Augusta Utilities Dept. Robin McMillon/Augusta Utilities Dept. Jim Rush/Augusta Utilities Dept. Jeff Henderson/CH2M HILL COPIES: FROM: Bob Davis/CH2M HILL DATE: November 19, 1999 This is to attest that CH2M HILL has reviewed and agrees with the modifications to the Clearwell Baffling and Chemical Addition project proposed in Change Order No.1. From our perspective as Program Managers for the bond issue projects and Resident Observer on this project, we believe the modifications are necessary for the successful completion of the project and operation ofthe water treatment plant. AUGUSTAIW-1VCHANGE ORDER #1 MEMO,DOC ~' , ~. ". ;" ZE ~35 Telfair Street Ted W. Ellis. P,E., Chm. of Board, Emeritus (ii ,Augusta, Georgia 30901.2494 J. J. Tankersley, P.E., President E N GIN E E R S J. R. Armstrong, P.E., Vice. President ZIMMERMAN, EVANS AND LEOPOLD, INC. (706) 724-5627 Jorge E. Jimenez. P.E., Secretary J. T. Eubanks, P,E.. Treasurer C. D. Drown. P.E. November 23, 1999 Mr. Jim Rush Augusta Utilities Department 2760 Peach Orchard Rd. Augusta, GA 30906 Re: Highland WTP Change Order # 1 Dear Jim: Enclosed are 5 copies of Change Order # 1 signed by the Contractor and by us. We have negotiated with the Contractor on your behalf and reviewed each proposal. We recommend approval of the change order as submitted. A summazy of the change order items is attached and copies of each proposal and pertinent correspondence are included for reference. In summary, the items can be grouped as follows: 1. Repair 2 high service pump motors and clean electrical switchgear (POO) 2. Replace leaking fitting and 2 oil-lubricated valves and affected piping (p01C, POID.I, P01D.2, P03, P04) 3. Install additional bracing and temporarily relocate duct bank in order to install valve (P02) 4. Replace I additional oil-lubricated valve and inspect, drain, and dispose of gear oil (P06, P07, PlO) 5. Purchase part for horizontal mixer and provide startup services (P08) 6. Replace leaking valve (P11) 7. Install duct manhole in Central Avenue (PI2) Discussions of proposals are included in the correspondence that accompanies each proposal. Please call us if we can be of service. Sincerely, ZIMMERMAN, EVANS AND LEOPOLD, INC. ~~~ Kenneth E. Green, P.E. Enclosure /KEG 9810 Ill' Rush 08 CO I. doc