CHANGE ORDER
C.O. NUMBER:
BID NUMBER:
DATE 11/16/99
PROJECT TITLE: Clearwell Baffling & Chemical Feed Replacement Project
ORIGINAL CONTRACT DATE 06/99 PROJECT NUMBER (W-1)
OWNER Augusta-Richmond County Commission-Council P,O, NUMBER P08635
CONTRACTOR AquaSouth Construction, Inc.
Repair of high service pum ps 2 and 4 Clean m ed. Voltage
MCC
$11,495,00
2
3
4
R epa if 30~ line at post flash mixer
$7,66500
Replace 30" line, clean and reuse fillings
$38,618,00
14
Replace aill/alves 2-5 and 2.7. Place in 8x8 vaults
$65,862,00
14
5
6
7
8
9
Install additional cribbing, tern p. rem ove duel bank, sub. 6'
precast m snhole for vault.
$12,487.00
Rem 0 II e and 0 is P 0 5 e 0 foil con I. soil.
$1,79100
Replace 30~ street ell wllh 30. MJ ell
$4,08400
Inspect. drain and dispose of gear oil in oillubricaled valves
$2,484,00
Replace oil Valve 1-2
$28,689,00
1 4
New stuffing box for horizontal Mixer. Startup services from
o US Filter,
$4,931.30
1 1 Diver and crew standby at 20. junction box.
$2,369,00
1 2 Replace leak.ing Valve 1-1
$31,355,00
14
1 3 Install duel manhole in Central Avenue
$3,82500
$215,655.30
56
TOTAL AMOUNT OF THIS CHANGE ORDER $ 215,655.30
The contract time will be increased/decreased by 54 Calendar days as a result of this change.
ORIGINAL CONTRACT AMOUNT $ 2,026,969.00
PREVIOUS CHANGE ORDER (I~JCRE/\SE!.'DECRE/'.SEl) $ 0.00
THIS CHANGE ORDER (INCREASE/D~CREJlSE:i) $ 215,655.30
TOTAL CONTRACT WITH CHANGE ORDER $ 2,242,624.00
****************************************************************************************************************
FUNDING SOURCE/ACCOUNT $ 215,655.30 from 508043410/5425110
NUMBER
REQUESTED BY: James W, Rush DATE: 11/16/99
ENGINEER
SUBMITTED BY: N. Max Hicks '1111 DATE: 11/17/99
DEPARTMENT HEAD
Created on 11/16/99 12:37 PM
~ ~
C;' " ,',
,I~ ,
~.': 0 .
FINANCE
ENDORSEMENT:
RECOMMENDED BY:
APPROVED BY:
t t... ~~"'"
COMPTRO R
~'K.~
o NISTRATOR
-;-
DATE: , ~I ~ fer;-
DATE: \'1./1 ~ fq~
DATE: I !l(ler/ r9
71!1
Created on 11/16/99 12:37 PM
,;'-.
-/'
MEMORANDUM
CH2MHILL
W-l, Clearwell Baffling and Chemical Addition Project-
Change Order No. 1
TO:
Max Hicks/Augusta Utilities Dept.
Robin McMillon/Augusta Utilities Dept.
Jim Rush/Augusta Utilities Dept.
Jeff Henderson/CH2M HILL
COPIES:
FROM:
Bob Davis/CH2M HILL
DATE:
November 19, 1999
This is to attest that CH2M HILL has reviewed and agrees with the modifications to the Clearwell
Baffling and Chemical Addition project proposed in Change Order No.1. From our perspective as
Program Managers for the bond issue projects and Resident Observer on this project, we believe the
modifications are necessary for the successful completion of the project and operation ofthe water
treatment plant.
AUGUSTAIW-1VCHANGE ORDER #1 MEMO,DOC
~' , ~.
".
;" ZE ~35 Telfair Street
Ted W. Ellis. P,E., Chm. of Board, Emeritus (ii ,Augusta, Georgia 30901.2494
J. J. Tankersley, P.E., President E N GIN E E R S
J. R. Armstrong, P.E., Vice. President
ZIMMERMAN, EVANS AND LEOPOLD, INC.
(706) 724-5627
Jorge E. Jimenez. P.E., Secretary
J. T. Eubanks, P,E.. Treasurer
C. D. Drown. P.E.
November 23, 1999
Mr. Jim Rush
Augusta Utilities Department
2760 Peach Orchard Rd.
Augusta, GA 30906
Re: Highland WTP Change Order # 1
Dear Jim:
Enclosed are 5 copies of Change Order # 1 signed by the Contractor and by us. We have negotiated
with the Contractor on your behalf and reviewed each proposal. We recommend approval of the
change order as submitted. A summazy of the change order items is attached and copies of each
proposal and pertinent correspondence are included for reference. In summary, the items can be
grouped as follows:
1. Repair 2 high service pump motors and clean electrical switchgear (POO)
2. Replace leaking fitting and 2 oil-lubricated valves and affected piping (p01C, POID.I, P01D.2,
P03, P04)
3. Install additional bracing and temporarily relocate duct bank in order to install valve (P02)
4. Replace I additional oil-lubricated valve and inspect, drain, and dispose of gear oil (P06, P07,
PlO)
5. Purchase part for horizontal mixer and provide startup services (P08)
6. Replace leaking valve (P11)
7. Install duct manhole in Central Avenue (PI2)
Discussions of proposals are included in the correspondence that accompanies each proposal. Please
call us if we can be of service.
Sincerely,
ZIMMERMAN, EVANS AND LEOPOLD, INC.
~~~
Kenneth E. Green, P.E.
Enclosure
/KEG
9810 Ill' Rush 08 CO I. doc