CHANGE ORDER
CO NUJ\1BER 6
BID ITEM
DATE 12/07/2000
PROJECT TITLE
Clearwell Baffling & Chemical Feed Replacement Project
ORIGINAL CONTRACT DATE 6/1999
PROJECT NUMBER W-1
OWNER AUGUSTA COMMISSION
PO NUMBER
P08635
The following change order is hereby made to the proposal for the above project:
PAYEE
Aqua South
Construction,Inc.
TOTAL AMOUNT OF THIS CHANGE ORDER
The contract time will be INCREASED by Q calendar days as a result of this change.
$
51,055,29
ORIGINAL CONTRACT COST $ 1,207,688.00
PREVIOUS CHANGE ORDER (INCREASE) $ ~ 3~J. 33~.gl
THIS CHANGE ORDER (INCREASE) $ 51,055.29
TOTAL CONTRACT WITH CHANGE ORDER $ .1,703,7~J 1Q 10
'I 1.;;)0, 0''1 '?
FUNDING NUJ\1BER/ ACCOUNT NUJ\1BER 508043410 5425110
REQUESTED BY:
~~
NGI EER
II
SUB11ITTED BY:
FINANCE ENDORSEMENT:
RECOMlvfENDED BY:
APPROVED BY:
DATE: IL/tn
DATE: / t/(4/(JO
I~~/ ,4( 00
DATE: J t..-/ 1 ;-1 t.e>
DATE: / )j; /
DATE: '/0'/
\
~qlj.@~~.!.!;I~
Harold Jf Walker. President
. Robert K. Beck. Vice President Operations
Rhonda Johnson, Administrative Assistant
William C. Dobbing, Project Manager
Wade D. Woodring. Project Manager
Arthur D, Harper, Project Manager
J. Randall Myers, General Superintendent
December 4, 2000
(C(Q)\P'Yr
ZEL ENGINEERS, INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 30901
, .
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES, &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
" .,:
Dear Mr. Drown,
Per your request, we offer to expose the 30" Finish Water Line at vicinity of Valve
#5-3 to determine the feasibility of installing a single Line Stop Valve. Our scope
and price is detailed below for your review.
SCOPE:
Traffic Control (2 weeks)
Remove Paving & Curb
Excavate Trench, Obtain Pipe 0.0.
Backfill Trench w/flowable fill
Temporary asphalt patch
GRAND TOTAL
$ 1,695.00
645.00
5,756.00- .
2,784.00
745.00
$ 11,625.00
NOTE: This scope includes a temporary 2" asphalt overlay over flowable fill.
Permanent street repair with curb to be completed once decision is
made concerning valve installation.
Please address any concerns with the undersigned. Thank you for this
opportunity,
Sincerely,
aquaSouth CONSTRUCTION, INC.
I>
P,O. Box 747. 124 Eason Drive. Pooler, Georgia 31322
Tel. (912) 965-1250. Fax (912) 965-1044
Email: H20south@bellsouth.net.Augusta.GA (706) 650-0124
high_lIB
.aq!.@~~~~!!!
. Harold Jl, Walker. President
Rober! K, Beck, Vice President Operations
Rhonda Johnson, Administrative Assistant
William C. Dobbing, Project Manager
Wade D. Woodring, Project Manager
Arthur D. Harper, Project Manager
J. Randall Myers, General Superintendent
November 30, 2000
(C(Q)~V
ZEL ENGINEERS, INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 30901
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING, '.,!/\LVES, Gt
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
Dear Mr. Drown,
Attached is the summary of work performed from Monday, November 6, 2000
thru Monday, November 20, 2000. Also attached are the equipment invoices for
the 8" Diesel Pump and temporary electrical service.
Please address any concerns with the undersigned. Thank you for this
opportunity.
Sincerely,
aquaSouth CONSTRUCTION, INC.
cf
Bob Davis, CH2MHILL
Rob Lorenz, CH2MHILL
I>
P.O. Box 747 . 124 Eason Drive' Pooler, Georgia 31322
Tel. (912) 965-1250 . Fax (912) 965-1044
Email: H20south@bcllsouth.net.Augusta.GA (706) 650-0124
IlIgll_l1fj
~~I~
~==l
~~
"
~
TIME AND MATERIALS SUMMARY for C'WELL #5
NOV81nber 30, 2000
J['i!~; - :--::=---=-
i~JI",ls. elc
LABOR Labore 1~~R q
DATE SUj!'t F'man
MON, 10 8 0 Set up, Pump, L
11/6/00
TUES, ----
8 8 48 Clean Clearwwe
1117/00
.,
WED, 8 8 72 Clean Clearwell
11/8/00
'-'
THUR, .~-_.-
8 8 49 Clean Clearwell
11/9/00
FRI, -------.-
12 9 80 Clean Clearwell
11/10100
, ..
SAT, 4.5 4,5 0 Fuel & service r..l
11/11/00
SUN. -----
4 4 0 Fuel & service p,
11/12/00
MON. ~-----
5 5 24 Clean Clearweil
11/13/00
.
THUR, " -
7 7 49.5 Remove water &
11/16/00
,.
FRI, 7 7 28 Remuve water &
11/17/00
SAT, .-----
4 4 16 Remove water &
11/18/00 Fuel & service P
SUN, 4.5 4.5 0 Fuel & service F>
11/19/00
.,
MON, 7,5 7,5 45 Remove water [~
11/20/00
TOTAL 89,5 75/9.5 411.5
Superintendent
Foreman, regular
Foreman, overtime
Laborer
89.5 hours @ $ 52.00 =
75.0 hours @ $ 32.00 =
9.5 hours @ $ 48.00 =
411.5 hours @ $ 26.00 =
TOTAL
4,654.00
2,400,00
456,00
'10,699,00
$ 18,209.00
II
UlIlpS
-'rnps
n___.. _ ____
dry CleCJrwell
dry CleCJlwell
dry Clearwell;
.t!1!~~_______
umps
dry Clearv\l'I~II
IlIg".1IG
;,
TIME AND MATERIALS SUMMARY for C'WELL #5(cont.) N'JIJember 30, 00
MA TERIALS
FUEL
11/6/00
11/11/00
11/12/00
11/18/00
11/19/00
Lube @ NAPA
Diesel @ Speedway
Diesel @ Speedway
Diesel @ Speedway
Diesel @ Speedway
Subtotal
10%
TOTAL
EQUIPMENT
(C(Q)~V
'$ 15.69
209.14
59.55
112.89
179.41
$ 576.68
57.67
$ 634.35
8" Pump w/hose & fittings 11/6/00 thru 11/12/00
8" Pump w/hose & fittings 11/13/00 thru 11/19/00
8" Pump w/hose & fittings 11/20/00 thru 11/26/00
Subtotal
10%
TOTAL
SUBCONTRACTOR
$ 1,512.65
'1,064.65
'1,064.65
$ 3,641.95
364.2(1
--_.
$ 4,006.15
Installation of Temporary Electrical Service for Ventilation @ Cle2PNell #5
Completed 11/17/00 by ALRICH ELECTRIC CONTRACTING CO,
Labor
Materials w/tax
Subtotal
10%
TOTAL
$ 459.26
526.19
985.45
98.54
$ 1,083.99
SUMMARY OF EXPENSES
LABOR
MATERIALS
EQUIPMENT
SUBCONTRACTOR
GRAND TOTAL
$ 18,209.00
634.35
4,006:15
1.083.99
$ 23,993.49
lllqh_ 115
~ rllll'lIW'iilil~ ",.-,..;,,"",
1I~1 Sys~e...s 6~\0 "I{-)IN :3TF~EET
· '. BARDENDALE, AL 35071
. l PHOI"E: ( ....;() c:, ) 6ClE.l-17"":'":!' '::'A X ( "":'() "i ) I ()'7l.-1 .., "":'c;,
National Equipment Services 'I . , ." - ~ - .:"-' r. .:.. - ~ L1 _ c_ .. I .". .
2t00 Canton Road
Marietta, GA 30066
www.pum8r~ntal.com
a.:e
1000265
GUULU
· '&Associates
REMIT TO:
P.O. Box 11C,)7 .
Marietta, GA jOOGl-116l
I N 1..,'<......0 .I Lt..: (Q) rPY
~ '( t,,-:,
'-"
. '" :"'~>"":-;-..... ~' .-
. !VO/l ':,' , .~ ..'...: ' Slu p 1 ();
1::>). ..' . .... ~l _.)
.'0 " .:1 "111
.,.~. .:JOO
Invoicc-? No.
Bill To:
:.:;. :::; :::; 1 b (> 3
11--20-00
.......... ~ '.......
'-:.~---
~.
AQUASOU1H CONS1'RUCTIDN
CEI\ITI~(41_ (.\\,1[::
AUGUST(.,
AQUASOUTH CONSTRUCTION INC.
F'.O. BOX 747
POOLER GA 31322
............
Phone 912-965-1250
Purchase Order STE\,IE HILL
Te,...ms: NET .'10
Rental Period: 11-20-00 thru 11-26-00
:;:;1 ~:;mn;
6
UNIT/ITEM
UUANTITY
I::'R ICE / I::;;f~ TE
nl'1CJUNT
---------.--------.---------.--.------.-----.------____._._._..N.__......_._.M.....____.___._..__....__....._......__.______..__._.__.
G0044 Model AP200-60
Serial 1\10. 892
8 PUMP TRASH DSL VAC
METER in: 972.0 out:
c;'9~:.. 00 ('Jeek.
972.0 net: .0
c,'(/:'5.00
6SH10B-R
bIN X 10FT BLACK SUCTION
1.
No Uli::\rge
8S-R
8IN STRAINEr~
1
No C;..Oclt-ge
6DH50R-R
bIN X 50FT DISCHARGE HOSE
:"2
~~o Charge
8X6RED-R
BIN TO 6IN BAUER REDUCER
1
No CI'large
6X8II\1C-R
6" TO 8" BAUER INCREASER
:?
ND Charge
6SH10B-I=<
6IN X 10FT BLACK SUCTION
4
No CI-.,a'--gE'
8SH10B-R
8IN X 10FT BLACK SUCTION
1
No Chc\l'~ge
ifJ
-- CONTINUED ON NEXT PAGE
RENTALS ARE PAYABLE IN ADVANCE.
PAYMENT TERMS: Due upon receipt of Invoice. A service charge of 1.5% per month 1180/. annuml will be applied for any dclinqucnt amount.
~ "1Ull1I..PIj~I.'''.' .,."",
1I~,Sys"e"'S1711-D DEAN Fm~EST liOAD
. .. SAVANNAH, OA 31408
Na'tional Equipment Servicef'HONE ( c; 12) 964-2723 F(..~ X ( 912 ) 964.--2800
~OO Canton Road
Marietta, GA 30066
www.pum8~er!al.com
Bill To:
1000265
I ~ V 0.1 C E [;(Q)if2J)f
. ;, .~--.
'~\L'",,:~: 0 0
.....I\....~ ' .., "-"
~~. . I~ ....-....l~--...
NOli ':'1 )' . ,1,:...~__>
J-\ " L '.
I..) 1:.. . v <'vJO
-::::--..,
I NC . <::..:.:<-.
Ai __~U'ULU
''-J &Associates
REMIT TO:
P.O. Box 116'1ag8: 2
Marietta, GA 30061-1167
In vo 1. U~ No.
11-20-0q
:S:3:~:160:3
Ship To:
AQUASOUTH CONSTRUCTION
P.O. BOX 747
POOLER GA 31322
AQUABOUTH CONSTRUCTION
CENTI~("L (~'v'E
AUGUUTA
Phone 912-965-1250
Purchase Order STEVE HILL
Terms: NET"10
Rental Period: 11-20-00 thru 11-26-00
~:; J. Sinn ~
J
C)
UNIT/ITEM
QUnNTITY
F'\::;: I CE / F~(.)TE
(.\I'10UNT
-- - - --- - - - - - - - -- - - - - -- - -- _ __~.._ _ ___. _N' _ _ _ _ _ _ M'~ __ .__ _._ .._ ~ _~ MM' MM' _. _ _ . _ _.. _ _.. ,,_.._ ~ _...._ _ __. _ _ _.. _. .... MM'_
Tota 1 r~en ti:\ 1 5
(:,'<]5.00
69. 6~:i
'Ta}.{
Due
1, (/(.A. 65
PAYMENT TERMS: Due upon receipt of Invoice. A len/Ice charge of 1.5". per month \18% annuml will be applied for any delinquent al1lount.
- .
tnu, ~"~~:'D' ~;:I~y"~ '::Crr.~E~S'-~ 1__~~~('"1D
liS SAWiNNAI.1 ~ Gf-l ::':1.1.1.08
.Ad:;.. ill:f:i:....1.2) 964-:::72::::; F()X (91:2) 96'1.-'2800
I N V 0 I c:; E
...:000265
,(C(Q)f2~TD'
Il'~~ ULJLU
'U &Associates
REMIT TO: F' a ';1 E' : 1
P.O. Box 1167
Marietta, GA; 30061 i:1161.:J .
~~; ~~; :~:. :1. L, (l ::~
JASOUTH CONSTRUCTION INC.
'.0. BOX 747
POOLER GA 31322
{)[iU?ihDUTH CCiNFHFiUCT I UI\l
Cr:::I\lTI::;;(~L ?~''';L:
(":JLJGUE;T ()
b J SinH) :
c'
Phone 912-965-1250
Purchase Order STEVE HILL
UN I T / I TEI'1
QUANTITY
F'Fi I CE /1=((iTE::
AI"liJUNT
-----------.----------------------_.____._.__M_____.________.___N..__..._..___..~.__.__.._...___..._._....._...__....________.._.
(.;9:':i . 00 l\lr'E~ k
972.0 net: .0
Clf;- ~l . ()()
~~(1 C ha rg e
r.~C) Cllaroe
ND Ch.::\r.r;Je
No C1..'ElI"'ge
Nu Charge
No Ch;;\r~,le
No Chan;;)e
RENTALS ARE PA YABLE IN ADVANCE.
PAYMENT TERMS: Due upon receipt of Invoke. A I<<Yk:e charge of 1.5'" per month 110". annuml will be applied for IIny delinquent amount.
Terms: NET., 10
Rental Period: 11-13-00 thru 11-19-00
G0044 Model AP200-60
Ber ia 1 NrJ. B92
8 PUMP TRASH DSL VAC
METER in: 972.0 out:
6SHlOB-R
6IN X 10FT BLACK SUCTION
1
8S-R
BIN STFiAINER
1.
6DH50R-R
bIN X 50FT DISCHARGE HOSE
r;
..;;,
8X6RED'-R
BIN TO. bIN BAUER REDUCER
1.
bXBINC-R
6" TO B" B~)UER I NCFi:EASER
..,
.:.
6SHI0B-R
bIN X 10FT BLACK SUCTION
4
BSHI0B-R
BIN X 10FT BLACK SUCTION
1
-- CONTINUED ON NEXT PAGE --
__. " IJUUDlnil~.fm ',L..,." . I ,.-,:~,. .. "":':: ., -~:.,_< ' .,'~.,.' .
~ ~711-D D~AN \.UkEbT kOAD
" . $ys(erns SAVANNAH~ G?) :~;lil.08
~. ,--. .... ~t2) 964-27Z5 FAX (912) ?64..<2rJOO
-
National Equipment Services
2200 Canton Road
. ~~rietta. ~ ~OO66
www.Dum~i.enlal.com
Bill To:
1000265
.....
.t\-~;,~ 0 I f~ E
'-!.[" ,
'--- ';:., '-..
AI. ~ "",
.~')-, 'rO/~ .:. 1,<
,r- I} , . V 'J " .
'. . ....~ ..... "V 0 t
~ ill... '..... ~
:::--"" . "". <'OJ"
~, . ", c/O
.........,... ..,
. '~VVLU
.(J- &Associates
REMIT TO: F' a. (J E' : :;~
P.O. Box 1167
Marie<<a. GA130061J:-'1161J.
11-15-00
',"',
"-" -
'"
...
(Q)~~o,
:~'::3:':::1602
AQUA SOUTH CONSTRUCTION INC.
P.O. BOX 747
POOLER GA 31322
AQUASOUTH CONSTRUCTION
CENT}~:(:)I._ {~\lL=:
(~UGUF;T{")
Phone 912-965-1250
Purchase Order STEVE HILL
Terms: NET:.10
FO:ent.al Periocl: 11-1:;-00 thru 1.1...1(:;'...00
L:], s:\nin ;
(.:)
UN I T / I TEI'1
(.llJ(4~H I TV
Pli I CF: I F,() .rE
(~IVIOUNT
---------------------____________._.__.H_____..._____._._____..__.N__..__._..._...__._....._____....___._~...___._....________
Totallif.'!ntals
Tal':
~1?5.00
69.65
Due
.1,064.65
RENTALS ARE PAYABLE IN ADVANCE..
PAYMENT TERMS: Due upon rec:elpt of invoke. A service ~ge of 1.5'" per ~th 118% annum) will be applied for eny delinquent enlOUIIL
~ Ir'~WIII"Iiii"II" ,. ..J , .",,,
_~ Sys'te...s 650 MAIN ElTr:':EET
. GAROENDALE. AL 35071
Ncnionai Equipment ServicefHONE (205) 608-1723' FAX (20::1) 608--172':'-
~OO Canton Road
Marietta, GA 30066
www.pu"W~er~al.com
l
I
fl ~VULU
. '-If &Associates
REMIT TO:
P.O. Box 1161::\~.1f.?: 1
Marietta, GA 30061-1167
Invoice No.
11-10-0Q
:.::; :~; :.:::16 0 1
Bill To: 1000265
AQUA SOUTH CONSTRUCTION INC.
P.O. BOX 747
POOLER GA 31322
AQUASOUTH CONSTRUCTION
CENTF\AL (~V[:~
AUC)U~3TA
Phone 912-965-1250
Purchase Order STEVE HILL
, .
Terms: NET'10
Rental Period: 11-06-00 thru 11-12-00
~; 1 smn :
6
UNIT/ITEM
QUANTITY
F'r~ I CE / Ii?) TI:::
{)1'10UNT
G004tt
Serial No.
8 PUMF' TRASH
METER in:
Model AP200-60
892
DSL VAC
972.0 out:
Q95.00
WE~€0k
.0
99:'.':'.00
972.0 net:
6SHI0B-R
6IN X 10FT BLACK SUCTION
1
No Chal~ge
8S-R
BIN STRAINER
1
No Char-ge
6DH50R-R
6IN X 50FT DISCHARGE HOSE
,.,
.:..
No Chal~ge
8X6RED-fi
BIN TO 6IN BAUER REDUCER
1
No Cllarge
6X8INC-R
6" TO 8" BAUER INCREASER
,.,
.:..
No C hCl. rg E'!
6SHI0B-R
6IN X 10FT BLACK SUCTION
4
No Chat-ge
8SHI0B-R
8IN X 10FT BLACK SUCTION
1
No Charige
DEL&PICKUp MILE FLAT
.....
..::.
200.00 Each
400.00
ENV I RONI"IENT (")L FEE l 20 . OU F: i.1 C /1
CONTINUED ON NEXT PAGE
20 .'00
~LS ARE PA YABLE IN ADVANCE.
PAYMENT TERMS: Due up<<! receipt of Invoice, A.wvlce~... of 1.6% per monlh 118% annuml will be appllod for any "<lliI"""",1 .mounl.
~ ""II"iIPlll& 'H.._I ,1..'111,'.1\_ ,.:'_.'IL...I".'
1I~,5ys_eDlS17.11-D DEAN For':;;EST ROAD
. . SAVANNAH~ GA 31408
Nai:ional Equipment Servicef'HONE (912) 964-2723 FAX (912) 96"+-::~800
~90 Canton Road
Marietta, GA 30066
www.pu"W1~~al.com
I N V 0 ICE
'~UUL.u
.l:j- &Associates
REMIT TO:
P..O. Box 11613t;JE':: 2
Marietta, GA 30061-1167
Invoice No.
Bill To: 1000265
(C~~~
3::::=:1 (;O J
11-10-00
AQUASOUTH CONSTRUCTION INC.
P.O. BOX 747
POOLER GA 31322
AQUASOUTH CONSTRUCTION
CENTF~Al_ AVE::
AUGUC)T{)
Phone 912-965-1250
Purchase Order STEVE HILL
Terms: NET'10
Rental Period: 11-06-00 thru 11-12-00
Slsmn:
6
UNIT/ITEM
QUANTITY
F'I~ 1 CE / r';;(..')TE
AI"''IO U ~H
--------------------------------------____..___.__......__..N._____________._..._____________.
Tota 1 lien t.31~:;
Total Misc. Charges
Ta:.,
'7eI5.00
420.00
97.65
Due
1~512.65
RENTALS A E PA Y ABLE IIV ADV AIVCE.
PAYMEfolT TEA : Due upon receipt of invoice. A aervIce charge of 1.5% per month 118% annum) will be awlled 'or lIny dllliurl""nt "",ount.
. . ..'
~...~. -. . .
.' .'. :'./\ '.', "r'~- '~~'--:".-:-;,!.:~,:;:..,~~~.I;:,:;::~~i~;~~';l~:,~:.:-,' :l:;':::-;_,.~,...: :.~l:.' ~;._... --,.:-...-..,,-... ._--~~~- ~~-:-::'..:~:'::~.:'-_:'~~:~~:', ;~::"I;"~~':L :.~::.
~ /:I. '. .. .', . '11: .,..MJMBEF'l '." .'f.
Aldch Electric Contracting Co., Inc.
ELEcmlCAL CONTRACTORS
P.O. 1I0X 99 . 2110 \' ANDIVER ROAD
AUGlrSTA. GEORGIA 311'JlJ3
PHONE (71)(,) 73<io<$o102
::1126
. .. .
cc
~QIJASlJlml CONS'i RUCTI ON CO.
P.O. BOX 747
PClOLER, GA.
TENP POWEI<
~ 1327.
GEORGIA HHiC
TE:t1P IHRHIO - ctEARUELL 13 a AlJO\J!Hf) t.JATE:R WORKS
COliPl.ETE 11/37100
MATERIAL INCLUnING TAX
4~9.26
LAROR
S~6, 19
TUTAI. I\HOJ~T IJUE
9R~).4~
?r:l/Tn . ,-I :-!n '.<:":',0::" on.l
.-., T ....1 I ",., I 1'-, T ~ 'if r
,.......,. . ,-,,-, ,-"-,,....., " " I
, aqg!l~.!t.~
Harold J, Walker, President
Robert K. Beck, Vice President Operations
Rhonda Johnson, Administrative Assistant
William C. Dobbing, Project Manager
Wade D. Woodring, Project Manager
Arthur D. Harper, Projet:l Manager
J. Randall Myers, General Superintendent
December 4, 2000
, ~(Q)[PY
ZEL ENGINEERS, INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 30901
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES, &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
Dear Mr. Drown,
This represents documentation for work completed on November 21,2000
concerning repairing existing floor cracks in Clearwell #5. By wheel
measurement the total lineal feet repaired is 3,216 feet.
Per our proposal dated November 13, 2000 at a unit pricing of $ 4.80 per lineal
foot this yields a total sum of $ 15,436.80. We request this amount be
processed to be available for next month's billing (i.e., December pay cycle),
Please address any concerns with the undersigned. Thank you for this
opportunity.
Sincerely,
aquaSouth CONSTRUCTION, INC.
cf
Bob Davis, CH2MHILL
Rob Lorenz, CH2MHILL
I>
P,O. Box 747 . 124 Eason Drive. Pooler, Georgia 31322
Tel. (912) 965-1250. Fax (912) 965-1044
Email: H20south@bellsouth.net.Augusta.GA (706) 650-0124
hlgh_117
" ~,
2: E ~35 Telfair Street
T dWEll' P E Ch f B d Em . Augusta, Georgia 30901-2494
Ie . 15,.., m.O oar, entus
Joseph J, Tankersley, P,E" President ~ E N GIN E E R S
Jorge E. Jimenez, P.E., Vice-President
Charles D. Drown, P,E" Treasurer ZIMMERMAN, EVANS AND LEOPOLD, INC.
(706) 724-5627
'\"\"\'.ZELENGlNEERS.COM
Kenneth E, Green, P.E" Secretary
John R, Evans, P,E.
R. Nelson Williams, P.E,
John R, Armstrong, P.E., Retired
November 14, 2000
9810-02
Mr. Bob Davis
CH2M Hill
4824 Parkway Plaza Blvd.
Suite 200
Charlotte, NC 28217
~@@@DWl@~J
MOV J Jl am
II
J "./
Dear Bob:
We have received the price proposals from Aqua South and are forwarding them attached. Our
recommendations are as follows:
1. Repair of existing cracks in concrete floor of c1earwell #5 - $4.80ILF - We
recommend that this proposal be accepted. These cracks were originally repaired
approximately 17 years ago and need to be repaired again. Leakage in the clearwell
could affect the quality of the water, and further leakage around the bases of the
columns could lead to further settlement, increased leakage and eventually could result
in a progressive failure. The price per lineal foot offered amounts to approximately
$15,400, but I see no other safe alternative. Rob has informed the contractor that
keeping the floor dry is at his expense, so we must act as soon as possible.
2. Rates for cleaning c1earwell #5. We feel that these rates are reasonable and
recommend acceptance. (See breakout.)
3. Deduct for valve #5-3 - <$13,375.19> - We recommend that approval be held in
abeyance until we determine whether or not exercising the valve results in any
improvement.
4. Clearwell crack repair (Crash Site) - $1881.00 - Recommend approval.
5. Final Costs associated with diver on valve #5-3 - $1590.00 - Recommend payment.
Please let us know what the disposition of these items is in order for us to inform the contractor.
The filling of c1earwell #5 will affect the continuation of his work, the city also may have to pay
for additional dewatering of the clearwell if delays are encountered.
Very Truly Yours,
ZIMMERMAN, EVANS AND LEOPOLD, INC.
~~
C. D. Drown, P.E.
or ('0 ff2.ocGl:'-:P
#- 11/16/00
CDD:lmt
Enclosures
9810-02 cracks etc.doc
; I
Hll1olci), Wolker. "'eAide... . .
I(Mc:n K. KCClt. Vi,c rrcsHJenl Oper,u+n.,
Rhnnda In''n~ln. Ad,"in;"nalive ^IAI~~'"
William C, J)nlltlin.. Pr(ljccl Mnlla~er: '
WlU.lc I), Wondrins, P",;c" MnnDllcr 'I'
Arthur 0, Hal'!>CT. "r~1<<1 Mllnnscr :
J. R;mU;aJ1 Mye~, Gcntrlll SuptTinlClldd/ll
I
I:
, I
I
, I
"
,I
II
Ij
II
'11~1 '-l_>cOOU .J'=,: :.1 ;:-;:'-0"': FH:
,
:< 1c '?.;: 1 CI-l";
iCJ: :
;-0';
~E~ ~~-:--8':.
'aqg!!.p.!~b
November 13, 2000
t~[PY
ZEL ENGINEERS, INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 30901
Re; WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES, &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
Dear Mr. Drown,
The repair of existing cracks in the floor of Clearwell #5 can be repaired for a unit
pricing of $ 4.80 per lineal foot using the application procedure and detail
attached. This price rate is for application only and does not indude any effort
towards dewatering, etc. Based on our initial inspection subsequent to
completing the Clearwell Cleanup we estimate there to be approximately 3200
lineal feet of random cracking.
Please note the attached repair detail and procedure for your review. A speedy
decision concerning this work would be most appreciated. Thank you for your
assistance.
Sincerely,
aquaSouth CONSTRUCTION. INC,
.
P,O, Box 747 . 124 Eason Drive. Pooler. Geoq;ia J J 322
Tel. (91~) 965-1250. F:u (912) 965.J(J44
Email: H20~OUlh~bcIlS\IUlh.DCI.AugUSI3.GA (706) 6S0-0 124
~ogII_1I4
;:- . ,j02 :)0::-:
. ,
il
Ii
II
, I
,
,
! I
Ii
I'
I
II
il
(f
"
~ I
II
./
I,
I
"
,
~ j
,
, I
Ii
f
i:
: ~1_11 ,- ~....., - Co UUU .1'-: . c r;...1 .If 1 ; ,... ......
'\
~t~~~-~
.,L.P..
....~ oJ: ........-"C
-:.c.fan..I11.
~~~".,(L',:.t
~f~6;~
;11l'l2:t.;.~
q~~~~
..~?~~~~
~!'In~;
:~~;.:t~
';l
.,
~
l
"Z~
-ilc'-lb:.1U-.....
:: ,,1'7, ,. - - "-,'.....
-.. ,aJ , -JIJ...
I
CtzACk.
~
(<€PAIR J)E-rAIL. (c~IPY
~ I~ ~ 4"d,AC.
fb, E.S"" E .e
~
t ~ (p 01 tN/or APPc.,CIl1UJ
~ uee-r~E R.u&6!e
FtArJ ~
~ ~,
-:; ;/71/$JB'!>rfl.A7tr' 1/1 )jj
Pf!.oF, '-E 0ew"
~
~ @
-
PPoClE:W~E · -.
/. P(2.EfAi!E. ~8s-r~r~ ('.E. t!At)r~IE,I-~ A!flir~M. er~)
2.. 1tPPt-( p/<,I'/lE(<. D=- :5.3Zo )~0 ·
3. Af'PL.1 IJRE'"fHflnJe {lASE CdiTt7;") /.../fI-~: z
~. &y,&t;6 ~Er"fPRC!'Bnsvr-rAr'E /rl7O .~~ ~ :
CEtrrEICEfJ DIE/< CleACIC~ q,(,B ~ <2J !
5. .APPL.'j ,vRErrlf:lrlE lOP Cdrr (I;;') LIYI-t..cV-
. ~~~.,~ I
rI01';;06-2000 15:(jCl FPQr'1:FH:.
':;l1296S 1 O~~
TO: 1
706 724 578~ P.Ou2 003
,
H.>rnlu 'J. Wldbr. t>rci~' II
Rnbert K, U~It. Vice rrc.oi.scnl Operft .+n.
Rhonda Joholson. ,^","unimnriYC MII",nl
Wilham r.. Dobhlni:, PmJOCI MaRJierl \
Wade D. WuOOrin/:, Pl1'jc~1 ManaKer . I
...nh.., p. I-{~,rcr. !'roject M:\n"ltcr 1 l
J. RlInll~1I M)'e~. GCl1CrDI Supcrin'cn<j~1I
November 6, 2000
i I
ZEL ENGINEERS, INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta. Georgia 30901
, ,
I,
Re:
WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES, &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
.1
I,
II
\ I
I'
.'
I
, I
, ,
II
.,
I
I
I:
Deaf Mr. Drown.
A summary of our discussion follows concerning the Project Coordination
Meeting on Thursday November 2, 2000,
PROJECT COORDINATION MEETiNG
THVRSDA Y NOVEMBER 2, 2000
II
1
II
II
, ,
1. VAlVE IS-3 By mutual decision (i.e., ZEL & AVO). the replacement
ot Valve #5-3 wiD nor be completed. The Augusta UtilitieS Department
will exerase the Valve #5-3 once Clearwell #5 is complete to assess its
performance,
; I
'1
II
~ I
I
2. CLEARWELL .5 aquaSouth wiJI commence wont on cleanup or
Clearwell is on Monday, November 6.2000 on a time and materials
basis. Tentative milestones were set to finish lhe Clearwell including
hatch repair by Friday, November 10. 2000, Disinfection would be
complete by Wednesday. November 15, 2000 with the structure returning
to service. Joint and cractc repairs an!! to be complete per the design
approved under the base contract (i.e.. GACO-FLEX product) as directed
by the RPR.
3. CLEARWfLL '1 A target date 01 Monday. November 7.2000 was
agreed on by all parties to have Clearwell #1 ready for work. This allows
eleven days to fjJJ Clearwell #5 and empty ClealweU '1, aquaSoulh
estimates 4-6 weeks to complete the rehabililation In Cleerwel/ #1.
4. ": GORDON INTERCONNECTION LINE This worl( is wailing on
coun~1 approval. Per CH2MHllL. it is expected to be approved by
counCil sometime early in December.
I
I,
, '
I
'I
I'
"
II
,/
, I
I
.
P.O. HOll 747. 124 E.uon Dnvc. Pooler. Gc:nr!tiu 3JJ22
Tel. (912) 965-1250' Fu (912) 965.1044
Em.:liL H~O)l'Ulb@belll(lULh.ncl . Au~um., GA (706) 650-0124
Povh_113
~
~
tIO"i,I)b-2000 15: 00 FROt'1: FH;'
t
'0112%:' 104-1
TO: i ~OG ~24 S~89
ZEL ENGINEERS, INC.
November 6,2000
t~~~
PERSONS IN ATTENDANCE
Brantley KugJar. AUD
Brian Richards. AUD
Leon Burkhalter, AUD
Bud Hamlln. AUO
Dave Drown, ZEL Engineers
ROb Lorentz, CH2MHILL
Bob Davis. CH2MHILL
Wade Woodring, aQuaSouth
Robert Beck. aquaSouth
Harold Walker, aquaSouth
Work completed in Clearwell #5 to be invoiced on a time, material, and
equipment rate using the following schedule. Hours over 40 per week to be
billed with a 1.5 factor. Material and equipment to be billed at 10% over cost.
Labor Rates for cleanup in Clearwell #5
Superintendent
Labor Foreman
Laborer
$ 52.00
$ 32.00
$ 28,00
Please review and address any concerns to undersigned,
Sincerely,
aquaSouth CONSTRUCTION, INC,
hq\_' t]
P,OO:: 00::
I
I'
, I
. ,
: I
I;
. i
. .
I'
;1
j'
i I
"
I,
.
I'
I
, I
I
I
I
II
I
,
I
, I
: I
:1
,I
,
II
,
~ !
"
I
I!
, ,
~ I
'I
I:
, I
II
.1
"
,
,
I
"
t./(II " L> 2000 15: 14 FPQr'l: r H,
/
TO:1 7U~ 724 5789
.? 129651 0-1-1
BREAKOUT OF LABOR RATES
for aquaSouth CONSTRUCTION, INC.
Classification Rate Tools, Overhead Markup Total
w/burden etc. ~15%
LABORER $ 11.00 $ 6.00 $ 8.00 $ 3.75 $ 28,75
FOREMAN $ 13.00 $ 6.00 $ 8.00 $ 4.80 $ 31.80
SUP'T $ 28.90 $ 12.00 $ 8.00 $ 7.34 $ 56.24
D({~!)E('I' flCr. - ~O~ ~,-t..t~.
" ,~JOc. 002
I
II
I)
,
I;
I
I
,
!
I!
r
I:
II
. i
I ~
'I
I
I'
I
II
RECEIVED lOV 1 j 200lJ
aqy.@~9.!t.~ @@~W
c. J; uv'
Ila",I\I.I "".;lIk"I, l'r~"dt'lIl j
""h,'" I-: IIlTk, V'lT f'rl"1lit'1II ()rll'ra,I,oll'
J..:htlIH!:I J\)hn~"II. t\dnlllll~trall\'l" ^"ISlpnl
".lIhalll (' I )llhh'II~, f'r"ll't' I Ma"a~n ,
".ad,' I) W,,"dnll).:. J'r"jlTI Ma,,,,~~r ,
Anhur D. Harp~', f'r"ll'l'l Malla!!"1 ,
1. "a"Jall My~r.'. (icOl'ral Surcnllll'"d~rll
.::IN r8';o-o:4
November 3,2000
ZEL ENGINEERS, INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 30901
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES" &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
Dear Mr, Drown.
! i
Given the decision not to install Valve #5-3, we offer a deduct for the related
work under our existing contract for the labor and remaining materials. Please
note that the 30" butterfly valve and related materials have already been
purchased and are on site, Refer to the attached invoices for an itemized listing
of these items (i.e., Hughes Suppiy, Inc. and Dezurik). A breakout of mOl1ies
relating to this work follows for your review.
INSTALL VALVE # 5.3
LABOR
MATERIAL
EQUIPMENT
TOTAL
MA TERJALS ON HAND
$ 7,436.00
10,191.00
4,559.00
22,186.00
-8,810.81
. ,
NET DEDUCT
$ 13,375.19
I:
Please review and address any concerns to undersigned.
Sincerely,
j:
aquaSouth CONSTRUCTION, INC.
, '
, ,
I
. !
!
I,
. ,
,
I>
P.O. Box 747 . 124 Eason Drive. Pooler. Georgia 31322
Tel. (412,465-1250. Fax (YI2, 965-)044
Ernail: H20south(p'bellsouth.nel . Augusta. G.'; (7061650-0124
h,gh_'"
MATERIAL BREAKOUT FOR VALVE #5-3
1. VALVE
2. PRECAST TOP
3. FABRICATED PIPE
4. FLANGE ADAPTER
5. 01 GLAND, REST.
6. STEEL COUPLING
TOTAL
$ 4,091,68
995.10
702.99
1,838.69
613.11
569.24
$ 8,810.81
...
DeZURIK Invoice #RPI/31010770
HSI Invoice #33431251-01
U.S. FILTER Invoice #5871132
HSI Invoice #33014954-04
HSI Invoice #32797112-01
HSI Invoice #33014954-02
hlgh_'"
\ __' .:.0UG __:....1 .';:'011:FH:,
'j 1296::: 10-14
re,; l :-Ot':- ;'2-1 :,78':;
r' . .:102 002
atw~@l~Dq!l!
Re:
WATER TREATMENT PLANT CLEARWELl BAFFLING, VALVES. &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
H.rnlt! }. W~lkef. Pre';.!""l
Knb~rr K, Fle.:k, Vi!;!: }'rc.ilknl Orcrol ..
I(lInnd. }"hnsQIl. Al!nllniufDliyc AU i.. I
Wllli3m C. Dubbing, Vmjccr Mnnnier
cc W3dc D, W>>uW-iul;. l'rujccI MlInllgcr j
An1lllr D. lurpcr. Pro,CCI MOOftSCr
. <<::>> !P 11' J. """11 M,.", Goom".",""",,, '
II
'I
I,
I,
Ii
11
I
I
November 13,2000
ZEL ENGINEERS, INC.
ATIN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 30901
Dear Mr. Drown,
Per your request we quote the additional repair of the vertical expansion joints in
Clearwell #5 for the lump sum of One Thousandr Eight Hundred Eighry-one
Dollars [ $ 1,881.00 ) exactly. This repair involved the repair of 28 lineal feet of
expansion joint and approximately 4 feet of horizontal crack. All work was
completed using the materials and procedure (i.e., GACO-FLEX) previously
approved for the base contract.
Please address any concerns with the undersigned. Thank you for this
opportunity.
;,
!/
)1
Sincerely,
aquaSouth CONSTRUCTION. INC.
I>
1'0, Bnx 747' 124 E:uon Drive. Vooler, Got(lfBi.. .31322
Tel. (lJl:!) 965-12S0. Fax (912) 965.JO~
E-mail: H20$(IUlh@beluoulh.nel' Auguua. GA (706) 650-01201
h~."S
, I
t.
~t(ECEI\lED NOV D
a "'uaSouth
I>
B 2fJI}
@@[p)\'f
November 1, 2000
ZEL ENGINEERS, INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta. Georgia 30901
CDD~/
lIafl,id J. Walk~r. I'r~'1d~Il'
RIlherl K, Beck. Vice I're.'1delll (lperalU1n.\
RhllnJa JIlhll.\IlIl. .-\Jmlll'.\lr:JlIVt' '\"'.\Ialll
William C. Dohhln~. Pml,'el Manager I
\VaJ~ D. Woodrill~. Pm,~'.l :'...Iana~~r
Arthur D. Harp~r. Prlllee, i\1alla~er
J. RanJall Myers. (;cneral SUpertnl~nJenl
-:J N 9~ I 0 - 02..
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES" &
CHEMICAL FEED iviODIFICATIONS, AUGUSTA UT:UTlcS
DEPARTMENT
Dear Mr. Drown,
With respect to our on going investigation of Valve #5-3, we forward the Trip
Report for the inspection conducted on September 13, 2000 by Atlantic
Construction and Marine Services, Inc for your review.
The charge for this work is One Thousand Five HundracJ Ninety Dollars
[ $ 1,590.00 ] exactly, Please review and address any concerns to undersigned.
Sincerely,
aquaSouth CONSTRUCTION, INC.
I' () H", 7.17' I~.j I::a.\"" Dnve . I'""kr. (;,'''r.~ia .\ 1.12:
rL'1 fl)l~llJ():,-12:,()' 1':1., I'll';, l>65-1().j.j
1.,11.111. II.;ti,"""lld'hl'II'\""Ih.IIl:I' /\Il.~II";I. CiA 1711/11 /1~()-IlI:.j
,I
, :
,
h'9h_112
(j~
\11~';
" ~~.~~r-''-';'
"
,
ATLANTIC CONSTRUCTION AND MARINE SERVICES INC.
p, O. Box 2522 SAVANNAH. GEORGIA
(912) 232-6333 FAX 232-0061
October 3 1.2000
Aqua South Construction Inc.
P.O. Box 747
Pooler .G.A. 31322
Re:Underwater Pipeline Inspection
Mr. Wade Woodring
This document covers the findings from the September 13,2000 ACMS dive inspection
of a 30"pipeline and valve for Aqua South at the Augusta Ga. Potable water facilities
eastern clearwelL The initial plan for the dive was to enter the 30" pipeline to determine
whether or not the valve was operable or if it could be forced open. When we were called
about this job we were informed that the flow of the pipe would be minimal and that the
flow direction would be against the diver such as a headwind. but this was not the case.
After a quick review of the clearwell and the pipeline underwater I found that the flow of
the line was stronger than previously believed and that the flow was entering the pipeline
instead of exiting. In an attempt to penetrate the pipeline I learned that the inside of the
pipe was covered with a very slick algae like substance which would make it virtually
impossible for me to push myself backward out of the pipe ifa problem should occur. I
came to the conclusion that the dive was unsafe under these conditions was consequently
not feasible.
After the dive was abortecL the workers on site were directed to open and close the
valve repeatedly to try and break it free so that it could close completely. The valve was
opened and closed several times until we felt that it had broken free. and was closable.
The valve was put into the closed position. and another dive was done. to determine if the
flow had stopped. There was no perceivable flow going or coming from the pipeline. We
were then asked if we could go into the pipeline and check the valve, to make sure it had
closed completely. This was considered not feasible for diver safety reasons. There was
no way to determine if the valve in question was under differential pressures[(this is one of
the leading causes of fatal accidents in ~he commercial dive. industry) see ADC video
included in the correspondencel. Everyone on site agreed that it was likely that there was
a 90 degree turn in the pipe between the entry point and the valve in question. and this
posed another potential diver hazard.
Eric Crews
DiverfI nspector
Atlantic Construction and Marine Services
: I
HAlold J. Wo'ker. Pr...ide,,, , ,
I(nllen K. Hcc~. vi,c rrcsNJonl ~.u~~
Rhnncll )""_,n. ",hni'''''flIlI'''' ^."1~"'
WUIJ.m C. 1)(\llllln.. PmjCCI Mnn.!:cr .
Wade I). Wnnd,in!l. P'njeCl MOIl"ler /'
^nhur D. Homer. "rn,rel M.nnler
J. RouMlall My.:n, ~efllt Supcrin,endcirll
I:
.,
I
I
I!
"
/;
Ii
j f
. .I~~'- .._~-.::Ouu .;~: ': ~ ,...-;'I~;C1: rl-4.
~ 1 G. ~6:: 1 ~~1--
-c: :
:-.~~ .-:.-:' .:::"
,
,
aqIJJ!~
November 13,2000
~(Q)[PV
ZEL ENGINEERS, INC.
ATTN.: C.D. Drown, P.E.
435 T eltair Street
Augusta, Georgia 30901
Re; WATER TREATMENT PLANT CLEARWELL BAFFLING. VALVES, &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
Dear Mr, Drown.
The repair of existing cracks in the floor of Clearwell #5 can be repaired for a unit
pricing of S 4,80 per lineal foot using the application procedure and detail
attached. This price rate is for application only and does not include any effor1
towards dewatering, etc. Based on our initial inspection subsequent to
completing the Clearwell cleanup we estimate there to be approximately 3200
lineal feet of random cracking.
Please note the attached repair detail and procedure for your review, A speedy
decision concerning this work would be most appreciated. Thank you for your
assistance .
Sincerely.
aquaSouth CONSTRUCTION, INC.
.
1'.0. Hox 147. I~" Eason Drive. Pooler, Geoq,:.a J 1:1:'2
Tel. (91 ;:l '165-12.50 . F:u (912) 965.1044
Ema&J: HZOsoUlh~hc:IISllulh.Dc:t . ^u~usc;a. GA (70(1) n~O-OI24
...", tl.
.:. . ,)~::c: ,;O.~
.,
: I
,
I)
I,
'/
.
! I
Ii
"
,
Ii
II
II
II
"
! ,
I'
:1
, ;
I
I;
! I
, ,
i'
I;
I
.1
f
I
I
f~
~
~r~:t;-;
~~~~pd
.' .....;..~...
-:.c.c......
~'l(:Q'<'.:t.I
iv-....,~~
.,~C>-.Q~
~;~j
,,~~t.~
..~P.~~~
.. ....,.
~i'lU~1l
:t.':,;.::~
,
...
~
~
~
"'Z~
II.... - 0_ -.:.\'\.._:~_: -. .: . - I'; .-.....
,
, I .. f
.. ~ ~ -b - . ,,:--
'. . ~ .. ...
- .; I "
C(Z.ACK.
~
(<€PIt/R. j)e-rAII- (c~fP)f
~~I ~ 4" d.AE. I
fb,!:.S-rE~ ~
~
f _ (p" cAJ, 0 r: APPc., C/i 7<<J GP"
~ ufZef~~ Ru&6€ I
J~E+rJ ~ '
~/ /1/ /7/5J6STIZA-n( //1/ )
Pf!.oFl L-c. 0~
~
% @
-
P(loCEW~E
I. P~PAJ!E. ~6S1't<Ar€ (,,e. iR.:KRtYno.-E:ko:,sc AfArs,I)
2.. APFLf PR,t'/IER. D: :S.3zo)~0' .
3. APPL.'( ur<.I:fHllnJe /lASE carr6'i;') ~17/-~. z
~. &n~ ~E1"roRClFmEf{(/~E /rl7O .gr~.~ ~'
CEtrT~~ olE:!< ClCACIC~ q,c,B -.". <2J
5. ./tpPL.YUl<E(t#lWE lOP CdlT {Z'~ LrYI-/d)Y-
- c:upv~ !:"tItI..
.II.-r .,... /
t iG'.,-.j6 -20G8 ~ S: .)0 ;;::cr.,:,:-....:.
,i
.
~ 1 C -:-6': 1 ~J~~
'-:j6 ~2~ ,-:-;-:- ,;;. .JOe .JCC
,
tL"."..J J. WalLcr. I'ruiMftI L \
R<><<>cn /C. Uect. IIi". "'CoInIC"1 OlHl'''ti~".
Rholllla JotlllS(ln. A\lm,ni..rftl;YC ^..i.t'"
Wlllia.m c:. Dobtli",. ,,",10'1 Mlnaacr11
Wade D, WuuU""l. PJ'ft,eC:1 roC-naScr . I
....nh.., O. H~. f'roJect ~b"nltcr 11
J. Rln\l;1I MyCf"ll. Gene'''' S"pc,i"'C"4~1
"r. .
..... ;.
November 6, 2000
;!
ZEL ENGINEERS, INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 30901
, ,
I,
.1
1.
ii
~ I
I'
, ,
I
I
, ,
Re:
WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES, &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
Deaf Mr. Drown,
I:
,I
!
I!
A summary of our discussion follows concerning the Project Coordination
Meeting on Thursday November 2, 2000.
PROJECT COORDINATION MEETING
THURSDAY NOVEMBER 2, 2000
~ i
I
II
I!
; I
'1
I'
~ I
I'
: I
1. VALVE.s-3 By mutual dec1Sion (i.e., ZEL & AUD). the re~ment
ot Valve #5-3 wi>> not be completed. The Augusta Utilities Department
will exercsse the ValVe .s-3 once Clearwell #5 is comp&ete to assess ils
performance,
2. CLEARWELL .5 a<luaSouttl w;JI commence wont on deanup of
Clearwell f.5 on Monday, Noyember 6. 2000 on a time and malef1als
basis. Tentative mueslDnes were set to finIsh the Clearwell lOCluding
hatch repair by Friday. NoYembet 10. 2000. Disinfection would be
comptete by Wednesday. November 15, 2000 with the structure retuming
to setVice. Joint and cract repairs are to be complete per lhe design
approved under the base contract (Le.. GACO-FLEX product) as directed
by the RPR.
.1
I!
.'
'I
; I
.1
I'
, I
3. CLEARWELl_1 A larget date of Monday, November 7,2000 was
agreed on by all parties to have Clearwell #1 ready for work. This allows
eleven days to fill Clearwell #5 aad empty CIeatwelI '1, aquaSouth
estimates 4~ weeks to complete the rehabilitation in CleerweU _1.
4. FT. GORDON INTERCONNECTION UNE This WOfi( is waiting on
counCIl approval. Per CH2MHILL, it is expected to be approved by
council somel.lme early in December,
Ii
\
,
P.Q, tlox 7~7. 124 E.1son Dnvc. Pooler. GCClfglll 31.3::
TeL (Yl~) 965-12:50. Fu (91:2) 96.5.1044
Em;uJ. H:OSt'Ulbwbellaoulh.nct . ^u~uSla, GA (706) 050.0124
I I
I
~
~
"9'.113
1I0{~-0b -2008 1=: 'Xl FPCf1: ;:-.:,;
,. j~
] 12<?r::,= 10-l-l
ro:: ~06 ~:-l ~73~
ZEl ENGINEERS. INC.
November 6, 2000
rcrgrYf
PERSONS IN ATTENDANCE
BranlJey Kuglar, AUD
Bnan Richards. AUD
Leon Burkl'lalter. AUO
Bud Hamlin, AUO
Dave Drown. ZEL Engineers
Rob Lorentz. CH2MHlLL
Bob Davis. CH2MHILL
Wade Woodring, aQuaSouth
Robert Beck. aquaSouth
Harold Walker. aQuaSouth
Work completed in Clearwell'S to be invoiced on a time. material, and
equipment rate using the following schedule. Hours over 40 per week to be
billed with a 1.5 factor. Material and equipment to be billed at 10% over cost.
Labor Rates for cleanup in Clearwell #5
Superintendent
Labor Foreman
Laborer
$ 52.00
$ 32,00
$ 28.00
Please review and address any concerns to undersigned.
Sincerely,
aquaSouth CONSTRUCTION. INC.
"'G"_")
;:. . ,)o=- ')0':
/'
, I
, ,
, i
"
: I
jl
; I
, i
I,
I {
I
, I
I
.1
I
I
I
iJ
I
, I
:,
,I
.,
.
/I
,
! :!
, '/
j
II;
I.,
,. /
{
:'1
ii,
.11
ill
" J
"
"
11(:<.'- : _. - .:.Oulj ~ 5; 14 ,e-PCI": f-"" -.
,. ,;
J...:: ~.Jt.. ;.:..... :'7"d'_.
:'12':"b:,l"j......
BREAKOUT OF LABOR RATES
for aquaSouth CONSTRUCTION, INC.
Classification Rats Toola, Overhead Markup Total
w/burden etc. 1S%
LABORER $ 11.00 $ 6.00 $ 8.00 $ 3.75 $ 28.75
FOREMAN $ 13.00 $ 6.00 $ 8.00 $ 4.80 I $ 31.80
SUP'T $ 28.90 $ 12.00 $ 8,00 $ 7.34 $ 56.24
_ ,
r ~ fIe" (J. - ')O~ ~. - t:.. i~
:"-~DC (\ ,
. . .JU~ .,,:1.':,-
I
II
I)
I:
,
,
,.
I
!
I
!
j
I,
,
\'
II
j i
I
II
'I
1/
I
;1' :
, .
I,
;
I'
,
II
KI:CE'VEO IOV 1 j 200lJ
arm!!!!!!!! @@~w
- .v 1-/'
ltaflll.1 J \\-,lIk"I. l'f~,"11'1l1
l<lltwrt I\. Bl.',,:J.... Val.'I.' I'n.....'dcnl ()r'l'rattoll'
I{h0l1d;1 Johl1~l1n. l\dnlllll~lT;IIIVl' A......I~t.t111
Wlllialll C f)llhhlll;:. PfllllTI Malla~cr
\~."dl' I) Wlllldflll~. Pfllll'<'1 M"Il,'~~f
.\nhllf I) lI"fp~r. PflllL'l'l Mall.'"l"
J /{alluall M\'l'I\, (i~n~'al Sllrl'flllll'lld~lIl
;:IN 7'6/o-0~
November 3.2000
ZEL ENGINEERS, INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 30901
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES" &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
Dear Mr. Drown,
Given the decision not to install Valve #5-3, we offer a :leduct fer the related
work under our existing contract for the labor and remaining materials, Please
note that the 30" butterfly valve and related materials have already been
purchased and are on site, Refer to the attached invoices for an itemized listing
of these items (i.e., Hughes Supply, Inc. and Dezurik), A breakout of monies
relating to this work follows for your review.
INSTALL VALVE # 5-3
LABOR
MATERIAL
EQUIPMENT
TOTAL
MATERIALS ON HAND
$ 7,436.00
10,191.00
4,559.00
22,186.00
-8,81 0.81
NET DEDUCT $ 13,375.19
I'
Please review and address any concerns to undersigned.
Sincerely,
aquaSouth CONSTRUCTION, INC.
I>
P.o. Box 7..7 . ,~.. Easoll Drive' Pooler. Georgia ." ~~:
1"c'l. I I) I: I 411:'\.125(1 . Fax (1I1 ~ I 411:'\.' (14..
'-.l11all. 1120soUll1tO'hClls(lUlh.nc'I' :\U~U'I;I. GA ,7(1111 t1'iII.()I~..
h'Oh_,'1
[j~,
~~;)
<,,:...;~.fC'1
..~...
)... t,'
\,
MATERIAL BREAKOUT FOR VALVE #5-3
1, VALVE
2. PRECAST TOP
3. FABRICATED PIPE
4. FLANGE ADAPTER
5. 01 GLAND, REST.
6, STEEL COUPLING
TOTAL
$ 4,091.68
995.10
702.99
1,838.69
613.11
569.24
$ 8,810.81
...
DeZURIK Invoice #RP1/31 01 0770
HSI Invoice #33431251-01
U.S. FILTER Invoice #5871132
HSI Invoice #33014954-04
HSI Invoice #32797112-01
. HSI Invoice #33014954-02
nlgn_'11
"\ .._ _'-"_'1";
. ;. l_i 1: ':!""'t. .
.;.1 ~';'t:..:: : u-....;
- '.. .J'.... '- - _ __
. . '_'U~ .~11j2
.
,~ "
all!!~!!~~
I,
November 13, 2000
H.rnJt1} WJlk.r. Pte.;<./o,u
Knllc:n K. Ile.:k. Vi~c y,c.iUOnl Ore,o! II
Khond.t }"Ilnsoll. hUnlllulLnllivc ^uil. I
William C. Dubblnl:. !'mlter Mnnn,c.
(C~ w~ D. Ww.Uill~ "'U~CI MlInDSC' I
A"hll' 0, li.arpcr. P",lecl MDn"scr I
o /?J V'. .....'11 M"o. """""',.""O,"! '
!I
'1
II
'I
Ii
;,
ZEL ENGINEERS. INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 3090 1
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING. VALVES, &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
r
I
I
I
Dear Mr. Drown,
Per your request we Quote the additional repair of the vertical expansion joints in
Clearwell #5 for the lump sum of One Thousand, Eight Hundred Eighty-one
Dollars [ S 1,881.00 ] exactly. ThiS repair involved the repair of 28 lineal feet of
expanSIon joint and approximately 4 feet of horizontal crack. All work was
completed using the materials and procedure (i.e., GACO-FLEX) previously
approved for the base contract.
Please address any concerns with the undersigned. Thank you for this
opportunity .
, I
II
II
,
Sincerely,
aquaSouth CONSTRUCTION. INC.
.
"U Unr 747' 124 Euon Dri\l~ . Pooler. G~orgl;l JlJ22
Tel. (~I~) ?oj-12~O' F:u: (Ill:!) Q65.10~
E.m~a1: H:O~llulhtlbcjboulh.nel . AugU'(;l, GA (700) b50-01~.a
,,,,,,,.113
,
r .t<ECEJVEO (fOV a
.... II t1
arm!~!~!!
@@[F))f
Harold I Wal~~r. I'r,'s"k-1l1
l{on~r1 K, Ilct~, Vlt." I'r~"d~1l1 ')r>~r:Il""1\
Rhonda Johllson, :\dm""slra(l\~ . \\\IS,anl
Willlalll C. Dunnln;:. r"'l~tl '-'lall.I~~r
Wad~ D. W"udrln;:, P"'I~t1 '-'Iana~~r
:\r1hur D. Harp~r. PrOlttl :-'bIlJt~r
J. Randall '-'Ivtrs, (jtn~r:d 'iuptrlllltnd"'lll
..
!1 2fJIJ
C DD l./'
-:IN 9~ 10 -02.
November 1, 2000
ZEL ENGINEERS, INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 30901
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES" &
CHEMICAL rEED il/iODIFICATIONS, AUGUSTA UT:UTlcS
DEPARTMENT
Dear Mr. Drown,
With respect to our on going investigation of Valve #5-3. we forward the Trip
Report for the inspection conducted on September 13. 2000 by AtlantIc
Construction and Marine Services, Inc for your review.
The charge for this work is One Thousand Five HundracJ Ninety Dollars
[ $ 1,590.00 ] exactly, Please review 2nd address any concerns to undersigned.
Sincerely,
aquaSouth CONSTRUCTION. INC,
Project Manager
I>
I" I I~II\ ','. 1'11.1'11111)1'1\1'. l)llllll'r. (;l'tll~I.1 ~I ~~..:
11'1."1-'1 \),,'" I":"'(). )';1\ /L1I":' 1)/,-\ 111.1.1
I 11.111 11~1I'.'1I1111,'hl'II'111l11111l'1. \1I~1l'1.1.1;\ t"'llf.lf\"'I)i1!~:
"'lItl 1 1:
<:,\.... Uf(,,,
!,.~ \
.l --=',
I'.~.'
f ~ ,'\ 1 ..
(..,,, .-
'-
..
.
ATLANTIC CONSTRUCTION AND MARINE SERVICES INC.
P 0, Box 2522 SAVANNAH. GEORGIA
(912) 232-6333 FAX 232-0061
October 3 1.2000
Aqua South Construction Inc.
P.O. Box 747
Pooler .G.A. 31322
Re:Underwater Pipeline Inspection
Mr. Wade Woodring
This document covers the findings from the September 13. 2000 ACMS dive inspection
of a 30"pipeline and valve tor Aqua South at the Augusta Ga. Potable water facilities
eastern clearwelL The initial plan for the dive was to enter the 30" pipeline to determine
whether or not the valve was operable or if it could be forced open. 'Nben we were called
about this job we were intonned that the flow of the pipe would be minimal and that the
flow direction would be against the diver such as a headwind. but this was not the case.
After a quick review of the clearwell and the pipeline lUlderwater I tound that the tlow of
the line was stronger than previously believed and that the flow was entering the pipeline
instead of exiting. In an attempt to penetrate the pipeline I learned that the inside of the
pipe was covered with a very slick algae like substance which would make it virtually
impossible for me to push myself backward out of the pipe if a problem should occur. I
came to the conclusion that the dive was lUlsate under these conditions was consequently
not feasible.
After the dive was aborted. the workers on site were directed to open JI1d dose the
valve repeatedly to try and break it free so that it could dose completely. The valve was
opened and closed several times until we felt that it had broken free. and was closable.
The valve was put into the closed position. and another dive was done. to determine if the
flow had stopped. There was no perceivable flow going or coming from the pipeline. We
were then asked if we could go into the pipeline and check the valve. to make sure it had
closed completely. This was considered not teasible tor diver safety reasons. There was
no way to determine if the valve in question was under differential pressuresf(this is one of
the leading causes of futal accidents in t,he commercial dive, industry) see ADC video
included in the correspondence 1. Everyone on site agreed that it was likely that there was
a 90 degree turn in the pipe between the entry point and the valve in question. and this
posed another potential diver hazard.
Eric Crews
Oiver/I nspector
Atlantic Con~1ruction and Marine S~rviccs