CHANGE ORDER
CO NUMBER 13
BID ITEM
DATE June 8, 2001
PROJECT TITLE
Clearwell Baffling and Chemical Feed Replacement Project
ORIGINAL CONTRACT DATE QL.1222
PROJECT NUMBER W-1
OWNER AUGUSTA COMMISSION
PO NUMBER
Eilliill
The following change order is hereby made to the proposal for the above project:
PAYEE
Aqua South Construction,
Inc.
TOTAL AMOUNT OF THIS CHANGE ORDER
$
7,709.42
The contract time will be INCREASED by Q calendar days as a result of this change.
ORIGINAL CONTRACT COST
$
1,207,688.00
PREVIOUS CHANGE ORDER (INCREASE)
$
609,344.10
THIS CHANGE ORDER (INCREASE)
$
7,709.42
TOTAL CONTRACT WITH CHANGE ORDER
$
1,824,741.52
FUNDING NUMBER/ACCOUNT NUMBER
508043410
542511 0
REQUESTED BY: L.f}~~~ DATE: ~J rld/
SUBMITTED BY:- 1l.;f!, ~ DATE: 7/6/(!) (
J;:l,':t;.ENT HEAD J I
tA) l'lllel~ T}/qIOI
FINANCE ENDORSEMENT: ~~ ~JliLaf'^.a DATE: 7-r?-CJ( -S
COMPTROLLER
RECOMMENDED BY: ~~~ DATE: } /10"
(II~/O I
APPROVED BY: ~ L. " rDAlE
, r
MAYOR ~
I.
I
'.
1
.."
\,
.
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemeial Addition
Summary of Change Orders
Revised: 06/08/2001
Original Contract Price - W-1A (Clearwell Baffling)
Original Contract Price - W-1B (Chemical Addition)
Total Original Contract Price
Total Change Orders to Date
Total Revised Contract Price
Total Change Orders Percent of Original Price
Total Pending Change Orders
Total of Change Orders & Pending Change Orders
Total Pending & Final Change Orders Percent of Original Price
$1,207,688.00
$819,281.00
$2,026,969.00
$617,053.52
$2,644,022.52
30.44%
$0.00
$617,053.52
30.44%
Chan e Order No.1
Repair of high service pumps 2 and 4, clean medium voltage
1.1 MCC $11,495.00
1.2 $7,665.00
1.3 $38,618.00
1.4 Re lace oil valves 2-5 and 2-7 and lace in 8x8 vaults $65,862.00
Install additional cribbing, temporarily remove electric
1.5 ductbank, substitute 6' recast manhole for vault. $12,487.00
1.6 Remove and dis ose of oil contaminated soil $1,791.00
1.7 $4,084.00
1.8 Ins ect, drain and dis ose of ear oil in oil lubricated valves $2,484.00
1.9 Ae lace oil valve 1-2 $28,689.00
New stuffing box for horizontal mixer. Startup services for
1.10 horizontal mixer from U. S. Filter. $4,931.30
1.11 $2,369.00
1.12 $31,355.00
1.13 Install ductbank manhole in Central Avenue. $3;825.00
1 Chan e Order No.1 Total $215,655.30 $1 423 343.30 10.64%
06/08/2001
1 of 4
W-1 Change Order Summary
,.
, ~~
t'
+ ,
,
( t'
.
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemeial Addition
Summary of Change Orders
Revised: 06/08/2001
Chan e Order No.2
2.1 $4,805.00
2.2 $3,901 .00
2.3 i e and recast wall. $16,363.00
2.4 Install cove rin $13,921.00
2.5 Blast and Clean Wall $6,188.00
2.6 $20,592.00
2.7 $7,856.00
2.8 Clean & Disinfect Tank $4,232.00
2.9 Excavation and Additional Cribbin $2,142.00
2 Chan e Order No.2 Total $80 000.00 $1 503,343.30 3.95%
. . Chan e Order No.3
3.1 Ductile iron MJ Tee @ valves 2-5 and 2-7 $6,887.83
3.2 $749.37
3.3 3' x 3' aluminum hatch @ valve 2-1 $784.31
3.4 Rehabilitation of Clearwell1 -$453.00
3.5 Cost of c Iinder breaks -$170.00
3.6 Variance on Horizontal mixer startu -$1,078.00
3.7 Re air work at valve 2-3 $11,498.00
3.8 Dewater/disinfect clearwe1l1 $1,611.00
3.9 $1,678.00
3.10 $7,829.00
3.11 $3,533.00
3.12 $18,963.00
3.13 $3,143.00
3.14 Ste s from East Valve Pit to West Valve Pit $2,500.00
3 $57475.51 $1 560 818.8'1 2.84%
Chan
4.1 $8,203.00
4 $8 203.00 $1 569 021.81 0.40%
06/08/2001
2 of 4
W-1 Change Order Summary
I
1- i I. t
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemeial Addition
Summary of Change Orders
Revised: 06108/2001
Chance Order No.5
Connection of Auxiliary Pump Station and the Fort Gordon
5.1 Pumpino Station $83,676.00
5 Change Order No.5 Total $83 676.00 $1,652,697.81 4.13%
Chance Order No.6
6.1 Lime Removal from Clearwell NO.5 $23,993.49
6.2 Repair of cracks in the slab of Clearwell NO.5 $15,436.80
6.3 Investioation to locate valve 5-3 stopple valve $11,625.00
6 ChanQe Order No.6 Total $51,055.29 $1.703,753.10 2.52%
Chanae Order No.7
7 Clearwell No.1 Crack Repair $6,000.00
7 Change Order No.7 Total $6,000.00 $1,709753.10 0.30%
Chance Order No.8
Clearwell NO.2 - Dissassemble 3 - 30" Pipes and install 6'
8 square access hatch. $9,354.00
8 Chance Order No.8 Total $9,354.00 $1,719,107.10 0.46%
Chance Order No.9
9.1 Investioate Valve 5-3 bv diver $1,590.00
9.2 Remove brick veneer at clearwell #5 $953.00
9.3 Replace brick veneer at clearwell #5 $1,144.00
9.4 Repair of Vertical Joints at Clearwell #5 $1,881.00
9 ChanQe Order No.9 Total $5,568.00 $1,724,675.10 0.27%
ChanQe Order No. 10
10.1 Install Stopole Valve for Valve V5-3 Installation $45,153.00
10 ChanQe Order No. 10 Total $45,153.00 $1,769,828.10 2.23%
Chanae Order No. 11
11.1 Restoration of the 72" Concrete Finished Water Line $34,445.00
Installation of 2 D-O-L InnerFlex Assemblies in the 54" 01
11.2 Finished Water Line $5,998.00
11 Change Order No. 11 Total $40,443.00 $1810,271.10 2.00%
Chanae Order No. 12
12.1 Modifications to Fort Gordon Connection Piping $9,538.00
12.2 Deduction for return of 24" x 16" Tee -$677.00
12.3 Deduction for deletion of asphalt overlav in Central Avenue -$2,100.00
12 ChanQe Order No. 12 Total $6,761.00 $1817032.10 0.33%
06/08/2001
3 of 4
W-1 Change Order Summary
I I
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemeial Addition
Summary of Change Orders
Revised: , 06/08/2001
Chan e Order No. 13
13.1
13.2
13.3
12 .
Removal of Concrete Saffle Walls from Post Flash Mix Tank
Mobilization
Other
Chan e Order No. 12 Total
$4,777.00
$2,600.00
$332.42
$7,709.42
$1,824,741.52
0.38%
06/08/2001
40f4
W-1 Change Order Summary
. . .
,
2: E 1i35 Telfair Street
Ted W. Ellis, P.E.. Chm. of Board, Emeritusfj Augusta, Georgia 30901-2494
Joseph J. Tankersley, P.E., President E N GIN E E R S
Jorge E. Jimenez, P.E., Vice-President
Charles D. Drown, P.E., Treasurer
Kenneth E. Green, PE., Secretary
John R. Evans, P.E.
R. Nelson Williams, P.E.
John R. Armstrong, P.E., Retired
ZIMMERMAN, EVANS AND LEOPOLD, INC.
(70(;)724-5627
,\',v,v.ZEL ENGIJ'." E E I{S.COI\1
May 3,2001
9810-02
Mr. James Rush
Program Project Engineer
CH2M Hill
360 Bay Street
Suite 100
Augusta, GA 30901
'1'" ., ,i
I. I '
L MAY 04 2001 Jj
BY: __....._................_____..
Dear Jim:
We are forwarding, attached, the billing for the removal of the concrete baffle walls at the
end of the mixer. These costs are actual costs in accordance with our instructions to
aquaSouth.
Upon your approval, we will prepare a contract change order for the inclusion of this
work into the contract.
If you have any questions or require additional information, please call.
Sincerely,
p~~.
Charles D. Drown, P.E.
CDD:slvv
Enclosure
9810-02 rush Itr.doc
'>'8 "'uaSouth
,
~i CE]VED MAY
-::r II/' r ~ / C - cJ :2-
C':DO/
2 2001
COpy
Harolu J. Walker. Presiuenl
Robert K. Beck. Vi<.:e President Operations
Rhonua Johnson. Administrative Assistant
William C. Dobbing. Project Mana\ler
Waue D. Woouring. Project Manager
Anhur D. Harper. Project Manager
J. Randall Myers. General Superintenuent
April 27.2001
THRU: CH2MHILL
ATTN.: Jeff Henderson, RPR
360 Bay Street, Suite 100
Augusta, Georgia 30901
TO: ZEL ENGINEERS, INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 30901
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES, &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
Dear Mr. Drown,
We provide a summary of services performed Friday, April 20, 2001 for your
review at the Augusta Water Plant. Subject to your approval. we request this
work be incorporated into a future contract modification.
ITEM DESCRIPTION AMOUNT
1. CONCRETE CUTTING S 3.46200
2. CRANE, 4.5 hrs. @ $ 75.00/hr. 338.00
3. HAUL RUBBLE, 4.5 hrs. @ $ 86.00/hr 38700
4. 2" PUMP 44.00
5. SUPERINTENDENT, 9 hrs. @ 52.00/hr. 468.00
6. PROJECT MANAGER, 1 hrs. @ 78.00/hr. 78.00
TOTAL $ 4,777.00
Please address any concerns to undersigned. Thank you for your consideration.
Sincerely,
aquaSouth CONSTRUCTION, INC.
~\~i
a. Project Manager 1'.0 lill' 747 - 12-11:.1'"11 Dn\'<.: -1"lIlkr. C;c'lr:;I;I,I.;22
, 1".:1. ,\)121 W,'-12:,()' 1:;1.\ 1'112, "h:,-11144
1:111.111 112Ih"oll1'<I'hcil"1l111111<:1' \II:;U'I:I. (~..\ ,70h' 1,'O-1112.t
llUJn .144
(~~\
~, i~ rJ1
," "",1
,..:.:~\tfl.
. .:1.-23-201 2: 23PM
f!"ROt.1
,....::l
. ,i
.
aquaS.outh Construction, Inc.
P. O. Box 747
Pooler, GA 31322
912.965-1250
Fax: 912-965-1044
DAILY JOB ACTIVITY REPORT
PRoJECT: . tI
PROJECT NU ER:
SITE COHDmONS: l
NUMBER IN CREW:
WORK PERFORMED TODAY:
DATE: '-1" ;J..n-O I DAY: - ,q."
WEATHER (ClJoIe): ~ Cloudy Windy
TEMP.: 5'1 AM . '7 :L.. PM
RAIN: AM PM RAIN DAY? Yes
(Use back of report for details)
Phase % Complete Quantity · Hours Oesc;ribe Work.
-C IA + .2.. ')( ? ,.....~.A.J. ',., '" ~,.t:7= ...,.;0 ~ .....1.,,_
IlA~./3t../ Jf3..... ...J r~ -- -./1. .., IV"7 '~~/
4;;'-//) '" 1 .//.J ~.-I .
--
DELIVERIES (Identify Paperwork bv Job 1# and Phase Code)
VENDOR: DESCRIPTION: CONDITION
(pipe. rebar, _~quipment. etc.) (ok. damaged, etc.)
-
GENERAL NOTES; (meetings, inspections. visitors, issues,. problems, etc.)
1"1 ,Jr, - .2.1) .
SAFETY MEETING TODAY? Yes D No D INSPECTOR ON SITE No D
.CHANG! ORDER REQUeST? Yes D NoD (ItYes, Send Signed Copy to Onice)
BY: . REVIEWED BY:
FROM : 'DIXIE CONCRETE
1'1 i ,i
PHONE NO. : 404 669 2550
Apr. 23 2001 02:29PM Pl
INVOICE
Invoice Infonnation
Invoice #: 017590
Date: 04123101
Terms: Net 30 Days
Customer tI: 091459
PO#:
Job #:
Job Ticket: 11592
Dixie Concrete Cutting Co.
Drawer CS 198354
Atlanta, GA 30384-8354
Voice: Fax:
(404) 761-1100 (404) 669-2550
Site Information I
WATER TREATMENT PlANT
2822 CNTRL AVE.
AGUST A.GA.
AQUA SOUTH CONSTRUCTlON. INC
P. O. BOX 747
POOLER. GA 31322
1.00 HIS
4J2OI01, CUTJREMOVE WAll:.
2 OPERATORS. 14 HOURS @ $85.OOIHRJOPERATOR
1 HELPER, 14 HOURS @ $45.OOIHOUR
2.380.000
2,380.00
1.00 HIS
630.000
630.00
Subtotal:
Tax:
Total:
3,010.00
0.00
3,010.00
..-.....-..
1'1 .),
..~
ffi-
~:z:~
. u~
~~
Q..
. UJ...I
i5~
.
o
~ co
>=' 0
-- ...,
G;., ,..:.
.~ -
:E ~~
o '"'"c(
,... Q-
_(\10
CJ~;s
3ri .~
-JO.
~ a:~
:c ~
en CJ
_ :J
:> <
~
~
~
r-
OO
C\J
\J
c:
~
o
(ij
-..:
CD
....
as
~
o
z
l'd
.'
~
S
'0
~
~
)(
~
~
'5
, ~
:I:
5
.!
CD
-
~
>.
."'2
0
Q)
I/L .
::J
en C
<J <
li:
0 0
-J
0 )
N
OJ
.,..
CO
~
0)
...... ~
,.. ~
~
<0 I
.,..
U)
.,..
~
.,.. ~
. C"')
- "$
N ~
,...
.,..
.,.. ~
0
.,.. ~
CD
~
Q)
CO .~
a
.....
CD
14') I~ ~
~
~
f? ~
~
C'\I ~
~ K q.
;>7.
..c
(J) "0
.- ~
Z '0)
;:) 0
a)
d
Z \ en
~t 5 ~
~ ~ ~~
~>-"O
5 n ~
J:2~
.... .-
.g
(,)
(ii
-
~
CD
E
~ 5 .m
.- en
>'C; -
c: u co
cUo~~
~~d [
o 0 . >.
0-,0.1-
.
en
a:
~'lOtL::J
~'ldC;: :.: l Oi:-r;:;:- p
I ~I . t'
.
;. \
. ,\
. .:\
:,~
,: .';'..-
C:'d
a::
LIJ
,Q CW)
a:~
o ..
~
IX:
o
;-~ :,;:
(";
-
..:.:.
cj
Z :;
-. 0)
.. ('I) ('I)
. ,...,
o ,...11)
(J ~~
W~~a:
Z&nCftW
, ~&n~~
a:Sc(o.
"me) ·
~ ~It)
Zdclt)
~a:tiClO
'" :;:)GP
(/) C2~
a: :;:)"
W c:'-
o ~
Z '1::.
oc(
.
-.
~
j.
~
....
f<~
1
~
I
.j-
Q.
N:
I
w
C
~
~ I' I I ~i II I
. I~ ~1~ II!
4 I en I II!
'~. ,m i.'!! I
~ ;!o ','......' I,
; UJ'. \
1 ~; : ~ 1,.!: I
: ): I 1-". j.... i :
:)..j (en, :,... i
l'~ ;,z~!
I~i : !Q'~ :
,I ,"....~
~l: 1;~i.1
I J ! I' I i~~i
.'~~ I 11~1 ~
r~i ill 11
ii, I i I ! 1
I "1 I I ~ ! 'tl
~ ("I !I bJ
d I i I \:
Z i. i' i i~:
cr: I Ii! sl I
~ UJ, I i it-i! i I
~ ~ I > l:t! i ! ! ~
Z I co I 1-+ -W:E
ffi>~ 10 r-r-;+! : ~
~ ~ U1 I ffi I ~ ~("r i ! ,i ~
3~~~0Ixf:* 'lJ ~
u8~iJ~l__~. '4(
I.i:;;
I
-
'j
~
I- .
J:
<!l en ...J.
i:ij ~LL! ~
a: 0
~ .t-
....
z
w
2
w
w
a:
CJ
c(
...J
~
Z
w
a:
0)
~
:q
..9
"0
II
~~
~t ~ ~;!
~j~ i~
,1:i~:1.'
" . ~.I
~"
i ..~~.~~.
...... ' <:) '.' I
. . "~'::: i. I
,..~ m ~~
'0 ~.".!_.J
>- 't"
~ ~ : ~,,' 1
7"'\. I ~\! ~~
:'--"I~ IJ
~~ d li ~'I
C,,) ',.1 ,
2~ll
;~ ~ I
lU a: \";
~C,,)~! '0
o ai z ~8
~~~~
$::E~ffi :~
~I Q :'iii
'a:U . c;
o-E~ :0
.~~ ~ i ~
o~, 1-
~ <1) !-g
Ot~c= !<<l
UJz~$ Ie::
< :;l ,!!2.! .'~
....0.0; Q) I~
cnUt-CJ .1-
c ..
E ~
,9- ~
;:)
CT '
cu ,
"t:I ,.
c: __
co
2' '_
<D '$I
.!: ,~' ~'
ij ~'...
cu ',~
E -..
-
o
IE
~
,'-
}~
-"-
(5 r., \.
E \!
.~ \, i
'v '
<D
>
o
.0
co
<1)
=.n
(1) c:
~ .g
<J) <.)
<D ::!
- ...
<1)-
_ <J)
= .:;
o U)
i -~
'_ II')
E II')
~~
...
-OCU
c:'O
~3
&i~
... '-
.~
w ....
V'l 0
ctl ~
QJ W
-;'.Q
.0;::
~ 3
QJ;>.
.r::.c:
V'l cu
w-
0'-
'0 I.:
....9
o co
~ <ii
<1)0-
~o
W <D
~.o;
t-t-
,
,
~J
~
~~
I\~ ~
Q) ~
~ 0.:J
co 0 -<<:
i
j
1
:1
j
.,
. ;j
."
J
j
'...1
.j
.:1
,.
.J
i
..
i
I
,1
'I
1
1
. I
1
)
:j
. I
.,
I
~
a
~
'"
(.)
1
,I
'j
lU "D <1)
E ~.~
._ 0
'g u ~
- VI .-
~ ~ ,'fl.
.c.
--.a I-
~.Q. ,
~ (l) ~ t:l
Qj=.8 ~
.c 0 <<l Z
"
_-o~ ;n
o 0 ~ w
Z -,'':;: ClC
- 0) <.) 0
:Q)U), ...
o ~ ~ . ~
U~_.9- Q
UJ C:d> 0<(
z.cwo ..,
<(,--.::E~ a:
a:: ;t .9- = ~
u-;:,::l8. <(
z ~ g::l ~
OO)wj! ~
encu.c.o ...
-cu ..
a:: 'n ""'" >- ~
~~~C! ~
Z:>....-o "
ctcoC= 4(
m <<l --'
o.e ~ ~ ~
o -0 ~
0.0
. U m.!!2 ~
.j
.1.
I
j
!
HG:L:J "ld8C:": l OC-E:C-r
4.-23-281 2: 21 Pf-.1
FRU-1
, '
,
. ,
.
O,:Uiuted
'Rentals
431.6 BELAIR
AUGUSTA, GA
706-650-9898'
:~Jbh;Slti~ ~~: ~.:: ::~~~:.~:. ~~r:~: ;::::~::~!~:!~1e!:":::;~:~~~::::~~~~~\: ~~.: :',::: ;~
.:".:':~::~'" " ....~:""'.~............. .-.... ...:0....",::-..... ",. ,. r......... .........h......~...... '-::." . .... .' ......~.:::~.:..;.:.;;:;:.k,;;:::~"':~ ,~....~.
. .....,.~eoASGtJtm. CONS!IR~mN :nror:.~.., .,...""..""....... ........
;t_~'1~I;f~ll~?~
',... ,..... 'H~ ,,- :o;K-";' " . Ot:;~:~ ~~. , . :.:.,;.n;::;y,. a"" ~ "'Y"K~"" '.).Ij";.,....c:~....:..>y'>":
~r~::.::~r:~~,~~j_~~.~~~ ~~'t:::,~..~t~~~~~.~~~~~~~~~~~~; ;:':~~.
...:...::c.."'......I..:O.......,.A...to I''''''''"",,-:,,! ot.. If ................,a... .... 'I to".1I .......1". ..I"''''' ......"!':-:...... ,.........:::............... :~"'." 100. ...,
?~'~~ ~2~~ ~'.:F:~ iH~ ~E..~f~;:i iSib~~~: /~~:~? ::~~; ,;~: {0'??f::~~F~f:~.~i.~:l.?~~~ ;:~:
. >.~, . 9Jn~)::I_.,^*'.g.'~^. ili. ..".. . .,_ .._, ., .~_._,.. .... ........"'... .y.........; . "... ....".
:~:~.;:'.75f7.:~.~~~~. .. SttlW'er.~..r.ij.1~iJ:Nc:; F?f.::.~~S<:::~~~ ~=;.;~.:
:...""......-..... .......~~\ ......04 ,._................_.".,,~~-.4..._...~~..............> ..:,."v""~l.............:-.oto.ol
.'" . "''''mi:B' '~~~... .,....,~.y~y,.^,. ...." ".' ....,..,yy...,......,...,..... ,.
.;.....:..~...... ... C) .....,. ... ...(..4...'....."... :lo(..,.........M.....,..........I..'.......~::...~:..I..... ...............
..... .... ...."1;...1 .. I.. ....... ..... ............ :~.::. :-1.... . I .... .. . I ...... I .."""""-...>.... ..... ......I~ Io.....'...o(ta.
...A...I..~N!'o..... ~ ." .'M............._...............j.!...l'o..lt,> ..:A.,"'I..............otN..~.,.,..""4t~...4"""',.."....l#o.
1n~~~~~~.:JE~1~.~.~.:~~~~~~.1~~n~.J~~~~Jf.~~~~fJ}f~.~~~
.. ...... '::"""" .._:...:"I.J41....!.u .......... .....:0... ....."".....,........ 1>1:0. h .....:1 ...I.........."...I.:>.........l1YC:..:..: o:M.''''':. .....:.
1........"'.......,."..-...... I" ..................,......................... .................. .. 1...-,... ........__.........._..........................4>....~....,.,_........
;~~.~~ti .:;~.~~~~~..::~: ~;i~~~~.~~ ~ ; .Il ~~ ~!~.~~: ;:.~~i~~.~~ ji~ .i'~ ~~:L~~i.;~~~t~t?~?:~~~~t~i:E.~E
f-I ..:i
Page:
RENTAL OUT CONTRACT
..~ .::. : ':"':~::- ~:~~::.. .~::-" :: :.~.:..::......~ :; ,":::': ::" ..,....::. :t:.. " ...... ....;.... t..::.:.~.~:....::..:"':~:. ::,,:;;:;;..: .:.~..'
:fi~~~~~~~.l~;r~,~.t~:;~:~.~.:~.:~J.~:~~~j,;f.;i;~,~!:6f:~f.:~~J.J~:.~~;jf:~ ;,.,
.:~COlif:ract'f.ldt'. ';..:....;: 4:/',2 atJ. <l):"'''''''':'' ."........,.-... ~.,~<.<;:::..,,;.. .
~...~.~> ::"Y.~::;~~:""~" ";'';:''; 'l:~::~~t: :1.~..: ".: >~. .. ~t;..:. ;'" .~::.::~:::::~~oI;~~:~:.:;~I::~::~~:~~::~~::.~.~.~ .
yWaca"'out:; ...., ...... ~...... 4:/'-20'*0:-1;'"'' .... ::. 'T-'~'O:a"'"1?M': .
~':;.....>.......: . ..~~.::u..:.... .~..:-~:~~~~:::! :~.:'I":. .. .. ":... "': ..:. '., :~~F~~::~;~ ...;~~....:.. ~~. ...:.~.:.~.
.:.~tt~~~.:<~P\,l.~:h~:Ii.r.b.: ::; : \4L,~:7l. .0..=10. .:.:. .:.::,.: :.J~:;:Q..~.~PM.;
~4R~J~~~~f.I~~~:Y:;;~;:~~~~.!{:i:~:~~.~A~:,:
~~i:!!?$.~~;.~.;;:;~~;::;:;4,.:.,.,..:.: ..~Q~~;..qQ,~g.B
.l(fi.z~~ful~
.~;~;=?~...::~~~:::-E~j=~~~:E~::.::;.e :;~':~~f:l ~!.~=::..-..;=~~Sj[~~E~:;i~~~~~~A~~~~::::~...~~l~~~:;~::;::~~;:::-:.~ .;;~~~~~~::.:::;.:c::;::~:.: :::~:: :;::;::~:~:~::;:~;~:;:~:if.:~~;::~~~~:~:~!~~?;:~::.::::
r::.:~~~'%~~~~~.~f.f.~~~:;It:?~~I3t?~~T~2':~.;.L~.IT:::IF[;i~:::~;~~ y:~:::'::: :~:p.~r?:~;.'.:::.~'';!~~1r:::~~:~r.;:~~~2.i?:~~~.~
1.
PUMP 2 IN
:1.80058
ITEMS:
Item number
ENV
ENVIRONMENTAL CHARGE
WAIVER PROTECTION DECLINED
SUBMERSIBLE 110
Make: WACKER
v
Model:
35.00
STP.40 0
SALES
Qty
:I.
Unit
EA
35.00
Ser #:
105.00
5067043
31.5.00
Price
If applicable there will be a fuel charge at the end of the rental
Initials
::~;~~~~~~~~~==,;;:;.r~~~f:;~;~#"1V~~~=~~~:~~:;tr!:~~;;~:~.~
.::.:~ W~iIi:t:~ ::i;:~ :~:tci~.~:~PQI~W~?i~ ~~~..~..D;:~:~:~:oq.;.ai'jOt.~,..Of:~:i~:c;/lQr;n5.ME;;;Dmemc<..ui;n:o~: ~n~~:oV.~iiW.",o,
" :."CnlOllNN..A/;ft!/Icr,';/:.;':-n. ~~..I.~ ~..~""""~.OU\;.Qr,l!....mo. :o-.~ .1l~.a"!'.Ca:~~~1l:Oit.l8ll'l.cMlrM~..a;l1(IO/!Wlll..,. ..to suel'l ~OI~.f.. QUIDmOllt OGQJI\ng.ll~.~O\'anQ.Olltal~\
:: '.' .. ..".",. :."DiCit.,:- ~;~ '~~ uae.~ ~~J3lt'Ol~~CllSlllmel".ltIlllIil!l:llCIIt.l<<~..lI~.I!ftCl:8:lnM to.,~ lIf:tea.unt!<<J:n~,~It..Itllt:~;fllItl:Prow.lIf1:8'1I;ln !nO
:.:;.=~~~~.::~~.;~::==o:z~~:t7~~~.~:~.~.~2.~~; ~~:;~u:~~~..:~y..~~.~.~:1~~.~:i~;;~::~~~
~".In~. ~"""". """._lCltICIJIlQ!:tIllr.:rIJl7ll!.llId'l:lllldllleCil. . ':aet:1lIIVl:liri me:,..,....i.klie::""'~. :__ ~:rw.tlllll';MYld UllCllmll"Cl. I. RfIlllN0U5:''fT):malt.llO''I'lIll:.~.:llJtt.. .at. :.ctlho~; (':11
. ::.~.~. W~'llf..cf\lIl'Oe lI;~~A'!l;:Dt.:l!M.tDUl"<'ItlI" .1NtQe.'Cll'.oof(Ud'~:,l3i:::~ ...l6tall lfMI."'~IJ:OU\;'ltlCIUdIlO ~~.:k.Jld8V4_~::'("I..TN. .,.nrll
:...~ ~..Ilt."Oll*.::lUlIl8I<<:<<Il_ .u;~"'fN.. .....OOfIdaIoN'QI/lbilIad:IlC:lia\i.ol: C'u'Ulaw""~:'O"fIlIlN::ln Cualen"et .-.umk e11:~IIl: tNt.1lI ~/I8illl.:!Ot..aIl. cl<<ft'lGtr.r ant! :Otl'le'
. uanc:~..llItW'c..".....:OMIjIt.IIl::-"llIlllWei" w... u:6tbtt o<<lAOao- eN:\'.'M;,cwibliiib"lIfe' ~.IIY lM~lbU"o'eOf\lDl1'ION8 OH.flIVl!lWl::Tffllll'COlV/OtlA.l,;.;IGNli1O.BaOW'A8 Ofl
. OH'8f1fJloU ,Op,cu.rOMSlb ttt:AGIllIU: T.O'.&/..L Of!: 'I'..a.TtiIlM8.~.CQM)f'Ilowa'.ON~TH' ""'_ llI08'O'~Hl8"RINT A&::AGMalIHf;.121. ACrcNOWI.iD<WI:RIlCSIlT .OJ!-THS'8OUfIMfiM' IH
;'~~~~r;0:~:~~~~~~F"""!~;:)F~;t;!,HT"m, '" ""'",' ',," "" ',,'" ";;ii;!::,:'
:T:::~~.~~~~...' .., D~re
$12.00
Sso.OO
$86.00
FIRE. $15.00
EXTINGlJISHm
me $__
DAMAGE
KEY
MANUAl.
HARNESS
. NAME'.PRWrED:<.,.::
{)'l>
?.
~l ~2
CUSTOMER ~M K'T '~'A. . :=h~
muo V L-. V..
.~O<l.JP NUMBER TO STOP
~EN-:"" PH# ~ -706-650-9S98
~ANK YOU ~
I'"
OEU\I1;RED Ily....
DA Tl'.
.....~. etIl:'t'~l'l_lii... !~I..IG..,,;;r~..C'1=--
:1:::1.-,=-......::1. ..........:.....-, r ___, .___
. ,
-APR-28-2001 16:14 FROM:
"'-.... j I ~ I
, '
TO: 7063032429
P.001/007
. aquaSouth CON~TRUC~ION. I~C.
I - _ i t
I 912-965-1250
I -- j. 1
- _ - . ~ 912-96S-1Q44
Fax
FAXED
To: JEFF HENDERSON I CH2MHILl
From: WADE WOODRING
Pages: {Q
Fax: 706-303-2429
Phone= 706-294-5548
Date: 4/2812001
Re: AUGUSTA WATER PLANT CC:
o Urgent D For Review 0 Please Comment 0 Please Reply 0 Please Recycle
. Comments:
SEE AITACHED BREAKOUT OF SERVICES AT POST FLASH MIXER.
ORIGINAL MAILED TO DAVE DROWN. I WILL BE IN CONTACT WITH YOU
. UPON RETURN TO OFFICE ON MONDAY, MAY 7,2001.
THANK YOU!
aquaSouth CONSTRUCTION, INC.
WADE O. WOODRING
PROJECT MANAGER
RECEIVED: 4/28/01 17:1~; ->CH2M HILL; #403; PAGE 2
APR-28-2001 16:14 FROM:
TD:7063032429
P.002/007
J' t I
~1W~@l~.!t~
Hurold J. Walker. PJ'csiclclll
Robert K. Bcek, Vice PJ'llsidcnl OI'CrDliolls
RhondD John~(lll. A(1mjlli~lrl,livc ^~~iM~1ll
William C. DOhhing, rrojllcl MlInllger
Wude D. Woodring, Prl*cl Munll!;cr
Arlhur D. Harper, PrOjCCI Mllnllllcr
J. Rundall MyerR, (lclleml SI'pcrinlcndcn!
April 27, 2001
THRU: CH2MHILL
AlTN.: Jeff Henderson, RPR
360 Bay Street, Suite 100
Augusta, Georgia 30901
TO: ZEL ENGINEERS, INC.
AnN.: C.D. Drown, P.E.
435 T alfair Street
Augusta, Georgia 30901
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES, &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
Dear Mr. Drown,
We provide a summary of services performed Friday, April 20, 2001 for your
review at the Augusta Water Plant. Subject to your approval, we request this
work be incorporated into a future contract modification.
ITEM DESCRIPTION AMOUNT
1. CONCRETE CUTTING $ 3,462.00
2. CRANE, 4.5 hrs. @ $ 75.00/hr. 336.00
3. HAUL RUBBLE. 4.5 hrs. @ $ 8B.DD/hr. 387.00
4. 2" PUMP 44.00
5. SUPERINTENDENT, 9 hrs, @ 52.00/hr. 468.00
6. PROJECT MANAGER, 1 hrs. @ 7a.DO/hr. 78.00
TOTAL $ 4,777.00
Please address any concerns to undersigned. Thank you for your consideration.
Sincerely,
aquaSouth CONSTRUCTION, INC.
P.O. Box 747. 124 Elison Drive' PC)~ller, Georgia 31.322
Tel. (912) CJ65-ll50 . Fax (912) 965-1 044 tdgll_l~~
Emllil: H20southG'Nlc:llsolllh.net . AUgu~l.ll. GA (706) 650-0124
RECEIVED: 4/28/01 17:13; ->~H2M HILL; #403; PAGE 3
APR-28-2001 16:14 FROM:
TO: 7063032429
P.003/007
p.5
,
4-:23-2la1 2:23PM
FROM
aq'~aS~uth Construction, Inc.
P. O. Box 747
Pooler, GA 31322
912-965-1250
Fax: 912-96&-1044
DAILY JOB ACTIV.ITY REPORT
WORK PERFORMED TODAY:
DATE: '-I" ;1..0- 0 " DAY:
WEATHER (CirCa): @ Cloudy windy
TEMP.: 5. 'I AM . 7 '- . PM
RAIN: AM PM RAIN DAY? . Vos
(Use back of report for. details)
Phase % Complete Quantity · Hours Describe Work.
C; IA+ a2.. 'k' ? ,. ;AJt.J. ~ ~ t!J~~'" ~~.j.,,_
LJIJ A"d ,...-- ~,/ ." X'"J 'ltl q"
~ ~.I"'! ~ J1 .L, .//."-..-1 ,
---..-.....
SUBCONTRACTORS: Work % To Date EQUIPMENT: .Rented Company's Hours -...=
(Attach Daily Reports) Completed Complete :1.." $1..t!u".I<.'~- '-.J /~.." ,g7, 'if::J..
f},''( " t. ~(1 ~+,,_ /I ..u'_. .:s'~ TQ1v... _~M 1'-/ rIP" c~ I.... '\J LJ Y2.. r.29:2. ~
- fJu'9n Tr..e..I{ " 't 'l2-
,
-..
DEUVERIES (Identify Paperwork by Job # and Phase Code)
VENDOR: DESCRIPTION: CONDITION
(pipe, rebar, ~qu~pment, etc.) (ok. damaaed, etc.)
GENERAL NOTES: (meetings, inspections, visitors, iSsues. problems, ele.)
'" L ,y, -.2..{) ,
SAFETY MEETING TODAY? -
CHANGE ORDER REQUEST?
Yes D No D INSPECTOR ON SITE No D
Yes D No D ( If Yes, Send Signed CopY to Otrlee )
BY: .
REVIEWED BY:
.~.. l .,
RECEIVED: 4/28/01 17:13; ->OH2M HILL; #403; PAGE 4
. '
APR-28-2001 16:14 FROM:
TO: 7063032429
P.004/007
i' ' FROM': DIXIE CONCRETE
I.'
Apr. 23 2001 02: 29PM Pi
,
:.'
f
I,
/.
ilj'"
';
1,
j'
r
r
i'
r
I
f
i.
t
j
j
1
PHONE NO. : 404 669 2S5e
INVOICE
Invoice Information
Invoice #: 017590
Date: 04123101
Terms: . Net 30 Days
CU8tomer #: 091459
pot:
Job .:
Job Ticket: 11592
>
,-
Dixie. Concrete Cutting Co.
Drawer CS'198354
Atlanta. GA "30384-8364
Voice: Fax:
(<<U) '761..1100 (404) 669-2550
AQUA SOUTH CONSTRUCTION, INe
',',P. O. BOX 747
POOLER. OA 31322
Site rnfonnatlon
WATER TREATMENT PLANT
2822 CNTRL AVE.
AGUSTA,GA,
1.00 HIS
4120101, CUT/REMOVE WALL:
2 OPERATORS. 14 HOURS @ S85.OOIHRJOPERATOR
1 HELPER, 1.. HOURS @ $45.OOIHOUR
630.000
630.00
Subtotal:
Ta.:
Total:
3.010.00
0.00
3,010.00
APR-28-2001 16:14 FROM:
RECEIVED: 4/28/01 17:14; ->GH2M HILL; #403; PAGE 5
TO: 7063032429
i'
I:
I
!
i:
i~
JI
.r,~
'~.. ~:
~". ~~
. ~....
11.:...J
, UJ iii
. C j-;
i
I,
t
d
,2
':" - co
i,~ >=" ....
,~"Z ~
:.' ~ t::
, 0; co 0>>
'8i~
~R X cc
'-"00
..2 Q)W
.- f-'
.:,..... 0 ~
':::',~~ ~!
,m g
.,> <
~
:t .
, 0
~ z \ w
s ~~ ~ 8
C'IJ': l}F
c ~ 'tJ Cis
5>"2
:c~~
t-~
o
c;
-
~
CD ~
E ~
!j ~ Q)
-
~. S elf
~ :a~ ~
\J ~
~ . CD
-.::t" ~ .0 0 D- .c:::
~ o~Cl:~ 0
r- CD
ex:> 0.
N '! ::J
~
~ -
as
~ 0
L'd
~
f4
-
as
''CS
~
0
N
en
....
a:>> .
t-
..... t
"'"
~
to I
or-
U)
....
'lI:f' :
.....
.~ ~
....
~
N I~
-
"'"'
"'"' J
0
"'"'
C>> ~\
L.
CI) G)
:>
~
0
.....
CQ
1ft " ~ ~
"
"l:t
~
""
~
C'I ~
,- ^- rq
In .0
"C
.... ~
z
.;:) ~
~
)(
~
tl
ct
Q
-J
a:
P.005/007
I
wo~~ Wde~:~ Le~-e~-v
APR-28-2001 16:14 FROM:
RECEIVED: 4/28/01 17:1,4; ->GH2M HILL; #403; PAGE 6
.' '-, 'Il
:~
;:--
II:
Wf!')
,0 _
~ -
o
~
a:
Q' s.;
~- ".;: ~
'.
r
. .
l,i
;. \
: ,~
..,'~
~-I ..
f:'
':
,
:....~
. .....~
.. ".'
. 4
(,) ....
'~. m
.. l") C?
o ~m
CJ :g""
W~I~
zU) w
\ CIO CJ.
a:SC1~
Co) III .. In
Zo~1ft
-. o-~ ~ .;
en ~~
a: ~.....
W ca::'-
~ .1
c
.r.
'" .
(:'d
......
i~
"
('..::
1
~
t
.j-
~ .
;S I I .
,~ !~! F II
~ .~:!~... I
I..' ~! i 1~\ ~
. ~: I I'
I ~ VI ~ I ~I.
r,~ 1 I ~
~..1 I i ~b.L
" I Ki'l:"f
~: \, I I 5l ,:
: I i m '
I Q~' I
I I I I'
1.11 .: j ! i
"!. .! !:Q,! I
d Iii I H' i I
% ,. i ,', i l.JII I I "
ffi I , ! II i~ I I I ,
~~! I~ml !~ I ! I~
ffi I, . .l---r-i ~'
2~(J) Ie ; ~ I . I
~~~~~I~~ [ 'I ·
a8~G~LLLLlJ I
Q.
N:
I
w
~
if
. '
l.c
I
oS
j
J
~ .
~f3..J.
-J5
~I-
~
Z
w
:!
w
w
~
C)
ct
..J
:!
z
w
a:
I
oS
II
~~
-:- ~ t,
~ ! i~;l
f'.\ - I,
Yd I ~
; o~ ~
I-~I
. :~
\. . Qj . I
: ~7,'~'
f "":4 .
~ C)-q,
'-.; ~ ti "
~~'1~
~ ro : ~ ,1,
~'OI~I~~
~ ~ti~
'8 .~_
~~>r I'
~5~o
o ~~~~
z ~ liK:': iG
~~laffil-8
C} :r: Jl c :'rJ1
'cr: C) 1II z i ~
0-=< 0
'w a: _ u
~ ~ !. . i
wz~~ .S
.~ 5 .ra ~ "ii!
~()~~ F
I.
TD:7063032429
d>
=
C \
i.~
i :\\'
~~
~ ,.
~ -
~ ~.~.
- .... il
-5,...1
as "
E -..
-
~"
.S! /'Ii.:
,- '"
... ...
o \
~ ~
.-=: r., I
(I) 'r( .!
:>
.8 ~ ~
~
III
J;;
i~ ~i.~
lI) \.1 :@o>
J!!.5 i
CD la - ~.5
:5.1i ~ ~ .g:.
o lI) ....
_;.~ Ii; '8 I-
~ m li~ ~
~ -' .r; 0 -1i 2:
"8~ ~~~ i
~~ ~~~ ~
i.~ d ti ~ . i
.~ n m~'"
:~ ~~i'~ ~
s.! <('j 5. e :
f i ~ 11 '1 ~ ~
!~O~Cl)~ I~
~rol U)l\J.c~
,~~ ffi~j~
I~ ~J'~~ ~
~g. ~~:!
~~ . .c"tJ ~
~ t- ' ~.!!! II:
,
,
]', ~
w
~
....~
\, ": ~
t ~
8 01{
.j
. :1
, .j
; l'
~ '
. ~
~~~ ~da~:~ Le~-g~-V
P.006/007
,,'
1
]
'I
. . "
, .
,'~
:J
4
:.~~ .
i
. J
,1
'~
"1
RECEIVED:
4/28/01 17:14; ->GH2M HILL; #403; PAGE 7
APR-28-2001 16:14 FROM:
iA-:L:l-~~1l ~: ~ll-"M
.
t- KUM
L
i'
Q. United
.R.,.,.
~31G BELAIR FRONTAGE ROAD
AUGUSTA, GA 309099413
706-650-9898'
r'o
}"
i-
f\
; I
I
i
,
,.
""--r'~'i:...';"~.~'_~:~~~ "'. '..... ............ ."'''' -.,"".........:.,..............................,....... ....., ......... ............... .... ..... .....
.::!:If?.~~.:~f~..E:~.~~ :':' ~t~.#oc~:i..~ ~ ~ r..~; r~~.~:::x~~~~, ~~;. ;.:~:~1~}~~;:.:'~~,:.:.~~I~::.:.~~.~.~n.. :::.
7:;~:;.~~.SA~H!.:cON~U.am:tGN::~Na.~?-~;~;S~:-\;~;~~:.-~1.::~.~
:.... ......~._..................""'t.....:........" "'N ...."..., ... ..... ~;-!'...................." ..~.......~ ... "~~I""'''.'''';r.;..."""...... ............
~~i~::;~~:E~ B!-Gu:f~~I\m~,~~~~~--:;::~~~;.,!~~~~~~+.~~~~~~~~~~~N.~~?:;~.
...........:-...;.<MofW::,."'<";... .~.~.. ""....~.-:.~~..I..':":'J-...,~,~. I~...,........I .....~.I ,,,,",,,,........,1;... ,..ot I..." 1,1
i;;~]~=-r.::~;l~~Am:~ :'~} ~~.:~~::~.:~~.: ~r~:II. ~;t:;,~~~: !~\o:);;s..t'!~:~~r-;....:.;: j"i~~
.. ..",......-c ...W4P..",........,.. ........t.. #' ...,.,..'..~.:'''''.. ....'"..'" ....'.s.. ......"'....'.. .. . .
':::" ::::.:.~~OO'-l.$1:~5:~..~~:~:.::3;O~P:~:.S....~ ..:.~::~:~~~.: ~~.~:: ..~;~~i~::;~~. ~'...: ,:':
'..... "" ..., .:U ,,.~. .,~.., -, ..'. ~-" ~_... ;~ ~"..,.~,. '~~,.~.~. .~ t,~.,..~,.Q. ..,........,...
~~:.~:.;..:~.;'..C'ft~~:3~1. .....9. '~l~" ".::...,.~ .~:t!..:. .1; ';:;,. . ',rr;; '. ~..~~~~~.~~~.
.............:.....),;.... .....:_........~.;....... &......... .... ........Q........~t.... .... . ""'.... " .... .~ .",. .............IoI'IC
........~H............ ........:......,.v...:...:)c :'':4'... _'." ...: C( ..........:1 "'-.:........I..~ of "+.'~..11 -t...'. ...'1.....""........... ......^ 'i' 1'_..1" .110....... ~.
I'
.:'
r
l~
[,
"~.
c
r'
f'
J-
k
i'.
~~~..d ~!;i~~ . ;'.:r;~ i.FR it5i~~~::j ~~i~. .~tr ;C~,:f :'.;: ~'~~."';:~-e:~r~:~:.!;,:!~~~~~~~ii,:j1f.j; ~;r
. 'CUGtome~ :,::.:~-""JX,.E:Q:Q:6.':,,:':.' '. . :.: :.~,~ .'::~.: ";o.~:,':.,~., ":' ~"~:. :",. ~
. I'" .-........... . ......... .'. .~............~.i~)ir..... 1 "7' ,'..... . ,,.,.. oiH.. ... .,..........,",....04 ...... '''.'':;s.'''J ",....t.........~..., ..."".
:~:?..;?~:1l~~:~~t;''jI~~i:\''tt~~'''~1.W~ ~~~~~~:~~~~ ,,~~:.;~:
;.....................I......~~~l'It.g\........!...~~)t'..~~~~N!~~..M""fo......!t..I'1l#'I",c.'....~........M
:~~'. ~~~:::~:~.,B~~~7'4 V:.t.~:~ {~t~{!~ :J!~i!::~:~. ~:~:~.' :~.'; :.~~ F~~..~~~=: ~~~~~~t~~~i:~~..,:
.....,...I..~..........V~... ...."'~.~~:~.-:......... .....................:.. . ""':':'..:. ........ .HI..4 "l' ........ ,:,...,."""o(:.,.:...............t:.c.....c.......'.......' ,...
..J'''"""""," '.!!I ~ oC......~~ . '''~ .,..~~_....._..: ...;....I'h: (,:,,-:,'-:4.-" .'.1-."'''.-.0: 4...,...........lI_........
"I. ."",. .......,.... J;l' . .~.~~H'''' ~ ':Q' ..~A...I....")ooo...N. ....._...... .... ...... '.' _. ....:~~............_.... .....1.1..:..,
:!i'~,~~~:::.... ............ .."-~::J:_. ,..f.;.... ....:, _. ......-c:.;:;:;~:.;:;.: ~;.:::.-: ..;:..::;;::.~~':'~~l.:::;.~ .!;::~:.;::.::::;::.' ..:,;..i
. .',.: I"w. ............lIIlf 1110'..... "..... ...".... .......... ....,....... 'Of ....~....... ...... .....01.' I ...1'.... ............. "'.... ......" .......... ......
... ......,........... . ...-.......... .,..", .......~........ ",'" .' .... _"""...... ,b... ...........,.. I...,.., ....... ..... ..,,,,, "...... '.," ,..... ."..--.. .....1.
......,........,....,.............." ..~..,.r........ '''''.......f.. .................'l....~'.I........I..........."....,............,.... .....1...'....................
" ......,^........... ..1.... ....................... ......... ..,.... """) It "'"....... .."'.............1. ....... ,..........lj,...",.,.....",.-.I...I
i~+!': i..;~:;,,~:-,:..;; t..;,,~~:;:':' ~:::: ~ .;..~.:::..~ ~.. ~~;:...:. .. i~..t.U ~..'i.... .~i~,~::.;.:'.. ~ ::~:::.: :!..:ti~t:,l~~~'~ ,J~:1:'.:~~~:;.,..!
I"'" 11\'" .. ..",,,,,,, II. .".;41,,.,,. '. ~. .... . . .... ~ ,... ," "'" '. 1 . .. ,,,,,.t." ....... ............ '" .... ,..'I'......I..',;;;.~
;.t~~i~~~~ ~~,~.i~~ ',,:::'..: ~~.~~:..~~ = ; ,I~ :;~:~:~:;:~~~~~;J ;i~; ~.'=~':U:E~.~;i~ ri~i~;t~~l.:.e~.b~~
~
f,
~
Ii.
i<-
fi-
r
,.
,
TO: 7063032429
P.007/007
r. oJ
Page: 1
~Zf;':~~~f~1t:::~~6~'i.:~. ;..::.~' ..:~ :'~:'::.;..:;'~:';.':~~ ~i;;..;~~~~}.:A:~;:?::~.:.:.:.::::
..", ...,_l-niT.."J:.!. ""'" .. . ''''''''S...., . ... ...... N. .., r . )". ...
,..._ ..\.....~44.',~)i:I .... . ~ ................~~..... ............ ,~.. "\J \.., I...,. ..'
=---..4.;.t__....~~.1.8.i-i\~~.......~,... ..~J;.^_...."._.....,....;.........;w.....,... "1'::" ...... ..-: '.....11....
:f":-...;;::~r~~~~~~::. !.~;~tt."~:vjh~~~i::...V~;~:!~~ ;t:~r ~,'i.::;':;:....~~:;;;
.........J..~~""'~_.., ~~::...,........+~.:".:.~i-:....;..,~~jjLC' .....,....................." ..~
S:S;~!~~m. /: I : .~~i~.GA~~~.~~.e:~~:t&yHt'i:;,r~?~J..'":.~~/i!...~,:r~:.(
-....- ..,............... .~...'.....I................,'......l"~.e,.I....'"''l............I............'\......... ..,... ....,......"...1....
~~~f1~~~~~~~~~t1.~~;~~.)ti.~~~f~:j~~:~i~~~~~~~f.~~i~};~~~i:~~f~.~~
RENTAL OUT CONTRACT
:~~~21~[01~f1~r::;(C{~:,~~i~~f~1~l~i.wiR;~;f1.~~~;~
'....,~..r.~:b!:~~~.-+t'..::1'r...'".:-..............->.... : .......:... .,..".. ~............^".........."'............ ..~...'.... ,u I
:~.~~lt\.:cTA~t::1de~;:;~~~ jI.:~~2nt~o~~~?~'~~~1;~~.:'~:~.!.
~tt.'......~~T4.....,..Il......,.:.. .of..:......(~.............f:;.(._'^...t..:,"" ,..'..."'.........1 ~..:...............__..
'aJat:ej":t..... .t:;;. "M."'" '..II-:2:.:Ol~:tt.~'.... "..~:1r'ao.~...p.r~r ...~
F:;"':~:' ,4~~9~..~'i.r;~.~,:HHE~: ~~ 7;'~a:: .tw~~l~i~~...~,~~:.:.~,~.:f.~.i:
".~~~~..~V,~+.,.~tl.:>~....." ,,' ./1.:... "...1 "..$...~i'."..w""ctQ: .~f.o1;... ....
.~-~f)1):l~oc:~~~:t:.1~.~~Gil)~.R;~R~i:t~~~?m.~t.~ .
.t'~':!i.:::.~~."'"';:~::.t~"'.::'.!".-;:::~~.-4.<<.;;:::~.::.j\~~:~;;.....~~.~,.:;;,\;..t:~".~. f.
~t.IJ!n:M~' :: ~'..:.:.,..;..i.....~:. ~ ::.. ~.::'..t':~.~u. ~~ ~lt;1.....~..K~. ,
.I~....~i....'f....... ~J....,'~-1o"...,...,II....b:Jiil..+.-t~'tt:."~:~1t,. ..14... ~""'.......~". ....~ ........ot~_ ........
~:i:~~W~~~;~~~~~~:~~~;~~~;1lf~~:f~~\~~~Rt,,~~~~i~~f?~
~~::.e~re~=EBy"::~:~i>i~ON'Am~; ~:..ii,'!'..\!tin~,l;I'~~'t.: ~ ).:!.::.r~~~~~J ~'!~~..
t'.~:T...;...,:.1t."!"l: .......,.(,0....>0...:. .$:':' .."'U~.i,,~.I... ~..~;. .11........'..,.1' "I' "I' '. ,... "'j!1-'" .... """" ~.....
:~~1~..w:4ret1)i~~:.;::~::;-.;.~~:8~..~~~.t4i~:='ii:~~~~,i:":~:~~~~
~~.~~w.i~;:~~i~~~~~:':~}~~N~i~f3~iiiiki~li;,~.~~;'~:4.~~~:! ~~~tt~:~
....-..lto...........!t...,...HH.................ma.j ., '.... .,...... ......'...... ....to...... ..1......'" 011..............1...........:... .......,.,...........1.....1..10::: >44".... ..:.....:.......04 ......_:..,::....:~.........:.::....:.<N>...>..... ...-:--:-< _ .~"'Io"''''I'',"''MI'J'''''~''''''' ...~... _..... ...........~~.lo! t~. IE"! ~"! '41 .
.."...",....,.....-......-.....--....... t.,t1'I-.""..,......." . ...... ............... '41#1 ,....11...""I...I...IowC......I...._......_.:;,)~...".r.rl'....._.....:'....-:.I...._..+.. ..............0:;.........-.1.. ...-: .....:..~.N'..... ........i.:<._........~I.."..........~~I'.,.'. ..It'',,.~....r:...,....'~ ~ ..........,.
.. ..''woOl''........ ...... ....,. ................. ....1.... ...i.._...... ."'.u..................I.. ......'Il..........~............,..........II,.."'......"""......M~ .....i..._.I......h._..... ....._ "''''''''''_'.. :._........ :,...$....... +-.:............... ....o::..............li..........h...~.. oj''''''''''''' _,,~, ......~~~~
'"y.~'':m'~~'~V'i''' \ . ....... ." li:.............t.ilj.......,............II,...........~..I&........'...t.".."..1.""'4.....".....:......:.....m:n".:;........."r-......D~~...,..~....">>-:-).We~.(;..:.Io...I.~.q.:.\N ~.....,.li!.:Brna\a;,(a~...
: ~~;,Z~~~~'~.i:!~.t.:vt;.~~ tt.. "~" f.. ..~~::~ ~~~~:~~ ..l~'3 f~ ~~~~;2.~:~: ~j~~~8;.;i;~5t:ti~:~ ~ ~~~;.; ..~j.~:~ ~~.::,~:.~: :~t~ .~..~~:~I~~;:1 ~~~..:...~ ~3.. ~~}~}.:~:..} 3 ~.~':~:::~ ~.~:Z~;i2:~i~~,,~~,~~:;.'
1. PUMP 2 IN SUBMERSIBLE 110 V 35.00 35.00 105.00 315.00
180058 Make: WAqmR Model: STP.400 Ser #: 5067043
SALES ITEMS:
Qty Item'nwnber Unit Price
~ BNV" E.i\ ...
ENVrRONMBNTAL CHARGE.
WA.J:VER PilOTECTION DECLINED
;.:.
t
f.
!..
>.'
. ,
l;f' appl.icable
there will be
Initials
a fuel
charge at
the
r
,.
,
ICEV $12.00
MANUAl. $50.00
HARNESS $85.00
FIRE. $15.00
EXTINGlJlSHER
me $_..
DAMAGE
I
r:
J
j'
!
the
rental
end of
"~
"3 ..:l -
1IiJ. '31 , '& ~ -ro-f/J !)
CUS10MER MUST CA~ F=OP.
.?O<UP NUMBER TO STOP
.~EN-:r PH# 1-1tJ6.65O.9898
~K YOU ~
,.
i
I.
I:'
I,
r
l-
I'
t
i.
f
..~........:"'~.................,....'..~.h....."..."..,U............. . ...... ..' .............,,,,,. ........,....._.,~...,...,.^....'''"......"..:::..;:;'. .:,::J,... ~.;..'..:.::.::l;~.. ".
::~~~.~-~.-~~;-~.~,~-~:~~~-~IlYJi(*'1..~:Iai~~Jif~~~:~st.~"lIr'.#W:"ItlllCl...J'::'!P'~,' , \-
.. , ,.,..... ...... ..........-.. .....,..............1. .... ... ............................................,......\. ......'... ,...,. ... ...,._
;.~:: ,"'......, ........ H ..... ,.... ......,...., ~)Ip....!lW.oct~~~~~~~:~~.~~h~""",.t1t'~'.a r... .....'1 )1............"'....... ':!''''!'''"I''''''' ..~.:--:._.
:~~lI!l~~ :li.Wi~m\t&jJ ~~~Y.f.~~ltlcY.~.~.III:pir.-Jt,t_:~~t}O~'~Ptm~;~.G:I~~,:i.~l;i!iii~;;~~~o:~~:.~
. ~'C/lIUl/llllf:AIIftp"':f:.~m ""':.1\ . -lllll~':..:_Il.lhll'*t'WIlC~~.Wll=~.d~....~ll~~.Oi/lll1 C<w.enid".~CJliJftl~.Il!CI!llJlrG:~iIl~""""1I#1IlQ' ",'.
:.:.. ...r..,,,.,,.;...~.....:J,..,,,... .-.. . l'~''''--:''.l$DlIdrs:J ..~".........--!-.......IO~....I-...........ml...........tr..-_-- :~ _".....,.
" ,-..~ioI.:.i..;&:.;:';:;:.,~....,. -.-,.. -.. . ,. ., . . .-...... .-.;-,....... ...-.""'''........ ."..,. .........-... .. ""....... ,.,..-.' ......,~. II ,.,.. ...,.,
.."..,..~~ ~!f~.tf# ~~ T w;t...~1tJldurIft.II.c~'~,~:! I..:~~~::.: I~; !I,,'. ..:-....'.'i' :'''!'':'.~.,,:~''; i'';~.';'. :7:"'-:':',;,!~' ......-:-'~....~ h~~~~~,~~! .........~~"--~.'..~~~,.: '
..i:~~~ c)_,l*.~i""',ro cL~.Wt~~.Ib'd~'i;"\N,i.'T~lnli:iIliI~IlliIriit'aUlll.!iiw~ ildfl lIftd~C~J!~It;J)ii.~~6GbCi:.,:ri;iws~.,i:~iDNiJIII~....
~:l!'~..!~:~~.~mu:WI~lnIl1_.:..~:llr1IIW:l'tfIl'w.~'::..iftI~:lltI.~~".,,.,.:m1l1l.1lll7N(lll.;~,.,,~I~I'tJ:\1IIV:IJ~~IlIlOlllt,v.O~nl:~
:.:~IiiiIJIDrl)oO..)~I)IW'lr;~ li;".1A~':OrJ.,.tDWJal\t'~;ItlIIOt-'~.iW..fIJ.~.'l3i~.~e=t6t 1l1~~:0ClC;~ ~~'Iftd!.==" .~TNl'lfl'(.l!'
:.~~~.IlI~~~:llt:~.._oiif\Illfo&!QjItlaldilif.lltli6I..of;MIO'IMJ..., :lll:J6Ima~;15I:1:l1a~~f._lll...~i1lid..*'1..... .. 1lIl1lll,:ftit;.tt ... ..~; .,:.
'. -.;:.~'e~~.~~.~~II6.WAiD>.8li.:citliwob508liofti eM>l~ib~:;;ji"bt'"'' .ltralil!1'SnllS~O:t:~/.OIIS,~_".!!!lM-~~~IOtIAL!:81~O: '.'~ ::.
. ~:BEH~;OF;CUSJDI:IIttJ tltAGIl6a. 'r;Q'.AI.l OP.:ntll~.'COOIOmOIS.O".'l')f.I/~ &1OS'O,~..JlRNfAL.4Gll69lI1Hl.J2).~~.RQCO" .000':r14UlOU""_!lf,
"f~!~~!:~~~l!!'!~~.~~."...-9;~~~~~~;W~~~:t.;:J~..I..~.: "'~~J::~rt~: ~~r.r:';,~~; ~ ";~; ~~:~.:;:~~~;:~~~?:~:;,ri :~r~' ~~~~:;";;: X~~~:::' ~t~~~:~~r~~~~.':
~~lE1ill~!::~:i/~r~~'::~:iE:~i~LI~;~j5J~lf}~!i;:IT;~~!:~~SI~!t:;fN:~::fli~;~:1:blI!
, .
.
.
.
CIfNIHILl SUBJECT
BY
PROJECT NO.
DATE
. .
SHT_OF_
h -I 'lsu nn. ,r,
,
A. .J~ ~ '" - s" .r'1
W 1~1 I"
PI'"
tP '7!-l v.:~-r-l8 t; . I ~I~ (,~r. all ~ 76' ,I-P-~ "'"
c .~ ~l ;E>/S: (,5 S" "3 :> -~ IS (p~ 5'. tJ
"
c:: .q~ ,:d rol d ( 4. o-() I i 7d ,. ) J
c. 6, ~ . S~.1 7S' j-t 7~ ~ 40
oJ '"
,
C . . -IJ-J, ~Z >J' 0 2, 2/ ~. l 0
C (J. ;H~ trJJ (p 7t&. - ~ ) ~ oJ ~, 'l)
c. o. PI.. sk" 55 .2 \ !,( ~ ~ 4~1 JO s: :-r.. ~. d ."
C o. N 7 . J, d D " II' I.- t 77< ~, d
c: . d. :Hi) ~ 1S4 . .. 1I 3) . (II)
1"
c. q. .,d~ .5. s1~ ~ 110 0 tl~, ~~ (l. f ,
I
.tI~l) 1~ /l7..1. =-=-
C. fJ. Ov t;." ~ /7- -- (, 7q ,0
61 11. ! I. I tJ t
(, v. 11 JL1- '-1.- (~LL 7~ 1. d /
c ". -ii/ ~ i7~ /. . 'f>)
4- t~_I~5. I} P i' ~2 O~ ~D. PI
>> ":'/~
1?" IN. iJ~ ~ ',. . 1'J9, ~ POI, '8 ?-J 9. 2<- I~ ,
.,
C o. ~I (. c/.~e I ,.) - ,5. Z. 71
't1 It. ,,:Z~J:, z'
7:; --- Yf e", !,'S 7' d. " ~ U 31 9... I. c ~(
f- {p 1 'pl. ,."
.,
. '2 ~ ~i 7~ z. If}
- "2 q '5" 7 o. ~,
~ :r t 0 ? 4t
.j;; ~c ~, .:-- ,th, S; ..off ~ ~ 9 ~z 4 t
~ 4~ .
, J~ 7 1.0 ro
r ~
~
'ff 70- !'- 4- t.
-
REV 1/92 FORM 19
Original Contract Price - W-1A (Clearwell Baffling)
Original Contract Price - W-1 B (Chemical Addition)
Total Original Contract Price
Total Change Orders to Date
Total Revised Contract Price
Total Change Orders Percent of Original Price
Total Pending Change Orders
Total of Change Orders & Pending Change Orders
Total Pending & Final Change Orders Percent of Original Price
I. I,
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemcial Addition
Summary of Change Orders
Revised: 05/03/2001
$1,207,688.00
$818,758.29
$2,026,446.29
$609,344.10 ~
$2,635,790.39
30.07%
$0.00
$609,344.10
30.07%
Change Order No.1
Repair of high service pumps 2 and 4, clean medium
voltage MCC
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
05/03/2001
Repair 30" line at post flash mixer
Replace 30" line, clean and reuse fittings
$11,49500
$7,665.00
$38,618.00
Replace oil valves 2-5 and 2-7 and place in 8x8 vaults
$65,86200
Install additional cribbing, temporarily remove electric
ductbank, substitute 6' precast manhole for vault.
Remove and dispose of oil contaminated soil
Replace 30" street elbow with 30" MJ elbow
$12,487.00
$1,79100
$4,084.00
Inspect, drain and dispose of gear oil in oil lubricated valves
Replace oil valve 1-2
New stuffing box for horizontal mixer. Startup services for
horizontal mixer from U. S. Filter.
$2,484.00
$28,689.00
$4,931.30
$2,369.00
$31,355.00
$3,82500
$215,655.30
10.64%
Diver and crew standby at 20" junction box.
Replace leaking valve 1-1.
Install ductbank manhole in Central Avenue.
Change Order No.1 Total
$1,423,343.30
1 of 4
W-1 Change Order Summary
'.1 I ',t
.. -.
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemcial Addition
Summary of Change Orders
Revised: 05/03/2001
Change Order No.2
2.1 Clearwell No.1 - Plug existing lines and dewater structure $4,805.00
2.2 Interior lighting and ventilation $3,901.00
2.3 Remove existing wall pipe, install new pipe and recast wall. $16,363.00
2.4 Install cove ring $13,921.00
2.5 Blast and Clean Wall $6,188.00
2.6 Apply Coatings @ Wall $20,592.00
2.7 Remove/dispose Debris $7,856.00
2.8 Clean & Disinfect Tank $4,232.00
2.9 Excavation and Additional Cribbing $2,142.00
2 Change Order No.2 Total $80,000.00 $1,503,343.30 3.95% '7~ {'.fer
Change Order No.3
3.1 Ductile iron MJ Tee@ valves 2-5 and 2-7
3.2 21" pneumatic plug
3.3 3' x 3' aluminum hatch @ valve 2-1
3.4 Rehabilitation of Clearwell1
3.5 Cost of cylinder breaks
3.6 Variance on Horizontal mixer startup
3.7 Repair work at valve 2-3
3.8 Dewater/disinfect clearwell1
3.9 Rework at east valve pit
3.10 Slide gate at Clearwell 2
3.11 Repair slab at Clearwell 2
3.12 Replace pipe & fittings @ valve 1-1
3.13 Aluminum handrails @ postflash mixer
3.14 Steps from East Valve Pit to West Valve Pit
3 Change Order No.3 Total
$6,887.83 '"
$749.37 0/
$784.31 v
-$453.00 1
-$170.00 0/
-$1,078.00 v'
$11,498.00 ....
$1,611.00 ./
$1,678.00 V'
$7,829.00 v'
$3,533.00 v
$18,96300 .....
$3,14300./
$2,500.00
$57,475.51 $1,560,818.81
$8,203.00
/ $8,203.00 $1,569,021.81
2.84% -1'568
Change Order No.4
4.1 Lime Removal from Clearwell NO.3
4 Change Order No.4 Total
0.40% + ~'f 7
05/03/2001
2 of 4
W-1 Change Order Summary
~i . .
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemcial Addition
Summary of Change Orders
Revised: 05103/2001
,
Change Order No.5
Connection of Auxiliary Pump Station and the Fort Gordon
5.1 Pumping Station $83,676.00
5 Change Order No.5 Total /" $83,676.00 $1,652,697.81 4.13%
Change Order No.6
6.1 Lime Removal from Clearwell No. 5 $23,993.49
6.2 Repair of cracks in the slab of Clearwell No.5 $15,436.80
6.3 Investigation to locate valve 5-3 stopple valve $11,62500
6 Change Order No.6 Total Ii $51,055.29 $1,703,753.10 2.52%
Change Order No.7
7 Clearwell NO.1 Crack Repair $6,000.00
7 Change Order No.7 Total V $6,000.00 $1,709,753.10 0.30%
Change Order No.8
Clearwell No.2 - Dissassemble 3 - 30" Pipes and install 6'
8 square access hatch. $9,35400
8 Change Order No.8 Total Ii $9,354.00 / $1,719,107.10 0.46%
Change Order No.9
9.1 Investigate Valve 5-3 by diver $1,590.00
9.2 Remove brick veneer at clearwell #5 $953.00
9.3 Replace brick veneer at clearwell #5 $1,144.00
9.4 Repair of Vertical Joints at Clearwell #5 $1,881.00
9 Change Order No.9 Total / $5,568.00 $1,724,675.10 0.27%
Change Order No. 10
10.1 Install Stopple Valve for Valve V5-3 Installation $45,153.00
10 Change Order No. 10 Total ../ $45,153.00 $1,769,828.10 2.23%
Change Order No. 11
11.1 Restoration of the 72" Concrete Finished Water Line $34,44500
Installation of 2 D-O-L InnerFlex Assemblies in the 54" 01
11.2 Finished Water Line $5,998.00
11 Change Order No. 11 Total "/$40,443.00 $1,810,271.10 2.00%
Change Order No. 12
12.1 Modifications to Fort Gordon Connection Piping $9,538.00
12.2 Deduction for return of 24" x 16" Tee -$677.00
12.3 Deduction for deletion of asphalt overlay in Central Avenue -$2,100.00
+-'1 . '2. 9
4- z.f.p'1 b
05/03/2001
3 of 4
W-1 Change Order Summary
I . . .
. .
Revised: 05/03/2001
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemcial Addition
Summary of Change Orders
Change Order No. 12 Total
$6,761.00
05/03/2001
Cb's
I\ck '/11 J <.0e ~ :
1-L..\~ ~()
'lsrZ;> ~~ l \
4 of 4
$1,817,032.10
0.33%
W-1 Change Order Summary
:':::Ie'I:a&T~::I.
................~....-
et=e.lI,J_;;....-=-{51.1""'-----:l..~C1=_.
'MBR-2D~~001 10:16 FROM:
TO: 7063032429
P.001/006
, -I I
afluaSouth CONSTRVCTfON, IN~.
~- j -- 912-96$01250
1 -, I
: I ' fax~ 9"2~65-1~
Fax
FAXED
-
,
-
To: DAVE DROWN 1 ZEL
From: WADE WOODRING
Fax: 706-724-5789
Pages: 6
Phone: 706-724-5627
Date: 3/26/2001
Re: AUGUSTA WATER PLANT
cc: BOB DAVIS I CH2MHILL
o Urgent 0 For Review 0 Please Comment 0 Please Reply 0 Please Recycle
. Comments:
ATTACHED ARE COPIES OF THE ORIGINAL PROPOSALS FOR WORK
ALREADY COMPLETED. REQUEST CO #8 BE PROCESSED TO AllOW
PAYMENT.
SUMMARY OF WORK
CRACK REPAIRS @ CWELL #1
MODIFICATIONS TO C'WELL #2
LINE STOPPEL FOR VALVE #5-3
RESTORATION OF 72" FINISH WATER LINE
INSTALLATION OF COUPLINGS @ 72" FW LINE
TOTAL
$ 3,360.00
9,354.00
45,153.00
34,445.00
6.506.00
$ 98,818.00
aquaSouth CONSTRUCTION, INC.
~WOODRING
PROJECT MANAGER
RECEIVED: 3/26/01 10:1~; ->C~2M HILL; #302; PAGE 5
,MAR-2q-2001 10:16 FROM:
, 4.
TO: 7063032429
P.005/006
11;11',,111.1. W.llkcr. l'rc~i,lclll
I/"h~n K. lied. Vice 1'lc~ilh:lIl OIICI."lhlll.'
Ilhplhla JI111llS\"L ^.llIllll,~lritliv~ ^~'ii~tilllf
Willi:llll (', I)Ilhhill!!. 1'I"l'.ict:' {I",IIl;ll:cr
\\";lIk D, ,,"plldrill/!. '.'r".ic~.1 MII":'j:l'r
Arlhm 1.1 I !;,r!'l"I'. 1",,,jc~1 M:llI:'llcr
J. Ibllll:lll Myn~, GCllen,1 ~llpcriIlICI"lcll\
February 12, 2001 . t(Q)\P
THHU: CH2MHILL
ATTN.: Rob Lorentz, RPR
Suite 100, 360 Bay Street
Augusta, Georgia 30901
TO: ZEL ENGINEEI~S, INC.
ATTN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 30901
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING. VALVES" &
CHEMICAL FEED MODIFICATIONS, AUGUSTA U r1UTI[S
DEPARTMENT
Dear Mr. Drown,
We extend the following scope for restoration of the Finish W;;jler Line (72"
Concrete Pipe) leading from tile Filter OuilcJing to tile Post Flash Mixer.
SCOPE:
t. . Dewatering, pumps, and supervision
2. Estimate by ERI
3. Cleaning & disinfection
TOTAL
$ 2,~ '\'1.00
3.1.~8G.OO
_ S'1~t1)Q
$ 34,445.00
NOTE: Please review the ERI estimate which is attached. This proposal is all cslil1l.:lte
that may involve a variance in materials depending on orders given by the
RPR. Workmanship and material performance warranty to be prOlliUf.;ld lJy
ERI. Additionally, this scope does not include any intenor rubber banding at
the location of the joint repairs. It is the opinion of ERlthat it is not necesst:lry.
Please review and address any concerns to undersignod.
Sincerely,
aquaSouth CONSTHUCTION, INC.
19,
I> Project Manager
III . P.O. Box 747. 124 1~:l,~(J1\ Drive. Plloler. <leorgiu .'1322
Tel. (912) 965-1250 '/;IIX (1)12) 965-1044
Email: 1.120sIlUlh@hcllsolllh.I\C.I.Augusla.GA (706) 650-012/1
lll.Jll_I,I'
,~ n,.jCr.~.'\
~I~'"
~~A
~'"~
RECEIVED: 3/26/01 10:1tl; ->Ct-l2M HILL; #302; PAGE 6
.~AR-2q~2001 10:17 FROM:
TO: 7063032429
P.006/006
---- .
February 15, 2001 t~
THRU: CH2MHILL
ATTN,: Rob Lorentz, RPR
Suite 100, 360 Bay Street
Augusta, Georgia 30901
11:11\110.1 J. W~lkcr. I'lc~i,lcn'
R,.\[o"f1 K. lied.. Vi.;c 1'1 c~illclll Opel:'1 i(,n~
Rh""113 JnhJ\~'.III. ^,hnini~(ralivc ^~~i~1;11l1
Willi:lnl C. l)'.Ihhing. l'r".icO;I Mllllllr,Cf
Walle D. W...."lrinl;. f'wjc,.1 M;nlll~CI'
Arlhur D. (1:"'pcI. Prnic~l r...I;III1'licf
J, Rand:dl Mycr~, tlcncrlll Snl'cr'inIC/Illc/l1
TO: ZEL ENGINEERS, INC.
ATfN.: C.D. Drown, P.E.
435 Telfair Street
Augusta, Georgia 30901
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES.. &
CHEMICAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
"
Dear Mr. Drown,
Please note that upon further investigation, bolh joints are in fact deflected, This
will require two Inner-Flex seals with an increase of $ 508.00 with taxes. This
does not reflect any increase in overhead or markup.
1. Pickup and return to Atlanta. GA $ 651.00
2. Installation 504.00
3. Material Cost w/7% Sales tax 4,815.00
4. Markup @ 10% 482.00
5. Bonds 54.00
TOTAL $ 6,506,00
We are sincerely apologize for this oversight and request this amendment to our
original proposal dated February 14, 2001. See attached measurements
documenting both joints being deflected.
Sincerely,
aquaSouth CONSTRUCTION, INC.
a . Woo nng,
. Project Manager P.o, Uox 747' I Easolll)rive' Pooler. Georgia 31322
I Tel. (9 J 2) 965-125U . r:lx (912) 965.\ 04'1
ElItail: H20s011lhCpbellsoUlh.llct . AU8USI:l. GA (706) 650.0124
"iU'I_I~2
~-~
~l~
~;;;!/
./'~
'.. ,
i PERI(C~'IC ESTIMATE FOR PARTIAL PA~~CENT
", . I J. .~
".
. ~. ..
f AUGUSTA UTILITIES DEPARTMENT PAGE NO.: 2
PROJECT: WATER TREATMENT PLANT ESTIMA TE NO.: #19
A. WORK COMPLETED TO DATE
COMPLETED
Item Original
No. Item Description Estimate ,.
# Units This Period To Date
ADDITIONAL WORK / CO #1
22. REPAIR MOTORS; CLEAN MCC $11,495.00 100.00% $11,495.00
23. REPAIR 3D" PIPE @ MIXER $7,665.00 100.00% $7,665.00
24. REPLACE 3D" PIPE $38,618.00 100.00% $38,618.00
25. REPLACE VALVES 2-5 & 2-7 $65,862.00 100.00% $65,862.00
26. INSTALL CRIBBING / DUCTBANK $12,487.00 100.00% $12,487.00
27. REMOVE & DISPOSE SOIL $1,791.00 100.00% $1,791.00
28. REPLACE 3D" 01 MJ ELL $4,084.00 100.00% $4,084.00
29. INSPECT VALVES; DRAIN OIL $2,484.00 100.00% $2,484.00
30. REPLACE VALVE 1-2 $28,689.00 100.00% $28,689.00
31. REPLACE STUFFING BOX @ MIXER $1,481.30 100.00% $1,481.30
32. STARTUP SERVICES @ MIXER $3,450.00 100.00% $3,450.00
33. CREW STANDBY SERVICES $2,369.00 100.00% $2,369.00
34. REPLACE VALVE 1-1 $31,355.00 100.00% $31,355.00
35. INSTALL MANHOLE @ DUCTBANK $3,825.00 100.00% $3,825.00
ADD. WORK SUBTOTAL $215,655.30 $215,655.30
ADDITIONAL WORK I CO #2
36. 21" PNEUMA TIC PLUG $749.37 100.00% $749.37 v
37. 36 x 36 AL HATCH @ V 1-2 $784.31 100.00% $784.31 ....
38. REHAB CLEAR WELL #1 $77,858.00 100.00% $77,858.00 ff~, 0 ",;
39. 01 MJ TEE @ V #2-5 & 2-7 $6,887.83 100.00% $6,887.83
40. COST OF CYLINDER BREAKS ($170.00) 100.00% ($170.00)
41. REPAIR WORK@ V #2-3 $11,498.00 100.00% $11,498.00 ./
42. DEWA TER/DISINFECT C'WELL #1 $1,611.00 100.00% $1,611.00 ",
43. REWORK@EASTVALVEPIT $1,678.00 100.00% $1,678.00 ....
44. VARIANCE ON H. MIXER STARTUP ($1,078.00) 100.00% ($1 078.00) ....
45. EXC.lBACKF/LL @ C'WELL #1 $1,689.00 100.00% ($1 689.00:::
46. SLIDE GATE @ C'WELL #2 $7,829.00 100.00% $7,829.00 V'
47. REPLACE PIPE & FIT. vie. V1-1 $18,963.00 100.00% $18,963.00 v
48. REPAIR SLAB @ C'WELL #2 $3,533.00 100.00% $3533.00 ....
49. RAW WATER CONTROL LOOP $3,808.00 100.00% ($3 808.00:
50. HANDRAIL @ POST FLASH MIXER $3,143.00 100.00% $3,143.00 ....
ADD. WORJ{ SUBTOTAL $138,783.51 $138,783.51
-OTAL COST
Cumulative if more than one pagel
$354,438.81 _ $215,655.30
Page 2
;
,
Ii
Ii
I
Ii
r
,I
, '!
:. J",.
1 I PERJlf':IIC ESTIMATE FOR PARTIAL PA~f~;IENT
..c ~ ( r
..-
. ..
I
"
I AUGUSTA UTILITIES DEPARTMENT PAGE NO.: 3
PROJECT: WATER TREATMENT PLANT ESTIMATE NO.: #19
A. WORK COMPLETED TO DATE
COMPLETED
Item Original
No. Item Description Estimate
# Units This Period To Date
ADDITIONAL WORK I CO #3
51. LIME REMOVAL@ CLEARWELL #3 $7,566.00 100.00% $7,566.00
ADDITIONAL WORK I CO #4
52. MOBILlZA TION $2,286.00 100.00% $2,286.00
ADDITIONAL WORK I CO #5
53. JOINT REPAIR @ CLEARWELL #3 $2,094.00 100.00% $2,094.00
ADDITIONAL WORK I CO #6
54. VALVE #5-3, C'WELL #5 JOINT $5,568.00 100.00% $5,568.00
ADDITIONAL WORK I CO #7
55. INTERCONNECTION, ETC. $134,730.00 82.41% $59,976.40 $111,030.99
ADDITIONAL WORK I
56. CRACK REPAIRS @ C'WELL #1 $3,360.00 100.00% $3,360.00 $3,360.00
MODIFICATIONS TO C'WELL #2 $9,354.00 100.00% $9,354.00 $9,354.00
LINE STOPPEL FOR VALVE #5-3 $45,153.00 100.00% $45,153.00 $45,153.00
RESTORE 72" FINISH WATER $34,445.00 100.00% $34,445.00 $34,445.00
INSTALL COUPLINGS @ 72" FW $5,998.00 100.00% $5,998.00 $5,998.00
l'
,,1r
TOTAL COST
:Cumulative if more than one page)
$237,840.00 _ $128,544.99
;
!
,f
ill
il!
'''I
ill
:/
:I
Page 3
. .j
"
../...-""
.:.' '/:., '.
.,.. " "..
;" .
.
"
PERl.i)IC ESTIMATE FOR PARTIAL PA'.i:-JENT
PROJECT:
AUGUSTA UTILITIES DEPARTMENT
WA TER TREATMENT PLANT
#19
PAGE NO.:
ESTIMATE NO.:
4
B. SCHEDULE OF CONTRACT CHANGE ORDERS
CHANGE ORDER
DESCRIPTION
NO. DATE COST COMPLETED PRICE
1. 11/2/1999 CHANGE ORDER #1 215,655.30 100.00% $215,655.30
2. 4/25/2000 CHANGE ORDER #2 138,783.51 100.00% $138,783.51
3. 8/22/2000 CHANGE ORDER #3 7,566.00 100.00% $7,566.00
4. 8/22/2000 CHANGE ORDER #4 2,286.00 100.00% $2,286.00
5. 8/22/2000 CHANGE ORDER #5 2,094.00 100.00% $2,094.00
6. 1/16/2001 CHANGE ORDER #6 5,568.00 100.00% $5,568.00
7. 1/16/2001 CHANGE ORDER #7 134,730.00 82.41% $111,030.99
8. ADDITIONAL WORK 98,310.00 100.00% $98,310.00
TOTALS !~t~{!~li~lttiI1I!~~~Ii!i!!!i!ti!it1~IJtlfI~!!!!Iii!itt~t1IfIf~!r#IJ~lii! $581,293.80
ENGINEER:
ZEL Engineers
C. D. Drown, P.E.
~~
....,/3c/01 BY:
I ( DATE:
;f1f?))4#~
. J /2 'l h,
C. SCHEDULE OF
PREVIOUS PAYMENTS
NO. DATE AMOUNT
1 to 5 609,322.10
6. 1/14/2000 326,564.64
7. 2/22/2000 125,964.35
8. 3/17/2000 402,115.02
9. 4/14/2000 246,436.31
10. 5/26/2000 199,434.82
11. 6/9/2000 114,685.48
12. 7/21/2000 68,010.97
13. 8/18/2000 121,106.45
14. 1 0/13/2000 13,378.48
15. 11/22/2000 16,260.39
16. 1/19/2001 36,257.40
17. 2/9/2001 97,218.22
18. 9,812.30
TOTAL 2,386,566.93
BY:
DATE:
D. ANALYSIS OF PAYMENT ESTIMATE
ITEM
AMOUNT, $
(1) Original Contract Work Completed (A6)
(2) Change Order Work Completed (85)
(3) Total Work Completed
(4) Material Stored on Site (Attach Schedule)
(5) Total Work Completed and Materials Stored
(6) Less Retainage %
(7) Cumulative Payment Due (05-06)
(8) Less Previous Payments (C3)
(9) Balance Due This Payment
1,980,480.74
581,293.80
2,561,774.54
0.00
2,561,774.54
11,729.12
2,550,045.42
2,386,566.93
163,478.49
I certify that to the best of my knowledge and belief all items and
amounts herein are correct; that all work has been performed
and/or material supplied in conformance with the contract, and
that all balance is appropriate for payment.
aquaSouth Construction, Inc.
Wade D. Wo . g, P.E.
BY:
DATE:
APPROVED BY OWNER:
Page 4
. "
4 ,. .
.", -~OA.
. :.../. ...~ ~
. I. .
UTiliTIES DEPARTMENT
N. Max Hicks, PE, Director
ADMINISTRATION
360 Bay Street, Suite180
AUGUSTA, GA 30901
(706) 312-4154 - FAX (706) 312-4123
MEMORANDUM
TO: GEORGE R. KOLB, COUNTY ADMINISTRATOR
FROM: N. MAX HICKS, DIRECTOR, AUGUSTA UTILITIES
SUBJECT: W-1 CLEARWELL BAFFLING & CHEMICAL FEED REPLACEMENT PROJECT
DATE: 06/08/01
CC: FILE
Please find attached Change Order #13 for the above referenced project. The change order
consists ,of the following changes at the Highland Avenue Water Treatment Plant:
. Remove concrete and wooden baffle walls at the Post Flash Mixer
$4,777.00
$2,600.00
$ . 332.42
$7,709.42
The removal of the concrete baffle walls was required to increase the available water
production capacity from the Highland Avenue Water Treatment Plant. The total cost
for the change order is $7,709.42.
. Remobilization
· Other Miscellaneous Adjustments