CHANGE ORDER
CO NU1ffiER 10
BID IlEM
DAlE 1/22/01
PROJECT TITLE
Clearwell Baffling & Chemical Feed Replacement Project
ORIGINAL CONTRACT DATE M122.2
PROJECT NUMBER ~
OWNER AUGUSTA COMMISSION
PO NUMBER
~
The following change order is hereby made to the proposal for the above project:
PAYEE
Aqua South Construction,
Inc,
TOTAL AMOUNT OF THIS CHANGE ORDER
$
45,153.00
The contract time will be INCREASED by Q calendar days as a result of this change.
ORIGINAL CONTRACT COST
$
1,207,688.00
PREVIOUS CHANGE ORDER (INCREASE)
$
516,987.10
THIS CHANGE ORDER (INCREASE)
$
45,153.00
TOTAL CONTRACT WITH CHANGE ORDER
$
1,769,828.10
FUNDING NUMBER/ACCOUNT NUMBER
508043410
5425110
REQUESlED BY: ~42NE~~ DAlE: #~/
SUBMITTED BY: /1 ~ ~Ir~ DATE: 2/2j /0/
EP TM N HEAD " I
FINANCE ENDORSEMENT: 1J~c.B{AJ~~~ DAlE: c:;) -;}.. 7-Cf]
COMPTIl.OllER
RECOMMENDED BY: DATE: 1/!o /
APPROVED BY: DAlE: ',I,/d'
, ,
, .
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemelal Addition
Summary of Change Orders
Revised: 01/22/2001
Original Contract Price - W-1A (Clearwell Baffling)
Original Contract Price - W-1 B (Chemical Addition)
Total Original Contract Price
Total Change Orders to Date
Total Revised Contract Price
Total Change Orders Percent of Original Price
Total Pending Change Orders
Total of Change Orders & Pending Change Orders
Total Pending & Final Change Orders Percent of Original Price
$1,207,688.00
$819,281.00
$2,026,969.00
$562,140.10
$2,589,109.10
27.73%
$9,000.00
$571,140.10
28.18%
Revised Contract % of Originlll
AUD CO # CO Descrlotlon CO Amount Amount (W-1A) Contract
Chanae Order No.1
Repair of high service pumps 2 and 4, clean medium voltage
1.1 MCC $11,49S.00
1.2 Repair 30' line at post flash mixer $766S,OO
1.3 Reolace 30' line, clean and reuse fittinas $38,618.00
1.4 Replace oil valves 2-S and 2-7 and place in 8x8 vaults $6S,862,OO
Install additional cribbing, temporarily remove electric
1.S ductbank, substitute 6' precast manhole for vault. $12,487.00
1,6 Remove and disoose of oil contaminated soil $1 791.00
1.7 Replace 30' street elbow with 30' MJ elbow $4,084.00
1.8 Inspect, drain and dispose of aear oil in oil lubricated valves $2,484.00
1.9 Replace oil valve 1-2 $28 689.00
New stuffing box for horizontal mixer. Startup services for
1.10 horizontal mixer from U. S, Filter. $4,931.30
1.11 Diver and crew standby at 20' iunction box. $2,369,00
1.12 Replace leakina valve 1-1. $31,355.00
1,13 Install ductbank manhole In Central Avenue. $3,82S.00
1 Chanae Order No.1 Total $215 655.30 $1.423 343.30 10.64%
01/22/2001
1 of 3
W-1 Change Order Summary
"
'.
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemcial Addition
Summary of Change Orders
Revised: 01/22/2001
ChanQe Order No.2
2.1 Clearwell NO.1 - Plug existing lines and dewater structure $4,805.00
2.2 Interior Iiahtina and ventilation $3 901.00
2.3 Remove existina wall pipe, install new pipe and recast wall. $16363.00
2.4 Install cove ring $13,921.00
2.5 Blast and Clean Wall $6,188.00
2.6 Applv Coatinas @ Wall $20,592.00
2.7 Remove/dispose Debris $7,856.00
2.8 Clean & Disinfect Tank $4,232.00
2,9 Excavation and Additional Cribbin~ $2142.00
2 ChanQe Order No.2 Total $80.000.00 $1.503 343.30 3.95%
Chanae Order No.3
3.1 Ductile iron MJ Tee @ valves 2-5 and 2-7 $6,887,83
3.2 21" pneumatic plug $749.37
3.3 3' x 3' aluminum hatch @ valve 2-1 $784.31
3.4 Rehabilitation of Clearweil1 -$453.00
3.5 Cost of cvlinder breaks -$170.00
3.6 Variance on Horizontal mixer startuo -$1,078.00
3.7 Repair work at valve 2-3 $11,498.00
3.8 Dewater/disinfect clearwell 1 $1,611,00
3.9 Rework at east valve pit $1,678.00
3.10 Slide Qate at Clearwell 2 $7,829.00
3.11 Reoalr slab at Clearwell 2 $3,533.00
3.12 Replace pipe & fittinas @ valve 1-1 $18,963.00
3.13 Aluminum handrails @ POstflash mixer $3143.00
3.14 Steps from East Valve Pit to West Valve Pit $2 500.00
3 Chanae Order No.3 Total $57,475.51 $1 560 818.81 2.84%
Chanae Order No.4
4.1 Lime Removal from Clearwell NO.3 $8,203.00
4 ChanQe Order No.4 Total $8 203.00 $1,569 021.81 0.40%
01/22/2001
2 of 3
W-1 Change Order Summary
. .
Augusta 1996 Capital Improvements Program
Project W-1 Clearwell Baffling and Chemcial Addition
Summary of Change Orders
Revised: 01/22/2001
... ..- T Revised. Contract % of OrIginal
AUD CO # ... ., CO Amount Amount (W-1A) Contract
Chance Order No.5
Connection of Auxiliary Pump Station and the Fort Gordon
5.1 Pumoina Station $83,676.00
5 Chan~e Order No.5 Total $83 676.00 $1,652697.81 4.13%
Chance Order No.6
6.1 Lime Removal from Clearwell NO.5 $23,993.49
6.2 Repair of cracks in the slab of Clearwell No.5 $15436.80
6.3 Investiaation to locate valve 5-3 stooole valve $11,625.00
6 Chanae Order No.6 Total $51.055.29 $1.703,753.10 2.52%
Cham:!e Order No.7
7 Clearwell No. 1 Crack Reoair $6,000.00
7 Change Order No.7 Total $6.000.00 $1709,753.10 0.30%
Chan~e Order No.8
Clearwell NO.2 - Dissassemble 3 - 30' Pipes and install 6'
8 sauare access hatch. $9,354.00
8 Chan~e Order No.8 Total $9 354.00 $1719.107.10 0.46%
Chan~e Order No.9
9.1 InvestiQate Valve 5-3 by diver $1,590.00
9.2 Remove brick veneer at clearwell #5 $953.00
9.3 Replace brick veneer at clearwell #5 $1,144.00
9.4 Reoair of Vertical Joints at Clearwell #5 $1 881.00
9 Chan~e Order No.9 Total $5 568.00 $1,724675.10 0.27%
Chanae Order No. 10
10.1 Install Stopple Valve for Valve V5-3 Installation $45,153.00
9 Chance Order No.9 Total $45 153.00 $1,769828.10 2.23%
Pendina Chanaes
Provide and Install valve extension stems and boxes $3,000.00
Repair 72' filter effluent pipinQ $6,000.00
Total Pendina Chanaes $9,000.00 $1.733675.10 0.44%
01/22/2001
3 of 3
W-1 Change Order Summary
'aqg!~9.pJ!!
Harold J. Walker, President
. Robert K, Beck, Vice President Operations
Rhonda Johnson, Administrative Assistant
William C, Dobbing, Project Manager
Wade D, Woodring, Project Manager
Arthur D, Harper, Project Manager
J. Randall Myers, General Superintendent
January 8, 2001
rn&cg~ITW~1ID
Jill JAN 09 2001 J
BY:
---"--~-------------
CH2MHILL
A TIN.: Bob Davis
2822 Central Avenue
Augusta, Georgia 30909
Re: WATER TREATMENT PLANT CLEARWELL BAfFLING, VALVES" &
CHEMICAL FEED MODIFICATIONS, AUGUSTA lJTILlT!ES
DEPARTMENT
Dear Mr. Davis,
Per your request, we propose to install a single 30" Linestop valve to enable
installation of Valve #5-3 for the lump sum price of For1)r-five Thousand, One
Hundred Fifty-three Dollars [ $ 45,153.00 ] exactly. Our scope is detailed
below for your review.
SCOPE: All labor, materials, equipment, and subcontri.lcts to expose the
necessary pipe to install a single 30" Linestop Valve to stop flow into Clearwell
#5. Removal of stoppel vnlve, traffic control and permanent restoration per
Engineer's Office, City of Augusta is included in this sccpe.
NOTE: If stoppel valve is required beyond three days then a
daily charge for valve rental will be incurred for ea-:;h day
thereafter at $1,100.00 per day.
Please review and address any concerns to undersigned. Thank you for this
opportunity.
Sincerely,
aquaSouth CONSTRUCTION, INC.
Cf
1>. C.D. Drown, P.E.
I
ZEL Engineers
P.O. Box 747. 124 Eason Drive. Pooler, Georgia 31322
Tel. (912) 965-1250. Fax (912) 965-1044
Email: H20south@bellsouth.net.Augusta.GA (706) 650-0124
high_124
~~I~
l=-J
~~
IP.seo Line Stopping
. ,
Back to Main Menu
':"?'~
~i . '. ~:r r,:.~
j;;~,.:7 .:~~;.,
--
Page 1 of 2
~]JII-,,-,.~-'I;;:_--. r~~-:"~~0~::~
~"1 ~11'l!; J;hlplllr F,lfilnQ$: ~Ickl ..~Ifc1rt,
~ifl~ ~ng:: 9'(l""~: ,~, ~l(';f.\$.." Fccdl1a-dk;.
Line Stopping
Line stopping is a means of temporarily stopping flow in an operating pipeline. Line stopping
can be used to isolate piping systems for repairs, alterations, or relocations. If used in
conjuction with bypass lines, product flow can be continued around the isolated section of pipe
to be repaired.
I
"
Pivoting Head Line Stop Application
The following is the basic procedure used to perform a pivoting head line stop:
1. If you would like a hard copy of this illustration, simply print this page.
2. You can view an online animated version of this illustration if you have Shockwave installed.
3. You can also gowpload a self contained animated version of this illustration for offline viewing in Windows.
I
http://www.hottaps.comlstopping.htm
Line stop equipment is installed on the temporary tapping
valve and the valve is opened.
Line stop head enters the pipeline through the hot/wet tap
connection.
Temporary seal is achieved and pipeline flow is stopped
(unless bypass is in place).
Repair, alteration, or relocation of the pipeline is performed.
Line stop head is removed from the pipeline through the
_ _ hot/wet tap connection.
01/15/2001
IPSCO Line Stopping
, "
Page 2 of 2
~jl ;.::v:;,ry valve is closed and the line stop equipment is
7. Completion plug is installed on the tapping machine.
8. Tapping machine is installed on the temporary tapping valve.
9. Temporary tapping valve is opened and the completion plug is installed in the branch of the
line stop fitting and locked into position.
10. Line stop equipment and temporary tapping valve are removed from the line stop fitting.
11. Blind flange is installed on the line stop fitting.
A line stop procedure usually begins with a hot/wet tal2J2!Qfedure. The tapping fitting, however, is
provided with a Close-Sure flange so the valve may be recovered upon completion of the procedure.
In this case the tapping fitting is referred to as a line stop fitting. In addition to the hot tap equipment,
the line stop machinery consists of a stopping head inserted into the pipeline by an actuator. After the
stopping operation is complete and the line stop head is remove, the Close-Sure flange receives a
completion plug to seal the branch of the line stop fitting which allows the temporary valve to be
recovered.
Site last updated 4/20/98
E-mail iQsco@hottaps.com
http://www.hottaps.com/stopping.htm
01/15/2001
. J8t'!-1.2-200114: 55 FROM: FAX
. "
9129551044
TO:704 329 0141
P.001/003
. ....,;
aquaSoldh CONSTRUCTION~ INC. '
912~965-1250
fax 912~9th').1044
TQ: Bob Davis
FfP.,": Wade Woodring
F~: 704-329w0141
Pit~~: 3
~~,:' 1/1212001
PhQne: 704-329-0073 x216
,~:
Linestop @ Augusta Water Plant :.'
c~:
o "'rg~nt 0 For ReVl~ D Ple~ ~,,",",nt 0 P.1..a~ R~ply 0 Please Recyel~
, Cq~nts:
SEE ATTACHED FOR YOUR REVIEW.
;:;',f#ij; " ~'dJPJ:/co~ .d/,r#,{ ~, ~ 8
.~OODRING
PROJECT MANAGER
_ JAN-~2-2001 14:56 FROM:FAX
, c:?129651044,
TO:704 329 0141
P.002/003
.- . ~
. .
'8 uaSouth
Jilil4.W8.2001 ..<<:<<5)\P1
, '
. Harold J, Walkcr. Pte~i\lllllt
Rubert K. Ueck, Vice Prc!sidclll O,,~rlltic.ln~
RhllOdB John)llll. Admillislrnrivc ^~~i~rhlll
William C. Dol)hinl;. Pr(,jccI Mblllllll:r
W~\1c I), WUl.I,1rill~. Ptujll<;1 MlIllllllcr
Arthur I). Harper. Ptuje~1 Mhllullcr
J. R~lIdull MY!:r~. Gellc!t:11 SllrctilllclIJCl1l
. CH2MHILL
.l\iiN.:..~QP Davis
~87~Central Avenue
; ALl9U$t~, Georgia 30909
Re: WAT~R TREAT~ENT PLANT CLEARWELL BAFFLING, VALVES" &
CHEMICAL FE~D MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
. ,Dea.r Mr. Davis,
Per your request we propose to install a single 30" Linestop valve to enable
',in$t~lIation of Valve #5-3 for the lump sum price of Forty-five Thousand, One
HundrecJ Fifty-three Ooll~~ [ $ 45,153.00) exactly. o.ur scope is detailed
pelow for your review.
SCOPE: All labor, materials. 'equipment, and subcontracts to expose the
, necessary pipe to install a single 30" Linestop Valve to stop flOw into Clearwell
'#5. RemovC!1 of stoppel vC!lve, traffic control and permilnent restoration per
Fngine~r's Office, City of Augusta is include~ in this scope,
NOTE: If stoppel valve is required beyond three days then a
daily charge for vC!lv~ r~ntal.wj.1I be incurred for each day
thereafter at $1,100.00 per Qay.
PI~qse review and address any concern~ to undersigned. Thank you for this
QPport!.Jnity.
Sincerely.
aquaSouth CONSTRUCTION, INC.
Of,..
I> C.D. Drown, P.E.
ZEL Engineer~
P.O. Box 747 · 124 eason Drive . Pooler. Gl:orgill 31322
Tel. (91~)965.1250. FUll (912) 96.5-1044
EJTllJil: H20sl)uth@bell~outh.net. Augusta. GA (706) 650-0124
lligll_12.
. J.AN-12-20!2l1 ~4: 56 FROM: FAX
"
~ '.:~ T.;. .
\ l-'
eH~MHILL
SUMMARY OF VALUES
1. Traffic Control
2. ~cavate/backfill
3. Linestop Insert/Remove',
4. Restoration '
9129651044
',~" ",': '1. ,
TO:704 329 0141
P.003/003
January 12. 2001
30" Single Linestop
$ 1,345.00
5,623.00
. 3~.645,OO
5L540.00
, $ 45.153.00
, 'Il!ot;,-t! ,6jp1"', ~kcve -/r;'Nurc Ie/I ;1.
e.?)1 ru//",-f bloc L '
I1'ldrod- "'II""? /"YI u. 6'-Qe
fiJal ..rft,l'l'k
rf\ f, 9~ ~
h. tfJf ' c~ /111 I ;//~f T
It!/!
fJ (/1111
11101\...125
"'alm~~~.Y!!
Harold J. Walker, President
. Robert K. Beck, Vice President Operations
Rhonda Johnson, Administrative Assistant
William C. Dobbing, Project Manager
Wade D. Woodring, Project Manager
Arthur D. Harper, Project Manager
J. Randall Myers, General Superintendent
January 12, 2001
CH2MHILL
A TIN.: Bob Davis
2822 Central Avenue
Augusta, Georgia 30909
Re: WATER TREATMENT PLANT CLEARWELL BAFFLING, VALVES" &
CHEMiCAL FEED MODIFICATIONS, AUGUSTA UTILITIES
DEPARTMENT
Dear Mr. Davis,
.-, We forward a letter concerning valve insertions from IPSCO. Additionally, our
research confirms their their opinion. MUELLER no longer manufactures
insertion type valves. U.S. PIPE does maintain the capability to manufacture this
type of valve up to 20". The only company who installs insertion type valves is
FREE FLOW, INC (Mr. John Reef, 630-985-1945). Given this information, it
appears that the valve insertion method is not an alternative.
Additionally, we recommend you visit IPSCO's website [ hottaps.com ] for more
information concerning the line stop procedure. We attached a schematic of the
tapping sleeve for your review. This is the fixture that will remain in place once
the line stop is removed.
Please review and address any concerns to undersigned. Thank you for this
opportunity.
Sincerely,
aquaSouth CONSTRUCTION, INC.
1~@~llW~1ffi
JAM 1 7 2001 J
cc
C.D. Drown, P.E. ZEL Engineers
BY: ._a___o.._....__.___
I>
P.O. Box 747. 124 Eason Drive. Pooler, Georgia 31322
Tel. (912) 965-1250 . Fax (912) 965-1044
Emai1: H20south@bellsouth.net.Augusta.GA (706) 650-0124
high_125
1-11-2801 3:88PM
FROM
INTERNATIONAL PIPING SERVICES COMPANY
P.I
4528 36'1'H Sl'FleeT, ORLANDO. FLORIDA 32811 . PHONE: 04071tW3-2800 . TOll. FREE: 8881384-7726 . FAX: 407/843-2010
WEB: hUll:/Iwww.hottaps.com . E-MAIl.:lpSCO@hOtlaps.com . CON'l'AAC'1'OA LICENSE FL #Cu C056657
~ 1S09001
. Cer1!llooll No. Vl-lJh
January 11,2001
Aqua South Construction
P.O. Box 747
Pooler. GA 31322
Ann: Wade Woodring
r,
Dear Wade,
ACctQdlt~1>Y. ~
lh& OuIC~ Councu I
forCQ~ .
It was a pleasure to speak with you this week about the project in Augusta. As we discu~ we
used to be in the "Valv.e Insertion" business in the mid 1970's. Since then, we have pioneered the
more recent "Line Stop" technology and routinely do .'Valve Insertions" with this m.ethod.
One of the main reasons we don't insert valves any more is the use oflead at the joints. This
practice is antiquated and generally frowned upon by most cities and municipalities.
The second reason is sole sourcing for the"valve" and the equipment to do this work. It really
limits OUT ability to offer a fair cost to our customers when we are at the mercy of one valve
supplier for all the material and equipment on this type of project.
Finally, our experience has demonstnlted that our system is much Jess labor intensive and therefor
much more cost effective. We have been doing Linestops from 3/4" to 60" all over the world for
30 years and our technical crews are second to none in the industry.
If you .have any questions or concerns about any of our products or services, please do not
hesitate to call me. You may also view an animated line stop at our web site on the Internet.
(www.hottaps) I look forw~ to working with you in the future.
/"", ..../
",/-;
Michael Mainelli '.
SE Regional Sales
clc Augusta Utilities Department
P.2
~
':1
l";"~
~~
~~
I
:o!:
j
oj\"
...
,
1._
f
~
~
,...
~
fJ
~ 2 ~ ~ ,~
,..~~~~
~~~~~
~CbVl~).-
~ s: i! VI VI
rt"~~~~
I~ I I ).. :t..
~ <: ~ ~ 1.
~ ~a:~
:0 ~ :b.
(") :0 ;c:
~ 0 ~
~ ...
).. ~
I ).. {Jt
~ I ...
(,. tJt
0) <;)
FROM
57AM
9
-12-280
g
~ ~
Ii') ~ (')
"tl tj ~
~ r'J :"0
~~~~~
~~~~~
~ ~ ~ ~~~
"'ai:!~~VI
sa )., :b.
f>11~Vl
~ ~ f5'~
~ ;g
?(J .....
;t
~ ~
~
~
r.
(')
~
~
~
~
~
.
'(I,
"' :
-e.
......
...
~
~
.
.'
~
'J
~
ilo:
.
~~
O""f
;3l~
c::~
~""f
L-
2 ~
tI) tI)
~ ~
~ m
~~~
~oti)
"-I~~
a;j to ~~
~"'<
~~
~a~
~ ~
~ :s
~ I'ij
, ~
~
I
I
'fi
~; ~ ~~
~11~ . ~
; ~
i ~'
I~
~~
~~~
"'i
<..,dl:O
0::0 ~
>.: ~ j"l
~
~~~
~~
~",
stl)
~~
t H Hi!
~~iiiU
~
I
~
{Jt
~.
I
I