HomeMy WebLinkAboutCHANGE ORDER1 $186,450.00 CRANSTON ENGINEERING AUGUSTA CANAL FERC CONSTRUCIOTN To: Cindy Washington 10 /12 /10sh
ENGINEERING CONTRACT ( < _,,f-('
,..) .
r rt-e--:-) - c.,(7 <----)'
c
PROJECT TITLE Augusta Canal FERC Coo.
ORIGINAL CONTRACT DATE 2/25/09 PR %it
t
C �
OWNER AUGUSTA, GEORGIA
L ,
The following change is hereby made to the contr /
L 1 - 713 :
PAYEE t.ranston Engineering
TOTAL AMOUNT OF THIS CHANGE ORDER $ 18,115.00
The contract time will be INCREASED by 0 calendar days as a result of this change.
ORIGINAL CONTRACT AMOUNT $ 250,905.00
PREVIOUS CHANGE ORDER (INCREASE.) $ 0
THIS CHANGE OR / DER (INCREASE) $ 18,115.00
TOTAL REVISED CONTRACT AMOUNT WITH CHANGE ORDER $ 269,020.00
FUNDING NUMBER /ACCOUNT NUMBER 507043410 5425110
80320115 5425110
PROPOSED BY: �A 6Gl t. - DATE: , it°
DESI N ENGI a R
REQUESTED BY: ( , ar , fi/� ,. DATE: 7(Z // a
PROJECT ENGINEER J'ti
I
SUBMITTED BY: . 1) . W 444 .c..Z.4 DATE: 0($"-/10
DEPARTMENT HEAD
FINANCE ENDORSEMENT: /0C yfjnrb-66' cQQCan p DATE: 8 C� /0
COMPTROLLER / 7
/ DA 1'F
RECOMMENDED BY: 1 / 0 f /t //v
/ , 77 ADMINISTRATOR // f
APPROVED BY: ( �C • DATE: / l C z f. €,,
MA R
f