Loading...
HomeMy WebLinkAboutCHANGE ORDER NUMBER 001 GORDON HWY 24-INCH WATER MAIN EXTENSION ENGINEERING CONTRACT CHANGE ORDER CO NUMBER 001 I>A11E 2/16/09 GOWON HWY 24-INCH WA11ER MAIN EXTENSION PROJECT TITLE ORIGINAL CONTRACT DATE OWNER AUGUSTA, GEORGIA 8/02/2006 PROJECT NUMBER PO NUMBER 10153 P123188 The following change is hereby made to the contract for the above project: James G. Swift & Associates has provided a revised route for the existing Fort Gordon 18-inch Water Main to connect to the proposed Gordon Hwy 24-inch Water Main Extension, which is north of the Gordon Hwy and the Seaboard Coastline Railroad. Therefore, Swift was task to perform survey work for the redesign of the Fort Gordon 18-inch water main connection. Swift, also will provide specification for the alternate routings and present alternate routes with AUD .These items will serve to improve the construction efforts and help the City of Augusta save money in construction cost. PAYEE JAMES G. SWIFT & ASSOCIA11ES TOTAL AMOUNT OF THIS CHANGE OWER $ 26,826 The contract time will be INCREASEI> by Q calendar days as a result of this change. ORIGINAL CONTRACT AMOUNT $ PREVIOUS CHANGE OWER (INCREASE) $ THIS CHANGE OWER (INCREASE) $ TOTAL REVISEI> CONTRACT AMOUNT WITH CHANGE OWER $ FUNI>ING NUMBER/ACCOUNT NUMBER 511043410 PROPOSEI> BY: 80310153 REQUESTED ,/ SUBMIT11EI> BY: FINANCE ENI>ORSEMENT: RECOMMENI>EI> BY: APPROVEI> BY: -.-." _...-~>- =0'F~'D' If'"7:~,.-=-:,I''':-/ '_:.;.....;.Jd .) ~~I FEB 1 9 2009 Accounting Department 135,260 o 26,826 162,086.00 5212115 5212115 I>A 11E: ~/Iq / aq . I I>A 11E: ~ //17/0r ;j;!i/OJ I>A 11E: I>A 11E: c:9- -/<:f-~07 e//1 j" 1 I>A 11E: I>A11E: -sILl<%{