CHANGE ORDER NO. - 14
June 7, 2007
MODIFICATIONS TO THE CONTRACT ARE AS FOLLOWS:
See Attached Change Order # 14 Summary
Original Contract Sum.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..$
25,254,192.45
Change by Previous Change Order.................. ...$
471,815.61
Contract Sum Prior to this Change Order...... . . . . . ..$
25,726,008.06
f- This Change Order... . . . . . . . . . . . . . . . . . . . . . . .: .. . . . . . . . . . . $
402,812.17
New Contract Sum ........................................$
26,128,820.23
Contract Time will be as follows: 0 Calendar Days are added to the duration of Phase 3
and the Total Contract Duration
Signed by:
~
onstruction Co., Inc.
The LP A Group, Inc.
Ju ^-It 28 2007
DATE
g ~lli Regio al Airport
b . 27 .01
DATE
~
"11,~liJ7
1)Of Augus DATE
Must be signed by Construction Manager, Architect, Owner. Mayor and Contractor
Cc: All Signers
j
A Hotel/Bank Demolition
Change Order #14 Summary
June 7, 2007
Quantity Unit Unit Cost ($) Total ($) Time Extension
(Days)
LS $402,812.17 $402,812.17 0
Total $402,812.17 $402.812.17 0
Item No. Item Description
S:ICM FileslCO 14
Hotel/Bank Sitework Demolition Rev. 1 (April 16, 2007)
Item Description Quantity Units Cost/Unit Labor Material Subcontract
Cost Cost Cost
Abatement Costs - Hotel/Bank 1 LS 66000 0 0 66000
Demolition Costs - Hotel/Bank 1 LS 226075 0 0 226075
McKnight Working Foreman 120 HRS 25.6 3072
Silt Fence - Required 4000 LF $4.54 $0.00 $0.00 $18,160.00
Construction Fence - Required 2000 LF $6.00 $0.00 $0.00 $12,000.00
TopsoillHotel- Required 1503 CY $18/$5 $0.00 $27,05400 $7,515.00
Topsoil/Bank - Required 378 CY $18/$5 $0.00 $6,80400 $1,890.00
HydroSeed - Required 6 AC $2,00000 $0.00 $0.00 $12,000.00
Subtotal $3,072.00 $33,858.00 $343,640.00
McKnight Mark-Up (15%) $460.80 $5,078.70
McKnight Mark-Up (7%) $0.00 $000 $24,054.80
Bond (1.2%) $5.53 $467.24 $4,412.34
Total- Required $3,538.33 $38,936.70 $372,107.14 $414,582,17
Cost Savings Options
Option #1 . Use On-Site Fill
Fill MateriaUHotel- USE ON-SITE 4555 CY $6.00 $0.00 $0.00 $27,330.00
Fill MateriallBank- USE ON-SITE 1148 CY $6.00 $0.00 $0.00 $6,888.00
Subtotal $34,218.00
McKnight Mark-Up (7%) $2,395.26
Option #1 Added Costs $36,613.26
Option #2 - Remove Stone Base
Remove Stone Base 10000 CY $4.00 $0.00 $0.00 $40,000.00
Subtotal $40,000.00
McKnight Mark-Up (7%) $2,800.00
Option #2 Added Costs $42,800.00
Option #3 . Eliminate Access Road
Estimated Savings LS' 11 000 0 $0.00 $11,000.00
Subtotal $11,000.00
McKnight Mark-Up (7%) $770.00
Option #3 Cost Savings $11,770.00
Option #4 . Eliminate Bank Abatement/Demo
Bank Demo Cost Estimate 1 LS $9,000.00 $0.00 $0.00 $9,000.00
Subtotal $9,00000
McKnight Mark-Up (7%) $630.00
Option #4 Cost Savings $9,630.00
The Least Expensive Option Selection would be to perform the Required Work
($414,582.17), Eliminate the Access Road ($11,770) and Eliminate the Bank
Abatement and Demo. ($9,630) Best Cost =
The recommended option would be to perfonm the Required Work Recommended
($414,582.17) identified above and accept Option #3 (11,770) to eliminate the Cost =
Access Road
$393,182.17
$402,812.17
Uq/~J/~UUi ~D.UD rAA IUD ODd ~U~L
lnLI\H I \:JUl. L"\\~''l,.; l...Ul',:) 1
4:!:JUUl/VVu
McKnight Construction Co., Inc.
GENERAL CONTRACTORS
William D. McKnight - President
Mason McKnight, HI - Vice President
Huey E. Carter - Sec. - Treasurer
FOUNDERS:
Mason McKnight, Sr. 1900-1973
Mason McKnight, Jr. 1930-1994
P. O. Box 204718
Augusta, Georgia 30917
Office Phone: [706] 863-7784
Fax: [706] 863-2031
April 13, 2007
{FE NIUlfberI
Parsons Brinckerhoff Construction Services Inc.
1510 Hangar R~ Suite A
Augusta. GA 30906
Atin: Matt McCoy
RE: AUGUSTA REGIONAL AIRPORT
Cost Propostll HtItel tliid /Jimk
DemoIititm ( RevisioIJ)
Gentlemen:
Per your request, the following is a revise cost proposal for the work involved for the Hotel and Bank
demolition. This revised price includes the Hotel demolition, and all associated ~ however; it
excludes any Bank demolition, constmction oftbe access ~ and the haul-in fill to create the sloped
finish grade shown by LP A Basiailly, the CODtractorwill remove the buiIdin& parking,. as shown, and
leave the site level. Four inches of topsoil will be installed, and this site will be hydroseeded.
Ross &. Logan
Additional si:tework ( see breakdown)
Subtotal
McKnight 1% OIP
Subtotal
1/2% Bond
Total
$212,075.00
93,154.18
$365,229.18
25,566.08
$390,795.86
4,689.55
$395,485.41
RECEIVED
1 6 ZOu7
Please call if you ~ any additional information..
Sincerely,
MCKNIGHT CONSTRUCTION CO., me
Poi ;JoJ;wJ/~~-
Pat Patrick
Project Manager
PP:sdr
cc: Jobsite
pat041307. wpd
U't/.Lu/'::'U\11 ..LU.VU rot\..:\. IVU UUd ~VUl
m l...l\.n J UIL Ln............... \..Iun~.J J
~ V"'~I '\./VU
04/12~2007 '1.13 FAX 9043789747
ROSS AND LOI3At~
[4]001/001
, ,
Ross &- LOGAN
INDUSTR/~5
v7a Facsimile (706) 868-7516
April 12,2007
McKllight Construction Co., !nc-
Post Office Box 211900
Augusta, Georgia 30917
Attention: Pat Patrick
RE: Hotel and Bank DemGlition
Augusta Regional Airport
Augusta, Georgia
""Revised Proposal"
Ross & Logan Industries, Inc. is pleased to provide you v..'ith'this proposal for demolition. removal and
disposal as per drawing no.'s DM1, DM2 andDM 3, by The LPA Design Group, Inc., at the above~
referenced project for a. total lump sum price of $292,075.00. This price is inclusive of labor. supervision,
equipment and materials necessary to complete OUI' scope of work.
Pl'ic.e breakdown;
Hotel $206,075.00 \ ,
Ba.nk.. ~~~~" /9,000.00> ~17"2.. Dr5"~
Access Road ~. t) , ) ~ 11,000.00 I
Asbestos Abatement 66,000.00
.,.......
Price includes tite following:
v' Removal and documentation of proper disposal of refrigerant from Ale units in buildings to be
demolished
v' Fill in depression from pool removal with fill dirt
.;' Upon COIllpletion, rough gradinS of area. disturbed during demolition operations
Price excludes the following:
x Permits
)C Temporary protection
)C Erosion. noise andio-r dU5t control
x; Protection and/or relocation of items to remain
j; Backfill and/or eomps.ction
.Ie Shoring and/or bracing
Thank you for t..l-),e opportunity to propose Ibis service, I look forward to working with you. lfyou have
any questions or concerns, please contact me at (904) 378-9700.
~~~-tfuny, /?;J /J
..--..- I ~ :Z;:~
T odd Pritchard
PrQject Mani2g~
1) e m oh t to n · R e c y cl i 11 9 " Sit e Prep
6507 West Beaver Street, Jacksonville, FL 32254 P.O. Box 61206.. Jacksonville, FL 32236
904-378-9700 904-378-9747 Fax
'.
V '1: f ..1.. ~.. "" v v II -1. U . V i .i.' .fl....\. I V U U U ...
24
31
32
-&:,' J' "'B "' -. -'"
_Jl~r.8IDn.R. Timl,4.,....o1){',4 Eye-t:.Me.
"" 45-J()4 2 - Pad,
~ \ &afi'vl ~l'o l,' . \M
~ ..z V~s.c..t,..l -
I'C l r~) ~_, \ .
L OS "\ ~;... iLa., \!.Cl..Q \AM
~
11
I
2 [I: 4~ "" ; .(,. l t .It -<.iN IV
3 I I
~ 12~ l..f to'lt'S"t t-UU:..z @
51 I _ , .
61i 2~~ S-{ I A50kLt- R'f'~'V @.
7 I I I
\ L $' f)-epot'V .tIvt\.4,'jfr\
C.' I I U
I I
10 G; k. f,Vle. ~ -SAe
T
1-
,-~
.... -
wi
.
i ! : 4- ~
(po.:::
I
I .
, ,
t:
\.-zl:l"/s" ,I I :~.
, ii,
l:v.....s I I: i ~O:()
I ! ' I ; : j
! i3 OOD:
I ! I : , ;
Li t[~bo!
I I i,
, I !
@ looD ~
I
12 Ii lto 1r.l"s, \'it L-l. LUrnk;v\,-, .\-v-t-!.Vt\'-\M ~ U
1311 I ..J I
14\, i i JO~:(
::11/5.1:;1 ~ rO+-tO I'Z:~.,,~F.,;' .~;hi
I Ii
13 Ifll"~' VfJ I, \t\jclvose.ect
I
11
I i
; t" I
! I
i ~ !
; II > i
! ! 1-!
i , i' I
I
I : ' I
17
19
2011
21 r
22
I
I
,
I
23
33
),1
..*
35 i
')011
1,,'
37
i:..
]R I'
I'
39!f--i'
4CJ ; t'
II : I
r---r- I
/"
( M C:~t ",'v,* 'J
~ L.)
II
i
!
I
I
i
I
2
I
I
Ii
.J
H
II I
! !
rl
s
i
;
I '
!ZOIDioio:
. : (
: \ iZ 0:0:0;
,
, i
I I
r
:"jpbb'
i :
I
I ,
, i ..jls;o:Q I :' ~ i : i
: I i I!' ! :
r------~ '-.._~.. '
i 1';00 I I' .,~ i
I '
, I
, ,
i
:1 .g I !~
"eI v..'~~ v..,~
. I (
41 \";j 0 7
j Pre-pared B\l j
: Approved By !
i
I i I
I : !
I
I
It Ii: r I ; ;
lnilia~s i 03tE
,1
T
, i
!
i !
i: !
I '
, I
Ii
II
I
[
I
I
i2
i
,14
, 5
, i
; j
, I .
i i i
:
:, i: i I;
; I I ' I ,---1 8
: !! i 9
;
.!; !!;
1-1W1!~~~ ~:
! i 'i I
'! j I :
i : : i i
I' ,
I : : I ; i
i i j i I
1~1
I Iii
I 1
i '
, I
I ! I
! ,
! l
J !
.,
, i
I '
! ; I
'I i:!
!! Ii!
, i
i !
I
.
110
I ; !
j1
I
:; ! 1) I
, , ; i
I I I :j:: ' i.z.o; ~ ' (;'2 oplO;
---r+- I TTI ' ! i
I;j': --T-.-';'
,!! ! :, I, i I
I j; I
i ! ! ! ; ! ! I Ii: ! ;
Iii ,I' ! i! I ' : I II
; i~ qbirl ~ -LzRbs~ ~ i~~B l!51
2~ '} I ,i} rrh! rJf!: :,.,1, '-:>bfl,S II i J..; I
_ Ii -1-1 I .p::>I'::', -hi f.t, :.QD ~._, II I'
2511 II ! : ~S-5Z I igi\-bSl;'1jl I :5:415:i S:
26 II I ![+-Ll I I,' _:' I [':+!
27 II I I,. I I: !', ,
28-Hi i;' ,'f-IH~' I i i-t-
29 ! -~ ~-+--t-H-lil I i 't ,~~ l-l1:t: j
30 ! l' !\loTe " i i i ii',. : I':!
: ' f1 i"'iII,"; b....etJ..V~~,h'\ A.oe ~f; i i\..krtJ)~~ : "m' . . . l1tw" ~ \'1 t:.Jg
1 ~I ' b 'I ; : <:: i i i i ~ I;, it I : I '
'S :'r-P -to c..V&I-.-\-e.., e.VVl'\. Aj,,:: VldJft\ ,~,), t.,..ft,;-. I i, ',' I
, { I . , -~ if"T----:-y -- r-rt- i t
~ p"\'ce.. ~t; v1.f,T i lI\cG .o..~(~t..v i :.'st)V'.~~.~ t _~: _-t11._. ','^'1 ...... ...... .: i I r
I '" ., ' .' II j t ,. " f-~ '-T ' , i,
A -OI4,,"5.t~Vv, OCMV~; ,(,. :t~4-1 i i~ I ~rr tlJJ- il'. i ' ! , : i ,
.-J -' \ .JI" I, 'I' ',f ' I i!I' !i
! l! !: !. 1 ~ 1 I ' : IiI
Ii; ! II! '. ,;' 'i Ii. Ii:. i ','
i. I; jl L~-~---H-'-'~ ! 'I '
i; I !i'.' I L i' !': I
ii I ;1 -1~-'__IL-I' 1 I
I ! Jj :--r- ,T' ;-t=til ~'=tP1 I:; I I
I' I ,-- '!--.;---:, -. "-~I- "i ,
!"'"III I., .-~.'--'. ' .-:-1,--' .! I-~-t--'- !,~.i! I 9'.! 3';-
I . , ! ' I II I': I .. III! I Ii; .::0
I-i-Tj~:-- -I-o--,-r:1' M ' I I : '!-I
~: j;
'; 'tPf: I,
; : I \,~! l~;;t~5~-.,~1
i
, i
12
!
i i I
13
j ! r
i !
I ! !
I I
14
15
\6
17
18
, " i,
I
f9
i :
20
i !
21
: i I
22
23
26
27
: i I
i I !
I
128
'I
1[29
,-
130
I
13 )
~')
! J~
33
34
I::
,
~,;
.".
38..
~f~~
~..'O!~(:Ji/A
Public Service Committee Meeting
5/7/200712:30 PM
Airport Hotel/Bank DemolitionGost~ c.\.-{b.;~c.G ottoa..
Department:
Caption:
Background:
Analysis:
Financial.lm pact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
Augusta Regional Airport
Request approval of the cost regarding the airport
HotellBank Demolition.
The Augusta Aviation Commission requested a cost for
demolition and redevelopment of the property where the
hotel and bank buildings are located. This was not included
in the original cost for the new terminal construction.
Due to the condition of the existing facilities of the hotel and
bank buildings on airport it was decided that the property
would be better utilized as additional parking for airport
customers which would increase revenue for the airport.
$402,812.17 is the recommended cost for demolition and will
be funded 50% from customer facility fees and 50% from
Airport Capital Improvement Fund
Deny the request.
Accept the recommendation of the Augusta Aviation
Commission to approve the cost of the airport HotellBank
Demolition.
551081301/5411110
REVIEWEIlAND APPROVED_Ity:
~
~
Office OfTbe Administrator
A Frederick L. Russell, Administrator
Tameka Allen, Interim Deputy Administrator
Robert Leverett, Interim Deputy Administrator
Room 801 - Municipal Building
530 Greene Street - AUGUSTA, GA. 30911
(706) 821-2400 - FAX (706) 821-2819
www.augustaga.gov
May 15, 2007
Mr. Willis Boshears
Director - Augusta Regional Airport
1501 Aviation Way
Augusta, GA 30906
Dear Buster:
The Augusta-Richmond County Commission, at their regular meeting held on Tuesday,
May 15, 2007, approved of the cost regarding the airport Hotel/Bank Demolition. (Approved by
Public Services Committee May 7,2007)
If you have any questions, please contact me.