Loading...
HomeMy WebLinkAboutCHANGE ORDER 9 MCKNIGHT BUSH FIELD TERMINAL ~r 1 , MODIFICATIONS TO THE CONTRACT ARE AS FOLLOWS: RECEIVED TERMINAL AREA IMPROVEMENTS AUGUSTA REGIONAL AIRPORT AT BUSH FIELDacr '9 2006 CHANGE ORDER NO. - 9 ~l~GnDl1P September 26, 2006 ~'ffi1\T81) ftOUdf.ifBIA ([JFrF:/CE See Attached Change Order #9 Summary Original Contract Sum ................................. ..$ 25.254,1 92.45 Change by Previous Change Order.................. ...$ 228.052.75 Contract Sum Prior tg this Change Order... . . . . . . . . ..$ 25.482.245.20 This Change Order. . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . .. . . . . . . $ 47 .906.62 -f New Contract Sum ....................................... $ (' 25.530.151.82 .~ Contract Time will be as follows: 0 Calendar Days are added to the duration of Phase 3:' and the Total Contract Duration Signed by: C'\{~ 'ATE The LP A Group, Inc. 10.'0.0(. DATE i(/~ (vf,? DATE Must be signed by Construction Manager. Architect. Owner. Mayor and Contractor Cc: All Signers S:ICM FileslCO 9 McKnight Construction Co., Inc. GENERAL CONTRACTORS William D. McKnight - President' Mason McKnight, III - Vice President Huey E. Carter - Sec. - Treasurer FOUNDERS: Mason McKnight, Sr. 1900-1973 Mason McKnight, Jr. 1930-1994 P. O. Box 204718 Augusta, Georgia 30917 Office Phone: [706] 863-7784 Fax: [706] 863-2031 September 19,2006 Parsons Brinckerhoff Construction Services Inc. 1510 Hanger Road, Suite A Augusta, GA 30906 Attn: Matt McCoy RE: AUGUSTAREGIONALAIRPORT PR57 Gentlemen: In response to your letter dated 5-23-06, the following is a credit amount not to install the water and toilet for the rental car trailer. The estimate is based on pumping the holding tank once a week, for (12) months. Also, the water line would have been an insulated garden hose. Pump holding tank $155.00/mo X 12 months Misc. fittings, hoses, etc. Total credit $1860.00 100.00 $1960.00 Please issue a change order. Sincerely, MCKNIGHT CONSTRUCTION CO., INC. Ped pcdJud0 /&etu Pat Patrick Project Manager PP:sdr cc: 10bsite If;@lf;11'Wlf;) i SE.? Z 1 ~""n . rV\OI.-' .-----.. 8", __J-..-. \ . ...-- pat091806. wpd ,. August 22, 2006 Parsons Brinckerhoff Construction Services Inc. 1510 Hanger Road, Suite A Augusta, GA 30906 Attn: Matt McCoy RE: AUGUSTA REGIONAL AlRPORT PR59 Gentlemen: The following is a cost proposal from Simple Grinnell for the work required. to install the 25 pair jwnpers to the phone block in A003. Simplex Grinnell McKnight 7% OIP Subto1al 1360.39 95.23 1455.62 Please issue a change order for this amount. Sincerely, MCKNIGHT CONSTRUC110N CO., lNe. Pat Patrick Project Manager PP:sdr CiJ~t''? tt"B 'j .Mt\\\j'O C;~~ ~ t ,., cc: Jobsite pat082206.wpd SiIJJplexGrinnel1 3243 Sunset Blvd West Columbia, SC 29169-3427 (803) 476-0000 FPV<: (803) 476-0039 www.simplexgrinnell.com SimplexGrinnell Quotation TO: Mcknight Construction Co. POBox 2Q4718 Augusta, GA 30917 Project: PR 59 Phone Block add Customer Reference: SimplexGrinnell Reference: 216403820 Date: 07117106 Page 1 of 3 SimplexGrinnell is pleased to offer for your consideration this quotation for the above project. QUANTIT'C MODEL NUMBER DESCRIPTION 1 PR 59 Phone Block add PR 59 Phone Block add DPSUB SUBCONTRACTING LABOR District Services - PR 59 Phone Block add PM LAB PROJECT/CONSTRUCTION MGMT 2 Total net selling price, FOB shipping point, $1,360.39 Comments Equipment and Commissioning This quotation includes the equipment, transportation charges, and installation of the phone block cables as directed by McKnight Construction, and all applicable taxes. The price does not include conduit or 120 VAC power wiring to control or sub-panels, This quotation is for the additiDn of phone block cabling to interfaoe the Bell South equipment to the main A003 rack for the phone system. Thank you for ttle opportunity of quoting and we hope to have the pleasure of serving you. THIS QUOTATION AND PJtJ.Y RESUL TlNG CONTRACT SHALL BE SUBJECT TO iHE GENERAL TERMS AND CONDITIONS A TIACHED HERETO. I='ir.:o ,c;:;'::>l":llritv (";nmmllnlr:",tinn~ Sales & Service Augusta Regional Airport PR-SS CONTRACTORS QUOTE TO SIMPlEXGRINNELL Oe$crlptlon Qty Rate Materials MlHours Labor Rate Totallabor 50ft Amp F to M Cables 9 56.85 $511.65 12 $22.00 $264.00 Red Freight 1 48.00 $48,00 0 $0.00 $0.00 0 0.00 $0,00 0 $0,00 $0,00 0 0.00 $0.00 0 $0.00 SO.OO 0 0.00 $0.00 0 $0.00 $0,00 0 0.00 $0.00 0 $0.00 SO.OO 0 0.00 $0.00 0 $0.00 $0.00 0 0.00 $0.00 0 $0.00 $0.00 0 0.00 $0.00 0 SO.OO $0.00 0 0.00 $0.00 0 $0.00 $0,00 0 0.00 $0.00 0 $0.00 $0.00 0 0.00 $0.00 0 $0.00 $0,00 . 0 0.00 $0.00 0 $0.00 $0.00 Labor to Install ana Test SUBTOTAL $559.65 $264.00 6 % Sales Tax (if appliciable) $33.58 23 'Yo Labor Burden 1 $60.72 Totals $593,23 $324.72 10% Overhead $59.32 . $32.47 10% Profit $65.26 $35.72 Totals $717.81 $392.91 The total ADD for this change order is $1,110.72 Total change $1,110,72 Simple>::Grinnell Costs Labor Burden M/HouJ'S Mix Rate Total Labor Project Management 2.60 2 $25.00 $130.00 CAD 2.60 0 $16.60 $0.00 Design 2.60 0 $23.00 $0.00 Tech I Comm 2.50 0 $0.00 $0.00 PARTS Q $0.00 SO.OO 6% Sales Tax (if appliciable) $0.00 Totals sno,OO 15% Overhead $19.50 1 5% Profit $22.43 Totals $171.93 Cummins Cost to SimplexGrinnell $1,110,72 7% markup for SimplexGrinnell on sub $77.75 Simple){Grinnell Cost $171.93 T ofal Cost I $1,360.39f /~~ .' . McKnight Construction Co., Inc. GENERAL CONTRACTORS William D. McKnight - President Mason McKnight, III - Vice President Huey E. Carter - Sec. - Treasurer FOUNDERS: Mason McKnight, Sr. 1900-1973 Mason McKnight, Jr. 1930-1994 P. O. Box 204718 Augusta, Georgia 30917 Office Phone: [706] 863-7784 Fax: [706] 863-2031 August 8, 2006 Parsons Brinckerhoff Construction Services Inc. 1510 Hanger Road, Suite A Augusta, GA 30906 Attn: Matt McCoy RE: AUGUSTA REGIONAL AIRPORT PR66 Gentlemen: The following is a cost proposal for the removal of the additional unforseen asbestos encountered during the building demolition, and the removal of the contaminated soil discovered during the removal of the underground storage tank. Pyramid Remedial Systems McKnight Construction 7% O/P Total $38,944.00 . 2,726.00 $41,670.00 Please issue a change order for this amount. The time impact for this additional work was submitted to your office last week. Sincerely, MCKNIGHT CONSTRUCTION CO., INC. fo:tPa/:Jwh~ Pat Patrick Project Manager PP:sdr lID~@~lrW7~1ffi 1m AUG I (J 2006 ~ BY: ---!!J!!/i_________ cc: 10bsite pat080806b.wpd PY,RAMID.Remedial Systems, Inc. . . Revised Change order #1 PO BOX 1268 Alpharetta, GA 30009 (678) 366-1919, (770) 777-5981 FAX Page...L of.1 PROJECT NAME: AUQusta Reoional Airport PROJECT NO.: PRS - 05-354 CHANGE ORDER DATE: 8-7-06 CONTRACT: McKniaht Construction and between PYRAMID Remedial Systems. Inc (PYRAMID) DATED 3-5-05 ================================================================================== DESCRIPTION OF CHANGE - 1. Performance and payment bond increase due to change order Additional amount of payment and performance bond due to change order @ 2.5 % of increase in contract amount. 2. Asbestos Containing Material (ACM) abated in addition to original scope of work Removal and disposal of approximately 2,520 SF of carpet over yellow glue over black mastic. (Contour A3) Removal and disposal of approximately 702 SF of ceramic tile over multi layers of asbestos floor tile and mastic. (Contour A4) Removal and disposal of approximately 770 SF carpet over yellow glue over black mastic. . Removal and disposal of approximately 120 SF of black mastic bebind mirrors. Removal and disposal of approximately 500 SF of floor tile and mastic from back corridor of rental center telephone room. (Contour AI) Removal and disposal of approximately 150 SF of floor tile in the bar area (Contour A5) Removal and disposal of asbestos tiles and mastic Wlder the walls while demolition was in progress. · Maintain two (2) asbestos technicians and one (I) supervisor on site for two (2) weeks (40 hour week) and include per diem, hotel stay, mobilization to the site, material cost, transportation and disposal of asbestos waste to the landfill. · Obtaining Georgia EPD approval of the process of wet demolition and extension of notification. Additional floor tile and mastic per contour's JWle 22,06 survey and designated A2, A6, A7, A8: Total additional abated area 654sf (see break down below) · Removal and disposal of 288 SF of floor tile and mastic from telephone lobby (Contour A2) · Removal and disposal of 96 SF of floor tile and mastic from mechanical room north of The telephone lobby. (Contour A6) · Removal and disposal of 126 SF of Floor tile and mastic from the restrooms, west of US Airways Bag room. (Contour A7) · Removal and disposal of 144 SF of floor tile and mastic from the Overflow men's room ( east of the terminal restrooms). (Contour A8) Credit for designated Contour area C1, C2,C3, C4 and C5 Total additional Credited area 1286 SF (see break dO\>TI below) · Area beneath middle section of ticketing counter, 105 SF (contour C1) · Area at Continental baggage hallway, 72 SF (Contour C2) · Continental ticketing area, 714 SF. (Contour C3) · No tile, no black mastic, No removal work was conducted at US Airways bag room, 339 SF (Contour C4) G $4,582.00 $3,550.00 $1,706.00 $ 360.00 $ 1,975.00 $ 455.00 $ 12,840.00 $981.00 <$1,929.00 > PYRAMl,D'Remedial Systems, Inc. Revised Change order #1 PO BOX 1268 Alpharetta, GA 30009 (678) 366-1919, (770) 777-5981 FAX PROJECT NAME: AUQusta Reoional Airport PROJECT NO.: PRS - 05-354 CHANGE ORDER DATE: 8-7-00 CONTRACT: MeKniaht Construction and between PYRAMID Remedial Systems, lne (PYRAMID) DATED 3-5-05 Page2. of.2 ---------------------------------------------------------------------------------- ------------------------------------------- ---------------------------------- · Area at hallway extending west from US Airways Bag Room, 56 sf. (Contour C5) Sub-total additional asbestos abatement and credits 3. Remediation of UST contaminated soil Over Excavation, transportation and disposal of contaminated soil from the UST pit included: · Management and administration of remediation activities · Cost of Subcontractor Excavation and transportation to Sub title D landfill plus lO% · Landfill charges on 10 tandem truck loads, plus 15% · Cost of Backfill charge, 16 loads plus 1(11/0 · Credit to GC for backfIll covering original tank cavity in original scope of work. (one Load) Subtotal Remediation of UST contaminated soil and credit The above changes are hereby made to the Contract Documenb: Total this Change Order $ 38,944.00 Please note that previously submitted change order numbers 1,2,3 and 4 are now included in this Revised Change order #1 By authorization of this change orqer, McKniaht Construction hereby authorizes PYRAMID to perform additional work at the Above-referenced Location. Accepted by: Date (PYRAMID Remedial Systems, Inc.) Accepted by: Date (McKniQht Construction) .' . 7CXP-77/~5/'7( McKnight Construction Co., Inc. Iy? GENERAL CONTRACTORS William D. McKnight - President Mason McKnight, III - Vice President Huey E. Carter. Sec. - Treasurer FOUNDERS: Mason McKnight, Sr. 1900-1973 Mason McKnight, Jr. 1930-1994 P. O. Box 204718 Augusta, Georgia 30917 Office Phone: [706] 863-7784 Fax: [706] 863-2031 August II, 2006 Parsons Brinckerhoff Construction Services Inc. 1510 Hanger Road, Suite A Augusta, GA 30906 Attn: Matt McCoy RE: AUGUSTA REGIONAL AIRPORT Gentlemen: During the building demolition, Thompson Wrecking encountered unforseen concrete from a previous building under the Airport Terminal scheduled for demolition. Parson Brinckerhoff was informed of this unforseen condition. The flooring are the cost for the removal of this existing concrete. Thompson Wrecking McKnight 7% O/P Total $6,300.00 441.00 $6,741.00 Please issue a change order for this amount. Sincerely, MCKNIGHT CONSTRUCTION CO., INC. -Pot Po1AU'L I-s~ Pat Patrick Project Manager PP:sdr cc: lobsite 1m IT: @ IT: TI"W lli: W lli1 AUG 1 4 2006 B Y: __~p.~_._---,.< pat081106.wpd :. .... HIRAM E. THOMPSON President GLEN F. THOMPSON Vice President THOMPSON BUILDING WRECKING CO~, ~NC. 631 Eleventh Street P.O. Box 932 Augusta, Georgia 30903 Phone (706) 722-1432 Fax (706) 722-4253 Commercial Demolition Equipment Rental Grading / Clearing August 10, 2006 TO: PAT PATRICK McKNIGHT CONSTRUCTION CO. FROM: HIRAM E. THOI\1PSON REQUISTION NO. 081106 AUGUSTA REGIONAL AIRPORT DEMOLITION CONTRACT During the last demolition phase of the Augusta Regional Airport in July 2006, Thompson Building Wrecking broke out, trucked away and disposed of (28) 20 yard loads of additional concrete per the superi.ntendent's request. It was agreed that We treat this as an extra. 28/20 YARD LOADS OF CONCRETE @ $225.00 PER LOAD............ .$$6,300.00 ~~~ Hiram E. Thompson President